Loading...
HomeMy WebLinkAboutRM 05-03-74May 1974 10:30 A. M. Presiding Officer I. ROLL CALL SOUTH BEND REDEVELOPMENT COMMISSION REGULAR MEETING 1200 County -City Building 227 W. Jefferson'Boulevard Mr. Fred J. Helmen, South Bend, Indiana 46601 President !sent: Mr. Fred J. Helmen, President Mr. John E. Chenney, Vice President Mr. Donald Wiggins, Member ent: Mr. B. L. Wade, Assistant Secretary Rev. Willie V. Williams, Secretary egal Counsel: Media: ers Present: LPA Staff: 2. APPROVAL OF MINUTES Mr. Kevin J. Butler Ms. Jeanne Derbeck, South Bend Tribune Reporter Mr. Larry Ford, WSJV -TV Reporter - Photographer Mr. Dan Akin, Site Project Engineer Clyde E. Williams & Associates, Inc. Ms. Janet S. Allen, Interested Citizen Mr. Gene Evans, Civic Planning Association Mr. Frank Fahey, Abar Construction Company Mr. & Ms. George Pope, Jr., Interested Citizens Mr. John A. Walsh, First Bank & Trust Company Mr. Lou Wilcox, Director, River Bend Plaza Auth. Mr. Timothy Walsh, Attorney Mr. Charles F. Lennon, Jr. Mr. Wm. C. Ellison Mr. Frank J. Alford Ms. Dorothy Howell Mr. C. Wayne Brownell Mr. Larry Wartha Mr. Edwin R. Bauer Ms. Gertrude Barth 0 motion by Mr. Chenney, seconded by Mr. Wiggins and unanimously MINUTES carrie , the Minutes of the Regular Meeting of May:3, 1974, were APPROVED approv d. 3. APPROVAL OF CLAIMS On motion by Mr. Wiggins, seconded by Mr. Chenney and unan- imously carried, the claims - totalling $67,236.64 - were approved for pay ent. -1- CLAIMS APPROVED 3. APPROVAL OF CLAIMS (Cont'd) P.E.A. INDIANA R -57 nterprise Record P.E.A. CODE ENFORCEMENT E -5 Ardmore Home Improvement - Hattie Walker #21 -10 N.D.P. PROJECT A -10 Real state Purchase Russell H. Fisher, Exec. Estate of Karl Dubail, 66 -25, SE #1 Industrial Savings & Loan, #59 -28, SE #1 Reloc tion Claims C arles L. Douglas, #66 -11, SE #1 C arles L. Douglas, #66 -11, SE #1 C arles L. Douglas, #66 -11, SE #1 V lma Jordan, #2 -17, MN #1 V lma Jordan, #2 -17, MN #1 Other S utheast Side Neighborhood PAC N rthern Indiana Public Service SE #1 S uthBend Tribune SE #1 - MN #1 T i- County News SE #1 - MN #1 P. E.1A. INDIANA R -66 $ 285.48 Total $ 285.48 $ 773.09 Total $ 773.09 Total Anton J. Sayer I. & M. Electric Co. Harvey Jackson d /b /a Jackson Wrecking Co. & First Natl. Bank S uth Bend Exterminating Company C yde E. Williams & Associates Inc. Total MERRY AVENUE PROJECT Real state Purchase C arles & Jennie Roscoe & D. L. Mathews #1 -31 L rna Benjamin & D. L. Mathews #1 -36 11 It II II 1137 -2 Total $ 2,675.00 2,850.00 200.00 10,497.00 160.00 25.00 200.00 1,925.00 59.95 27.07 30.87 $19,099.89 $ 1,512.00 49.65 8,239.14 30.00 2,301.08 5,369.70 $-17,501.57 $ 1,012.40 876.00 876.00 $x.40 3. APPROVAL OF CLAIMS (Cont'd) REDEVELOPMENT REVOLVING FUND URBAN REDEVELOPMENT FUND American Society of Planning Officials $ 25.00 A. Ba cho - R -57 complaints. (208 Bendix Dr.) 176.00 Housing Authority, Cityof South Bend 82.75 South Bend Water Works 24.00 Total $ 307.75 REDEV LOPMENT DISTRICT CAPITAL FUND - 1972 North American Signs Louis N. Wilcox 4. OMMUNICATIONS $ 95.00 833.33 Total $ 928.33 Grand Total $ 67,236.64 Clyde E. Williams & Associates letter dated 4- 25 -74: This letter, over the signature of Mr. Edward E. Werley from EPD called our attention to the fact that a different type of brick is be ng used than that called for in the specifications. Mr. H lmen read parts of the letter which indicated truss paving brick is being used to pave the Plaza instead of extruded brick, as called for in the specifications. He asked whether pressed brick is as good as extruded brick and if the guarantee is for only five years what is the status at the end of five years. Dan Akin said that asically, a five -year guarantee on the brick is like a warranty -3- PAVING BRICK PROJECT R -66 Payroll: April 16, 1974 to April 30, 1974 $ 10,951.99 Community Development 1,766.66 Continental Assurance Co. 1,089.00 Jame A. Hill 10.80 I.B.M. 27.00 James R. Meehan & Assoc. 