Loading...
HomeMy WebLinkAboutOpening of Bids - Pinhook Park Pavillion Improvements Proj No 118-077B - Rieth-Riley ConstructionA CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK gaaa; Project Name Pinhook Park Pavilion Improvements Project No. 118-077B For Bids Due Tuesday, November 26, 2019 PART I _.. (Must be completed for all bids. Please type or print) Date: 11/26/19 Bidder (Firm). Michiana Contracting Inc Address:. 7843 Lilac Rd, PO Box 929 City/State/Zip: Plymouth, IN 46563 Telephone Number: 574 936-8613 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Pinhook Park Pavilion Improvements Project No. 118-077B the City of South Bend, Indiana, in accordance with plans and specifications prepared by: DLZ Indiana, LLC, 2211 E. Jefferson Blvd., South Bend, IN 46615 and dated 10/28/19 _ for the sum of (enter the Total Bid as shown on the Proposal) Enter sum of HTotA I Base Bid plus Alternate's P�� �� (, s shown on Proposal) Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attac a t. By (Si nature) Scott Kirkpatrick, Presiden. (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Genevieve E. Miller, Member Elizabeth A. Maradik, Member Therese J. Dorau, Member Laura L. O'Sullivan, Member Attest: Linda M. Martin, Clerk Version 4/2/2019 Contractor's Bid for Public Works - 2 Project Name Project No. For Bids Due: Contractor Name: BID/PROPOSAL CITY OF SOUTH BEND Pinhook Park Pavilion ............. --- 118-077B Tuesday, November 26, 2019 Michiana Contracting Inc BASE BID Item Description Quantity Unit Unit Price Total Amount No. 1 Improvements of first floor Public Restrooms Lobby, and Social Hall. 2 Allowance No. 1: Sound System and 1 LS $5,000.00 $5,000.00 --wiring. 3 Allowance No. 2: Ceiling -mounted 1 LS $2,000.00 $2,000.00 . projector__L_� _.......... BASE BID TOTAL rry 1 0 ALTERNATE #1 Item Description Quantity Unit Unit Price Total Amount No. _ 1 Improvements to Kitchen. 00 (o '70, QD 2 Allowance No. 3: kitchen appliances. 1 LS $3,500.00 $3,500.00 ALTERNATE #1 TOTAL�� "- Bidder (Firm): Michiana Contracting Inc Address: 7843 Lilac Rd, Po Box 929 City/State/Zip: Plymouth,IN 46963 Telephone Number: _ By _9d G (Signature) Scott Kirkpatrick, President (Printed Name of Person Signing) Version 4/2/2019 Contractor's Bid for Public Works - 7 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF INDIANA ) SS: MARSHALL COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or iiContractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 4/2/2019 Contractor's Bid for Public Works - 4 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently teams is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundryproducts made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 4/2/2019 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 26th _....... day ofl ovember2019 Michiana Contracting Inc Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Scott Kirkpatrick, President Printed Name and Title Subscribed and sworn to before me this 26th day of November 12019 My Commission Expires _ omU612.1 _ Notary Public County of Residence Marshall Version 4/2/2019 Contractor's Bid for Public Works - 6 Init. SFAIA Documenit A31 - 2�01 0OTM Bid Bond CONTRACTOR: (Name, legal status and address) Michiana Contracting, Inc. P. O. Box 929 SURETY: (Name, legal status and principal place of business) The Cincinnati Insurance Company Plymouth, IN 46563 Cincinnati, OH OWNER: (Name, legal status and address) City of South Beni hoard of Ptibljq,Works County -City Building ltonlaa 1316, 2 ? Wcst LAT6ison Blvd South Bend, IN 46601 BOND AMOUNT: Five Percent of. the Total Bid PROJECT: (Natlte, location, or address, and Project number, iftiny�) Pinhook Park Pavilion Improvements; ProjectNo, 118-077B This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered ( 5% of Total Bid plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, its provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner arid Contractor, and Ilac Contractor either (l) enters into a contract with the Owner in accordance withthe terms of such bid, and gives such bond or'bonds as may be specified in the bidding, or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner,`for the faithfal performance of such Contract and for flee prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 21st day of November 2019 AtA Document A31011" — 2010, Copyright 01963,1970 and 2010 by The American Institute of Archtects. All rights reserved,' A kfMM TlAs AIA" Doc uraaemat !is pi ofected I11�r,y tU,D, Coll!uyrmght IlLaw and IntemafUonW f ueaates. Unauthorized mlopooduuckion rrr aUlarfrUbWiwi of''96s Arc iym"ma. nuent, or any III'uoii'Uon of K11 iray w°esumllf Iirm severe ciiisiilll and rrmmgnM peu aHleo, aind MH I°umm Ip imseauted to the mmrael min extent possible a indem° the Aaw Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org, 061110 Fairfield, Ohio POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That THE CINCINNATI INSURANCE COMPANY, a corporation organized under the laws of the State of Ohio, and having its principal office in the City of Fairfield, Ohio, does hereby constitute and appoint Mark E. Wobbe; Barbara E. Pearson; Nicole L. Bicknell; Jennifer L. Kasznia; William J. Cerney, III; Wesley L. Mantooth; Jordan M. Scheiber; Sandra L. Junk; Theresa M. Burns; Megan E. Riesenberg and/or Cheryl E. Alkire of South Bend, Indiana its true and lawful Attomey(s)-in-Fact to sign, execute, seal and deliver on its behalf as Surety, and as its act and deed, any and all bonds, policies, undertakings, or other like instruments, as follows: Any such obligations in the United States, up to Thirty Five Million and No/100 Dollars ($35,000,000.00). This appointment is made under and by authority of the following resolution passed by the Board of Directors of said Company at a meeting held in the principal office of the Company, a quorum being present and voting, on the 6", day of December, 1958, which resolution is still in effect: "RESOLVED, that the President or any Vice President be hereby authorized, and empowered to appoint Attorneys-m- Fact of the Company to execute any and all bonds, policies, undertakings, or other like instruments on behalf of the Corporation, and may authorize any officer or any such Attorney -in -Fact to affix the corporate seal; and may with or without cause modify or revoke any such appointment or authority. Any such writings so executed by such Attorneys -in - Fact shall be binding upon the Company as if they had been duly, executed and acknowledged by the regularly elected officers of the Company." This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of the Company at a meeting duly called and held on the 7" day of December, 1973. "RESOLVED, that the signature of the President or a Vice President and the seal of the Company may be affixed by facsimile on any power of attorney granted, and the signature of the Secretary or Assistant Secretary and the seal of the Company may be affixed by facsimile to any certificate of any such power and any such power of certificate bearing such facsimile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed and certified by certificate so executed and sealed shall, with respect to any bond or undertaking to which it is attached, continue to be valid and binding on the Company." IN WITNESS WHEREOF, THE CINCINNATI INSURANCE COMPANY has caused these presents to be sealed with its corporate seal, duly attested by its Vice President this 86 day of March, 2017. THE CINCINNATI INSURANCE COMPANY CORPORATE SEAL Vice President STATE OF OHIO ) ss: COUNTY OF BUTLER ) On this 81, day of March, 2017, before me came the above -named Vice President of THE CINCINNATI INSURANCE COMPANY, to me personally known to be the officer described herein, and acknowledged that the seal affixed to the preceding instrument is the corporate seal of said Company and the corporate seal and the signature of the officer were duly affixed and subscribed to said instrument by the authority and direction of said corporation. 1 vv0t "��✓,.