November 12, 2019
Mr. Jordan McCormack
American Structurepoint, Inc.
205 W. Jefferson Blvd., Ste. 404
SouthBend, IN 46601
RE: Amendment No. 1 to Professional Services Agreement
Dear Mr. McCormack:
The Board of Public Works, at its meeting held on November 12, 2019, approved the above
referenced agreement for Poppy Road lift station repairs and lift station life cycle Analysis
in the amount of $7,570 for a new total $48,770.
Enclosed please find a copy of the agreement for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
9 r
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
AMENDMENT NUMBER I TO OWNER -ENGINEER AGREEMENT
1. Background Data:
a. Effective Date of Owner -Engineer Agreement: Au st 27, 2019
b. Owner: Board of Public Works, City of South Bend, Indiana
C. Engineer: American Structurepoint, Inc.
d. Project: Poppy Street Lift Station Force Main Repair
2. Nature of Amendment
X Additional Services to be performed by Engineer
X Modifications to Payment to Engineer
3. Description of Modifications:
a. The backwater valves on CSO 003 have failed and allow river water to enter the
sewer.
1) Research backwater valves that can be installed in the existing structure and
can prevent the 500 year flood elevation from backing into the existing sewer
system. Assume that the largest storm from the typical year is the flow that
must pass the valves. Provide recommendations on which valve best suits the
City's goals. Review valve alternatives with City staff. Finalize selection of
valve.
2) Determine the structural support required for the selected valve.
3) Develop installation plans and specifications to be used to quote the
installation of the new valves.
b. Life Cycle Analysis of Developer Provided Lift Stations
1) Develop a methodology for developers to use to justify the construction of
lift stations which will only serve the proposed development.
2) The life cycle analysis shall include:
a) How the capital cost for the lift station and force main as well as the off -
site gravity sewer which could be installed instead of the lift station
should be calculated.
b) Operation and Maintenance tasks associated with the lift station as well
as gravity sewer.
201801884 Amendment 1
c) Determine the appropriate maintenance cost, power costs, and remaining
useful life factors, yearly power cost increase percentage, yearly labor
cost increase percentage, and discount rate. How to apply these costs to
the life cycle analysis.
3) Prepare a narrative on how to calculate the life cycle cost estimate.
4) Review documents with City staff and finalize documents.
4. Compensation for the project will be adjusted as follows:
Original Contract $41,200
Credit for unused effort on Poppy Street LS ($20 572)
Amendment No. 1 w "2 142
New Contract Total $48,770
The effort will be billed on an hourly rate basis at the same hourly rates as in the
existing agreement.
2
201801884 Amendment I
Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this
Amendment. All provisions of the Agreement not modified by this or previous Amendments remain
in effect. The Effective Date of this Amendment is the date used by last sjggiitory r�fc -ended below.
OWNER:
City of South Bend, Indiana
Board of Public Works
ENGINEER:
American Structurepoint, Inc.
By: By
......... .
Title: Gary "r'�lt�t, 1 ��siel'r Title: ordan McCormack, North Regional Services
.
Manager
By:
Title:
By:
Title:
By:
Title:
By:
Title:
Attest:
Title:
Date:
aura L. O'Sullivan, Member
L Ia�a�ctl� �. Maradik, Member
Therese J. Dorau , Member
Genevieve E. Miller, Member
- J d7iMAartin)_'Cl 1l1
Date:
201801884 Amendment l
AMERICAN
STRUCTUREPOINT
1 N C
MANHOUR JUSTIFICATION WORKSHEET
Project Title: South Bend Poppy Lift Station Force Main
Client: City of South Bend
Project Number: 2019-01884
Project Manager: Cindy Fort
P:\2019\018841A. Management\Proposal_Contract\Contract\Manhour Jusfificalions\201901884.UI.2019-10-21.A w amd 1, 201901884.U1.2019-10-21,v4 w amd 1, Fee-MHJ 10/21/2019
�V� STRUCTUREPOINT
INC
MANHOUR JUSTIFICATION WORKSHEET
Project Title: oulh, Bt2 P2EE %„.6j'C , 00'ldtol"tl j=0Id7£} �BdfH
Client: CAy Or SOLIVI 88nd
Project Number: 2019-01884
Project Manager: Cindy Fort
P:\2019\01884\A. Management\Proposal_Contract\Contract\Manhour JusUfications\201901884,.U1.2019-10-21.v4 w amd 1, 201901884..Ul 2019-10-21.v4 w amd 1, Fee -MHJ 10/21/2019
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date November, 4 2019
Department
Name Jacob M. Klosinski Engineering / Utilities
BPW Date November :12 2019 Phone Extension Ext. 9496
�a�anmm�mr r uamommm�imumwwmw�imiwmw�mm surn�nxuaee w NMPMPMmmmmmmMMMMEmm
,,.�.............. ...,. _ ....__. __.......... _ .... .._ ..._ ...........................
Require' Prior to Submittal to Board
... __ _.... _ _..........
BPW Attorney ® Attorney Name Clara McDaniels
Dept. AttorneyAttorney Name
.........................._......ww.....w _...... .._._....
........_.._
Purchasing
Check the Appropriate Item T ype —
LJ Professional Services Agreement ❑ Contract
Open Market Contract
® Amendment/Addendum
F] Bid Opening
❑ Bid Award
[:] Quote Opening
❑ Quote Award
Proposal Opening
❑ C/O & PCA No.
❑ Chg. Order, No.
Traffic Control
❑ Other:
Reuuired Information
All Submissions
Proposal
LJ Special Purchase, QPA
❑ Req. to Advertise
❑ Reject Bids/Quotes
E] PCA
❑ Resolution
Ease./Encroach
❑ Title Sheei
Company or Vendor Name
American Structurelj ... t, Inc --
-._......................... ....
Yes If Yes, Approved by Purchasing
New Vendor
® No
MBE El
MBE/WBE Contractor
Completed E-Verify Form Attached
❑ Nos
Project Name
PTpyy RoadmLift Station
Project Number
119-073
Funding Source
Utilities, Wastewater, Repair Parts & Other EquipmentwRepair & Mamt
Account No.
641-0630-793 31-02
Amount$41,200
(Original);mAmendment 1 adjustedyrice $48,770 (+$7,570)
Terms of Contract
Lump Sum (Hourly, Not to Exceed)._.
Purpose/Description
The Division of En Engineering and t t�litzm�.s_re requests approval ww
al of Amendment
No. 1 for the Professional Services Agreement for the sab'ect project to ad(
additional services for CSO 003 ro, air plans and Lift Station Life Cycle Qc
Anal sis.
-
For Chang rders 71_
Amount of ❑
Increase $ ..........�.___.....................................
Decrease �$
Previous Amount
$
Increase /o
Current Percent of Change:
Decrease ( %)
New Amount
$
Increase %
Total Percent of Change:
............................................... ....................
Decrease ( %)
Time Extension Amount:
....... ...................._.._ w �� .
New Completion Date:
._........................_�................�a _....A...�������..... ..�...�.�.�.�_...�.�.�.�.��