HomeMy WebLinkAboutAmendment No 1 to PSA - Poppy Rd. Lift Station Repairs & Lift Station Life Cycle Analysis - American Structurepoint, Inc.1316 COUNTY -CITY BUILDING PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD FAX 574/ 235-9171 SOUTH BEND_ INDIANA 4660I -I 930 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDF PUBLIC WORKS November 12, 2019 Mr. Jordan McCormack American Structurepoint, Inc. 205 W. Jefferson Blvd., Ste. 404 SouthBend, IN 46601 RE: Amendment No. 1 to Professional Services Agreement Dear Mr. McCormack: The Board of Public Works, at its meeting held on November 12, 2019, approved the above referenced agreement for Poppy Road lift station repairs and lift station life cycle Analysis in the amount of $7,570 for a new total $48,770. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, 9 r Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU AMENDMENT NUMBER I TO OWNER -ENGINEER AGREEMENT 1. Background Data: a. Effective Date of Owner -Engineer Agreement: Au st 27, 2019 b. Owner: Board of Public Works, City of South Bend, Indiana C. Engineer: American Structurepoint, Inc. d. Project: Poppy Street Lift Station Force Main Repair 2. Nature of Amendment X Additional Services to be performed by Engineer X Modifications to Payment to Engineer 3. Description of Modifications: a. The backwater valves on CSO 003 have failed and allow river water to enter the sewer. 1) Research backwater valves that can be installed in the existing structure and can prevent the 500 year flood elevation from backing into the existing sewer system. Assume that the largest storm from the typical year is the flow that must pass the valves. Provide recommendations on which valve best suits the City's goals. Review valve alternatives with City staff. Finalize selection of valve. 2) Determine the structural support required for the selected valve. 3) Develop installation plans and specifications to be used to quote the installation of the new valves. b. Life Cycle Analysis of Developer Provided Lift Stations 1) Develop a methodology for developers to use to justify the construction of lift stations which will only serve the proposed development. 2) The life cycle analysis shall include: a) How the capital cost for the lift station and force main as well as the off - site gravity sewer which could be installed instead of the lift station should be calculated. b) Operation and Maintenance tasks associated with the lift station as well as gravity sewer. 201801884 Amendment 1 c) Determine the appropriate maintenance cost, power costs, and remaining useful life factors, yearly power cost increase percentage, yearly labor cost increase percentage, and discount rate. How to apply these costs to the life cycle analysis. 3) Prepare a narrative on how to calculate the life cycle cost estimate. 4) Review documents with City staff and finalize documents. 4. Compensation for the project will be adjusted as follows: Original Contract $41,200 Credit for unused effort on Poppy Street LS ($20 572) Amendment No. 1 w "2 142 New Contract Total $48,770 The effort will be billed on an hourly rate basis at the same hourly rates as in the existing agreement. 2 201801884 Amendment I Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is the date used by last sjggiitory r�fc -ended below. OWNER: City of South Bend, Indiana Board of Public Works ENGINEER: American Structurepoint, Inc. By: By ......... . Title: Gary "r'�lt�t, 1 ��siel'r Title: ordan McCormack, North Regional Services . Manager By: Title: By: Title: By: Title: By: Title: Attest: Title: Date: aura L. O'Sullivan, Member L Ia�a�ctl� �. Maradik, Member Therese J. Dorau , Member Genevieve E. Miller, Member - J d7iMAartin)_'Cl 1l1 Date: 201801884 Amendment l AMERICAN STRUCTUREPOINT 1 N C MANHOUR JUSTIFICATION WORKSHEET Project Title: South Bend Poppy Lift Station Force Main Client: City of South Bend Project Number: 2019-01884 Project Manager: Cindy Fort P:\2019\018841A. Management\Proposal_Contract\Contract\Manhour Jusfificalions\201901884.UI.2019-10-21.A w amd 1, 201901884.U1.2019-10-21,v4 w amd 1, Fee-MHJ 10/21/2019 �V� STRUCTUREPOINT INC MANHOUR JUSTIFICATION WORKSHEET Project Title: oulh, Bt2 P2EE %„.6j'C , 00'ldtol"tl j=0Id7£} �BdfH Client: CAy Or SOLIVI 88nd Project Number: 2019-01884 Project Manager: Cindy Fort P:\2019\01884\A. Management\Proposal_Contract\Contract\Manhour JusUfications\201901884,.U1.2019-10-21.v4 w amd 1, 201901884..Ul 2019-10-21.v4 w amd 1, Fee -MHJ 10/21/2019 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date November, 4 2019 Department Name Jacob M. Klosinski Engineering / Utilities BPW Date November :12 2019 Phone Extension Ext. 9496 �a�anmm�mr r uamommm�imumwwmw�imiwmw�mm surn�nxuaee w NMPMPMmmmmmmMMMMEmm ,,.�.............. ...,. _ ....__. __.......... _ .... .._ ..._ ........................... Require' Prior to Submittal to Board ... __ _.... _ _.......... BPW Attorney ® Attorney Name Clara McDaniels Dept. AttorneyAttorney Name .........................._......ww.....w _...... .._._.... ........_.._ Purchasing Check the Appropriate Item T ype — LJ Professional Services Agreement ❑ Contract Open Market Contract ® Amendment/Addendum F] Bid Opening ❑ Bid Award [:] Quote Opening ❑ Quote Award Proposal Opening ❑ C/O & PCA No. ❑ Chg. Order, No. Traffic Control ❑ Other: Reuuired Information All Submissions Proposal LJ Special Purchase, QPA ❑ Req. to Advertise ❑ Reject Bids/Quotes E] PCA ❑ Resolution Ease./Encroach ❑ Title Sheei Company or Vendor Name American Structurelj ... t, Inc -- -._......................... .... Yes If Yes, Approved by Purchasing New Vendor ® No MBE El MBE/WBE Contractor Completed E-Verify Form Attached ❑ Nos Project Name PTpyy RoadmLift Station Project Number 119-073 Funding Source Utilities, Wastewater, Repair Parts & Other EquipmentwRepair & Mamt Account No. 641-0630-793 31-02 Amount$41,200 (Original);mAmendment 1 adjustedyrice $48,770 (+$7,570) Terms of Contract Lump Sum (Hourly, Not to Exceed)._. Purpose/Description The Division of En Engineering and t t�litzm�.s_re requests approval ww al of Amendment No. 1 for the Professional Services Agreement for the sab'ect project to ad( additional services for CSO 003 ro, air plans and Lift Station Life Cycle Qc Anal sis. - For Chang rders 71_ Amount of ❑ Increase $ ..........�.___..................................... Decrease �$ Previous Amount $ Increase /o Current Percent of Change: Decrease ( %) New Amount $ Increase % Total Percent of Change: ............................................... .................... Decrease ( %) Time Extension Amount: ....... ...................._.._ w �� . New Completion Date: ._........................_�................�a _....A...�������..... ..�...�.�.�.�_...�.�.�.�.��