� e MARK J. H LEER, Attorney at Law CrI py"" NOTARY PUBLIC - STATE OF OHIO *� My commission has no expiration Ir ri,,,a1� date. Section 147.03 O.R.C. I, the undersigned Secretary or Assistant Secretary of THE CINCINNATI INSURANCE COMPANY, hereby certify that the above is a true and correct copy of the Original Power of Attorney issued by said Company, and do hereby further certify that the said Power of Attorney is still in full force and effect. GIVE.N trn&r nary hand and scal of ^grid Company at Fairfield, Ohio. this I ,,>/_ day of CORPORAT SEAL i OHIO BN-1005 (3/17) Secretary 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAx 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: November 15, 2019 ww To: All Planholders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: Pinhook Park Pavilion Improvements Project Number: 118-077B Date Received: 11/15/19 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy bid package upon submittal. MUST also be included with your THIS ADDENDUM MAY AFFECT YOUR BID. Notes: mows The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Michiana Contracting Inc Scott Kirkpatrick, President Authorized Signature: `... Date: 11 /15/19 Version 4/2/2015 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 A., P� 1Y M PHONE 574/235-9251 FAx 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: November 22, 2019 To: All Plan_holders From Linda M. Martin, Clerk Board of Public W ........ orks ITITITITITmm. Subject Addendum Number: 2 Project Name: Pinhook Park Pavilion Improvements Project Number: 118-077B ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 11/22/19 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy ;MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Michiana Contracting Inc Authorized Signature: Scott Kirkpatrick, President Date: �1 22119 Version 4/2/2015 1316 COUNTY —CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS December 28, 2018 Mr. Scott Kirkpatrick Michiana Contracting, Inc. 7843 Lilac Rd., PO Box 929 Plymouth, IN 46563 RE: Pre -Qualification Verification Dear Mr. Kirkpatrick: PHONE 574/235-9251 FAx 574/235-9171 This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, .. µ Linda M. Martin, Clerk GARY A. GILOT DAVID P. RELOS ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU W G w _N R ag ga W CO w0 a a Oiz CO)CW G 0 m 0IL v2w 0w z ar F- 0 z E z 0 O ~ �a m� C�a c W m 0 a w m N O c ;a d m E =. O ;� m0 M 111 CCO W G m la CO WC.' O O r+ > O C U N - V O 41 � Q O d o. w Y aN+ `o 0 0 0 IL N m � r o 0 3 o� m o O aT+ � L r E C �m r+ r Ln C. >� m !C rL+ 4) N t m s r 3 d > a° O. N =_ d � � N 0 0 O. O N t N � E m r0+ d r d � N O'� 7 0 t 0 N N C H = O O O 0 m r0 V w m CO CU d w 00 N c d E d > O CL I IL � Y 0 IL Q O O _m C � E c0 z U aD d U Z rn c U cu c 0 00 0 ti N c O •m OD L U m CL U) m -o 0 d d) aCD (_ O T ON oTL � L N 8-6 CX L) U m a _ a o L U O_ m N C N of U NCo E? M w m w m O U) 5D Q N E m z N 2) N E co z a_ 00 .z PROJECT NAME: PINHOOK PARK PAVILION IMPROVEMENTS ADDENDUM NO. 1 Date: November 15, 2019 To: All Plan Holders From: Linda M. Martin, Clerk of the Board of Public Works Included in this addendum are the following documents. ATTACHMENTS 2019-11-14 Pre -Bid Conference Agenda 2019-11-14 Pre -Bid Conference Minutes and Sign -In Sheets You must acknowledge receipt of this addendum by signing the first page, returning it via facsimile to (574) 235-9171, and a copy of the first page must be included with your bid. — This addendum consists of a total of 11 pages — Version 4/2/2019 118-077A Pinhook Park Site Improvements & 118-077B Pinhook Park Pavilion Improvements November 14, 2019 10:00 A.M. (Local Time) I. Welcome and Introductions Sign -in Direct all questions, in writing, during bidding: Alicia Czarnecki, Project Engineer for South Bend Public Works, aczernec southbendin. ov Questions due by 5:00 p.m. (Local Time) Thursday, November 21 s', 2019 Final Addendum will be issued on Friday, November 22nd, 2019 Project Overview 118-077A Pinhook Park Site Im rovements A. Work includes construction of site improvements including but not limited to asphalt trail, playground, trailhead, boat and kayak launch, concrete sidewalks, crosswalks, and landscaping at Pinhook Park (2801 Riverside Drive) in South Bend. B. The Base Bid covers all items according to the intent of the Plans and Specifications except as listed below: 1. Add Alternate 1 — Overlay of East Perkin Lot: Prepare asphalt surface including; mill parking lot and remove pavement as indicated in plans. Reconstruct parking lot as indicated, overlay parking lot, apply pavement markings and install signage as indicated on plans. 2. Add Alternate 2 —Boat Launch Parkin Lot: Prepare asphalt surface, including crack repair and apply liquid asphalt treatment per special provision. Pavement markings and signage within this area are to be included in the Base Bid. 3. Add Alternate 3 - South Fishing Pier: Construct sidewalk connection from trail, furnishings, concrete abutment, gangway, and floating pier system as indicated on plans. 4. Add Alternate 4 Picnic Loop: Construct Line G in its entirety, and Line D from Station 10+00 to Station 14+27, and connection to parking lot, including removals, earthwork, trail, pavement markings, signage, trees, sedge/perennial mix area and seeding. Construct 2 concrete pads for future picnic tables within lawn area. 5. Add Aiternate 5 — West Connector: Construct Lines E and F in their entirety, and Line A from Station 10+00 to Station 12+25, including removals, earthwork, trail, pavement markings, signage, trees, sedge/perennial mix area, and seeding. 6. Add Alternate 6 — Playground Swincl Expansion: Construct expanded playground surfacing area as shown on plans to encompass swing component, including earthwork, base materials, procurement and installation of swing component, surfacing, 1 log bench and seeding. (Note: Flush concrete band will be eliminated at interface of base bid and alternate surfacing areas. See plan enlargement.) 7. Add Alternate 7 — BolandDrive Extension: Construct Line C in its entirety, including removals, earthwork, trail, pavement markings, signage, trees, and seeding. 118-077B Pinhook Park Pavilion Improvements A. Work involves interior renovation of the existing pavilion at Pinhook Park (2801 Riverside Drive) in South Bend. B. The Base Bid covers improvements to the first floor Public Restrooms, Lobby, and Social Hall according to the intent of the Plans and Specifications except as listed below: 1. Alternate 1 _.. Interior improvements to the Kitchen Ill. Schedule 118-077&Pinhook Park Site Improvements A. The project will have a substantial completion date of July 15, 2020, and a final completion date of July 31, 2020. Exclusive of seeding and planting which shall occur such that planting can occur within seasonably appropriate window, with planting completion of September 30, 2020. B. Contractor shall provide a schedule to Owner prior to beginning any work on the site: 1. When developing project schedule, Contractor shall prioritize completion of playground, trailhead, and trail work east of the boat launch parking lot/access drive prior to beginning work on west half of Pinhook Park. 2. Stabilization of project site (fine grading, seeding, erosion control, etc.) shall occur in phases as areas are completed as noted in the plans. 3. As contiguous areas are completed, Contractor and City shall determine whether and when these areas may be opened to the public. 4. Construction of boat launch shall be scheduled within seasonally appropriate window for lower water levels. 5. Include a Site Utilization Plan showing temporary facilities and/or utilities, staging areas, construction site entrances, vehicle circulation, and parking areas for construction personnel and any proposed phasing of said facilities or routes. C. Project work for Pinhook Park Pavilion Improvements 118-077B will be ongoing until approximately March 31, 2020. Contractors to coordinate access as required to share staging space in upper east lot. D. The Park shall remain partially open throughout construction. Minimum access shall be maintained as follows: 1. Angel of Hope: Shall remain open, including drive and parking access, except when trail immediately adjacent is under construction, throughout duration of construction. 2. Pinhook Pavilion: Shall remain open, including upper/east lot drive access to existing accessible parking spaces from completion of work on City Project 118-077B (anticipated March 2020) through end of construction. 3. Boat Launch: Shall remain open, including parking lot, except as required for construction of new launch and any improvements within the lot itself, throughout duration of construction. E. Liquidated Damages - $500/ calendar day — Special Provisions Section XVI.B.2 F. The owner must be notified 10 business days prior for any deviations in the agreed upon schedule or methods. 