Loading...
HomeMy WebLinkAboutChange Order No 2 - 510 S. Main St. Building Improvements Proj No 119-084 - HC3 LLC dba St. Clair DevelopmentTtl NT 1316 COUNTY -CITY BUILDING I i PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD FAX 574/ 235-9171 SOIITH BEND_ INDIANA 46601-1830 " �r. F „o 1865 o CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDOF PUBLIC WORKS November 12, 2019 David St. Clair HC3 LLC d/b/a St. Clair Development PO Box 6114 South Bend, IN 46660 RE: Change Order No. 2 - 510 S. Main Street Building Improvements — Project No. 119- 084 Dear Mr. St. Clair: The Board of Public Works, at its meeting held on November 12, 2019, approved the above referenced Change Order for an increase of $6,458.50, bringing the current contract amount to $161,162.96. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 11/5/2019 119-084 - 510 S. Main Street Buildin Improvements 9/10/2019 PCR #5-Restroom Accoutrements PCR #6-Locking Thermostat Covers PCR #7-Fence Tarp Deduct PCR #8-Remove Old Signage PCR #9-Paint Facade PCR #10-Replace Extra Ceiling Tile PCR #11-Add Water Heater PCR #12-Add 'Keep Off Signage PCR #13- Furnace Repair PCR #14-Front Door Tint PCR #15-Replace Stolen Do $� outs The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion dateltime w Contractor Signature - Printed Name and Title HC3 LLC d/b/a St. Clair Develgpment Company Name P.O. Box 6114 Address South Bend, IN 46660 City, State, Zip $ 149,485.00 $ 5,219.46 $ 154,704.46 Increased ' t_J Decreased $ 6,458.50_..._._._.�. $ �161,162.96 4.17 % 7,81 % 10/25/2019 0 days _....._ Oda s 10/2512019 CONSTRUCTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC ORtS Approved Date. ,P Gary A. Gilot, rresidenit Genevieve E, Miller, Member Elizabeth A. aradik, Member There J. Dorau, ber L ira L. O"Su va e ber, Change Order #2 Price Breakdown • Restroom Accoutrements $1,501.00 - Added paper towel dispenser (omitted) • Locking Thermostat Covers: $194.00 - In order to lock controls • Fence Tarp Deduct: ( ) - In lieu of slats (same screening purpose) • Remove Old Signage $1,120.00 - Remove all 'Salvation Army' signage • Paint Facade $1,400.00 - Add aesthetic appeal • Replace Extra Ceiling Tile $854.00 - Excess the replacement needed • Add Water Heater $1,106.00 - No hot water feed from adj. building as thought • 'Keep Off' Signage $100.00 - Added to eliminate potential liability issues • Furnace Repair $546.00 - Secondary furnace repaired for use as a backup • Front Door Tint $292.50 - Added for privacy reasons • Replace Stolen Downspouts $439.00 - Original downspouts stolen and needed replaced �4NU NIA i7,�;fl. " DEPARTMENT OF PUBLIC WORKS - DIVISION OF ENGINEERING Project Number: 119-084 Project Name: 510 S. Main Street Building Improvement Change Order #: 2 DATE INITIATED: 10-25-19 BPW DATE: 11-5-19 Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Various unforeseen and aesthetic items added to improve the functionality and safety of the winter amnesty building. Attachments: (List documents support change — required) See attached price breakdown Amount of BIncrease / [--]Decrease: $ 6,458.50 Categories (Pick One): Previously approved Change Order(s): $ 5219.46 lig Scope of Work - Current Percent of Change: 4.17 8 Differing Site Conditions, Changed Conditions ❑ Conflicted Specifications and Drawings New Total Amount: �. � ..._..............—... 161,162.96 ❑ Failed Materials $ ❑ Error ❑ Omission Total Percent of Change: 7.81 % ❑ Final Quantity Adjustment ' Funding Secured From 30 . 14077. 0 (filled out by PM) RECOMMENDED BY: Dan Jones _. �... Project Inspector (Print Name) (Signature) (Date) REVIEWED BY: Toy Villa ° ' Construction Manager (Print Name) (Signature) (Date) APPROVED BY: Alicia Czarnecki Engineering Project Manager (Print Name) (Signature) (Date) APPROVED BY: i Kara Boyles in City Engineer (Print Name) (Signa rya) (Da ) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 10/30/19 mmmm Name Alicia Czarnecki/Pani Me e ° Department C n ineeri / DCI BPW Date 11/12/I9 Phone Extension 5903 mmomoMMMNmmow ffl m mffl ...�... _. ....w............... lie u�d Prior to Submittal to Board BPW Attorney ❑ Attorney Name Dept. Attorney [] Attorney Name Purchasing .............�..._w...... Check the Appropriate Itemav... Reqy Professional Services Agreement E] Contract Open Market Contract ❑ Amendment/Addendum 0 Bid Opening ❑ Bid Award ❑ Quote Opening ❑ Quote Award sal Opening C/O PCA ❑ Ch . Order, No. 2 ❑ Traaffic Control µ g• ® Other: Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description aired Information All Submissions " Proposal Special Purchase, QPA ❑ Req. to Advertise ❑ Reject Bids/Quotes 0 PCA Resolution 0 Ease./Encroach ❑ Title Sheet HC3 LLC dba St Clair Development ❑ Yes❑ If Yes, Approved by Purchasing H No F1 MBE Completed E-Verify Form Attached ❑ Nos WBE ments 510 Main Street Building Improvem s 119-084 ........REDIT /Grants &SubRedevelopment General al _.._. .......... 408.1001.460.39.30 / 433.1050.460.39.30 See attached summary of change order items due to chanced/unforeseen site conditions. Amount of Increase $ 6,458.50 (� Decrease ($ ) Previous Amount $ 154,704.46 Current Percent of Change: New Amount Total Percent of Change; Time Extension Amount New Completion Date: Increase 4.17% Decrease ( %) $ 161,162.96 Increase 7.81 % Decrease 0 days