Loading...
HomeMy WebLinkAbout6C (3)Community 1200 Coun 9021 To: From: Subject Date: 50UTA 6F 'V11II: N� & Economic Development • IB 5 ity Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 r Phone 574/235 -9371 Fax 574/235- Redevelopment CCjommissi n Ann Kolata61 / _ Proposal from Weaver Boos — 520 S. Lafayette September 6, 2012 Attached is a proposal from Weaver Boos Consultants for soil and groundwater testing at the former Studebaker Museum location at 520 S. Lafayette. This is additional testing that has been requested by the Indiana Department of Environmental Management. Task 1 (further site investigation) of this proposal as approved by the Board of Works in the amount of $26,952 but the Board of Works has only set ide $26,000 for this work. They are asking that the Redevelopment Commission use $952 of TIF to nd the balance of Task 1. Staff recommends approval of this request. Please co4tact me at 235 -9374 or akolatagsouthbendin.gov if you have any questions. SOOS CO S�TLT�ivT� August 14, 2012 WBCP- 001 -17 -12 Ms. Arn Kolata, Senior Redevelopment Specialist City of South Bend Community and Economic Development 227 W. Jefferson Blvd. South Bend, IN 46601 Re: Proposal for Environmental Consulting Services Former Studebaker Museum 20 S. Lafayette Blvd. South Bend, IN 46601 ID #24951 UST # 200702503 Dear Ms. Kolata: Weaver Boos Consultants, LLC. (Weaver Boos) appreciates the opportunity to provide the City of South Bend (the City) this proposal to complete a Further Site Investigation (FSI) of a leaking underground storage tank (LUST) release that occurred at the referenced site (Site). The Indiana Department of Environmental Management (IDEM) has requested the FSI in response to their review f an Initial Site Characterization (ISC) Report prepared by Weaver Boos, dated May 6, 2010. he objective of the FSI would be to fully delineate the nature and extent of soil and ground ater impacts associated with the UST release. In addi ion, Weaver Boos understands that the Site may be redeveloped for multi- family resident al usage. The Property is currently zoned for non - residential usage. As a result, another objectiv of the investigation is to expedite possible residential closure of the site so develop lent can move forward without hindrance. PROJECT BACKGROUND In October 2006, a previously undocumented 1,500- gallon UST was discovered during demoliti n of the former Studebaker Museum building. On January 4, 2007, the UST was removed from the Site. Upon removal there were visual indications (stained soil) of a possible release froin the UST in the surrounding soils. A limited amount of impacted soil was removed 4055 A9eghan Beeler Coin? o Soulh Bend, IndiCnla 46628 • Phone: (574) 271 -3447 o Fax: (574) 271 -3343 www.weaverboos.com Ms. A i Kolata August 14, 2012 Page 2 of 9 and disposed at a nearby landfill. Soil confirmatory samples were collected from the sidewalls and floor of the resultant excavation and tested for total petroleum hydrocarbons (TPH). TPH was detected in four of the six samples collected. The concentrations detected exceeded the Risk Integr ted System of Closure (RISC) Residential Default Closure Levels. As a result, a release was re orted on January 19, 2007 (LUST incident #200702503). On February 15, 2007, Envirorunental Incorporated completed and submitted to the IDEM -UST Section an Underground Storage Tank System Closure Report documenting all of the closure activities to date. Based on the results of the UST closure, Environmental Incorporated requested IDEM issue a No Further Action (NFA) Letter, The UST Section of IDEM concluded that the closurc report prepared by Environmental Incorporated was incomplete since the appropriate soil parameters were not tested for, no groundwater sample was collected and tested, and no decontamination procedures were provided. The NFA request was not approved. IDEM requested that the nature and extent of soil and groundwater contamination be defined with t e results being provided in an ISC report and if necessary a FSI report. Weaver Boos comp] ted ISC activities and forwarded an ISC report to IDEM in May 2010. The ISC report concluded the following: W the Constituents detected in the groundwater above Indiana RISC residential closure levels include TPH, benzo(a)pyrene, and 1,2- dichloroethane. Groundwater impacts were identified at a depth of approximately 22 -24 feet below the ground surface and migrating to the southwest. Soil impacts were identified near the depth of the water table. Constituents detected above Indiana RISC residential closure levels included lead, naphthalene, and TPH. Boos recommended that a FSI be undertaken