34.50 P.E.A. Code Enforcement E -3 10,000.00 Roemer, Sweeney, Butler & Simeri 200.00 Singer General Tire Co., Inc. 12.50 Sout Bend Water Works 39.33 Xero Corporation 1,093.40 Ha erhill's 101.95 St. incent dePaul Thrift Shop 87.00 LaSalle Park Homes 162.00 Total $ 25,576.13 URBAN REDEVELOPMENT FUND American Society of Planning Officials $ 25.00 A. Ba cho - R -57 complaints. (208 Bendix Dr.) 176.00 Housing Authority, Cityof South Bend 82.75 South Bend Water Works 24.00 Total $ 307.75 REDEV LOPMENT DISTRICT CAPITAL FUND - 1972 North American Signs Louis N. Wilcox 4. OMMUNICATIONS $ 95.00 833.33 Total $ 928.33 Grand Total $ 67,236.64 Clyde E. Williams & Associates letter dated 4- 25 -74: This letter, over the signature of Mr. Edward E. Werley from EPD called our attention to the fact that a different type of brick is be ng used than that called for in the specifications. Mr. H lmen read parts of the letter which indicated truss paving brick is being used to pave the Plaza instead of extruded brick, as called for in the specifications. He asked whether pressed brick is as good as extruded brick and if the guarantee is for only five years what is the status at the end of five years. Dan Akin said that asically, a five -year guarantee on the brick is like a warranty -3- PAVING BRICK PROJECT R -66 4. COMMUNICATIONS (Cont'd I on yo r car - this guarantee is absolute for five years regardless of pr )blems -with replacement at no cost to the 'owners'. Mr. Helmei said he gathered the truss paving is an alternate and he wonde ed whether the alternate was as good as the original. Mr. Akin tated that they have exactly what they intended to get to do this paving and the error (as stated in Mr. Werley's letter) was that EPD did not modify the written specs after selecting an alter ate paver. Mr. Helmen asked "What is the cost "? Mr. Akin stated that we have what was recommended by the joint venture, we do not have a substitute at less cost. Mr. L nnon stated that the specs that were written is what we now have. We have the option to accept the substitute which is equal to or more than what was originally the intent of the specifications. Mr. H linen asked about the difference between extruded and pressed brick Mr. Lennon said that extruded brick comes out of a form - is pu hed out and pressed brick is squeezed out and sliced off. Mr. Helmer asked if we are getting what the specs called for.. Mr. Akin said there is no real problem with the bricks - these are stronger and m (re durable. Mr. Wiggins asked if we are correcting the error of so eone who write the specs and Mr. Lennon said "Exactly ". Mr. Wiggins moved to accept the modification and place letter on file. Mr. Chenney seconded—motion passed unanimously. b. HUD letter dated April 19, 1974: This letter, over the signature of Daniel B. Bowman, Technical Services Branch, related to the wage decision for Project Ind. E -6, copy of the decision was attached. C. Hickey Co., Inc. letter dated April 23, 1974: This letter over he signature of James T. Zakrocki, Project Manager, concerns the lift gate at Walker's Shoes (River Bend Plaza). over Jeffe over Plaza signa advis Water signat Sectio III of WAGE DECISION IND. E -6 WALKER SHOES LIFT GATE R -66 Hickey Co, Inc. letter dated April 24, 1974: This letter JEFFERSON BLVD. e signature of Mr. Zakrocki, concerns extra work to be done on ADD'L WORK on Blvd. R -66 Hickey Co., Inc. letter dated April 25, 1974: This letter, PAVING - PLAZA e signature of Mr. Zakrocki, concerns paving pattern for the R -66 per letter from Hastings Pavement Company). HUD letter dated April 26, 1974: This letter, over the C.O. #3, WATER re of Mark Griffin, Chief, Architectural and Engineering Section, FORCE ACCT. concurrence on Change Order No. 3, Bureau of Water Supply, PHASE III -R -66 orce Account on Phase III, Project Ind. R -66. I. HUD letter dated April 26, 1974: This letter, over the C.O. #10 TO ire of Mark