118.077 Pinhook Park Pavilion Improvements A. The project will have a substantial completion date of March 15, 2020, and a final completion date of March 31, 2020. B. Project work for Pinhook Park Site Improvements 118-077A will begin in Spring 2020. Contractors to coordinate access as required to share staging space in upper east lot. C. Liquidated Damages - $500/ calendar day — Special Provisions Section XVI.B.2 D. The owner must be notified 10 business days prior for any deviations in the agreed upon schedule or methods. IV. Work Within Utility Easement 118-077A Pinhook Park Site Improvements A. Contractor shall follow the guidelines in Special Provisions Section XXIV during all work within the AEP easement on the project site. If any Contractor has any concerns during the course of work, immediately notify Owner and Engineer so that AEP may be contacted for guidance. V. Bidding Overview A. Plans and Specifications 1. The Contract Documents are on file and available for public inspection commencing on the first advertise date during regular working hours at the Department of Public Works (1316 County -City Building, South Bend, Indiana), and at MACIAF 3215-A Sugar Maple Court, South Bend, IN 46628. Additionally, the Contract Documents will be available that same day for inspection or purchase at American Reprographics Company ("ARC", located at 1303 Northside Blvd., South Bend, Indiana, 46615), http://www.e-arc.com, (574) 287-2944, toll free at (800) 783-7231. There will be a non-refundable charge for reproduction as set by ARC for every set of documents for all bidders. B. Bid Requirements 1. Bids must be on the City of South Bend Contractor's Bid for Public Work Form, accompanied by a Certified Check or Bid Bond in the amount of not less than five percent (5%) of the bid total, in a sealed envelope noting the project name, number and your company's information on the front. 2. Acknowledgement of receipt of any Addendum must be included in bid submission. a. Addenda will be published on the ARC website. 3. MWBE Forms must be completed, signed, and handed in with the bid submission. These forms are shown in the bid proposal, Contractor's Bid for Public Works, sheets 4 — 6. 4. A checklist for bidders is included in the Contractor's Bid for Public Works, sheet 1. The Responsible Bidder checklist is located in General Conditions, sheets 6-10, and will need to be completed in its entirety for the contractor to be eligible for award. 5. Bids are due at the Office of the Board of Public Works, County -City Building Room 1316, 227 West Jefferson Blvd, South Bend, Indiana, 46601 until the hour of 9:30 a.m., Local Time, on November 26th, 2019. C. Award of Bid 1. The anticipated bid award date is December loth, 2019. Bids remain subject to acceptance for sixty calendar days after bid opening. 2. Upon award, the successful Bid provider shall supply the following bonds a. i ayrment Bond within seven (7) days of the Notification of Award for an amount equal to one hundred percent (100%) of the contract amount. b. Performance Bond, within seven (7) days of the Notification of Award for an amount equal to one hundred twenty-five percent (125%) of the contract amount. c. Maintenance bond within ten (10) days of acceptance of the project by the City of South Bend, for an amount equal to ten percent (10%) of the final contract price, guaranteeing for a period of three (3) years after the date of acceptance of the project by the City of South Bend. 3. Payments for work completed during this project will be made every thirty (30) calendar days. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. 4. Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. VI. Comments by Department of Public Works A. Tree Protection — see Special Provisions Section XXX VII. Contractor Questions 9DLZ ARCWTECT URS. -ENO I MEN I KO-'ELANNMO SURVEYING -CONSTRUCTION SERVICES INNOVATIVE IDEAS EXCEPTIONAL DESIGN UNMATCHED CLIENT SERVICE MEETING MEMORANDUM MEETING DATE: 11/14/2019 DATE: 11/14/2019 CLIENT: City of South Bend WRITTEN BY: Sara Hicks PROJECT: Pinhook Park Site Improvements (118-077A) Pinhook Park Pavilion Improvements (118-077B) PROJECT #: 1861-1578-90 LOCATION OF MEETING: Pinhook Park Pavilion (2801 Riverside Dr.) PURPOSE OF MEETING: Pre -Bid Conference ATTENDED BY: See Attached Sign -In Sheets DISCUSSION: I. Welcome and Introductions —All parties signed in and introduced. Project contact and deadlines shared as shown on agenda. II. Project Overview — Description of work and breakdown of alternates reviewed for both projects as shown in agenda. III. Schedule — Project deadlines and related staging, coordination, and access requirements were reviewed as shown in agenda, including liquidated damages and schedule changes for both projects. IV. Work Within Utility Easement — AEP easement bisects the northern edge of the park and City emphasized need to follow AEP guidelines as outlined in agenda and special provisions. If any clarifications are required, submit to Alicia prior to deadline for questions. V. Bidding Overview — Availability of documents, bid requirements, and process for award of bid were reviewed as included on agenda. VI. Comments by City/DLZ Tree protection is very important on this project due to the nature of the park and the mature tree canopy. Tree protection provisions should be followed be Special Provisions Section XXX. VPA encouraged contractors to take care to minimize soil compaction within all areas, particularly outside of work zone areas. Staging is located to occur mainly on paved surfaces to limit compaction. The VPA has scheduled events including a large Renaissance Fair scheduled later in 2020. It is important to plan schedule to accommodate these events and have as much of the park available for use as possible. DLZ 2:211 E Jefferson E4lvd, South Bend, IN 46615-2692 II 0II:7IICE" 574,,236.4400 II 01MII..IIINHE WWW.D1LZ,C0M .Akron Rtr:IIEGanratatlrne Bvidgemr ift Buons Harbor Chicago CIrndunNaaU aevOarnd Colu nibus Detroit NR rlt Fort WaV nR IndWnna poB JoHlla;t Ka0arnmazoo Laurfd nq N..r Anytesrn L&9anl Wrs en MaadI,Orn MMrrlrcnwWe Munster Muskegon Pittsburgh POYI Itsrrenun saoM JosepSN SoutlhBend 'rt'asWdo Waterford PROJECT NAME: PINHOOK PARK PAVILION IMPROVEMENTS ADDENDUM NO.2 Date: November 22, 2019 To: All Plan Holders From: Linda M. Martin, Clerk of the Board of Public Works The following BID/PROPOSAL page and/or plan/detail is to be added/changed within the contract documents. The information contained in this Addendum shall become a part of the drawings and specifications the same as if originally incorporated therein. The original drawings and specifications dated October 28, 2019, as prepared by DLZ Indiana, LLC, shall remain in their entirety, except as modified by this Addendum. The items herein shall supersede information in the specifications and on the drawings. Plans Sheet Number Action E2.1 Added new dedicated circuit for garbage disposal in Concessions Rm. Updated Panel Schedule to clarify existing vs. new circuit breakers. Part Number, symbol and keynote updated for exit signs. Corrected error in Light Fixture Schedule for Fixture A2. Updated note for overhead projector outlet. Added General Electrical Notes V and W. Updated note for new IT rack. The attached BID/PROPOSAL page(s) replaces the original page or plan/detail change where noted. A FULL AND COMPLETE COPY OF EACH CORRECTED PAGE IS ATTACHED TO THIS ADDENDUM. You must acknowledge receipt of this addendum by signing the first page, returning it via facsimile to (574) 235-9171, and a copy of the first page must be included with your bid. — This addendum consists of a total of 3 pages (2-8.5x11, 1 full size plan sheet) — Version 4/2/2019 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. Attached. 2. Attach a listing of public works projects currently in process of construction by your organization. Attached. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. Attached. 4. Attach references from private firms for which you have performed work. Attached. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) Attached. 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. Attached. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. Listing will be provided upon request prior to contract approval. 4. Attach a listing of equipment you have available to use for the proposed project. Attached. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. Yes. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 4/2/2019 Contractor's Bid for Public Works - 3 MICHIANA CONTRACTING, INC FORM 96, SECTION II, QUESTION 2, SUBCONTRACTOR LISTING A.HATTERSLEY & SONS INC PO BOX 5366 A+ PLUMBING, HEATING, COOLING 9595 TYLER ROAD A-1 DOOR SPECIALITIES INC PO BOX 202 A-1 STRIPING SERVICE INC 56825 SPIREA ROAD ABELL ELEVATOR INTERNATIONAL 1256 LOGAN STREET ABSOLUTE CONSTRUCTION & DESIGN 3535 W SHORE DRIVE ACCULEVEL ACCURATE STRIPING INC AFFORDABLE AWNING & CANVAS AIRMARKING CO, INC ALL CITY ELECTRIC, INC. ALLIED CONSTRUCTION SERVICE ALLIED WINDOW INC AMERICAN EAGLE TREE SERVICE 9495N WALDRON RD PO BOX 35 2545 UNION ROAD PO BOX 526 2747 FREEMAN STREET 2293 BUNCHBERRY CT 11111 CANAL ROAD 455 S.R. 261 ARNT ASPHALT SEALING INC 1240 SOUTH CRYSTAL AVENUE ARTISIAN INDUSTRIAL METALS INC 6600 ARTISAN WAY ARTIZAN FLOORING 14493 LINCOLN HWY, STE D ATLANTIC CONSTRUCTION COMPANY 4226 ALLMOND AVENUE BEER & SLABAUGH, INC. 23965 US 6 EAST BERTSCH-FRANK & ASSOCIATES 4630 W JEFFERSON BLVD #6 BLANKENBEKER & SONS LAND SURV. 618 E COURT AVENUE BLUE PRINCE INC 317 E MARION BROUWER'S CARPET & FURNITURE 333 E CENTER ST. EXT. BURNS CORPORATION C & S DRYWALL INC C&E EXCAVATING CENTRAL PAVING INC CERTIFIED FLOOR COVERING INC CERULEAN PAINTING, INC. CLASSIC TURF CLEAN AIR CORPORATION PO BOX 136 50783 COBUS RIDGE LANE 53767 COUNTY ROAD 9 PO BOX 357 5150 W 84TH ST 4000 WEST 106TH ST, SUITE 125-418 437 SHERMAN HILL RD PO BOX 3053 CLEAN AIR ENVIRONMENTAL SERVICE PO BOX 314 CLINTON KORFHAGE LANDSCAPING 1823 HEATON ROAD COMFORT CARPETS, INC. 3120 N. HOME ST CONCRETE CONTRACTING SOLUTIONS 754 S FRONT STREET COUNTERTOP SHOPPE INC 505 W JEFFERSON ST CRANE INDUSTRAIL SERVICE CO IN 11035 ANDERSON ROAD CULVER ROOFING, INC 4050 WEST 4TH AVENUE CUSTOM AWNING 1251 THIRD STREET CUSTOM FENCING, INC. 28445 450W CUSTOM MILLWORK & DISPLAY INC 2102 W WASHINGTON STE 1 D.A. DODD LLC 14 E. MICHIGAN, PO BOX 430 DEMUYT MASONRY INC 3107 E NORTHPORT ROAD DESCO FLOOR SYSTEMS 1851 E BROADWAY FORT WAYNE, IN 46895 BREMEN, IN 46506 NEW HAVEN, IN 46774 NEW CARLISLE, IN 46552 LOUISVILLE, KY 40204 BREMEN, IN 46506 ROSSVILLE, IN 46065 YORKTOWN, IN 47396 WALKERTON, IN 46574 ROCHESTER, IN 46975 FORT WAYNE, IN 46802 LAFAYETTE,IN 47905 CINCINNAIT, OH 45241 BOONVILLE, IN 47601 BENTON HARBOR, MI 49022 LOUISVILLE, KY 40228 PLYMOUTH, IN 46563 LOUISVILLE, KY 40209 NAPPANEE, IN 46550 FORT WAYNE, IN 46804 JEFFERSONVILLE, IN 47130 MISHAWAKA, IN 46545 WARSAW, IN 46582 HAGERSTOWN, IN 47346 GRANGER, IN 46530 ELKHART, IN 46514 LOGANSPORT, IN 46947 INDIANAPOLIS, IN 46268 CARMEL, IN 46032 WOODBURY, CT 06798 SOUTH BEND, IN 46619 NORTH LIBERTY, IN 46554 LOUISVILLE, KY 40216-2827 MISHAWAKA, IN 46545 COLUMBUS, OH 43206 PLYMOUTH, IN 46563 GRANGER, IN 46530 GARY, IN 46406 OSCEOLA, IN 46561 WARSAW, IN 46580 SOUTH BEND, IN 46628 ROLLING PRAIRIE, IN 46371 ROME CITY, IN 46784 FORTVILLE, IN 46040 1 MICHIANA CONTRACTING, INC FORM 96, SECTION II, QUESTION 2, SUBCONTRACTOR LISTING DON MARK FENCE CONTRACTOR 6325 QUEEN ROAD PLYMOUTH, IN 46563 DTH CONTRACTORS LLC 1112 CLAY ST MISHAWAKA, IN 46545 DYNAMIC AUDIO SOLUTIONS 2308 CORAL BAY COURT FORT WAYNE, IN 46814 E & B PAVING 310 BLACKETOR DRIVE ROCHESTER, IN 46975 ECLIPSE MASONRY 600 N 653 E KOKOMO, IN 46901 EDWARD J. WHITE INC 1011 S MICHIGAN ST SOUTH BEND, IN 46601 ESHELMAN EXCAVATING 5999 E US HWY 6 KENDALLVILLE, IN 46755 EXTREME CLEAN 54855 HOLLYWOOD BLVD SOUTH BEND, IN 46628 FINAL TOUCH PAINTING 2014 BLUE SPRUCE CIRCLE WARSAW, IN 46580 FIRE BARRIERS LLC PO BOX 455 COLUMBIA CITY, IN 46725 FORSEY CONSTRUCTION INC 2018 IRONWOOD CIRCLE SOUTH BEND, IN 46635 FORT WAYNE REINFORCING INC 4483 COUNTY ROAD 19 AUBURN, IN 46706 FOWLER FINISHES, LLC 2035 W 700 N ROCHESTER, IN 46975 FUERBRINGER LANDSCAPE DESIGN 22539 BRICK ROAD SOUTH BEND, IN 46628 GARCIA CONCRETE CONST., INC 2316 SOUTHYARD COURT FORT WAYNE, IN 46818 GAUNT & SON ASPHALT, INC 5511 WEST OLD 24 WABASH, IN 46992 GRIFFEN PLUMBING & HEATING 2310 TOLEDO ROAD ELKHART, IN 46516 GYPSUM FLOOR SYSTEMS INC 63700 CR 31 GOSHEN, IN 46528 HASKINS UNDERGROUND INC 8111 9B ROAD PLYMOUTH, IN 46563 HENSLEY & SON INC. 9206 15TH ROAD ARGOS, IN 46501 HINSHAW ROOFING & SHEET METAL PO BOX 626 FRANKFORT, IN 46041-0636 HIS CONSTRUCTORS INC 5140 E 65TH STREET STE B INDIANAPOLIS, IN 46220-4817 HOOSIERLAND EXCAVATING 18941 NEW ROAD SOUTH BEND, IN 46614 HRP CONSTRUCTION PO BOX 266 SOUTH BEND, IN 46624-0266 HYDRO - TEK SEEDING, INC. 26428 COUNTY ROAD 52 NAPPANEE, IN 46550 INDIANA EARTH, INC. 10343 MCKINLEY HIGHWAY OSCEOLA, IN 46561 INDIANA SIGN & BARRICADE INC 5240 E 25TH STREET INDIANPAPOLIS, IN 46218 INDIANA TRAFFIC SERVICES INC 3867 NORTH COMMERCIAL PARKWAY GREENFIELD, IN 46140 INTERIOR FINISHES INC 3601 W. MCGILL ST SOUTH BEND, IN 46628 J & R SEAMLESS GUTTERS 16160 LINCOLN HIGHWAY PLYMOUTH, IN 46563 J.A. REKE & SONS PO BOX 298 EATON, OH 45320 JBT AEROTECH, JETWAY SYSTEMS 1805 WEST 2550 SOUTH OGDEN, UT 84401 JEFFREY COOPER PAINTING INC. 18322 COUNTY ROAD 18 GOSHEN, IN 46528 K & S ENGINEERS, INC 9715 KENNEDY AVENUE HIGHLAND, IN 46322 L.L. GEANS CONSTRUCTION CO 1905 ELDER ROAD MISHAWAKA, IN 46545 LANGFELDT EXCAVATING LLC 11126 LINCOLN HWY E PLYMOUTH, IN 46563 LAPORTE CONSTRUCTION CO., INC PO BOX 577 LAPORTE, IN 46352 LEE COMPANY, INC 27 S 12TH ST TERRE HAUTE, IN 47807-3901 LEISURE POOL & SPA SUPPLY 1405 N INDIANA AVE SYRACUSE, IN 46567 LEMASTER STEEL ERECTORS 53518 COUNTY ROAD 9 ELKHART, IN 46514 LOOKIN' GOOD CONSTRUCTION INC PO BOX 260 NEW CARLISLE, IN 46552 MARCE'S DRYWALL 632 S LAKE ST WARSAW, IN 46582 MARSHALL COUNTY GLASS CO., INC 7501 N. MICHIGAN ST PLYMOUTH, IN 46563 MARSHALL ROOFING & SIDING 1727 HIGH ST LOGANSPORT, IN 46947 MCGRATH REFRIGERATION INC 2520 S US HWY 35 KNOX, IN 46534 2 MICHIANA CONTRACTING, INC FORM 96, SECTION II, QUESTION 2, SUBCONTRACTOR LISTING MCMILLAN INTERIORS MICHIANA CONTRACTING MIKE'S TREE SERVICE INC MILLWOOD ROOFING & CONST. INC MOORE'S CONCRETE INC MORRIS & SONS ROOFING INC NATIONAL CONSTRUCTION RENTALS NIBLOCK EXCAVATING NORTH CENTRAL MECHANICAL INC OVERHEAD DOOR P & S CONCRETE, LLC PEYTON'S BARRICADE & SIGN CO PHEND AND BROWN PRATT'S FLOOR INC PRECISION PAINTING & DECOR PREMIER COMMUNICATION PREMIUM CONCRETE SERVICES PRICE NURSERIES PROJECT DESIGN & PIPING INC QUALITY PLUMBING & HEATING R. YODER CONSTRUCTION RACQUET SPORTS INC. RAINY DAYS GUTTERING PO BOX 133 PO BOX 929 4891 SOUTH 300 WEST 1176W800N PO BOX 509 208 E QUAD ST PO BOX 4503 PO BOX 211 1721 N CEDAR ST STE 1 58745 EXECUTIVE DRIVE 10995 3B ROAD PO BOX 1294 367 E 1250N, PO BOX 150 PO BOX 827 19201 PIERCE ROAD 902 INCENTIVE DRIVE 712 RICHMOND ST 7880 KING ROAD 3615 TRANSPORTATION DRIVE 120 E MCKINLEY ST, PO BOX 428 PO BOX 69 5850 COMSTOCK PARK 2921 5TH ROAD RAY NOLAN ROOFING COMPANY INC 4606 ILLINOIS AVENUE RIATA RESTORATION LLC 56740 CR 35 RIETH RILEY CONSTRUCTION CO. PO BOX 477 ROADSAFE EVANSVILLE 3122 OLYMPIA DRIVE ROADSAFE HOLDING 3519 HARDING ST ROSEMA CONSTRUCTION INC PO BOX 8949 ROSS MASONERY, INC ROYAL CUSTOM PAINTNG LLC SANTAROSSA MOSAIC & TILE CO SCHEURICH INC SCHNDLER ELEVATOR CORPORATION SHAMBAUGH & SONS LP SHIRLEY ANN CLEANS SIMON CEILINGS & FRAMING SKYLINE ROOFING & SHEET METAL SLUSSER'S GREEN THUMB SMITH ERECTORS INC SOLID PLATFORMS INC SPECIALTIES COMPANY LLC STAR FLOORING CORPORATION STEVE'S CARPET SERVICE INC STONECREEK INTERIOR SYSTEMS 20750 ROOSEVELT ROAD ATWOOD, IN 46502 PLYMOUTH, IN 46563 HUNTINGTON, IN 46750 MILFORD, IN 46542 LAKEVILLE, IN 46536 BOURBON, IN 46504 PACOIMA, CA 91333-4503 BRISTOL, IN 46507 MISHAWAKA, IN 46545 MISHAWAKA, IN 46544 PLYMOUTH, IN 46563 JEFFERSONVILLE, IN 47130 MILFORD, IN 46542 PLYMOUTH, IN 46563 LAKEVILLE, IN 46536 FORT WAYNE, IN 46825 ELKHART, IN 46516 PLYMOUTH, IN 46563 FORT WAYNE, IN 46818 BUNKER HILL, IN 46914 NAPPANEE, IN 46550 COMSTOCK PARK, MI 49321 BREMEN, IN 46506 LOUISVILLE, KY 40213 MIDDLEBUR, IN 46540 GOSHEN, IN 46526 LAFAYETTE,IN 47909 INDIANAPOLIS, IN 46217 FORT WAYNE, IN 46898 SOUTH BEND, IN 46614 1851 E SOUTHWAY BLVD, PO BOX 500 KOKOMO, IN 46902 2707 ROOSEVELT AVE, PO BOX 18190 INDIANAPOLIS, IN 46218 1008 N 6TH STREET MONTICELLO, IN 47960-0 PO BOX 70433 CHICAGO, IL 60673-0433 7614 OPPORTUNITY DRIVE FORT WAYNE, IN 46825 PO BOX 73 KNOX, IN 46534 28830 NEW ROAD NORTH LIBERTY, IN 46554 3060 W. MINNESOTA ST INDIANAPOLIS, IN 46241 125 MONTGOMERY ST, PO BOX 33 PO BOX 168 6610 MELTON ROAD 9350 E 30TH ST 1515 STAR SCHOOL ROAD 11011 S MICHIGAN ROAD 7603 GREEN MEADOWS DRIVE LOGANSPORT, IN 46947 MARKLE, IN 46770 PORTAGE, IN 46368 INDIANAPOLIS, IN 46229-1075 HASTINGS, MI 49058 PLYMOUTH, IN 45452 LEWIS CENTER, OH 43035 c� MICHIANA CONTRACTING, INC FORM 96, SECTION II, QUESTION 2, SUBCONTRACTOR LISTING SUPERIOR FIRE & WATER FULL RES SUPERIOR INSULATION CO TEMPLE & TEMPLE EXCAVATING THE ART MOSAIC & TILE COMPANY THE DRYWALL DOCTOR INC THE GIRL'S THING THOMAS EXCAVATING & WELDING THYSSENKRUPP ELEVATOR PO BOX 200 2500 LEAF DRIVE 1367 SOUTH STATE ROAD 60 PO BOX 569 PO BOX 778 17845 MAIN ST, PO BOX 97 17643 16th Road 2726 E KEMPER ROAD TR CONCRETE CONSTRUCTION, INC 11133 SHADYLAND DR TRAFFIC CONTROL SPECIALISTS IN 1810 W. PACIFIC AVE. TRIANGLE WINDOW FASHIONS, INC. 2625-A BUCHANAN AVE SW TRUITT CONSTRUCTION INC 13793 ERDMAN RD VANADCO SIGNS 10625 ST RD 10 VIDA PLUMBING & HEATING INC 52007 Plantion Drive W.G. BRUDNEY CONST., LLC WATER WORKS LLC WAYNE ASPHALT & CONSTRUCTION WENDT CRANE & RIGGING WOLF COMMERCIAL ROOFING, INC ZIOLKOWSKI