HomeMy WebLinkAboutChange Order No 1 - City of South Bend Wayfinding Signage Program, Phase 1 Proj No. 119-052R - Geograph Industries, Inc.1
,.F t
1316 COUNTY -CITY BUILDING
PHONE PHONE 574/235-9251
227 W. JEFFERSON BOULEVARD�Ad
F f FAX 574/ 235-9171
SOUTH BEND_ INDIANA 46601-1 930
a ,,
I1l65
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
December 19, 2019
Mr. Matt Panzeca
Geograph Industries, Inc.
475 Industrial Dr.
Harrison, OH 45030
RE: Change Order No. 1 — City of South Bend Wayfinding Signage Program, Phase
1 —Project No. 119-052R
Dear Mr. Panzeca:
The Board of Public Works, at its meeting held on December 19, 2019, approved the
above referenced Change Order for an increase of sixty-three (63) days with a new
completion date of January 24, 2020.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
�....
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
CITY OF SOUTH BEND, INDIANAN
DEPARTMENT OF PUBLIC WORKS�����
PROJECT CHANGE ORDERr
DATE: 11120/2019
PROJECT NO: 119-052R
_._ ...... _.... _. .. ._
PROJECT NAME: C05B WavfindinSinag� Ir�raPhase 1 Base * AIt.1 & 3,1 wwwww
CONTRACT DATE: 8/27/2019
CHANGE ORDER NO:._..�_�.�...._�_.._._........._...��.................... � ..
SUBJECT OF CHANGE ORDER: PCR fk1-Added Cantract Time Due to Decorative Pole Lead Time.
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion dateltime
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
CONTRACTOR
Contractor in tare
Printed Name and Title
Ceograph 1ndUS1fieS, Inc.
-...�
Company Name
475 Industrial Drive
Address
Harrison, OH 45030
City, State, Zip
$ .139,157.00..
$ 0.00
$_. I gt / 0..
Increased
Decreased $ _ 0.00
$..m_.....�..39nW?_7..0�,,
0.00 %
11/2212019
Odd
1124/2020
FOR PROVA
--T—,C-" %.-Nwo
CONS ZYC
TION MANAGER �—
CITY OF SOUTH BEND
BOARD OF PUBLIC IRKS
Approved Date .. / 1
Oenevi ve E. Mfflef. Member
E mAeth K Maradik, Member
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
PROJECT CONSTRUCTION CHECKLIST
Project No.
119-052R
NTP
9/16/2019
Project Name
COSB Wayfinding Signage Program - Phase 1 (Base + Alt.1 & 3)
Sub. Comp.
10/18/2019
Contractor
Geograph Industries, Inc.
Final Comp.
1/24/2020
Inspector
JJE
Today's Date
11/27/2019
PAY APPLICATIONS & CHANGE ORDERS CHART
Pay App
Contract — EVA
.......... .ou ..........N, ..,. ..............
$100.000.00
S50.000.00
�.1")Il'i" )-I(.1 11/1/2019 12/1/2019 1/1/2020
.... .........
PAYMENT APPLICATION SUMMARY
End Date
Total
Deductions
Sub Total
Prev. Pmts
Amount
Prev Pmt Error
1
11/20/2019
$57,842.40
$2,892.12
$54,950.28
$0.00
$54,950.28
-
2
3
4
5
S
-
-
-
$0.00
$54,950.28
CHANGE
ORDER SUMMARY
Date
Prv. Contract
Change Amt.
New Contract
Change %
Total %
Added Days
1
_2
11/20/2019
$139,157.00
$0.00
$139,157.00
0.00%
0.00%
63
3
4
5
S
-
-
$0.0011
0.00%
1/24/2020
POST -CONSTRUCTION DOCUMENT CHECKLIST
Items
Notes
Date Rec'D
1
Final Pay Application
2
Project Completion Affidavit
3
Final Waiver of Lien
4
Final Change Order
5
Complete Certified Payrolls
6
As -Built Documents
7
Testin Re orts Ilk
8
Warranty Information
Signature: Date:
o
11/20/2019
Josh,
This letter is to request an extension on COSB Wayfinding Signage Program — Phase I, from November
22nd, 2019 to January 31", 2020. The specified poles are due to ship on January 6th, 2019. Geograph will
need one (1) week in production once received, and then one (1) week on -site for installation. Below is a
timeline to back-up this request.
9/10/2019 Geograph began Shop Drawings and confirmed pricing on Beacon Poles
Geograph received final quote on Beacon Poles and Lead Time of 10-12 weeks
9/11/2019 Geograph received additional technical specifications on Beacon Poles to incorporate in Shop Drawings.
