November 12, 2019
Keith Stevens
Indiana Earth, Inc,
10343 McKinley Hwy,
Osceola, IN 46561
RE: Change Order No. 2 - Western Ave. Streetscape, Phase III — Project No. 118-076
Dear Mr. Stevens:
The Board of Public Works, at its meeting held on November 12, 2019, approved the above
referenced Change Order for an increase of $133,724.31, plus an additional twenty-two (22)
days, bringing the current contract amount to $2,809,540.66, and the revised contract
completion date to November 30, 2019.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER
DATE:
PROJECT NO:
PROJECT NAME:
CONTRACT DATE:
CHANGE ORDER NO:
SUBJECT OF CHANGE ORDER
11/1/2019
118-076
Western Avenue Streetsca a Phase III
5/28/2019
PCR #2-update trams, add'I pipe work
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
s
Printed Name and Title r`
Indiana Earth„ Inc.
Company Name
10343 McKinley Highway
Address
Osceola, IN 46561
City, State, Zip
$ 2,634,385.35
$ 41,431.00
$ 2,675,816.35
XX Increased
Decreased
$ 133,724.31
$ 2,809,540.66
5.00 %
6.65 %
11 /4/2019
4.5 days
22 days
11 /30/2019
EO,R APPROVAL
CONST LION
MANAGER
CITY OF SOUTH
BEND
BOARD OF PUBLIC WORKS
Approved Date:
ai^ A. Gilot,' resident
4AUL pAk
Genevieve E. Miller, Member
Elizabeth A. Maradik, Member
........
There Dorau , l b wr
Laura L. O'Sullivan, eiber
Western Ave. Southside Extras
Kentucky Ave.
Pavement removal -118 SYS @ 5.61= $661.98
Removal of unsuitable material - 200 CYS @ 6.67 = $1,334.00
53 Stone — 60 TONS @ 26.41= $1,584.60
Base #440 — 55 Tons@ 71.00 = $3,905.00
Total = $7,485.58
Line W
Removal of unsuitable material — 3370 CYD @ 6.67= $22,477.90
Cutting fence for school —1 EA @ $500.00
Concrete donut for Lake street sanitary —1 EA @ $500.00
Total = $23,477.90
Falcon Street
Pavement removal — 300 SYS @ 5.61= $1,683.00
Removal of unsuitable material — 200 CYS @ 6.67 = $1,334.00
53 stone base — 350 ton @ 26.41= $9,243.50
Stand up curb — 50 LFT @ 48.44 = $2,422.00
Manholes — 2 EA @ 3,085.0 = $6,170.00
Catch basins — 2 EA @ 2,045.00 = $4,090.00
Water main grade storm pipe 12" —130 LFT @ 31.96 = $4,154.80
Base #440 —51.33 Tons @ 71.00 = $3,644.43
Base #880—102.96 Tons @ 71.00 = $7,310.16
Patching — (-55) Tons @ 152.00 = $ (-8360)
Total = 31,691.89
Transfer machine for asphalt placement cost $5,390
Sanitary Repair for 18" line at Lake Street going west was $26,460. No extra mob cost by Rieth Riley
but added temporary stone patch and maintenance. New total: $24,100.
18" of Sanitary pipe repair at manhole at Falcon Street and going east. $3,350
Added bollard. Per line item $1000.00.
There will be 1 less of the storm catch basin and 2 less of the storm manhole line items. — ($8215.00)
COST ADJUSTMENTS TO NORTHSIDE OF WESTERN
Falcon Street
Pavement Removal 293.33 SYS @ 5.61= $1645.58
HMA Base #880 = 80 TON @ 71.00 = $5680.00
HMA Base #440 = 25 TON @ 71.00 = $1775.00
53s 6" 75 TON @ 26.41= $1980.75
Patching #880 = 25 TON @ 152.00 =-($3800.00)
Total = $7,281.33
Lake Street
Pavement Removal 305 SYS @ 5.61= $1711.05
HMA #440 = 109 TON @ 71.00 = $7739.00
53s 6" = 125 TON @ 26.41= $3301.25
Patching #880 = 75 TON @ 152.00=-($11,400.00)
Total = $1,351.30
Kentucky Street
Pavement Removal 242 SYS @ 5.61= $1357.62
HMA Base #440 = 92 TONS @ 71.00= $6532.00
53s 6" = 104 TON @ 26.41= $2746.64
Patching #880 = 100 TON @ 152.00 =-($15,200)
Total =-($4563.74)
Drywells
Drywell, fabric, stone, casting adjusting rings, equip and labor. 3 each at $5,370/each = $18,075.00
Storm Adjustments for getting around Duct bank
Includes coring, boots, 8" DIP, new catch basin to replace MH = $11,568.00 LS
Savings from MH =-$3,085
Savings from 12" storm pipe 68' @ $25.35 =-$1,723.80
Total = $6759.20
Duct bank concrete slab and footings at Lake Street
RRiley labor = $1.851.41
Rebar & Concrete = $2,378.88
RRiley equip/misc. _ $124.71
Sub to do rebar = $385
IE Labor & equip = $500
Plastic = $100
Markup = $534
Bond = $106.80
Total: $5,446.80 LS
#2 stone and Geogrid Northside
#2 stone delivered = $5966
2 rolls geogrid = $1168
Excavator 7 hrs x 170/hr = $1190
Laborer 2 hrs x 80/hr = $ 160
Markup = $848.40
Bond = $186.65
_ $9519.05
Winter Concrete Adjustments
700 CYi)s @ $2.25 = $1575.00
Grand Total = $133,724.31
Total for CO #2 = $133, 724.31
rytY4 14d
V'` DEPARTMENT OF PUBLIC WORKS
' DIVISION OF ENGINEERING
Project Number: Project Name: Western Ave Streetscpape Phase 3 Change Order #: 2
DATE INITIATED: 11/01/2019 BPW DATE
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.).
