Loading...
HomeMy WebLinkAboutChange Order No 1 - City of South Bend Wayfinding Signage Program, Phase 1 Proj No. 119-052R - Geograph Industries, Inc.1 ,.F t 1316 COUNTY -CITY BUILDING PHONE PHONE 574/235-9251 227 W. JEFFERSON BOULEVARD�Ad F f FAX 574/ 235-9171 SOUTH BEND_ INDIANA 46601-1 930 a ,, I1l65 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS December 19, 2019 Mr. Matt Panzeca Geograph Industries, Inc. 475 Industrial Dr. Harrison, OH 45030 RE: Change Order No. 1 — City of South Bend Wayfinding Signage Program, Phase 1 —Project No. 119-052R Dear Mr. Panzeca: The Board of Public Works, at its meeting held on December 19, 2019, approved the above referenced Change Order for an increase of sixty-three (63) days with a new completion date of January 24, 2020. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, �.... Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANAN DEPARTMENT OF PUBLIC WORKS����� PROJECT CHANGE ORDERr DATE: 11120/2019 PROJECT NO: 119-052R _._ ...... _.... _. .. ._ PROJECT NAME: C05B WavfindinSinag� Ir�raPhase 1 Base * AIt.1 & 3,1 wwwww CONTRACT DATE: 8/27/2019 CHANGE ORDER NO:._..�_�.�...._�_.._._........._...��.................... � .. SUBJECT OF CHANGE ORDER: PCR fk1-Added Cantract Time Due to Decorative Pole Lead Time. The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion dateltime Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR Contractor in tare Printed Name and Title Ceograph 1ndUS1fieS, Inc. -...� Company Name 475 Industrial Drive Address Harrison, OH 45030 City, State, Zip $ .139,157.00.. $ 0.00 $_. I gt / 0.. Increased Decreased $ _ 0.00 $..m_.....�..39nW?_7..0�,, 0.00 % 11/2212019 Odd 1124/2020 FOR PROVA --T—,C-" %.-Nwo CONS ZYC TION MANAGER �— CITY OF SOUTH BEND BOARD OF PUBLIC IRKS Approved Date .. / 1 Oenevi ve E. Mfflef. Member E mAeth K Maradik, Member DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING PROJECT CONSTRUCTION CHECKLIST Project No. 119-052R NTP 9/16/2019 Project Name COSB Wayfinding Signage Program - Phase 1 (Base + Alt.1 & 3) Sub. Comp. 10/18/2019 Contractor Geograph Industries, Inc. Final Comp. 1/24/2020 Inspector JJE Today's Date 11/27/2019 PAY APPLICATIONS & CHANGE ORDERS CHART Pay App Contract — EVA .......... .ou ..........N, ..,. .............. $100.000.00 S50.000.00 �.1")Il'i" )-I(.1 11/1/2019 12/1/2019 1/1/2020 .... ......... PAYMENT APPLICATION SUMMARY End Date Total Deductions Sub Total Prev. Pmts Amount Prev Pmt Error 1 11/20/2019 $57,842.40 $2,892.12 $54,950.28 $0.00 $54,950.28 - 2 3 4 5 S - - - $0.00 $54,950.28 CHANGE ORDER SUMMARY Date Prv. Contract Change Amt. New Contract Change % Total % Added Days 1 _2 11/20/2019 $139,157.00 $0.00 $139,157.00 0.00% 0.00% 63 3 4 5 S - - $0.0011 0.00% 1/24/2020 POST -CONSTRUCTION DOCUMENT CHECKLIST Items Notes Date Rec'D 1 Final Pay Application 2 Project Completion Affidavit 3 Final Waiver of Lien 4 Final Change Order 5 Complete Certified Payrolls 6 As -Built Documents 7 Testin Re orts Ilk 8 Warranty Information Signature: Date: o 11/20/2019 Josh, This letter is to request an extension on COSB Wayfinding Signage Program — Phase I, from November 22nd, 2019 to January 31", 2020. The specified poles are due to ship on January 6th, 2019. Geograph will need one (1) week in production once received, and then one (1) week on -site for installation. Below is a timeline to back-up this request. 9/10/2019 Geograph began Shop Drawings and confirmed pricing on Beacon Poles Geograph received final quote on Beacon Poles and Lead Time of 10-12 weeks 9/11/2019 Geograph received additional technical specifications on Beacon Poles to incorporate in Shop Drawings. 9/12/2019 Matt from Geograph called for confirmation on pole lead time prior to pre -con meeting 9/16/2019 Matt from Geograph met with Josh, Toy, Cara, Alicia, Brian and Bob for pre -con Matt from Geograph informed all parties of this 10-12 week lead time. 9/18/2019 Geograph was told the 4" Beacon Poles could NOT be used. Geograph was sent a revised quote using 5" Beacon poles. 