Loading...
HomeMy WebLinkAbout09/03/1909 Board of Public Works Minutes4 7`8 Friday SeD ember 3rd_ 1Q0q. The Board met,in regular session at 10 A. Me All members present. .Engineer reported grade on alley east of Mich*fan street from Monroe street to South street. Same approved. Lints ordered at Wayne & Eddy streets and LaPorte 8c Howard avenues. Robert H. Evans Co. ask permission to enclose a portion of the east side of Vistula avenue adjacent to the right-of-way of the Grand Trunk Western R. R. and also a space in,Howard Park, during the construction o-r' the Grand Trunk Western R. R. Co's bridge. across the St. Jos.River. IMPROVEMENT'RESOLUTION S0. 609. Resolved by the Board of Public Works of the City of South Bend, Indisna: That an improvement be made of the kind, size, location and terminal points as follows: Asphalt - Macadam pavement on Howard avenue from Van Buren street to Michigan avenue. Said improvement shall be known and designated as "TOTE HOWARD AVENUE ASPHALT MACADAM PAVEMENT IMPROVEMENT" and shall be constructed according 6o the plans and speceif5.cati ons prepared by the City Civil Engineer, filedheewi.th. Notice of this resolution shall be published on the 4th day of September and on the llth clay of September, 1909, in the South bend Daily Times. This Board will give a hearing on this resolution at its office in the City Hall on the'21st day of September, 1909, at 7:15 P.M. .A Bond or Bonds to be issued to the Contractor in payment for such work where the property owner signs waiver required, as according to law. Which said bonds steal bear interest at the rate of six p;er cent per ate?urn, payable as provided by law. Adopted this 3rd day of September, 1909, BOARD OF PUBLIC WORKS. IMPROVEMENT RESOLUTION NO. 610. Resolved by the Board of Public Works of the City of South Bend, Indisna: `mat an improvement be made of the kind, size, location and terminal points as follows: Cement sidewalks on West .Washington street from Walnut street to Circle avenue. Said improvement .shall be known and designated as "THE We WASHINGTON STREET SIDEWALK IMPROVxE1,UTT" and shall bE constructed according to theplans and specifications prepared by the City Civil Engineer, filed her' wit Notice of this resolution shall be published on the 4th day of September and on the llth day of September, 1909, in the South Bend Daily Times. This Board will give a hearing on t is resolution at its office in the City Hall on the 21st day of September, 1909, at 7:15 P. M. A BonD or Bonds to be issued to the Contractor in payment for such work where the property owner signs waiver required, as aceoRding to law. Which said bonds shall bear i=-merest at the rate of six per cent per annum, payable as provided by law. Adopted this 3rd day of September, 1909. BOARD OF PUBLIC WORKS. IMPROVE',IENT RESOLUTION NO. 611. Resolved by the Board of Public Works of the City of South Bend, lindiaha 'That an improvement be made of the kind, size, location and terminal points as follows:,Cement sidewalks on Wa, nut street from Napier street to Linden avenue. Said improvement shall be known and cesignated as "THE WALNUT STREET CEMENT SIDEWALK IMPROVEMENT" and shall be con- structed according to the plans and speci_'ications prepared by the City Civil Engineer, filed herewith. Notice of this resolution shall be published on the 4th day of Sept. and on the llth day of Sept. 1909, in the South Bend Daily Times.. This Board will give a hearing on this resolution at its office in the City Hall on the 21st day of Sept. 1909 at 7:15 P. M. A Bond or Bonds to beissued,to-the Contractor in payment for such work Yh ere the property owner signs waiver required, as according to law. Which said bonds shall bear interest at the rate of six p Er cent p erannum. payable as provided by law. Adopted this 3rd day of September, 1909. BOARD OF PUBLIC WORKS. Friday September 3rd, 1909. ' IMPROVEMENT RESOLUTION NO.612. Resolved by the Board of Public Works. of the City of South Bend, Indiana: That an improveinent'be made of the kind, size, location and terminal points as follows: Cement sidewalk on S. Michi?an street fromWayne street to the Grand Trunk Western 'y. tracks. Said improvement shall be known and designated as "THE S. MICHIG AN STREET CEMEINT SIDEXALK IMPROVEMENT" *and shall be constructed according to theplans and specifications prepar#d by .the City Civil Engineer, filed herewith* Notice of this resolution sHall be published on the 4th day of September and on the 11th day of Sept. 1909, in the South Bend Daily Tines. This Board will give a hearing on this reso- lution at itsoffiee in the City Hall on the 21st day of Sept. 1909, at -7:15P.M. A Bond or Bonds to be issued to the Contractor in payment for such work where the property ot&rner signs waiver required as according to iww. 