L. Griffin, Chief, Architectural and Engineering CONTRACT #5 - i, advises concurrence on Change Order #10, Contract #5, Phase PHASE III, R -66 Project Ind. R -66. -4- 4. Sig an the and Mr. that anyc figu to H and and wou 1 lots COMMUNICATIONS (Cont'd) h. HUD letter dated April 24, 1974: This letter, over the PHILADELPHIA, iture of James E. Armstrong, Director Revion V, Chicago, advised INC. R -66 )peal for determination regarding "Direct Property Loss" by RELOCATION 'hiladelphia, Inc. had been received from Mr. Theodore E. Poledor CLAIM asked that the entire file on this parcel be forwarded for review. elmen asked how we are going to finalize this. Mr. Lennon stated we have paid relocation claim in the amount of $47,488 - and that e in any area has the right to request a review. We checked our es and found them to be correct so this information was forwarded D and Mr. Poledor then has the opportunity to go over our heads sk for a review. Mr. Helmen asked if we would wind up in court r. Lennon stated that the difference is about $22,000 and it have to be at their expense if we went to court. "We have spent of staff time on this - it`has been going on for about two years.' i. HUD Letter dated May 1, 1974: This letter, over the sig- RE -USE AP- nature of Stephen D. Havens, Director of Operations Division, indicated PRAISALS -A -10 that appraisals for re -use in SE #1, Project A -10, as submitted by SE #1 Messrs. Eckert and Pence, are not acceptable to HUD. Further detail is r quested. Mr. ennon indicated the appraisers will have to go back and do what HUD �as asked, just as they did on a previous unacceptable report. Mr. iggins moved these communications (b) through (i) be accepted and plac d on file. Mr. Chenney seconded, motion passed unanimously. 5. SOLD BUSINESS a. The Frances Shop, Sidewalk Repair - Mr. Lennon stated that there was copy of a report from Dan Akin before the Commissioners, re- garding damage and recommendations for correction. Mr. Akin stated that if this work had been done under the Mall contract and based on pric s we are currently using, ignoring the fact there are heating elements there, the work could have been done for $1,000. H. G. Christman has quoted a price of $4460. and the additional money is probably for damages to heating elements and coloring. Mr. Helmen stated he has a memo indicating heating elements are not important anym re. Mr. Lennon said our concern is that this must conform with the est of the Mall. Mr. Wiggins said Mr. Fischgrund appeared at the ast meeting and said that with the canopy system he did not think heat ng was that vital. Mr. Lennon said that we have Commission approval to try to negotiate a price on what is necessary to complete the work - we say we are not at fault - we are trying to conform with the Plaza, we wish you would have done this last year ". SIDEWALK REPAI FRANCES SHOP R -66 Mr. lelmen asked at what point this work would have to be done without the eating elements in the sidewalk. Mr. Lennon then asked Mr. Akin how uickly we can complete this work if they agree - can it be done in t e next six weeks. Mr. Akin said there would be no problem if Hickey does it. Mr. Wiggins said he was willing to authorize payment of the amou t we would have incurred originally - $1,000, and so moved. -5- 5. Mr. qui acq pro was car Thi sub new of of of thi We Uni cos for of Jun pai tha OLD BUSINESS (.Cont'd) Chenney seconded the motion - motion passed unanimously. b. Resolution No. 479: This Resolution authorizes the ac- RESOLUTION NO. ition of property by condemnation, Parcel #66 -5, concurred in- 479 ADOPTED, isition price of $800, in SE #1, Project NDP A -10. Post ap- A -10, MN #1 al was requested for adoption of this Resolution. Said motion made by Mr. Wiggins, seconded by Mr. Chenney and unanimously ied. C. Change Order #11 to Contract #2, Phase III, R -66: is the Change Order that was approved at the las t meeting, ect to