Additional work that was needed to update or add to existing items based on quantities used
during phases 1 and 2. Also necessary changes to storm sewer system, and to improve pavement
integrity on the side streets coming into Western Avenue. This change order also includes the use
of a transfer machine for paving asphalt and two different sanitary repairs to the existing main due
to collapse. This CO should also include a time extension of 6 days. 1 day for sanitary repair at
Falcon, 3 days for sanitary repair at Lake, and 2 days for installing new manholes and catch basins
Attachments: (List documents support change — required)
N/A
Amount of BIncrease / El Decrease: $ 133,724.31
Categories (Pick One):
Previously approved Change Order(s): $ 41,431.00 ❑ Scope of Work
"" 8 Differing Site Conditions, Changed Conditions
Current Percent of Change: 5 0 % ❑ Conflicted Specifications and Drawings
New Total ................w � .....�...._........_.
2,809,540.66 ❑ Failed Materials
Amount: $, _❑ Error
❑ Omission
Total Percent of Change: 6.65 % ❑ Final Quantity Adjustment
Funding Secured From:, 324-...!.°.5D- 46b-4Z-0
(filled out by PM)
RECOMMENDED BY:
r
7
Christopher Holth
Project Inspector (Print Name) (Sinatu (Date)
REVIEWED BY:
Toy Villa g
Construction Manager (Print Name) (Signature) (Date)
APPROVED BY:
Kyle Silveus
Engineering Project Manager (Print Name) (Sign re) (Date)
APPROVED BY:
Kara Boyles
City Engineer (Print Name) (S nttrr (Dt
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 11 /5/19 Department Public Works
..................... _............. _..............
Name Kyle Silveus Division/Bureau Engineering
.........................__ �..._...............
.........
BPW Date 11 /12/19 Phone Extension 9083
uired Prior to Submittal to Board
Legal ❑ Attorney Name: Clara McDaniels
Controller Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing
H Agreement
[] Professional Services
Bid Opening
❑ Quote Opening
® Change Order No. 2
Ease/Encroach.
F Other:
n Michael Schmidt
LJ Contract
E] Resolution
F] Bid Award
❑ Quote Award
❑ C/O & PCA No.
❑ Traffic Control:
Company or Vendor Name
New Vendor
MBE/WBE Contractor
MBE/WBE Contractor Requested
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Indiana Earth, Inc.
Proposal
❑ Req. to Advertise
❑ PCA
Yes LJ No LJ If Yes, Approved by Purchasi
MBE ❑ WBE
�................W
No F1 Yes Name of Comoanv
Western Ave. Streetsca e -,_Phase III
............. .........................
118-076
_.................... .............................
RWDA TIF....-....... _.......
324-1050-460-42-03
$133, 724.31
Addendum
❑ Title Sheet
Additional work needed due to unforeseen conditions including
utility conflicts
LJ Required Contractor's Certification Forms Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.)
ii/ ri -, / ri r, .,r/i //,r ,ri / i r / r�. //..,, ., / ,,.. /... ,,, ,:, rir//. Jr/ i „ ..✓ ,r, i„ r r r..,,.
/r
„/
Amount of ® Increase $ 133,724 31
❑ Decrease � -----__ _................N. __....
Previous Amount $ 2,675,816.35
.........._................................................. .-_..-......................
Current Percent of Change; 5% ._........
New Amount $ 2,809,540.66
Total Percent of Change: 6.65%._m............. _................._.......
Disoersal After