Loading...
HomeMy WebLinkAboutTransfer of Ownership - Industrial Wastewater Discharge PermitCITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR EPARTMENT OF PUBLIC WORKS Eric Horvath, Director December 2, 2019 Board of Public Works City of South Bend 1316 County City Building 227 West Jefferson Boulevard South Bend, IN 46601 RE: Transfer of Ownership Industrial Wastewater Discharge Permit Dear Board Members: The Division of Environmental Services recommends approving the Industrial Discharge Permit renewal for St. John-Mittelhauser & Associates at the December 10, 2019 Board of Public Works Meeting. This is a permit for a remediation site that is a very small quantity discharger, having only discharged 150 gallons in the last five years and reported a maximum expected flow of 150 gallons per day. The permit has been changed so the permittee only is required to monitor for pollutant parameters expected to be present based on historical analytical data and on the contaminants of concern present at the remediation site. Other than this, there have been no significant changes to the permit. If you should have any questions, please don't hesitate to contact me at (574) 235-5852, or at Itrapp@southbendin.gov. Please let me know if the Board requests Pretreatment's attendance at the Board Meeting to present this permit. Sincerely, Latiren Trapp Pretreatment Manager City of South Bend Division of Environmental Services Department of Utilities 3113 Riverside Drive South Bend, IN 46628 (574)235-5852 Itrapp@southbendin.gov Enclosure(s) - Industrial Discharge Permit Signature Page & the Permit's Part I- Effluent Limitation and Part 11- Monitoring Requirements Facility Description A soil vapor extraction (SVE) remediation system on site operates to remove/reduce subsurface Volatile Organic Compound (VOC) contamination due to a former dry cleaning operation at the site. The remediation system will operate 24 hours 7 days a week. As the air from the SVE cools, condensation may form in the piping. The discharge will consist of this condensation. During times of elevated groundwater levels, it is possible that the SVE system may also remove some contaminated groundwater. The contaminated groundwater will be collected and sampled in the same manner as the condensate water. PART I — EFFLUENT LIMITATION A. Sample Port and Collection Location Sample Site Outfall # 315 is located on the site known as Monarch Textile Rental Services at 812 North Wilber Street, South Bend, IN 46628. In the SVE Equipment trailer located on the Northwest corner of the site, the sample port is located downstream of the wastewater holding/knock out tank and the granular activated carbon vessels. The wastewater will discharge to a sewer lateral connection located inside the Monarch facility. 2. Sample Site # 315 shall not exceed the following effluent limitations. Any discharge of water or waste having a pH lower than 6.0 S.U. or a pH higher than 11.0 S.U. is prohibited. In addition, the permittee's wastewater discharge shall not exceed the following effluent limitations: a. Daily Maximum Limit means the maximum allowable discharge limit of a pollutant during a calendar day or any 24-hour period that represents a calendar day. Where Daily Maximum Limits are expressed in units of mass, the daily discharge is the total mass discharged over the course of the day. Where Daily Maximum Limits are expressed in terms of a concentration, the daily discharge is the arithmetic average measurement of the pollutant concentration derived from all measurements taken that day. In the case of samples collected by the grab method, the daily maximum shall be applied as an Instantaneous Maximum Allowable Discharge Limit or as an Instantaneous Minimum Allowable Discharge Limit as follows: i. Instantaneous Maxinitim Allowable Disch re Limit — shall mean the maximum concentration or loading of a pollutant allowed to be discharged at any time, determined from analysis of any discrete or composite sample collected, independent of the industrial flow rate and the duration of the sampling event. St. John-Mittelhauser & Associates Industrial Wastewater Discharge Permit page 1 of 38 H. histantaneotis 'Minii ium Allowable Discharge Limit — shall mean the minimum concentration of a pollutant allowed to be discharged at any time, determined from analysis of any discrete or composite sample collected, independent of the industrial flow rate and the duration of the sampling event. The lower pH limit is applied as an Instantaneous Minimum Allowable Discharge Limit. b. Monthly Avera to Limit means the maximum allowable average of daily discharges over a calendar month, calculated as the sum of the concentrations of all daily discharges measured during a calendar month divided by the number of daily discharges measured that month. C. "Prohibit; No permittee shall introduce or cause to be introduced certain pollutants, substances, or wastewater into any public sewers, directly or indirectly into the POTW including, but not limited to gasoline, benzene, naphtha, fuel oil or other pollutants which create a fire or explosive hazard to the City's sewer system or POTW. St. John-Mittelhauser & Associates Industrial Wastewater Discharge Permit page 2 of 38 PART II - MONITORING REQUIRMENTS A. Monitoring Frequency 1. The following parameters shall be monitored at the frequency and with the sampling type stated below. All measurements, tests, and analyses of the characteristics of water and wastes to which reference is made in this permit shall be conducted using the methods and procedures approved in 40 CFR 136 and amendments thereto, unless otherwise specified in an applicable Categorical Pretreatment Standard. The following parameters shall be monitored at sample site # 315 with the methods and at the frequency stated below: Sampling Fre Parameter _�_ __...n. mm....... quency Sampling Type Oil & Grease - Total I SemiAnnual Grab Oil & Grease TPH (ma SemiAnnual Grab . ...SU_.._._.SemiAnnual pH ( ) ..a .....w.. _ Grab .TTO.( g/ ... * *) SemiAnn.._..... ual _ _b...... ...... Grab �X len .. ( m.. /�)..,... .. y e g � .