CONSTRUCTION PO BOX 189 PO BOX 42 6600 ARDMORE AVE PO BOX 666 1319 N IOWA ST 4050 RALPH JONES DRIVE LAKEVILLE, IN 46536 FERDINAND, IN 45732 SALEM, IN 47167 SOUTH BEND, IN 46624-0569 GRANGER, IN 46530 TYNER, IN 46572 Culver, IN 46511 SHARONVILLE, OH 45241 PLYMOUTH, IN 46563 KNOX, IN 46534 WYOMING, MI 49548 BEAR LAKE, MI 49614 ARGOS, IN 46501 Granger, IN 46530 STROH, IN 46789 MONTICELLO, IN 47960 FORT WAYNE, IN 46809 WABASH, IN 46992 SOUTH BEND, IN 46628 SOUTH BEND, IN 46628 4 Michiana Contracting Inc - Equipment List ZEQ-1007 250OHD 2007 PICK UP ZEQ-1018 2018 CHEVY 1500 ZEQ-1100 2000 GMC 7500 W/CRANE ZEQ-1199 1999 CAT 416C BACKHOE ZEQ-1414 2014 CHEVY PICKUP TRUCK 1500 ZEQ-1419 2019 CHEVY 2500 HD ZEQ-1481 GREENLEE POST DRIVER ZEQ-1482 HUSQVARNA ELECTRIC SAW 14" ZEQ-1486 1986 SULLAIR 185 DPQ AIR COMP ZEQ-1499 REDI HAUL TRAILER ZEQ-1507 2007 CHEVY PICKUP ZEQ-1519 2019 CHEVY 2500 HD ZEQ-1556 POST DRIVE ZEQ-1569 8' LADDER - SMALL TOOLS ZEQ-1604 2004 CHEVROLET 2500 HD ZEQ-1607 BELSHE TRAILER ZEQ-1619 2019 CHEVY 1500 ZEQ-1704 2004 CHEVROLET 2500 HD ZEQ-1810 #1810 BUCKET TRUCK ZEQ-1910 #1910 BUCKET TRUCK ZEQ-1998 WIRE REEL TRAILER ZEQ-2010 #2010 BUCKET TRUCK ZEQ-2105 2005 CHEVY 2500 ZEQ-2108 REEL TRAILER ZEQ-2109 2009 INT'L 4300 DURASTAR TRUCK ZEQ-214 2014 CHEVY SILVERADO 1500 4X4 ZEQ-2208 REEL TRAILER ZEQ-2213 2013 CHEVY P/U TRUCK 3/4 TON ZEQ-2316 2016 BELSHE FLATBED TRAILER ZEQ-2398 1998 1 HC4700 ZEQ-2406 CHEVY 2006 PICK UP TRUCK ZEQ-2416 2016 BELSHE FLATBED TRAILER ZEQ-2593 1993 BELSHE TRL T-16 ZEQ-2600 2000 PadFoot Compactor Michiana Contracting Inc - Equipment List ZEQ-2707 2007 FREIGHTLINER DUMP TRUCK ZEQ-2913 2013 14' DUMP TRAILER ZEQ-3007 2007 DT-256 BELSHE TRAILER ZEQ-3097 97 VERMEER LM42 PLOW/TRENCHE ZEQ-3103 2003 FL70 FREIGHTLINER LTECH TA40 ZEQ-3115 2015 BELSHE F1330-2EP TRAILER ZEQ-315 2015 CHEVY SILERADO ZEQ-3207 2007 DT-256 BELSHE TRAILER ZEQ-3308 2008 DUMP TRAILER ZEQ-3313 2013 1/2 TON CHEVY PICKUP TRUC ZEQ-3406 2006 GMC BUCKET TRUCK ZEQ-3497 1997 BLESHE TRAILER ZEQ-3506 2006 CHEVROLET C5500 ZEQ-3598 1998 BLACKHAWK GASPIPE TRAIL ZEQ-3705 2005 CHEVROLET SILVERADO 1500 ZEQ-3715 2015 MSI 12' DUMP TRAILER ZEQ-3888 1988 586E CASE FORKLIFT ZEQ-3897 1997 I/R RT706G FORKLIFT ZEQ-3907 2007 GMC C5550 ZEQ-3993 1993 CHILTON POLE TRAILER ZEQ-4006 2006 60KW PORTABLE GENERATOR ZEQ-4014 BOBCAT T630 2014 ZEQ-4080 GENERATOR ZEQ-4111 2011 CHEVY CRUZE ZEQ-4112 2012 CATERPILLAR 262C LOADER ZEQ-415 2015 CHEVY SILVERADO 2500 HD ZEQ-4205 2005 304 CR CAT MINI ZEQ-4298 1998 CHEVY CK 2500 ZEQ-4304 2004 ATLAS COPCO XAS97 AIR COM ZEQ-4313 2013 ATLAS COPCO AIR COMPRESS ZEQ-4391 1991 SULLAIR A/C MODEL 125DPQ ZEQ-4398 1998 DAWSON TRAILER ZEQ-4404 AIR COMPRESSOR ZEQ-4504 2004 ATLAS COPCO A/COMPRESSO 1 Michiana Contracting Inc - Equipment List Michiana Contracting Inc - Equipment List ZEQ-4599 1999 ECLIPSE ARROWBOARD ZEQ-8788 1988 STAFFORD TRAILER ZEQ-4612 2012 BOBCAT S750 SKID STEER LD ZEQ-8896 1996 BELSHE RB-2 TRAILER ZEQ-4711 2011 S630 BOBCAT ZEQ-9096 1990 CASE 360 TRENCHER ZEQ-5007 2007 CAT 305CCR MINI ZEQ-917 2017 250OHD CHEVY SILVERADO ZEQ-5112 2012 INTERNATIONAL TERRA STAR ZEQ-9209 2009 CHEVY SILVERADO 4X4 ZEQ-5203 2003 C-4500 GMC TRUCK ZEQ-9512 2012 CHEVY 4X4 PICKUP ZEQ-5406 2006 GMC 2500 P/U TRUCK ZEQ-9708 2008 CHEVY PICK UP ZEQ-5510 2010 CAT 305C MINI EXCAVATOR ZEQ-9808 2008 CHEVY PICK UP ZEQ-5805 2005 CAT 430D BACKHOE LOADER ZEQ-9908 2008 CHEVY PICKUP TRUCK ZEQ-5906 2006 CHEVY PICKUP ZEQ-A11601 #5203 - BUCKET TRUCK ZEQ-6006 2006 F-550 16' BOX TRUCK ZEQ-A11602 #2109 - BUCKET TRUCK ZEQ-6105 TRENCHER ZEQ-A13506 BUCKET TRUCK #3506 ZEQ-616 2015 SILVERADO ZEQ-A17798 1998 TRAIL KING TRAILER ZEQ-6297 1997 FORD LT900 W/NATIONAL 562 ZEQ-A19608 #9608-2008 CHEVY PICKUP ZEQ-6299 VERMEER 5750 TRENCHER ZEQ-LEXUS 2013 LEXUS ZEQ-6311 2011 Vermeer Quad Track Tracto ZEQ-M1030 MILLER WELDER ZEQ-6498 1998 VOLVO 11 YARD VACUUM TRK ZEQ-M1038 TARGET CONCRETE SAW ZEQ-6500 1999 RING O'MATIC JET VAC ZEQ-M1040 KAWASKI MULE ZEQ-6706 2006 CHEVY 2500 PICKUP ZEQ-M1067 WALK BEHIND CONCRETE SAW ZEQ-6809 2009 TAR BUGGY/STEPP ZEQ-M1073 BACKHOE HAMMER ZEQ-716 2016 CHEVY COLORADO ZEQ-M1106 STRAW BLOWER ZEQ-7198 1998 INTERNATIONAL 4700 MIX TR ZEQ-M1193 GENIE S-40 ZEQ-7208 2008 VERMEER BORE MACHINE ZEQ-M1236 2000 GENI GS 1930 SC LIFT ZEQ-7398 1998 CUSTOM TRAILER ZEQ-M1237 CAT FORK LIKFT ZEQ-7508 2008 SUPERLINE 6 TON TRAILER ZEQ-M1265 ARROWBOARD ZEQ-7607 2007 BORING MACHINE VEEMEER ZEQ-M1278 CONCRETE MIXER ZEQ-7704 2004 INTERNATIONAL 4400 TRUCK ZEQ-M1456 TARGET PRO 35 WALK BEHIND SAW ZEQ-7798 1998 TRAIL KING TRAILER ZEQ-M2000 SPOOL TRAILER ZEQ-8098 1998 COLEMAN GENERATOR ZEQ-M2001 SPOOL TRAILER -CUSTOM BUILT ZEQ-817 2017-250OHD CHEVY SILVERADO ZEQ-M89 BOB CAT AUGER ATTACHMENT ZEQ-8199 MICHAEL/TRAILER MODEL 1203M ZEQ-M921 VERMEER MIX UNIT ZEQ-8295 1995 BELSHE RB-2 TRAILER ZEQ-MC1006 BACKHOE FORKS 2 Michiana Contracting Inc - Equipment List ZEQ-8401 2001 INTERNATIONAL CRAME ZEQ-8603 2003 CHEVY 2500 HD ZEQ-8703 2003 CHEVY 250OHD ZEQ-MC1258 2007 PORTABLE LIGHT TOWER ZEQ-MC1259 2007 PORTABLE LIGHT TOWER ZEQ-3716 MSI DUMP TRAILER ZEQ-MC1265 2009 ALLMAND ARROWBOARD ZEQ-MC1266 2009 ALLMAND ARROWBOARD ZEQ-MC1267 2009 ALLMAND ARROWBOARD ZEQ-MC1268 2009 ALLMAND ARROWBOARD ZEQ-MC1279 2004 MX 125 MUD MIXING SYSTEM ZEQ-MC1361 BOBCAT BROOM ZEQ-MC1408 SMALL CONCRETE BUCKET ZEQ-MC1412 JLG 26' SCISSOR LIFT ZEQ-MC1413 JLG 20' SCISSOR LIFT ZEQ-M1415 JLG SCISSOR LIFT ZEQ-MC1440 12' SNOW PUSHER ZEQ-MC1447 30C AUGER ATTACHMENT BOBCAT ZEQ-MC1448 FFC PREPARATOR SOIL PREPARER ZEQ-MC1449 NEW HOLLAND 716BSNOW BLOWR ZEQ-MC1450 SULLAIR CIPPING HAMMER FBCH-3 ZEQ-MC1451 DEVIL BISS AIR ELEC GENERATOR ZEQ-MC1452 MUSTANG 3" PUMP ZEQ-MC1453 PLATE COMPACTOR ZEQ-MC1457 BOSCH TABLE SAW/WTS 3000STAN ZEQ-MC1501 SPECTRA PRO MARK 220 (GPS) ZEQ-MC619 10' LEVELER ZEQ-MC832 PRESSURE WASHER ZEQ-MC849 RAKE ZEQ-MC9096 1996 16' REEL TRAILER/OKLAHOMA ZEQ-MC921 7198 MIX UNIT Michiana Contracting Inc - Equipment List ZEQ-MC1066 BOBCAT CONCRETE HAMMER ZEQ-MC1232 AUGER-ATTM ZEQ-MC1244 DRILL HAMMER ZEQ-T1 WELLS CARGO JOB SITE TRAILER ZEQ-T12 1998 WELLS CARGO TR 1082202 ZEQ-T13 1999 WELLS CARGO TR 1085113 ZEQ-T14 1999 WELLS CARGO TR 1085111 ZEQ-T16 2007 WELLS CARGO TRAILER ZEQ-T17 2008 WELLS CARGO TRAILER ZEQ-T18 2008 WELLS CARGO TRAILER ZEQ-T19 2015 CARGO MATE TRAILER ZEQ-T20 7X16 CARGO MATE 3 3. If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the governmental unit in the event that you subsequently determine that you will use a subcontractor on the proposed project. Listing will be provided upon request prior to contract approval. 4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors may also be required to be listed by the governmental unit. Michiana Contracting Inc has a large fleet of heavy equipment and contractors tools sufficient to complete this project. A detailed listing is available upon request. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, please explain the rationale used which would corroborate the prices listed. Yes. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the governing body awarding the contract must be specific enough in detail so that said governing body can make a proper determination of the bidder's capability for completing the project if awarded. CITY OF SOUTH BEND va"�srrr MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY/ DEVELOPMENT PROGRAM,�, JJ� FORM MWBE-2.0 . EVIDENCE OF GOOD FAITH EFFORTS iyr�us This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: Plnhook Park Pavilion Improvements Date: 11/26/19 Project Name: 118-077B Bidder: Michiana Contracting Inc Contact Person: Scott Kirkpatrick, President Telephone: 574-936-8613 Address: 7843 Lilac Rd, PO Box 929 City: State: Zip: 46563 Email: skirkpatrick@michianacontracting.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below': EVIDENCE OF GOOD FAITH EFFORTS MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business SK Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: 1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. SK 2. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. "Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other SK requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down SK contracts into smaller units to facilitate MBE/WBE participation) ESKCONTRACT RECORDS The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the ojob. Proper demnstration of Good Faith Effort requires es .__........ next ......- q 'res your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 4/2/2019 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-2.1 MBEIWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE 1 OF 1 Pinhook Park Pavilion Project Number: I rove t MBE/WBE Participation Goal 0% Project Name: 118-077B Bidder: Michiana Contracting Inc By: President 11/26/19 (Signature) 9 (Title) (Date) MBE/WBE Firm Owner or Contact at MBE/WBE Firm Telephone: Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: MBE/WBE Firm Owner or Contact at MBE/WBE Firm Telephone: Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Email: Email: Version 4/2/2019 Contractor's Bid for Public Works - 10 CERTIFICATE OF QUALIFICATION to provide CONSTRUCTION SERVICES for PUBLIC WORKS PROJECTS to the STATE OF INDIANA This Certification Board, having duly considered application for qualification in terms of apparent experience and financial resources, and under the applicable Indiana Code 4-13.6-4 and adopted rules of this Board, hereby issues a Certificate of Qualification to provide construction services to the State of Indiana for Public Works Projects to: MICHIANA CONTRACTING INC 7843 LILAC RD PO BOX 929 PLYMOUTH IN 46563 Phone 574-936-8613 Fax 574-936-6201 Company Offlclal SCOTT WALLSMITH for the twenty-seven month period stated herein, unless revoked by this Board for cause„ and in the classifications of services stated below. This certificate supercedes any previous certificate. 1542.00B Inst. Bldgs.(Hosp., Schl., Prsn.)>$1,000,000, <$10,000,000 1542.01 Institutional Bldgs (Hospitals, Schools, Prisons) 1542.02 Commercial Buildings (Offices, Stores, Restaurants) 1542.04 Additions, Alterations, Remodeling, and Repair 1731.01 Electrical Work In excess of $ 160,000.00 CERTIFICATION DATE 1/10/2018 EXPIRATION DATE 4/10/2020 THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PUBLIC WORKS DIVISION CERTIFICATION BOARD, 402 WEST WASHINGTON STREET, ROOM W467, INDIANAPOLIS, INDIANA 46204, ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION. Tracy L. Cross, Uwe Secretary Certification Board DAPW P02 State Form 3903R Rev. 07/06 ISSUED BY Aw tatut lOrputtarM, of TransportAm ifflei roMnmH,m who has filed with the Department a Contractor's Statement of Experience and Financial Condition as required under Indiana Code 8-23-10, is hereby qualified to bid at any Department of Transportation letting in Classes of Work and within the amount and other limitation of each classification as listed betow, for such period as the uncompleted work on hand from all sources does not exceed the Aggregate amount, Classification references by name or s mbol are in accordance with the definitions in the Contractor's Statement of Experience and Financl2condition. This certificate supersedes any certficate previously Issued, but is subject to revision or revocation according to the law, If and when changes in the financial condition of the contracting firm or other facts justify such revision or revocation::, AGGREGATE.......... ---- ...... ___-_-__-___................ -_....................... ... _--.... _- S24,570,00 uo^n zo^epIC MoTSYSTEMS -..... ---- ... --......... __-______-_�$z*,57o,0v 01/2 rnaovooLEumPIPE ovuTvLLATuzw'... .......................... ................. ........ --....... ......... -_- $/,000,000 o/m TRAFFIC CONTROL: HIGHWAY LIGHTING ...... ...................... ....... ................ ........ ... ................... $e4,570,00 o/xo FORCE MAINS AND LIFT STATIONS ..... ................. ............ -.................. ... ... ........ .................... $1,000,00 0377 zo*pac MAINTENANCE ............... -__--_--.......... _-.............. - $24,570,000 mxo TREE TRIMMING AND REMOVAL ..... ...... .......... --.... ...... -......... -__--'-_........... $1,000,00 0000 WATER AND WASTEWATER TREATMENT SYSTEMS -___-_....... $2*,570,00 o*xo TELECOMMUNICATIONS INSTALLATION mCONNECT ........ -_........ .... ............................. $2*,570,000 E(A) TRAFFIC CONTROL: SIGNAL INSTALLATION .............................. ......... .............. ................ ............ %24570,00 E(D) TRAFFIC CONTROL: SIGN INSTALLATION __........ -_-~....... ....... _~'~__~~~-...... $2*570,00 PREQUALIFICATION ENGINEER CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC CHECKLIST FOR BIDDERS Project Name Pinhook Park Pavilion Improvements Project No. 118-077B For Bids Due Tuesday, November 26, 2019 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. x Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and x Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted x Form [MWBE-2.1]. x Acknowledge Receipt of 2 Addendum(s) included with the bid, x All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either x printed or typed underneath signature. This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Michiana Contracting Inc Date By Authorized Representative: Signature: _g - Print Name & Title: Scott Kirkpatrick, President Version 4/2/2019 Contractor's Bid for Public Works - 1 11 /26/19 194'DLZ ARCHITECTURE• ENGINEERING• PLANNING SURVEYING •CONSTRUCTION SERVICES INNOVATIVE IDEAS EXCEPTIONAL DESIGN UNMATCHED CLIENT SERVICE City of .South Bend Pinhook (Park Improvements Page 2. of 3 added that the plans indicate that areas are to be stabilized as work progresses, particularly in regard to seeding, to minimize unestablished, open areas remaining by mid to late summer when these events will occur. Pavilion will be closed to use (other than VPA access as needed for maintenance) so awarded contractor will be able to set work schedules freely. Any areas of the pavilion utilized by the contractor are expected to be left in equal or better condition than found at completion of work. Addendum is anticipated to be issued on Friday and currently is slated to include meeting minutes and modifications to detectable warning special provision and detail. No approved equals have been accepted at this time. VII. Contractor Questions (Including subsequent responses by DWCity where applicable) Question 1: Is it possible to get cut/fill calculations or will only common excavation quantity be provided. Answer 1: Earthwork summary table(s) will be provided with Addendum #2. Question 2: How will wind chime allowance be handled? Will a lift be required to hang? Answer 2: Windchime will be selected by City during submittals process. It is anticipated that allowance will cover cost of chime, shipping, and installation. Manufacturer is provided in specifications if contractors wish to visit their website. It is anticipated that the selected chime will be of 90" hanging length/451b weight or less. Height of actual hanging location has not been measured but it is likely a lift will be required to hang, in order to hang at a height to prevent tampering. Question 3: In regard to Compacted Aggregate #53, what is referred to as 'local aggregate'? Answer 3: The use of locally mined aggregate will not be allowed. Limestone, crushed concrete, or clean slag that meet the prevailing INDOT Specification would all be acceptable. Question 4: Could planks be replaced with cast -in place concrete at boat launch? Answer 4: Yes. The use of planks is intended to simplify work below the water level. If contractor has means to construct CIP slab below the water level we would entertain that option. Question 5: Are beams on sides of ramp necessary with aggregate underneath as base? Answer 5: Yes, this is to reduce impact of washout and animal burrowing. Question 6: Can planting completion date be modified to account for fall dig of trees? Answer 6: Yes. This will be addressed in addendum. INNOVATIVE IDEAS City of South Bend WDLZ EXCEPTIONAL DESIGN Pinhook Park Improvements ARCHITECTURE. ENGINEERING • PLANNING UNMATCHED CLIENT SERVICE Page 3 of 3 SURVEYING •CONSTRUCTION SERVICES ACTION ITEMS: No. Description 1 Issue Addendum #1 2._„e... Submit any contractor questions�p Issue Addendum #2 (if required) 4 .... Submit Bids . by 9:30 am local time.. 5 Bid ......� ,. ..... ...�w Opening Award Proiect to deadline Responsibility Due Date DLZ/City .... .... ..� www9 11/15/1 ...�.--- Bidders.... 11/21/19 DLZ/City 11/22/19 Bidders 11/26/19 City 11/26/19 Citv...,, 12/10/19 The foregoing constitutes our understanding of matters discussed and conclusions reached. Please review these items and advise the undersigned, in writing and within five (5) business days, of any errors or omissions. CC: Those in attendance Kara Boyles (City) File, jkh, spk DI-Z REPRESENTATIVE Sara Pic,P,CPESC-IT Project Manager i Z �. p .i �►' 1 N '� m n a •� r O W kn g GY 1 U IIli n.s r� 3 1H V gi k 91 M, H, , 'i ? 1 0 rl 1 1 6 F- PI z 60 R I H, Hl as F- - k, Hj J!, w 9 LLI W 55 a R 4., 11�2 w 111! 2 2 TI, z w ------------ - - - M, M K R � . ......... ..... ...... n1l. Nil uj cc m C) Lu 0 cc mc Is 12 z w 04 Ld > Lu [14 0 IL _j mm in _j z 0 > z o. LLI Z [L g I& U) z EL LU cl U, LU U) Lu _j �T M D LL u, , HH, LF11 I uj . . ....... CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Pinhook Park Pavilion Improvements Project No. 118-077B For Bids Due Tuesday, November 26, 2019 Contractor Name: Michiana Contracting Inc The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 313t for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 3/19/2019 General Conditions - 6 POST SID SUBMISSIONS°. Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 3/19/2019 General Conditions - 7 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) x By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) x By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) x Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) x Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) X Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid x specifications or contract. (iv) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (v) For every project, submit evidence of participation in apprenticeship and 'training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 3/19/2019 General Conditions - 8 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). List identifying all former business names. Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) (iv) years. Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the united States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 3/.19/2019 General Conditions - 9 (ix) Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: 11 /26/19 (Sign Here) Scott Kirkpatrick, President (Print Name Here) Michiana Contracting Inc (Name of Company) 7843 Lilac Rd, PO Box 929 (Address of Company) Plymouth (City) IN (State) 574-936-8613 (Telephone Number) Version 3/19/2019 General Conditions - 10 Business Name: MICHIANA CONTRACTING, INC. Entity Type: Domestic For -Profit Corporation Creation Date: 09/25/1985 Principal Office Address: 7843 LILAC RD, PO BOX 929, PLYMOUTH, IN, 46563, USA Jurisdiction of Formation: Indiana Title Name Treasurer Lisa L Botto CEO Scott Wallsmith Vice President Todd Wallsmith President Scott Kirkpatrick Vice President RANDY LONGANECKER Type: Individual Name: Scott D. Wallsmith BUSINESS INFORMATION CONNIE LAWSON INDIANA SECRETARY OF STATE 11/25/2019 07:39 PM Business ID: 198509-725 Business Status: Active Inactive Date: ' Expiration Date: Perpetual Business Entity Report Due 09/30/2021 Date: Years Due: Address 7843 Lilac Road PO Box 929, Plymouth, IN, 46563, USA 7843 Lilac Rd., PO Box 929, PLYMOUTH, IN, 46563, USA 7843 LILAC ROAD, P.O. BOX 929, PLYMOUTH, IN, 46563, USA 7843 LILAC ROAD PO BOX 929, Plymouth, IN, 46563, USA 7843 LILAC ROAD PO BOX 929, Plymouth, IN, 46563, USA Address: 811 Willis Park, North Webster, IN, 46555, USA ATTACHMENT TO Bid for: City of South Bend, Indiana, Department of Public Works Pinhook Park Pavilion Improvements Project No. 118-077B Bid Date/Time: November 26t", 2019 @ 9:30am (Local Time) 1. Bidder Permanent Place of Business: Michiana Contracting Inc is an Indiana Corporation incorporated Sept 25, 1985 with physical address of: 7843 Lilac Road Plymouth, IN 46563 Phone: 574-936-8613 Fax: 574-936-6201 and mailing address of: PO Box 929 Plymouth, IN 46563 2. Michiiana Contracting Inc Listing of Equipment — see attached listing 3. Work Experience of similar nature — see attached listing of "General & Electrical" projects completed within the last 5 years. 4. Qualifications: Indiana Department of Public Works — Certificate of Qualification Indiana Department of Transportation — Certificate of Qualification 5. Proposed plan for performing the project: We have reviewed in detail all pertinent plans, specifications and addendums relating to this project and will start work upon Award of Contract and Notice to Proceed. We will work to keep pace with all involved for a timely completion on or before the specified completion date. 6. Completion date for project: As stated in contract 7. Date on which work can commence: As soon as we receive Award to Contractor.. MICHIANA CONTRACTING - EXPERIENCE DATE CONTRACT # CLASS DESCRIPTION CONTRACT $ 5/29/2012 C153 G PLYMOUTH COMM SCHOOL OF INQUIRY $ 989,190.00 7/19/2012 C154 G/E ALICK HOME MEDICAL - NEW BLDG $ 997,343.00 7/26/2012 C155 G/E FORT WAYNE AIRPORT - GATE ELECTRIFICATION $ 912,000.00 9/18/2012 C157 G/E IVY TECH -ADMINISTRATION BLDG RENO $ 81,400.00 9/27/2012 C156 G/E E & B PAVING - OVERHEAD DOOR $ 35,430.00 1/16/2013 C158 G/E CASTON SCHOOL CORP - FACILITY ADDITION/REND $ 1,103,040.00 4/24/2013 C159 G/E/H CITY OF PLYMOUTH - RIVER PARK SQUARE $ 1,642,167.19 5/2/2013 C160 G/E PLYMOUTH COMM SCHOOL - RIVERSIDE $ 62,290.00 7/23/2013 C161 G/E WANEE COMM SCHOOL CORP - 2013/2014 RENO $ 882,600.00 2/3/2014 C162 G MARION AIRPORT - HANGAR REHAB $ 111,275.00 4/29/2014 C163 G CARROLL CONSOLIDATED SCHOOLS - HEALTH/FITNESS CTR $ 1,305,560.00 5/15/2014 C164 G WINONA LAKE - LIMITLESS PARK $ 1,032,000.00 9/22/2014 C165 G/E CHURCH OF THE BRETHREN - ELEVATOR $ 112,500.00 12/1/2014 C166 G/E WANEE COMM SCHOOL CORP - KITCHEN RENO $ 223,000.00 3/6/2015 C167 G/E PERU PUBLIC LIBRARY - CHILDREN'S AREA RENO $ 1,199,900.00 4/28/2015 C168 G/E CULVER PARK DEPART- HANDRAILS $ 69,500.00 5/1/2015 C169 G/E CITY OF PLYMOUTH - LEDYARD WATER TREATMENT PLANT $ 253,380.00 6/25/2015 C170 G TOWN OF CULVER - WASTE WATER TREATMENT IMPROVE $ 1,119,200.82 9/23/2015 C171 G CASTON SCHOOL CORP - BUS GARAGE $ 62,820.00 10/28/2015 C172 G/E POLYGON CORP - BREAKROOM/CUST SVC RENO $ 367,000.00 10/30/2015 C173 G MASONITE CORP - PLANT RESTROOM RENO $ 32,105.00 12/4/2015 C174 G/E CASTON SCHOOL CORP - BAND/CHORAL & WEIGHT/FITNESS RENO $ 214,550.00 12/4/2015 C175 G AMI INDUSTRIES - RESTROOM #2 RENO $ 32,900.00 12/9/2015 C176 G/E WANEE COMM SCHOOL - 2016 FACILITY IMPROVE $ 1,138,565.00 12/30/2015 C177 G LAKELAND MIDDLE SCHOOL - OFFICE RENO $ 126,820.00 2/8/2016 C178 G/E PLYMOUTH PARK DEPT - POOL $ 83,877.00 5/20/2016 C179 G/E PLYMOUTH PARK DEPT-TENNIS COURTS $ 1,628,500.00 10/17/2016 C180 G/E LAVILLE JR/SR SCHOOLS - SCIENCE DEPT LAB RENO $ 191,870.00 1/23/2017 C181 G INDIANAPOLIS METRO AIRPORT - HANGAR REHAB $ 427,600.00 3/14/2017 C182 G/E WANEE COMM SCHOOL - 2017 HIGHSCHOOL ADDITION/REND $ 2,868,350.00 8/30/2017 C183 G/E CITY OF PLYMOUTH - CITY HALL ADDITION/REND $ 2,163,700.00 10/25/2017 C184 G MASONITE CORP - WALKERTON DOCKS $ 98,388.00 1/11/2018 C13.54 G/E CASTON SCHOOL CORP - ELECTRICAL GEAR REPLACE $ 169,215.00 5/3/2018 C185 G INDIANA DUNES STATE PARK - ANNEX REMODEL $ 157,882.00 6/5/2018 C186 G/E FULTON COUNTY AIRPORT - CORPORATE HANGAR & OFFICE $ 1,183,750.00 10/4/2018 C187 G CITY OF PLYMOUTH - NIXON FIELD MASONRY REPAIR $ 45,935.00 10/30/2018 C188 G REES THEATRE - DEMOLITION $ 39,850.00 1/1/2019 C189 G/E CITY OF SOUTH BEND - VPA REMODEL $ 490,000.00 5/14/2019 C190 G/E TOWN OF CULVER - BEACH LODGE RENOVATION $ 1,720,950.00 7/1/2019 C1385 E CULVER TOOL & ENGINEERING - NEW BLDG ELECTRICAL $ 559,308.00 M rWO8401k%W411l t'indianaMerrtrreyy Chapter /19 Pie se accept this as verification that Michiana Contracting, Inc is a member in good standing of Associated Builders & Contractors of Indiana/Kentucky, Inc since 1991. 's Program is certified by the Federal Department of Labor, :e of Apprenticeship and Training and by the National ter for Constructions Education and Research (NCCER). of Indiana uses the NCCER curriculum. Michiana Contract- ing currentlly has 13 (thirteen) students enrolled in the appren- tic ship training program e l free to call me with any questions regarding our p renticeship program. nticeship Coordinator 2701 Industrial Dr. Ste. 190—Elkhar4 Indiana 46516— 574-218-0340 brianne@abcndianakentucky.org aa.oraW 9#01 and COMMMOM too. Indiana/Kentucky Chapter Training Program Agreement Between ABC of Indiana/Kentucky and Michiana Contracting, Inc. August 2os9 Mkok Since Michiana Contracting, Inc. is located in Plymouth, IN farfrom any ABC training center, Michiana Contracting will implement an in-house Construction Craft Laborer apprenticeship training program under the sponsorship of ABC Indiana/Kentucky. A training partnership between Associated Builders and Contractors of Indiana/Kentucky (ABC) and Michiana Contracting is ofgreat value to both organizations by combining efforts to improve the construction industry through professionally trained craft professionals. This written agreement clarifies the agreement between ABC and Michiana Contracting to provide an in-house apprenticeship training program located at Michiana Contracting, Inc., 7843 Lilac Road, P.O. Box 929, Plymouth, Indiana 46563. This Training Program Agreement between ABC and Michiana Contracting is effective beginning August 2019 and will be reevaluated in August 2020. ibififitj Both organizations understand the necessity of submitting paperwork in a timely manner and commit to meeting established submission