9/19/2019 Geograph questioned the break-away/base cover fit and compatibility with 5" poles 9/20/2019 Dave from Geograph contacted Josh Ehmer about possible compatibility issues. Geograph sent Shop Drawings to our Engineer to Stamp 9/23/2019 Dave from Geograph was informed that break -away system was not required. 9/30/2019 Geograph received Stamped Engineered Drawings 10/14/2019 Geograph had all approvals, drawings and information and Beacon Poles were ordered. 10/21/2019 Geograph received confirmation that Beacon Pole order was processed and started. 12/30/2019 10 WEEKS FROM ORDER 1/6/2020 12 WEEKS FROM ORDER Thanks in advance and please let me know if you need anything else. Matt Panzeca 513.202.9200 matt anzeca@peoprai3h-ind.com yglMk N'Ip M1 h DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING 1 1 9-52 R COSB Wayfinding Signage Program - Phase 1 1 Project Number: Project Name: Change Order #» ��MMMMM� DATE INITIATED: 11/20/19 BPW DATE: 20 Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Add 63 Contract Days Due to Decorative Pole Lead Time. Attachments: (List documents support change — required) Contractors request & time -line. Amount of ❑ Increase / ❑ Decrease: $ Categories (Pick One): Previously approved Change Order(s): $ 0 ❑ Scope of Work -- ❑ Differing Site Conditions, Changed Conditions Current Percent of Change: % ❑ Conflicted Specifications and Drawings ­­­....... . . . ...................... ❑ Failed Materials New Total Amount; $ 139,157.00 ❑ Error El Omission Total Percent of Change: % ❑ Final Quantity Adjustment Funding Secured From: (filled out by PM) RECOMMENDED BY: Josh Ehmer 11/27/19 Project Inspector (Print Name) (Signet ;) \ (Date) REVIEWED BY: , e e Construction Manager (Print Name) (Signature) (Date) S Loo�- APPRO ED BY: Engineering Project Manager (Print Name) (Signature) (Date APPROVED BY: City Engineer (Print Na e) (Signature) (Date BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 12/11/19 Name Alicia Czarnecki Department Engineering ---------------- BPW Date 12/19/19 Phone Extension 5903 BPW Attorney RgL�ir d Prior to Submittal to Board Attorney Name Dept. Attorney F-1 Attorney Name Purchasing Check t ro JItem T c _ Rc; Professional Services es A e ent Contract ontract E] Open Market Contract Amendment/Addendum Bid Opening [ Bid Award Quote Opening Quote Award ❑ Proposal Opening C/O & PCA No. ® Chg. Order, No. 1 [l Traffic Control F-1 Other: Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract All Submissions LJ Proposal F Special Purchase, QPA 0 Req. to Advertise ❑ Title Sheet ❑ Reject Bids/Quotes [—] PCA E] Resolution Ease./Encroach Ge Yes l. Flu Industries, Yes i, Inc .__. Approved by Purchasing ® No MBE ❑ WBE Completed E-Verify Form Attached Nos Citof South Bend Wayfinding Signa a Program - Phase 1 119-052 R ....................................... West Washington TIF ($10,000.00) River East TIF ($30,000.00) River West TIF ($25,700.00) Professional Services (rest of amount) 324-1050-460-42-03 ($10,000.00) 429-1050-460-42-03 ($30,000.00) 422-1050-460-42-03 ($25,700.00) 217-0602-367-31-06 (rest of amount) Purpose/Description CO #1 — Added Contract Time due to Decorative Pole Lead Time For ChanLc Orders Oi l Amount of Increase $ 0 ❑ Decrease ($ 0) ����..............................._..............�..___ .............._................._.........-.......... Previous Amount $ .................................................... Increase 0% Current Percent of Change: Decrease (0%) New Amount $- ................. Increase % _....................................... Total Percent of Change: Decrease ( % mm Time Extension Amount: 63 days ITITITITITITITITITITITITITITITITITITITm New Completion Date: 1/24/2020