9/12/2019 Matt from Geograph called for confirmation on pole lead time prior to pre -con meeting
9/16/2019 Matt from Geograph met with Josh, Toy, Cara, Alicia, Brian and Bob for pre -con
Matt from Geograph informed all parties of this 10-12 week lead time.
9/18/2019 Geograph was told the 4" Beacon Poles could NOT be used.
Geograph was sent a revised quote using 5" Beacon poles.
9/19/2019 Geograph questioned the break-away/base cover fit and compatibility with 5" poles
9/20/2019 Dave from Geograph contacted Josh Ehmer about possible compatibility issues.
Geograph sent Shop Drawings to our Engineer to Stamp
9/23/2019 Dave from Geograph was informed that break -away system was not required.
9/30/2019 Geograph received Stamped Engineered Drawings
10/14/2019 Geograph had all approvals, drawings and information and Beacon Poles were ordered.
10/21/2019 Geograph received confirmation that Beacon Pole order was processed and started.
12/30/2019 10 WEEKS FROM ORDER
1/6/2020 12 WEEKS FROM ORDER
Thanks in advance and please let me know if you need anything else.
Matt Panzeca 513.202.9200 matt anzeca@peoprai3h-ind.com
yglMk N'Ip M1
h
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
1 1 9-52 R COSB Wayfinding Signage Program - Phase 1 1
Project Number: Project Name: Change Order #»
��MMMMM�
DATE INITIATED: 11/20/19 BPW DATE: 20
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.).
Add 63 Contract Days Due to Decorative Pole Lead Time.
Attachments: (List documents support change — required)
Contractors request & time -line.
Amount of ❑ Increase / ❑ Decrease: $
Categories (Pick One):
Previously approved Change Order(s): $ 0 ❑ Scope of Work
-- ❑ Differing Site Conditions, Changed Conditions
Current Percent of Change: % ❑ Conflicted Specifications and Drawings
....... . . . ......................
❑ Failed Materials
New Total Amount; $ 139,157.00
❑ Error
El Omission
Total Percent of Change: % ❑ Final Quantity Adjustment
Funding Secured From:
(filled out by PM)
RECOMMENDED BY:
Josh Ehmer 11/27/19
Project Inspector (Print Name) (Signet ;) \ (Date)
REVIEWED BY:
, e e
Construction Manager (Print Name) (Signature) (Date)
S Loo�-
APPRO ED BY:
Engineering Project Manager (Print Name) (Signature) (Date
APPROVED BY:
City Engineer (Print Na e) (Signature) (Date
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 12/11/19
Name Alicia Czarnecki Department Engineering
----------------
BPW Date 12/19/19 Phone Extension 5903
BPW Attorney
RgL�ir d Prior to Submittal to Board
Attorney Name
Dept. Attorney F-1 Attorney Name
Purchasing
Check t ro JItem T c _ Rc;
Professional Services es A e ent
Contract
ontract
E]
Open Market Contract
Amendment/Addendum
Bid Opening
[
Bid Award
Quote Opening
Quote Award
❑
Proposal Opening
C/O & PCA No.
®
Chg. Order, No. 1
[l
Traffic Control
F-1 Other:
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
All Submissions
LJ Proposal
F Special Purchase, QPA
0 Req. to Advertise ❑ Title Sheet
❑ Reject Bids/Quotes
[—] PCA
E] Resolution
Ease./Encroach
Ge Yes l. Flu Industries,
Yes
i, Inc
.__.
Approved by Purchasing
® No
MBE ❑ WBE Completed E-Verify Form Attached Nos
Citof South Bend Wayfinding Signa a Program - Phase 1
119-052 R
.......................................
West Washington TIF ($10,000.00)
River East TIF ($30,000.00)
River West TIF ($25,700.00)
Professional Services (rest of amount)
324-1050-460-42-03 ($10,000.00)
429-1050-460-42-03 ($30,000.00)
422-1050-460-42-03 ($25,700.00)
217-0602-367-31-06 (rest of amount)
Purpose/Description CO #1 — Added Contract Time due to Decorative Pole Lead Time
For ChanLc Orders Oi l
Amount of Increase $ 0
❑ Decrease ($ 0) ����..............................._..............�..___
.............._................._.........-..........
Previous Amount $
....................................................
Increase 0%
Current Percent of Change: Decrease (0%)
New Amount $- .................
Increase %
_.......................................
Total Percent of Change: Decrease ( %
mm Time Extension Amount: 63 days ITITITITITITITITITITITITITITITITITITITm
New Completion Date: 1/24/2020