HomeMy WebLinkAboutChange Order No 3 - Western Avenue Streetscape, Phase III Proj No. 118-076 - Indiana Earth, Inc.1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS December 19, 2019 Mr. Keith Stevens Indiana Earth, Inc. 10343 McKinley Hwy. Osceola, IN 46561 PHONE 574/235-9251 FAx 574/235-9171 RE: Change Order No. 3 — Western Avenue Streetscape, Phase III — Project No. 118- 076 Dear Mr. Stevens: The Board of Public Works, at its meeting held on December 19, 2019, approved the above referenced Change Order for an increase of twenty-seven (27) days with a revised completion date of December 27, 2019. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 12/16/2019 118-076 Western Avenue Streetsca a Phase III 5/28/2019 3 PCR #3-Add a Substantial Completion Date to Contract and add 27 Days (Utility and Weather Delays), Bringing Substantial Completion Date to 12/27/2019. Move Final Completion Date to 4/21/2020 for Remaining Work. See Attached. The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extensioo by this c al nge order New completio ate/time nature P&ted Na I the and Title Indiana Earth, Inca Company Name 10343 McKinley,Highway Address Osceola, IN 46561 City, State, Zip $ 2,634,385.35 $ 175,155.31 Increased $ 2,809,540.66 Decreased $ 0.00 $ 2,809,540.66 0.00 % 6.65 % 11 /4/2019 26.5 days 27 days 12/27/2019 CONST TION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WO S Approved Date: Jd.C�/' Gary A. Gilo ., President Genevieve E. Miller, ember I - "—e I "—� � J) Elizabeth A. Maradik, Member ar i of 1 , r � I i City of South Bend RE: Western Ave Delays We have encountered the following delays and are requesting all these days for an extension: 1) November 11,12,13 & 21 we had rain and snow days, soils could not be disturbed or concrete placed = 4 days 2) Crews had winter conditions (16 days, see attachment) of winter weather slowing them down and the concrete setting has been slowed by the colder temps. Concrete crews having to put blankets on and take off the blankets and crews wearing heavier gear for the cold has slowed production. 16 days x 3 hours per day = 48 hours at 8 hrs day = 6 days 3) The NIPSCO gas line encountered delayed work in the area at Lake Street until their line was re- routed in November, the mainline concrete roadway could not be poured until this was completed. = 12 days 4) The extra time for the AEP duct bank encountered at Lake Street = 1 day 5) The added concrete to install at the grass islands next to handicap ramps along with the added walk on Lake south of Western = 1 day Total days so far from list above: 24 days Due to the unanticipated delays we expect our intermediate completion date of Dec 27, 2019. We anticipate to open Western Ave for traffic in both directions on December 16, 2019 as discussed at our weekly meeting on 12/4/19 and provided AEP has removed their utilities as planned. We are working hard and continuing to work through the cold and rain days to gain on completion until weather does not allow progress. For in the spring of 2020. Since the project encountered extra work and time delays, the permanent striping had to be put off until the temperatures reach 50 degrees and dry in the spring. The temporary markings will be removed and install the epoxy and thermoplastic markings once the temperatures allow. This work will take 3-4 good weather days in April of 2020 along with the punch list work. We are requesting 38 days in starting in April 2020 to complete this spring work which includes added days due to the uncertainty of weather conditions during a normal April. INDOT anticipates 18 days in April for weather, see attached weather for April last year showing 10 days. We suggest meeting in the middle with 14 days for the weather conditions. The