Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Amendment No 1 to PSA - Design Services for the East Race Sewer Analysis - Christopher B. Burke Engineering, LLC.
1316 COUNTY -CITY BUILDING PHONE PHONE 574/ 235-925I 227 W. JEFFERSON BOULEVARD ` Nb Le '1 FAX 574/ 235-9171 SOI ITH BFND. INDIANA 46601-1830 _ 1"865 � CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD F PUBLIC WORKS November 12, 2019 Mr. Jon D. Stolz Christopher B. Burke Engineering, LLC. 220 W. Colfax Ave., Suite 500 South Bend, IN 46601 RE: Amendment No. 1 to Professional Services Agreement Dear Mr. Stolz: The Board of Public Works, at its meeting held on November 12, 2019, approved the above referenced agreement for design services for the East Race sewer analysis in the amount of $48,400. Enclosed please find the original of the amendment for your signature. Please sign and return the original agreement to our office and retain a copy for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU This is EXHIBIT K, consisting of 3 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated April 10, 2018. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 1 1. Background Data: a. Effective Date of Owner -Engineer Agreement: November 12, 2019 b. Owner: Board of Public Works, City of South Bend, Indiana ("Owner") C. Engineer: Chistopher B. Burke Engineering, LLC (CBBEL) ("Engineer") d. Project: East Race Sewer Analysis m(1m18-034) ("Project") 2. Description of Modifications: a. Engineer shall perform or furnish the following Additional Services: 1) Task 1— Revise Report: CBBEL will revise the current draft of the report based on the following new information: a) Updated SDC tables and numbers provided by the City b) New routing of sanitary sewage from Cascades Phase 2 & 3 which will result in a new Colfax Lift Station upgrade schedule. c) Pump data provided by the City that will replace the previously Population Equivalence (PE) calculations. CBBEL will utilize the updated calculations and the City's lift station standards to provide a revised report that will include updated recommendations. 2) Task 2 — Bid Documents and Permits: CBBEL will prepare plans and specifications for bidding purposes. CBBEL will use existing aerial images as the base for the plans. The project specifications will utilize INDOT standard pay items and special provisions when applicable. No topographic survey will be obtained as part of this project. CBBEL will prepare and submit permit applications to IDEM for the new lift station. 3) Task 3 — Design Coordination with the City: CBBEL will meet the City to discuss review comments on the plan submittals. The City anticipates three submittals and will include 30%, 60%, and 90% plan sets. A field check is also anticipated. At total of four (4) meetings have been included in this task. 4) Task 4 — Bidding Services: CBBEL will provide "As -Needed" Bidding and Services that include: a) Attend a Pre -Bid Meeting b) Respond to contractor questions and issue addenda (if needed). Page 1 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. c) Compile a certified bid tabulation sheet and assist City staff in analyzing the bids provided for an award recommendation. 5) Task 5 - Construction Engineering Services: CBBEL will provide "As -Needed" Construction Engineering Services that include: a) Attend the pre -construction meeting, review project submittals, and respond to design questions that come up during construction. b. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: N/A c. The responsibilities of Owner are modified as follows: d. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: 1) Task 1: $$13,40 2) Tasks 2 through 4: J,20,000 3) Task 5: $5�,0 0 e. The schedule for rendering services is modified as follows: + Revised Report — four (4) weeks from receipt of updated data from City • Final Bid Documents — eight (8) weeks after approval of final report (dependent on City review process) f. Other portions of the Agreement (including previous amendments, if any) are modified as follows: 5. Agreement Summary (Reference only) a. Original Agreement amount: $ 25 000.00 b. Net change for prior amendments: $ 0.00 c. This amendment amount: $ 48 400.00 d. Adjusted Agreement amount: $ 73,400.00 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Page 2 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is 11 /12/2 19 OWNER: PP City of South BenduuuBoard of Public Works.... Ream of Pu e �a By: o ENGINEER: Christopher B. Burke Engulaeerilt LLC By: Jon D. Stolz 20 Title:NOV �' ,, _ mm � Title: Managing Vice -President m Date Signed: Date Signed: .............. . Page 3 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/05/2019 Department Public Name Zach Hurst Works / En inecrin BPW Date 11/12/2019 Phone Extension 3057 ..... Re quired Prior to Submittal to Board BPW Attorney ❑ Attorney Name Dept. Attorney Purchasing ❑ Attorney Name F] Check the Item Type - Requiredfor All Submissions H Professional Services Agreement LJ Contract ❑ Proposal Open Market Contract Z Amendment/Addendum E, Special Purchase, QPA Bid Opening Bid Award [-] Req. to Advertise EJ Quote Opening Quote Award ❑ Reject Bids/Quotes Proposal Opening ❑ C/O & PCA No. F-] PCA E] Chg. Order, No. ❑ Traffic Control EJ Resolution Other: E, Ease./Encroach Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description hristo Yes No Information B. Burke If Yes, Approved by Purchasing ❑ Title Sheet 0 MBE Completed E-Verify Form Attached ❑ Yes ❑ WBE ❑ No East Race Sewer Analysis 118-090 .............. ................ River East TIF 429-1050-460-31.02 $48,400.00 Amendment No, 1 for design services to account for revised flow inform°natic and aesthetic updates. __ ... For Change Orders Onl Amount of Increase $ [� Decrease ($ ) Previous Amount $ Increase % ............. Current Percent of Change: Decrease ( % New Amount $ Increase % Total Percent of Change: Decrease( % Time Extension Amount: New Completion Date: