Loading...
HomeMy WebLinkAbout02/15/1910 Board of Public Works Minutes5 8T M Board met in regular seseion at IO A.M. F. E Lambert absent ' City Engineef�.' s report on. Grade and Curb .opt I,�,,S 11 Avenue Report placed on file Resolved. by the Board of Public WorkS of the City of South Bend Indiana. that the City Engineer be hereby directed to prepare general plans and specifications for Grade and Curb on LaSalle Avenue and submit the same to the Board for its examination and aproval, at a meeting to be held on the I5th. day of March 1910 at 7-I5 P.M. Engineer .reort on pl&ns and specifications received and filed. IMPROVEMENT RESOLUTION .# 3. Resolved by the Board of Public works of the City of South Bend Indiana. That it is necessary to improve LaSalle Avenue From Eddy Street to Sunnyside Avenue by gradim-7 said Avenue from property line to property line,and curbing the roadway with cement. curb. All as shown on plans and in accordance with profiles,detail plans and specifications on file in.the office of the Board. of Public works of the City of South Bend Indiana.and such improvement is now ordered. Be it further Resolved,that the Board of Public works fix the I5th day of March 1910 at the hour of 7-I5 P.M. at the office of the Board. of Public works in the City Hall in this city,a,s the time and the place for the public consideration of the said proposrd improvement,at which time said Board of Public works will hear all persons interested or whose property is liable to be assessed for said improvement,€end will decide whether the benifitsto the property liable to be assessed for said improvement ,rill equal the estimated cost thereof. Be it further Res-olved that notice of the time and place of such public consideration be published and mailed in the manner provided. by law. Adopted this I5th. day of February 1910 Board adopts plans and specifications- as reported by the City Engineer on .Improvement Resolution -#.3. "A Bond or Bonds to be issued to the Contractor in payment of such work where the propert owner signs -waiver required,as according -,to law which said bonds shall bear interest at the rate of six per -cent per.annum,payable as provided by law. I hereby certify that my estimates of t"e maximum cost of the most expensive pavement designated by the Board of Public works in Improvement Resolution #.I,adopted. by the said Eoard at its said meeting held the 4-th. day of February 191,,:) for the improvement of Praris Avenue from Sa,mPle Street to V.ebster Street in said City of South Bend Indiana. including the labor and cost of material,i s the sum of $4.5,000.00 w. S. MOIRE City Engineer Petition for tirade,Curb,and Walk on Dale Avenue from Indiana Avenue to Dayton Street signed by A. H. Rice and four others refered to the City Engineer Petition for Pipe Sewer on East Broadway from Miami Street to the East line of Lot 12 Leers2"th. Addition,si�;ned by D. C. Leer and three others. a City Attorney reports in the matter of Mrs, Mary Fentons walk on Taylor St. and Madison St..that he would recomend granting the bondmen more time to look up the contracror. Preaident d