Commission Legal Counsel review. We have come up with language which is rather extensive - -we have a total increase 75,123 and a decrease of $19,428.40 for a net project increase 55,694.60. This includes the Jefferson Street alternate items 35,500. The net increase cost is about $16,194, according to Change Order. Item B was the omission of the bus shelters. tided those back in. Hickey has a labor increase in their n contract after June 1, 1974. We have broken out the labor for the Jefferson Street alternate and propose to pay them the labor cost increase after June 1, prorated on the amount Drk they are unable to complete by June 1. Whatever is done by 1 is under the original contract price. Anything else will be an additional 11.51 per square foot. We are going to assume the electrical work will be done by June 1. Mr. kin said he seriously doubted it would be done - -a lot finished but all. A discussion followed about placement of bus shelters, whether we need all those planned, etc. Mr. Helmen asked how many we are planning on - Akin said "17. Mr. Helmen asked if it was too late to scrap them and Mr. Wiggins said we have scrapped 10. Mr. Helmen asked where they are spotted and it was indicated we are letting the transportation company tell us where to put them. Mr. Helmen asked if i was too late to cancel these shelters - the answer was that it is too late, we have already cancelled 10 of them. Mr, iggins stated that we are going to have some alternates because the us company is already having problems in terms of financing. They have a Federal Capital Grant and can't touch it. Mr, elmen stated that he thought there were plans for four bus shelters along their block of Jefferson Street and he does not think they are necessary, that they have a bus shelter in their building. Mr. ennon said he agrees with Mr. Wiggins, it is too late to cancel and if we can sell them to the bus company..... the Change Order cove ed the 10 that were cancelled. CHANGE ORDER #11, CONTRACT #2, PHASE III, R -66 Kevii Butler stated the third area is supervisory overhead costs Hickey expe is to incur after the end of the original contract, June 25, 1974. Mr, ielmen asked if we have the option to approve or not approve this chap e. Mr. Butler stated we have the option of whether their bid 5. TOLD BUSINESS (Cont'd was valid as accepted by the Commission - we might be put in the position of having to rebid this phase of the Mall work. Mr. Akin statel that it would seem we are too far along for that.. Mr. Butler statel that he agreed, we are too far along. If we were to re- bid, it would be at current prices. Mr. Wiggins suggested we might renegotiate what we have because they have already done some of tho work. Mr. Akin then said that the allowances made for the perio following June 25 are not anywhere near what the actual costs will �e. Mr. B tier indicated we are planning on a day by day basis after June 25, with a maximum of nine weeks over. Mr.. Oesterling told us he feels it cannot run more than three to four weeks over.... and f els they have a good chance of being done by June 25. Mr. Akin aid he also feels they will finish by June 25. Mr. Htlmen asked if it was the consensus of the Board and the Director that his contract work will be done by June 25. Mr. L nnon said that because of pressure by our staff and Dan, they are c operating and are trying to finish - their progress schedule indic tes the work will be complete by June 25. Mr. B tler indicated he had no alternative after going over with Tom and Ken (figur sand working them out himself, but to conclude this is a fair approach. Th only concern we have at all is that they delay unnecessarily. They iave guaranteed us they will not delay. Mr. H lmen asked, "We have no choice in the matter do we ?" and Mr. Butle answered: "As a practical matter, no, we are just changing the langu ge ". 