Loading...
HomeMy WebLinkAbout2019-12-12 116082D 1674 Bid TabMcCormick Engineering, LLC.234 N. Ironwood Dr.South Bend, IN 466151 Mobilization and Demobilization LS 1 $ 8,800.00 8,800.00$ $ 16,057.50 16,057.50$ $ 6,500.00 6,500.00$ 2 Selective Clearing LS 1 $ 2,000.00 2,000.00$ $ 13,000.00 13,000.00$ $ 1,000.00 1,000.00$ 3 Temporary Silt Fence EACH 40 $ 5.00 200.00$ $ 3.25 130.00$ $ 3.00 120.00$ 4 Temporary Seeding EACH 70 $ 5.00 350.00$ $ 5.00 350.00$ $ 3.00 210.00$ 5 Bollard EACH 4 $ 500.00 2,000.00$ $ 465.00 1,860.00$ $ 350.00 1,400.00$ 6 Erosion Control Blanket SYS 70 $ 10.00 700.00$ $ 2.75 192.50$ $ 4.50 315.00$ 7 Seeding, U LFT 70 $ 5.00 350.00$ $ 28.00 1,960.00$ $ 4.50 315.00$ 8 Service Pole CYS 1 $ 12,000.00 12,000.00$ $ 6,350.00 6,350.00$ $ 6,000.00 6,000.00$ 9 Antenna CYS 1 $ 800.00 800.00$ $ 1,200.00 1,200.00$ $ 500.00 500.00$ 10 G-Node CYS 1 $ 4,000.00 4,000.00$ $ 11,500.00 11,500.00$ $ 13,250.00 13,250.00$ 11 Sensor, Level EACH 1 $ 4,000.00 4,000.00$ $ 2,000.00 2,000.00$ $ 4,100.00 4,100.00$ 12 Plug Valve Assembly CYS 1 $ 40,000.00 40,000.00$ $ 26,000.00 26,000.00$ $ 70,000.00 70,000.00$ 13 Control Cabinet Assembly TON 1 $ 100,000.00 100,000.00$ $ 71,000.00 71,000.00$ $ 72,544.00 72,544.00$ 14 Controller Cabinet Foundation, Type P-1 SYS 1 $ 1,800.00 1,800.00$ $ 2,500.00 2,500.00$ $ 3,300.00 3,300.00$ 15 Electrical Work LFT 1 8,000.00$ 8,000.00$ $ 9,900.00 9,900.00$ $ 9,500.00 9,500.00$ 16 Valve and Sensor Calibration SYS 1 4,000.00$ 4,000.00$ $ 12,000.00 12,000.00$ $ 1,200.00 1,200.00$ TOTAL189,000.00$ 176,000.00$ 190,254.00$ I hereby certify that this is a true representation of the Unit Prices associated with the Bids received on December 10, 2019for the Miami Basin Valve Replacement ProjectDavid. L. McCormick, PE, D.WREIndiana Professional Engineer No. 19800330Date: 12/11/2019Unit Price Total AmountUnit Price Total AmountHRP Construction Inc. Selge ConstructionItem No.Description Unit Quantity Unit Price Total AmountEngineer's EstimateBids Open Date: December 10, 2019MEL Project No. 01674Tabulation of BidsCity of South Bend Board of Public WorksCity Project No. 116-082DMiami Basin Valve Replacement Project