__ SemiAnn... ual Grab Flow, total (gpd) Daily Continuously Flow Monthly (total) Monthly Continuously See Flow Measurement Requirements referenced in Part III - Reporting Requirements. ** See Attachment 4 B. Monitoring Definitions 1. Composite — Samples are obtained through flow -proportional sampling technique over a 24-hour period or for the duration of discharge within the 24-hour sampling period, including multiple batches of wastewater. If the permittee demonstrates that time -proportional sampling is accurate or as representative as flow - proportional sampling, then a time -proportional sample may be collected. a. If the permittee chooses to demonstrate that time -proportional sampling is accurate or as representative as flow -proportional sampling, the permittee must submit a request, which includes the certification statement found in Part III (A) (4) signed by the Authorized Representative [see Part IV (B) (15)], within 120 days of the effective date of this permit or they shall commence flow -proportional sampling at that time. Request to conduct time -proportional sampling is subject to the Control Authority approval. St. John-Mittelhauser & Associates Industrial Wastewater Discharge Permit page 3 of 38 2. Grab Sample — A single sample collected from a wastestream without regard to the flow in the wastestream and over a period of time not to exceed fifteen (15) minutes and taken at a time representative of normal discharge. 3. Continuously — The permittee shall monitor the discharge flow continuously and submit totalized daily flows with the Periodic Compliance Report (PCR). Each PCR shall include all flow measurements for the entire monitoring period covered in the report. This flow information shall be in addition to the flow data collected during sampling which shall be measured from the start of the sampling event to the end of the sampling event. 4. Daily monitoring frequency requires sampling to be conducted one (1) time in each calendar day. (Report due on the 201h of the following month) Weekly monitoring frequency requires sampling to be conducted one (1) time in each calendar week (Sunday to Saturday). (Report due on the 20th of the following month) 6. Monthly monitoring frequency requires sampling to be conducted a minimum of one (1) time per calendar month. (Report due on the 20th of the following month) 7. Semiannual monitoring frequency requires sampling to be conducted a minimum of one (1) time per semiannual period. (1st Semiannual Period: January to June [Report due on the 201h of July]. 2nd Semiannual Period: July to December [Report due on the 201h of January]) Quarterly monitoring frequency requires sampling to be conducted a minimum of one (1) time per calendar quarter. (1st Quarterly Period: January to March [Report due on the 201h of April]. 2nd Quarterly Period: April to June [Report due on the 20th of July]. 3rd Quarterly Period: July to September [Report due on the 201h of October]. 4th Quarterly Period: October to December [Report due on the 20th of January]) 9. The following conventional pollutants shall incur a surcharge in excess of the stated limitations below, as stated in Section 17-23(b) of the City of South Bend's Municipal Code. Surcharge for ammonia (NH3-N) >25 mg/L Surcharge for BOD5 >250 mg/L Surcharge for phosphorus >10 mg/L Surcharge for Total Suspended Solids (TSS) >250 mg/L St. John-Mittelhauser & Associates Industrial Wastewater Discharge Permit page 4 of 38 C. Representative Sampling 1. Sampling shall be carried out by customarily accepted methods to reflect the effect of constituents upon the sewage works and to determine the existence of hazards to life, limb and property. 2. All wastewater samples must be representative of the permittee's discharge. 3. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. a. The failure of a permittee to keep its monitoring facility in good working order shall not be grounds for the permittee to claim that sample results are unrepresentative of its discharge. St. John-Mittelhauser & Associates Industrial Wastewater Discharge Permit page 5 of 38 City of South Bend Department of Public Works Remediation Site — Permit No. 812 In accordance with all the terms of Chapter 17 of the City of South Bend's Municipal Code, and with any applicable provisions of federal or state law and regulations, permission is hereby granted to: St. John-Mittelhauser & Associates 1401 Branding Avenue, Suite 315 Downers Grove, Illinois 60515 For Site Located At: Monarch Textile Rental Services 812 Wilber Street South Bend, In 46628 for the contribution of wastewater into the City of South Bend Publicly Owned Treatment Works. This permit is granted in accordance with the application filed on 18 Se ptembei• 201 �). Effective on: 22 Deceinbc!,2,01,9 Expires on the: 21 D c in er, 2024 Any violation of the terms and conditions of this permit shall be deemed a violation of the City of South Bend Municipal Code and will subject the permittee to the sanctions set out in section 17-11 through 17-13 of the Municipal Code. The permittee shall file an application for a renewal permit, a minimum of 90 days prior to the expiration date. Approved By: Board of Public Works Gary . Gilot, P.E. Genevieve E. Miller Laura O'Sullivan 1 Z17, betlt A. dM Therese J. Dorau BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 12/2/19 . . ......... Name Lauren TraDD Department Utilities BPW Date 12/10/19 Phone Extension 5852 Requited P nor,to,,Subm'ittal to,Board BPW Attorney E] Attorney Name Dept. Attorney EJ Attorney Name ................. ............. Purchasing 1:1 LJ Professional Services Agreement LJ Contract Open Market Contract F-1 Amendment/Addendum ❑ Bid Opening ❑ Bid Award ❑ Quote Opening ❑ Quote Award ❑ Proposal Opening C/O & PCA No. El Chg. Order, No. ❑ Traffic Control N Other: Industrial Discharg Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description H Proposal Special Purchase, QPA Req. to Advertise ❑ Title Sheet Reject Bids/Quotes PCA Resolution ❑ Ease./Encroach .............. - . .. . . ........... ❑ Yes[:] If Yes, Approved by Purchasing F-1 No [:] MBE Completed E-Verify Form Attached Yes F WBE E] No al7, -f increase Amount of❑ . .......... Decrease ($ Previous Amount $ Current Percent of Change: New Amount Total Percent of Change: Time Extension Amount: New Completion Date: 9.1 Increase % Decrease % Increase % .................... Decrease %