timelines. Mir . a la a assure all rules and regulations are followed per ABC, NCCER, and the U.S. Department of Labor (DOL) guidelines. a provide classroom and lab space, equipment, and training, materials that adequately support implementation and continuation of the CCL apprenticeship training program; ■ pay salaries for in-house program instructors) ■ ensure apprentices will attend class for no less than 144 hours per level of study as required by the DOL. Update flashpoint (database)on a monthly basis: o Students: Enter OJL hours per ABC 1policy; o Education Contact: Approve or Deny OJL hours Atthe start of the academic year, the training company will submitto ABC a stating date, enrollment forms for each student accompanied by a driver's license and proof of high school graduation, a DOL form, and an NCCER Registration and Release Form At the conclusion of the academic year, the Education Contact will submit to ABC, all sign in sheets, performance profiles and written tests along with a completed Form Zoo. a, NCCER certify instructors teaching classes for Michiana Contracting in-house apprenticeship program; • order all craft textbooks; • provide orientation materials, DOL information, NCCER credentials, and invoices, verify attendance in Flashpoint, send to students and education contacts final grade reports, wage letters; • ensure reports are completed and submitted as required by ABC, NCCER, and the DOL; ■ provide support to education contacts, instructors, and students as needed; and • audit the training site annually to verify that all program guidelines, regulations,, and instructional practices are being met In-89,UlS_Program osts Costs for the ABC Training Program to be held by Michiana Contracting are listed below. Core/Level i—Cost per Student • New Student Application Fee $ 200.00 • Annual Tuition $ 500.00 ■ Textbooks $ 200.00 (Instructor Textbooks - sioolcopy as needed) $ Soo.00 Level 2 —Cost per Student • AnnualTuition $ 500.00 • NCCERTextbooks $ 150.00 (Instructor Textbooks - $soolcopy as needed) $ 650.00 Program costs for each student are quoted as of January 1, 2oig and may be subject to change. .A.M" &. Ngke Where program guidelines, regulations, andfor training conditions are not sofficiently met by au ^ ndorthetrainin facili ABC of . dropagitqd_015 with r W M dN 'W N 1.Y4 result in a termination of the training agreement. As additional students are added to a class, it is the responsibility of the training member to ensure ABC is notified and supplied with the appropriate information as listed above. pg. 2 5jonatym TOWning Company Re �► ,w e P9.3 v 04 u n c� to L41r^ NIBC A so�tatapd Boa➢td�rt+ and contractwa, UK Indiana/Kentucky Chapter Associated Builders & Contractors of Indiana/Kentucky 5001 N Shadeiand Avenue Indianapolis, IN 46226 317-596-4950 Apprentices attend school for 4 years. Classes are held one night per week for 4 hours with 3 hours of online study. All programs are ap- proved by the U.S. Department of tabor, Office of Apprenticeship. Intro to Construction Math Intro to Hand Tools & Power Tools Intro to Construction Drawings Basic Rigging Alternating Current Motors: Theory and Application Electric Lighting Conduit Bending Pull & Junction Boxes Basic Communications 1' Conductor Installations Basic Employability I Cable Tray Skills Load Calculations— Load Calcula- Branch & Feeder tions--Feeders & Circuits Services Conductor Selection health Care & Calculations Facilities Practical Applica- Standby and tions & Lighting Emergency Systems Hazardous Locations i Basic Electronic Theory Overcurrent Fire Alarm Protection Systems Distribution Specialty Equipment Transformers Transformers Advanced Controls Intro to Materials Conductor Terminations Commercial Handling I and Splices I Electrical Services Orientation to the Grounding & Bonding Motor Calculations Electrical Trade Electrical Safety Circuit Breakers and Voice, Data & Video Boxes Intro to Electrical Control Systems & Fun- Motor Controls Circuits damental Concepts Electrical Theory Intro to the National Electrical Code Device Boxes Hand Bending Raceways & Fittings Conductors & Cables Basic Electrical Con- struction Drawings Residential Electricals Services Electrical Test Equipment HVAC Controls Heat Tracing and Freeze Protection Motor Operation and Maintenance Medium -Voltage Terminations/ Splices Special Locations Introductory Skills for Crew Leaders n Indiana/Kentucky Chapter Associafed Builders & Contractors of IndisnalKentucky Indianapolis, IN 46226 317-596-4950 Apprentices attend school for 4 years, Classes are held one night per week for 4 hours with 3 hours of online study. All programs are approved by the U.S. Department of Labor, Office of Apprenticeship, Basic Safety Commercial Rigging Equipment Site Layout 1: Dis- Comr Commercial tance Measurement I I & Leveling Intro to Construction Moth Roofing Applications I Rigging Practices Site Layout It: Angu- Intro to Hand Tools & Thermal & Moisture Power Tool! I Protection Intro to Construction Drawings Basic Rigging Basic Communica- tions Basic Employability Skills Intro to Materials Handling Orientation to the Trade Building Materials, Fasteners & Adhe- sives Hand & Power Tools Introduction to Con- struction Drawings, Specs & Layout Floor Systems Wail Systems Ceiling Joist & Roof Framing Basic Stair Layout Introduction to Build- ing Envelope Systems Exterior Finishing Cold -Formed Steel Framing Drywall Installation Drywall Finishing lar Measurement Properties of Con- Advanced Roof crete Systems Reinforcing Concrete Advanced Wall Systems Handling & Placing Advanced Stair Concrete Systems Trenching & Exca- Introduction to Light vating Equipment Foundations & Slab- I Welding On -Grade Doors and Door Vertical Framework Commercial Finish Hardware Work Suspended Ceilings Horizontal Frame- Site Preparation work Window, Door, Floor Tilt -Up Wall Panels & Ceiling Trim i Cabinet Installation & Fabrication M Introductory Skills for the Crew Leader: Orientation to the Job Leadership Skills Project Control For-Ifu"', e'r, ati, n,,, o enrollment` I M O N co N LO N E `O LL aD U) 0 r m d U c O U co C (U U 2 N x O m O N U N J M M ti O LL w F- U W 3 O a Y Of U_ J d LL O 41 c aD E 0 Ca C c O f6 Y N a Y O O L C i7 LL. ?ll November 21, 2019 RE: Michiana Contracting, Inc. To Whom It May Concern: In compliance with the United States Department of Treasury's Listing of Certified Companies, this letter will serve to confirm that at this time the surety company The Cincinnati Insurance Company is listed with the United States Department of Treasury's Listing of Approved Sureties according to Department Circular 570. THE CINCINNATI INSURANCE COMPANY iennifer L. Kasznia Attorney in Fact jlk/ www.GibsonIns.com 1([Vjl�)) t (800) 814-2122 1 (800) 836-2122 South Bend, IN Plymouth, IN Indianapolis, IN Fort Wayne, IN Elkhart, IN Kalamazoo, MI ACCEPTANCE The above bid is accepted this. day of , subject to the following conditions: Contracting Authority Members: PART II (For projects of $150,000 or more— /C 36-1-12-4) Governmental Unit: City of South Bend, Indiana Board of Public Works Bidder (Firm) Michiana Contracting Inc Date (month, day, year): 11/26/19 These statements to be submitted under oath by each bidder with and as a part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? What public works projects are now in process of construction by your organization? Expected Contract Amount Class of Work Completion Name and Address of Owner Date $1,183,750.00 Electrical/General 2019 Fulton CO Airport -Corp Hangar&OfF e $ 490,000.00 Electrical/General' 2019 City of South Bend-VPA Remodel $1,720,950.00 Electrical/General 2020 Town o uver- eac o ge Reno $ 559,308.00 Electrical 2020 Cuiver Tool! &Engineering -New 4. 9 Have you ever failed to complete any work awarded to you? No If so, where and why? List references from private firms for which you have performed work. HRP Construction PO Box 266 South Bend, IN 46624 Mr. Paul Fallon RBC Precision Product 225 Industrial Drive Bremen, IN 46506 Mr. Don Peoppel White Flyer 317 Kleckner Knox, IN 46534 Mr. Tim Gutner Masonite Corporation 101 Industrial Park Dr Walkerton, IN 46574 Mr. John Felix Ancilla Domini 9601 Union Road Donaldson, IN 46513 Ms. Susan Black SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the governmental unit to consider your bid.) If awarded this contract, we will start work when we receive contract and notice to proceed, we have sufficient employees on staff to complete the work, and will work to keep pace with all involved for a timely completion on or before the specified completion date. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. Please see attachment.