'Which said bonds shall bear interest at the rate of six per cent per annum, payable as provided by lave. Adopted this 3rd day of September, 1909. BOARD OF PUBLIC WORKS. " IMPROVEMENT RESOLUTION NO. 613. Resol,ved'by the Board of Public Works_ of the City of South Bend, Indiana: That an improvement be made of the kind, size, location and terminal points as follows: Cement sidewalks on Napier street from Maple street to Cherry street. Said improvement shall be known and designated -as "THE NAPIER STREET CEMENT SIDEWALK IMPROVEMENT" and shall bE constructed addording to theplans and specifications prepared by the Uity Civil Engineer, filed herewith. Notice of this resolution sha7 bepublishdd on the 4th day of Sept. ar*0_ on the llth day of :Sept. 190% in the South Bend Daily Times. This Board will give a hearing'on tis resolution at its office in the City Hall on the 21st day of :3ept. 19099 at 7:15 P. M. A Bond or Bonds to beissued to the Contractor in payment for such work where the property owner signs waiver required, as according to law. Which said Bonds shall bear interest at the rate of six per cent per annum, payable as provided by lair. Adopted this 3_^d day of September, 1909. BOARD OF PUBLIC WORKS. IMPROVEMENT RESOLUTION NO. 614. Resolved by the Board of Public Works of the City of South Beni?, IndiFwna:' That an improvement be made of the kind, size, location and terminal points as follows: Grade, Curb & 'Falk on Huron street from Arnold street to Webster. street. Said improvement stall be known and design "_THE HURON STREET GRADE, CURB & wALK IMPROVEMENT" and shall be constructed according to the plans and specifications prepared by the City Civil Engineer, filed herewith. Notice of this resolution shall be published on the 4th day of September and on the llth day of September, 1909, in the South Bend Daily Times. This Board will give a hearing on this resolution at its office in the City'Hall'on the 21st day of September, 1909, at 7:15 P.I. A Bond or Bonds to be issued to the Contractor in payment for such work where the propertyowner signs waiver, required as according to lww. Which said bonds shall bear interest at the rate of six per cent per arum, payable as provided by law. Adopted this 3rd day of September, 1909. BOARD OF PUBLIC WORKS. IMPROVEMENT RESOLUTION NO. 615. Resolved by the Board of Public Works of the City of South Bend., Indiana: That an improvement be made of thekind, size, location`and terminal points as follows: Grade, Curb & Walk on Vassar avenue from Woodward avenue to Leland avenue. Said improvement shall be known and designated as "THE VASSAR AVENUE GRADE, CURB & WALK IMPROVEMENT" and shall be constructed according to theplans and speicifeations prepared by the City Civil Engineer, filer] herewith. Notice of this resolution shall be published on the'4th day of September and on the llth day of September 1909, at7:15P. M. A.Bond or Bonds to be issued to the Contractor in payment for such work Vzere the property owners signs waiver required, as according; to law. Which said bonds shal bear interest at the rate of six per cent per annum, payable as provided by law. Adopted this 3rd da�j of September, 1900,. BOARD OF PUBLIC WORKS. 4 l j Friday September 3rd, 1909. IMPROVE%IENT RESOLUTION No. 616. Resolved by the Board of Public Works of the `City of South Bend, Indiana: That an improvement be made of the kind, size, location and_.terminal points as follows Gradq Curb &- Walk on Fifth street from Linden avenue to Orange street. Said improvement shall be known and designated as "THE FIFTH STREET GRADE, CURB & WALK Ii - PRO1M4ENT" and shall be constructed according to the plans and specifications prepared by the City Civil Engineer, filed herewith. Notice of this resolution shall be published on the 4th daft of Sept. andon the 11th day of Sept. 19092 in the ,South 113end Daily Times. This -Bon Board will give a hearing on this resolution at its office in the City Hall on the 21st day of Sept. 1909, at 7:15 P,14. A Bond or Bonds to be issued to the Con tr.ctor in payment for such work where the property owner sins.waiver required, as according to law. -Which said bonds shall bear interest at the rate of six per cent per annum, payable as provided by law. Adopted this 3r(3 day of September, 1909.- BOARD OF PUBLIC VVORKS. IMPROITMENT RESOLUTION No. 617. ResolveD by the Board of Public Works of the City of South Bend, Indiana: Th& an improvement be`made of the kind, size, location and terminal points as follows: Pipe sewer in and along Pine street from Napier street.to the Lake Shore & Michigan Southern R. R. right-of-way. Said improvement shall be known and designated as "THE PINESTREET PIPE SEWER DAPROVEMMM" and shall be constructed according to theplans and specification prepared '�_y the City Civil Engineer, filed herewith. Notice of this reslution shall be published on the 4th day of Sept. and on the 11th day of Sept. 1909, in the South Bend Daily Times. This Board will give a hearing, on this resolution at its office in the City Hall on the 21st day of Sept..1909, at 7:15 P.M. A Bond or Bonds to be issued to the Contractor in payment for suchwork where the property owner signs waiver required, as according to law. Which said -Bonds shall bear interest at the rate of six per cent pr annum, payable as provided by law. Adopted this 3rd day of''September, 1909. BOARD OF PUBLIC WORKS. IMPROVE14ENT RESOLUTION No. 61ig. Resolved by the Board of Public Works of the City of South Bend, Indiana: That an improvement be made of the kind, size, location and terminal points as follows: Pipe sewer in and along Jaquith Court from the trunk sewer in Prairie avenue to a point about 70 feet east of Chapin street. Said improvement shall be known and designated as the "JAQUITH COURT PIPE SEWER IMPROVEMENT" and shall be constructed according to the plans and specifications prepared by the City Civil Engineer, filed herewith. Notice of this resolution shall be published on the 4th day of September anD on the llth day of Sept. 1909, in the South Bend Daily Times. This Board will give a hearing on this resolution at its office in the City Hall -on the 21st day of September 1909, at 7:15 P. M. A Bond or Bonds to be issued to the Contractor in payment for such work where the property owner si.,, s waiver required, as according to law. Which said bonds shall bear interest at the rate of six per cent. per annurt, payable as provided by law. Adopted this 3rd day of September, 1909. BOARD OF PUBLIC WORKS. IMPROVEMENT RESOLUTION No. 619. Resolved by the Board of Public Works of the City of South Bend, Indiana: That an improvement be made of the kind, size, location and terminal points as follows: -Pipe sewer in and along North Eddy street from the trunk sewer on South Bend avenue to Howard street and thence crest on Howard street to Notre Dare avenue.' Said improvement shall be known and designated as "THE EDDY STREET & HOWARD STREET PIPE SEWER IMPROVEIRNT" anD shall be constructed according to the plans and specifications prepared by the City Civil Engineer, filed herewith. Notice of this resolution shall be published on the 4th day of Sept. and on thellth day of Sept. 1909, in the South Bend Daily Times. This Board will give a hearing on this resolution at its office in the City Hall on the 81st day of Sept. 1909, at 7:15 P.M. A Bond or Bonds to be issued to the Con�,ractor in payment for such work where the property o«rner signs waiVer required, as ac--cording to law. Which SFid bonds shall bear interest at the rate of six per cent per £Innum, payable as provided by law. Adopted this 3rd day of September, 1909. BOARD OF PUBLIC WORKS. 4$ ' 76" Friday Septerf:ber 3rc-, 1909. IMPROV04011 T RESOLUTION? NO. 620. Resolved by the Board of Public Works of the City of South Bend, Indiana: That an improvement be made of the kind, size, location and. terminal points as fellows: Pipe sewer in and along College street from Linden avenueto Washington street. Said improvement shall be known and designated as "THE COLLEGE STREET PIPE SEWER IMPROVEMET and shall be constructed according to the plans and specifications prepared by the City.Civil Engineer, filed herewith., Notice of this resolution shall be published on the 4th day of September and on the 11 th day of September, 1909, in the South BenD Daily Times. This Board will give a hearing on this resolution at its office in the Cher Hall on the 21st day of September 1909, at 7:15 P.M. Bond or Bonds to be issued to the Contj-�actor in payment for such work where the property owner signs waiver required, as according to law. 'Which said Bonds shall bear interest at the rate of six per cent. per armum, payable as provideO by law. Adopted this 3rd day of September, 1909. BOARD OF PUBLIC WORKS. IMPROVEMENT RESOLUTION NO. 621. Resolved by the Board of Public Works of the City of South Bend, Indiana: That an improvement bemade of the kind, size, location and terminal points as follows: Pipe sewer in and along Garfield Court from the manhole in the Washington street sewer south to the end of Garfield Court. Said improvement shall be known and designated as "THE GARFIELD COURT PIPE SEA IMPROVEMENT" and shall be constructed according to the plans and specifications prepared by the City Civil Engineer, filed herewith.. Notice of this resolution shall be published on the 4th day of Sept. and. on the llth day of Sept. 1909, in the SouthBend Daily Times. -This Board will give a hearing on this resolution at its office in the City Hail on the 21st day of September, 19092 at 7:15 P. M- A Bond or Bonds to be issued to the Contractor in payment for such work where the property owner signs waiver required, -as according to law. Which said bonds shall bear interest at the rate of six per cent per annum, payable as provided by law. Adopted this 3rd day of September, 1909. BOARD OF PUBLC WORKS. PRESIDENT.