6. NEW BUSINESS Resolution No. 480: This Resolution authorizes the execution RESOLUTION of Redevelopment Agreement for the disposition of land and the exe- NO.480 ADOPTED cution of Quit -Claim Deed for transfer of title to Peter Harvey, Ind. R -57 Project R -57, LaSalle Park, Parcels #7 -2, 3 and 4, selling price of $555. Resolution No. 481: This Resolution authorizes the execution RESOLUTION NO. of the Redevelopment Agreement for the disposition of land and exe- 481 ADOPTED cutiop of Quit -Claim Deed for transfer of title, parcel #7 -5 and 7 -6, R -57 LaSalle Park Project R -57, to H. Williams, A. Brooks and H. Jones, at a sel ing price of $411.00.; and authorizing like documents for dis- posit on of land and transfer of title, parcel #15 -1, LaSalle Park Proje t R -57, to New Salem Missionary Baptist Church, for $749.00. On mo- Resole :ion by Mr. Wiggins, seconded by Mr. Chenney, and carried, itions 480 and 481 were adopted. -7- ZI deta esse sinc woul a "g to v the caus the woul he p NEW BUSINESS (Cont'd) C. Sculpture Placement - River Bend Plaza: Ed Bauer gave a led report concerning placement of the Mooney piece which, in ice, recommended a change in placement site as originally planned the 16' sculpture would have to "fight with" 20' high trees which. I no doubt grow taller and since the artist considers his piece ,teway" or "theme" piece, he felt there was better opportunity ew this sculpture in the area opposite the LaSalle Hotel- in sland. This particular site would be far more impressive and fewer installation problems than the original site, since possible removal of trees in order to properly place the piece I cost $500 per tree, per Dave Burroff. Mr. Bauer indicated !rsonally approved the location change..with supportive arguments. Mr. elmen asked "you plan on moving only one piece, everything else will remain the same, do we agree on this "? SCULPTURE PLACEMENT CHA MOONEY -R -66 Mr. Chenney objected to the move and said he did not believe the artist should have the say of where the sculpture should be placed. Mr. Wiggins moved to approve the change, Mr. Chenney seconded and motion was carried. d. Authority to close out rehab parcel #13 -8, R -57, George H. and Ella Pope: Mr. & Ms. Pope were in attendance at the meeting and here was alengthy discussion during Executive Session - which was nterrupted by the necessity for calling the Regular Meeting to order - discussion resumed following other business. Mr. Timothy Walsh, Attorney for the Popes, made the following comments: "I would like to sum up briefly, there were a number of unfortunate circum- stances here - between the contractor and the owners - the type of workmanship that was done, whether or not the contract terms have been complied with, and that the Popes are now, and have been, living in a home that has not been redeveloped to specifications and there is now a limited amount of funds to cover any additional work because of the cost of construction work today as opposed to when it began. We would recommend to the Department that this matter be submitted to the con- tractor and the inspector and they go over the work with the Popes and see what has to be done, the work that has been done and see if some amicable solution to the problem can be found—this would be our ecommendation to this staff ". Mr. as f time betw If w Dixi Mr. I on tl time elmen asked who we would appoint and Mr. Lennon observed that r as staff time goes, we frankly could not afford to spend more - involving Kevin, Alford.... without a spirit of cooperation en the two parties. There appears to be no way to reconcile this. can serve as a mediating force, fine, otherwise we are "whistling " again. sutler reminded the Commission that basically, the contract period iese rehab projects is sixty days and this should be adequate ...this one has gone on almost three years. Mr. Fahey of Abar REHAB PARCEL #13 -8, R -57 GEORGE POPE 0 NEW BUSINESS (cont'd) stated that they (the construction company) could not get down to the 'nitty gritty" - it "just kept revolving and revolving and got nowhere". Mr. Fahey then said that he knew the Popes are not satisfied and he would be in favor of having someone inspect the work Mr. Helmen asked if the Popes had the house built and Mr. Pope said "No ". Mr. Butler asked whether all the parties would be willing to meet next week with Mr. Ellison and the inspector, at the site and indicated they would have a copy of the specifications and make a determination at that time of what has been done and what remains to be done and come to some agreement. Mr. Helmen then asked that someone be assigned to meet with the interested parties and come back and report to the Commission at the next meeting. Mr. Butler then said the aim would be to have the entire matter completed at the end of this month...with the parties coming to an agreement and Mr. Fahey get on the job by the middle or end of next week. Mr. Ellison asked if someone would be requesting more money for this project and Mr. Lennon stated that we have no other money except what is in escrow at this time.. Mr. Pope said that every time the Department sends someone out to his house, all they get is paper work. Mr. Lennon then asked that Mr. Ellison, the inspector, a representative of th construction company and the Popes get together and we will have full report back to the Commission by the next meeting. e. Award of Demolition and Site Clearance Contract No. 3, NDP A 10, SE #1 and MN #1. Authorization to advertise for this Con- tract was received in Commission Meeting of March 15, 1974. Ad- vertisement appeared in The South Bend Tribune and Tri- County News on March 29 and April 5, 1974. The certification of proofs of publi ation were presented by Mr. Lennon. The bid opening was held Dn May 1, 1974, at 10:00 A.M., E.S.T., in the Department of Redev lopment. Five (5) bids were received out of the eight firms requesting bid documents, publicly opened, as follows: NAME F CONTRACTOR BID AMOUNT Tony omich & Sons $ 9,240.00 1924 Oakland Avenue Joliet. I1 60435 Jacks n Wrecking Co. RR 4, Box 233A Roche ter, In 46975 O'Nea 1104 1 South Trucking Co. I. Donald St. Bend, In 46613 9,220.00 10,820.00 APPROVAL OF AWARD OF DEMO & SITE CLEARANCE CONTRACT #3- A -10 TO: WARNER & SONS V NEW BUSINESS (Cont'd) NAM OF CONTRACTOR BID AMOUNT B & J Demolition Co. $ 9,195.00 4081 E. Ohio Street South Bend, IN 46618 War er & Sons, Inc. 811330.00 P. . Box 87 E1 hart, IN 46514 Mr. Lennon advised that after review, the staff recommendation is for award of the above contract to the low bidder, Warner & Sons, Inc., in bid amount of $8,330.00. Engineer's estimate for this contract was $10,675.63. On n car) Wa rr of 1 are 7. dist proj made publ Sout otion by Mr. Wiggins, seconded by Mr. Chenney and unanimously ied, Demolition and'Site Clearance Contract #3 was awarded to er & Sons, Inc., in bid amount of $8,330.00, subject to approval egal counsel and HUD approval, and the President and Secretary authorized to enter into a contract. PROGRESS REPORTS 1) River Bend Plaza: The May Construction Schedule was RIVER BEND PLA-2 ributed to Downtown Retailers and others on May 1 - with a SCHEDULE - R -6E action of 98% completion by the end of May. Mention was also of the first issue of the River Ben Gazette, the monthly Plaza !cation, which will accompany the Mother's Day issue of the ) Bend Tribune. Mr. ennon indicated the first electrical units will be at Inwood Stor area and proceeding along Western Avenue & Baer's Home OUtfitters. We are putting a small slab in two different areas. We will not remo e any trees. Mr. elmen welcomed Lou Wilcox back from his Louisville trip and asked him im for some observations as to what he has been doing. Mr. Wilcox said he would first like to publicly recognize the positive article Ms. Derbeck did relative to the Plaza. He then said he was very much encouraged after they saw the Louisville operation - the