approval request submitted will eliminate the potential for liquidated damages until May 7, 2020. Final costs for winter conditions are not know at this time as they are still accumulating and the project team has been notified. We will address these costs when finalized prior to the close of the project. Respectfully, Keith Stevens, Operations Manager 10343 McKinley Hwy. Osceola, IN 46561 • (574) 674-6488 • FAX (574) 674-6480 12/5/2019 South Bend, IN Monthly Weather I AccuWealher NOW RADAR MINUTECAST HOURLY DAILY MONTH el NOVEMBER - 2019 v Sun Mon Tue Wed Thu Fri Sat 10127 10/28 10/29 10/30 10/31 1 2 Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp 61°/47° 59°i43° 52°/,io° 42°/37° 44°/33° 44°/26° 47°/35° Hist. Avg. Hist. Avg, Hist, Avg. Hist. Avg. Hist. Avg. Hist. Avg, Hist. Avg. 58°/40° 57°/391 51°/39° 56°/39° 56°/39° 55°/38° 55°/38° 3 4 5 6 7 8 9 Actual Temp Actual Temp Actual Temp Actual Tamp Actual Temp Actual Temp Actuel Temp 50°i29° 20 530i43° 460i26° 56°i26° 37°/26° 370i21- 10 470/26° Hist. Avg. Hist. Avg Hist. Avg. Hist. Avg. Hist. Avg. Hist. Avg. Hist. Avg. 54°/38° 54°/37° 54°/37° 53°/37° 53°/36° 52°/36° 52°/36° 10 11 12 13 14 15 16 Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp 46°/35° 40i24° 24°/6- 27 /b° It 320/24° if 36°/21- r& 400125° Hist, Avg. Hist. Avg. Hist. Avg, Hist. Avg. Hist, Avg. Hist. Avg. Hist. Avg. 51°/36° 51°/35° 50°/35° 50°/34° 49°/34° 49°/34° 48°/33° 17 18 19 20 21 22 23 Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp 390, 24° 1 39 /33° 43°/36- 48°/36° 54°i•n° 41°i22° 36°i19^ Ito Hist. Avg. Hist. Avg. Hist. Avg, Hist. Avg. Hist. Avg. Hist. Avg. Hist. Avg, https;/Iwww.accuweather.com/en/us/south-bend/46601/november-weatherf328791?year=2019 1/5 Substantial Completion 12/27/2019 Attachment#2 2019 Remaining Work - CON Western Ave. 1 2 Install all signs, including bus stop signs. Fix disturbed sod at U-Haul western entry, 3 Trees needs adjusted near Family Dollar, and Across from Iowa, 4 Relocate Cesar Chavez sign at Kentuck per plan. 5 Full removal of concrete not done behind sidewalk at NE Cor of Kentucky; wedge and level per plan or landscape if desired by owner. 6 Clean up concrete between curb and tree grate at southeast corner of Kentucky . N — — — — �00 O 0 W —1 O (n A W N O CO -I O Cn A W N 0 < < D n 0D D D 00s o 0)o a' m a m a m o o v a s CDQ o aQ o° m o< 3< a � y" N.=r 3 m y _w N y C CD a) M O 3 O y O C C N y fD Cl Cn Cn N Cp CD �, O y O 7 a) Cn N Cn p3j Z Q a1 n CD CCD = v C<D n -Can fD < CD .�•F Q — Cab Cn O 7 CD Cn CD N C) CD Cr 0 I11 C L 0 d N* (n = o Cn D1 j CD u N 0 0) en M d a n � CD Cn S. n , O Z CD (D TI Q CD CA CD y N 3 CD �. Ill o .Q. n= o p a) 3 3 — — O x m 7 o CA CJ CD c 7 O CD a) O O O� " -. Cn 0) O— v Q o o o o N < a— r••1• co 0 CD _=— o = .* 3 ,� O C cD Q O O W- O (� O O P CD — < O 7 U O .n.. 3 °� N .n•. <n N qD Ca CD x — 0- p a1 a1 N o to , Ej. g— N to O 3 o ° 1• CD v m v L v+ 0 CD 7 Nia m m c N a°� =r y > > 3 � o � o O a, O 3 0 o- � � v aY Cr CD N U y .�T S '.y x La O"".. �y 7 j cn .v O a1 'Q N Cp <' N s C a v S Cn O N w O O" — < O CO CD Q c cn O c (�D ' � o G N D CD a�cn o y o �.o .. m 3 n u, 'a w a� ° s '. D3 CD 0 o CD CIS a " N a TICD 7 CD 2) n O N N °' o CD v, D c O 0 CA y a, 3 r ari m 0 x CD 3 O �+ — _ m Cn a ; m m CD CD 3 — 0 CD n �. 7 m r m m 12/5/2019 South Bend, IN Monthly Weather I AccuWeather NOW RADAR MINUTECAST HOURLY DAILY MONTH APRIL 201B ,.. Sun Mon Tue Wed Thu Fri Sat 4/I 4/2 4/3 4/4 4/5 4/6 4/7 Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp 34°/22° 43°/17° 43°/35° 35°/25° 41°120° 380i23° 32°/17- Hist. Avg. Hist, Avg. Hist. Avg. Hist. Avg. Hist Avg, Hist. Avg. Hist. Avg. 54°/34° 54°/34° 54°/34° 55°/34° 55°/35° 56°/35° 56°/36° 418 4/9 4110 4/1) 4/12 4/13 4/14 Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp 04 fit 41i14° 0°/22° 44°i20° 65°/35° 73°/49° 72°/48- 52°/35" Hist. Avg. Hist, Avg. Hist. Avg, Hist, Avg. Hist. Avg. Hist Avg. Hist, Avg. 56°/36° 57°/36® 57°/37° 58°/37® 58°/37° 59°/38° 59°/38° 4/15 4/16 4/17 4/18 4/19 4/20 4/21 Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp 42°/33° 34 /2s° 37/23° 41°i20° 45°/27° 5 8/23- 56529® Hist. Avg. Hist. Avg, Hist. Avg. Hist. Avg. Hist. Avg. Hist Avg, Hist. Avg. 59°/38° 60°/39° 60°/39° 61°/40° 61"/40° 61°/40° 62°/41° 4/22 4/23 4/24 4/25 4/26 4/27 4/28 Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp 64°/37° 72°/41- 63 r 55 /34° 63°/27 52 /is° °/29® Hist. Avg. Hist. Avg. Hist- Avg. Hist. Avg Hist. Avg, Hist. Avg, Hist. Avg. 62°/41® 63°/41° 63®/42° 63°/42° 64°/4? 64°/43" 64°/43° 4/29 4/30 5/1 5/2 5/3 5/4 5/5 Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp Actual Temp 58°i25. 74°/30° 839/52° 87161- 73°/60^ 69 /57° 7 °/s2° hitps:/hvww.accuweather,comlen/us/south-bend/466011april-weather/328791?year=201 B 115 DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Number: 118-076 Project Name: Western Avenue streetscape Phase III Change Order #: 3 DATE INITIATED: 12/16/19 BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Added days due to weather & utility delays. Attachments: (List documents support change — required) Contractors request (only partially approved). Amount of ❑ Increase / ❑ Decrease: $ Categories (Pick One): Previously approved Change Order(s): $175,155.31 ❑ Scope of Work --- 8 Differing Site Conditions, Changed Conditions Current Percent of Change: _ % ❑ Conflicted Specifications and Drawings ..... .... . . .... ....... ............................... New Total Amount:..... 2,809,540.66 ❑ Failed Materials $ ❑ Error El Omission Total Percent of Change: 6.65 ❑ Final Quantity Adjustment Funding Secured From: (filled out by PM) 0 RECOMMENDED BY: Josh Ehmer ����``"��y �� 12/16/19 Project Inspector (Print Name) (Si;gnatur) (Date) REVIEWED BY: _........ m._.. Construction Manager (Print Name) (Signature) (Date) APPROVED BY: Engineering Project Manager (Print Name) (Signature- � (Date) APPROVED BY: �02, W City Engineer (Prin Name) (Signature) (Date) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 12/16/19 Department Public Works .... ...........__... ....... Name Kyle Silveus Division/Bureau Engineering ............................_ ................. ..... BPW Date 12/19/19 Phone Extension 9083 Required Prior to Submittal to Board Legal ❑ Attorney Name: Clara McDaniels Controller El Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing E] Michael Schmidt Check the ADProeriate Item Tvee — Reaulreo'for All Submissions LJ Agreement F] Professional Services Fj Bid Opening F-1 Quote Opening ® Change Order No. 3 ❑ Ease/Encroach. El Other: L Contract Resolution ❑ Bid Award Quote Award ❑C/O &PCANo, Traffic Control: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount I eauired l Indiana Earth, Inc. Proposal Addendum [l Req. to Advertise ❑ Title Sheet ❑ PCA rn Western Ave.Streetscape - Phase III IT0.­_......._-..... .. .......... _._................. ............ _ ................... RWDA TIF 324-1050-460-42-03....................................._�www .....�._.................W $ N/A ...._......................................... Terms of Contract Purpose/Description Add a substantial completiondateto contract and add 27 days, bringing substantial completion to 12/27/19 and the final completion date to 4/21/20. Additional time was needed due to unforeseen conditions, weather, and utility! conflicts. mm ......... I Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) e orders Onf �- Amount of Increase $ 2-7.....................W............__............._w__ Decrease $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Copy Original ❑ ❑ ❑ ❑ ❑ ❑