area is 3 blocks long, basically a flat area, the trees have no planter bases, there is very little seeding and few places for people to sit. There were no more than a dozen benches in the whole area. There were two events going on in the Plaza, the U. S. Fife and Drum Corps and a fashion show and "I would estimate that over a period of a couple hours, there were at least 20,000 people there:' will 7. Ka r Wed to hou P1 a int abo and Ano War cit Tor Dow rec PROGRESS REPORTS (Cont'd) I King was along and we agreed the stores looked normal for a iesday. I was impressed with how clean the place was. I talked ;he maintenance group and they have ten people spread over 24 period, five days a week and it was very clean. The other ,a has an interesting financing plan which I would like to get with you gentlemen. The people of Louisville are most enthused it what happens there - the merchants are enthused - I walked up down to observe only six small empty spaces in the three blocks. ;her interesting thing, it's the only town I have seen since World II that has a Kresge's, Grants and McClellans. There were 55 es represented in the Regional Conference - including Honolulu and into, Canada. Ninety some cities belong to the International town Executives Association. As soon as we get some money, I mmend we join this group to be up on what is going on with town planning. I p an to go to Minneapolis later on. They are extending the Nicollet Mal and have plans for 3 more blocks. They have sky walks - presently a dozen to 15 of them and have plans for many more. From the retail standpoint, on the second floors of the buildings, the rental rate was averaging $5.50 a square foot - with the sky walks, they were able to at $7.50 a square foot and the traffic increased to the point whe �ent e the merchants were willing to rent the second floor areas. I ani going to Kalamazoo some time in May - I want to do all of these things before we open. 2) Ft. Wayne Trip. Mr. Helmen explained the Ft. Wayne trip was arranged at the invitation of the Percolator Club - a once a month bre kfast which is attended by about 300 people and they extended an invitation because the downtown area is weak, they have invited us to acquaint them withour program - how we went about it and what progress we are making. The fact that Ft. Wayne is inviting South Bend is a com liment. This is for the record. FT. WAYNL TRIP 3) Traffic re- routing - old South Shore Building. Ms. Janet Allen RE- ROUTING remarked that it was her impression that a couple councilmen are TRAFFIC working on the possibility of routing traffic through the South Shore Building area instead of routing them across to Main Street so they never get the view of the Mall. "That was the thought when the South Shor moved out and I believe it is worth thinking about. Mr. Farrand says this has not yet been decided." Mr. ris elmen said that the Commission could recommend for consideration but this outside their area. 4) GQnvenience outlets -Mall. Mr. Helmen asked about the possibility MALL ELEC. of installing more convenience outlets - whether we will need more power OUTLETS later and perhaps have to dig up concrete etc. to install them. - or will we have to string extension cords or what. Dan Akin said they have specs for one convenience outlet in front of Robertsons, one addi ional in each of the two outside columns. We have the necessary -11- 7. pape 75% remo PROGRESS REPORTS (Cont'd) work and have a price of $1855 for the work - Colip is due f this and Hickey the other 25% for labor because they have to e some Mr. flelmen asked if the program has gone too far to do this and Mr. Akin said "no, it can be done ". Mr. Wiggins thought most anything would use a 110 volt line and Mr. Akin said even the large sculpture uses 110 volts but Mr. Wilcox indicated that two of the first re- quests he has had for power entail the use of 220 volt lines; one of tse was a 1952 vehicle which dispenses hot dogs - he didn't rec what the other request was for. Mr. kin said there are several areas with large junction boxes and Mr. �ilcox indicated he had brought up the above items for the record. Mr. iggins moved to approve this expenditure of $1355. for conven- ienc outlets, seconded by Mr. Chenney and passed unanimously. b. NDP - A -10. Mr. Parrish submitted a report on the project NDP - A -10 PROD. indicating that of the total parcels to be acquired (105), 58 have been deeded to the Department, we have options on 8 parcels, the City of South Bend owns 22parcels and there are 8 in condemnation, makitig a total of 96 parcels in various stages of acquisition and a total of 9 left to be acquired. c. E -7. This project proposal has had first reading in the E -7 Coun it and they put it back in Committee. d. E -3 and E -5. These two projects have been closed out, audit E -3 and E -5 made and completed. For the record, there were no findings made against our epartment in the final audit. (6) �e. E -6 . This project has been going along smoothly, with six E -6 ontracts awarded, for a total of $85,000—there are 36 structures. f. Merry Avenue: Mr. Larry Wartha, Assistant Director of Adminis- MERRY AVE. trat on and Finance, submitted his written report for the monthof Apri , 1974 and update is: Ther is one relocation case remaining, Madison Scott; there are nine cond mnations, three are in settlement stages, and four structures ream n to be demolished. Rehabilitation Re ort. This written report was submitted by M �g. . William C. Ellison, Assistant Director, Operations Division: R -57 The one remaining rehab case in this project is that of Mr. & Ms George Pope and proposed disposition of this case was made in the regular Commission meeting minutes under 6 (d). E -3 One final inspection made. Rehab work in progress at 801 Turnock Street, James and Ina Austin. E -5 t Three remaining rehab jobs. E -6 Twenty -six (26) inspections were conducted during the month in -12 I. .1. 7. IPROGRESS REPORTS (Cont'd . Rehab reports continued: E -6 Code Enforcement Project E -6. Mr. Schlemmer will discontinue making inspections on May 3, 1974 as he is leaving the depart- ment. Three rehab contracts were awarded by the Approval Committee in the following amounts: Contract #4 #5 #6 $13,990.00 13,931.00 12,905.00 $40,826.00 Total amount allocated to date is $85,092.00 for 36 parcels. Four of the six on Contract #1 have been finalled out. The other two are not being worked on at present because of a shortage of materials. Work has started on Contract #2 but the pre- construc- tion conference was delayed for wage decision. Contract #7 has been advertised for bid and Contract #8 is being readied for advertisement early May. . Relocation Progress Report. Ms. Dorothy Howell, Director of Residential Relocation , submitted her written report for the month: Southeast A -10: Workload - 17 cases, ten (10) families, seven 7 individuals. One (1) family moved. Model Cities A -10: Workload - 6 cases, five (5) families, one 1 individual. Indiana R -57: Work load - 1 family, waiting for house they purchased to be vacated. Merry Avenue: Workload - 1 family, move pending. City -Wide: Workload - Nineteen (19) families; one referral re- ceived this month. Model Cities Substandard: Claims for-Extended Services are being approved for residents of Model Cities NDP A -10 area only. Workload - 14 families. Funds are limited and may be needed for another project area. 8. IADJOURNMENT. E -6 REPORT RELOCATION PROGRESS REPORT On motion duly made by Mr. Wiggins, seconded by Mr. Chenney and ADJOURNMENT unan mously carried, meeting adjourned at 11:49 A.M. 9. INEXT MEETING The next meeting of the Redevelopment Commission will be NEXT MEETING -13- 9. NEXT MEETING (Cont'd) at 0:30 A.M., Friday, May 17, 1974, in the Offices of the De- par ment of Redevelopment. es F. Lennor (SEA) r ExecutivqjDirector Fr el en, President -14-