to assess the extent of soil and groundwater nant migration away from the former location of the UST. Recommendations include illation of five additional monitoring wells and additional soil and groundwater sampling. IDEM �eviewed the Weaver Boos ISC, concurred with the recommendation to proceed with a FSI, an provided the following additional comments via letter, dated June 27, 2010. One additional monitoring well should be installed to delineate the benzo(a)pyr•ene in the groundwater. Ms. Ann Kolata August 14, 2012 Page 3 of 9 • Lead should be added as a contaminant of concern (COC) for groundwater sampling and TPH should be removed from the groundwater sampling scheme. • Quarterly sampling of the monitoring well network should be conducted. • Full QA /QC documentation should be provided to IDEM to validate results. • The earlier UST Closure Report deemed incomplete should be amended by providing the information requested in the UST Closure Checklist to IDEM's UST Section. PROJECT OBJECTIVES The initial objective of the project is to complete the FSI investigation, prepare the FSI report, and submit it to the IDEM. The ISC investigation will be completed in accordance with 329 IAC 9 -5 -5. 6 and be consistent with the Risk Integrated System of Closure (RISC), as amended. The investigation will also be in accordance with the IDEM correspondence to the City, dated June 27, 2011. The primary objective is to determine the full extent and location of soil and groundwater contaminated by the release in accordance with state requirements, ultimately leading to the issuance by the IDEM of a No Further Action or Closure Letter. The following presents our proposed Scope of Work to address these individual project tasks: • Task 1 — Complete Further Site Investigation Activities; • Task 2 — Prepare Corrective Action Plan (if necessary); • Task 3 — Implement Corrective Action Plan (if necessary); • Task 4 — Request Closure/NFA • Task 5 — Project Management related to LUST Activities. Each of these tasks is described in detail below SCOPE OF WORK Task 1 Complete Further Site Investigation Activities Sub-Task 1- A/Field Investi ation To co plete the assessment, Weaver Boos proposes to follow boring placement and soil /gro ndwater sampling requirements as recommended in the ISC Report and June 27, 2011 Ms. A Kolata August 14, 2012 Page 4 of 9 IDEM correspondence. To maximize efficiency, potential impacts will be characterized by advan ing a series of soil probes using a Geoprobe. Soil samples will be sampled continuously from each soil probe and field screened using a photoionization detector (PID) for the presence of contaminants associated with petroleum. Seven soil probes will be advanced as shown on the two attachments. Each soil probe will be advan ed to the water table (anticipated to be approximately 25 -30 feet). Soil samples will be collected and field screened for the presence of volatile organic compounds (VOC) by using a photoionization detector (PID). Unsaturated soil samples with the highest PID levels at the each boring locations will be submitted to an analytical laboratory for analysis of the following parameters: TPH GRO, TPH ERO, VOCs (including BTEX and MTBE), PNAs (inclu ing naphthalene), and lead as specified by the IDEM. By using a hollow stem auger rig, each soil probe locations will be converted to 2 -inch diameter monitoring wells constructed of PVC casing. The top of each well will be completed flush with the ground surface. Top of casing elevations will be surveyed. Ground water elevations will be measured in each well in addition to the three existing wells and a general groundwater flow direction will be determined. Each monitoring well will be constructed in accordance with general accepted construction standards and IDEM regulations. Ground water samples will be collected upon well completion and purging and submitted to an independent laboratory for analysi3 of the following parameters: VOCs, PNAs, total lead, and dissolved lead. Samples will also be collected from the three existing monitoring wells. For cot estimating purposes, we have assumed that the 6 soil samples and 9 ground water sample will be submitted for analysis. To support a possible closure for this site, Level IV data quality objectives (DQOs) will be met. The IDEM requires the collection of various quality assura ce /quality control (QA/QC) samples be collected during site characterization to ensure properl sampling and analytical techniques are being followed. These include a matrix spike/rnatrix spike duplicate (soil and water), equipment blank, field duplicate (soil and water), and trip blank (water). Weaver Boos estimates that an additional three soil samples and four water samples will be required to comply with QA /QC requirements. The actual number of analyses or parameters for this entire project might require modification based upon conditions encountered in the field and the laboratory analytical results. Any modification to the proposed analytical sampling program as outlined in this task or subsequent Ms. Aim Kolata Augus 14, 2012 Page 5 of 9 tasks Nvill be discussed in advance with the City. Sampling and laboratory analyses will be performed in general accordance with approved techniques and methods as outlined in USEPA SW-846, Test Methods_for Evaluating Solid Waste, Third Edition, and other published sources. Laboratory-certified sampling containers for the samples will be filled (and preserved) in accord ce with laboratory specifications. The samples will be placed into a cooler, packaged with is to maintain a shipment temperature of approximately 4 degrees Centigrade, documented with a chain -of- custody form, sealed, and shipped overnight or hand - delivered to the analytical laborat rv. 1 -B /Prepare Further Site Investigation Upon conclusion of the field activities related to the Final Site Investigation, a Report will be completed and submitted (upon approval by the City) to IDEM for review and approval (typically within 0 days). The report will contain the information outlined in 329 IAC 9- 5 -5.6. If nature and ext nt of contamination is defined when this task is completed then Weaver Boos will either proceec to Task 2 — Prepare Corrective Action Plan if corrective action is required or Task 4 — Reque t Closure/NFA if the contaminant concentrations do not exceed RISC Residential Default Cleanup Levels. If corrective action is necessary, then the completion of Task 3 — Implement Corrective Action will be necessary. Note, if the plume of contamination is widespread and migrated off -site then additional investigation activities, as part of the FSI, will be required prior to the completion of Task 2. Based on the results of the earlier ISC, this is not anticipated. These activities are beyond the scope of this proposal but will be forwarded to the City, in necessary, upon completion of the Task 1- . Per the IDEM correspondence dated, June 27, 2011, Weaver Boos will also correct any deficiencies in the UST Closure Report submitted to the IDEM UST Section in 2007 by others. The information may not be included in the FSI Report and will be submitted to the IDEM -UST Section fter City review and approval. Ms. A n Kolata August 14, 2012 Page 6 of 9 I In sup rt of the activities described additional communications (telephone, email, facsimile, and in -per Ion, either on -site or off -site) between Weaver Boos, City, IDEM personnel, and will occur to effectively manage the project. Task 4 — Prepare Corrective Action Plan (if necessary) If soil and/or groundwater contaminant concentrations exceed RISC Residential Default Closure Levels then corrective action will be necessary. Once the nature and extent of contamination has been d fined Weaver Boos will prepare a Corrective Action Plan (CAP). A specific scope of work and cost estimate for the preparation and implementation of the CAP cannot be provided until the site characterization has been completed. The CAP will be prepared in accordance with IDEM rules. The CAP may be prepared separately from the FSI Report and may or may not be submitted to IDEM concurrently depending upon the magnitude of the subsurface impacts. Based on our finding from the ISC and the IDEM correspondence, dated June 27, 2011, Weaver Boos anticipates that quarterly sampling of the groundwater may be all that is required (no active remedi tion) for the CAP. If this continues to be the case after the FSI has been completed then no separate CAP may be necessary. Typically, IDEM will require a minimum of two years of quarter y sampling to demonstrate that groundwater contaminant levels are below closure standards prior to proceeding with site closure. However, IDEM, may be amenable to a more expeditpd closure of the site in light of the proposed redevelopment. Task 3 � Implement Corrective Action Plan (f necessary) Weaver{ Boos can implement corrective action if found necessary by IDEM based on Site conditi ns. Task 4 � Request Closure/1VFA Once I EM approves the CAP (review will normally occur within 60 days of submittal), Weaver Boos will implement the CAP. Periodic progress reports may be required to be prepared and submitted to IDEM. Once the CAP has been completed then a closure report will be submitted requesting a No Further Action Letter (NFA) letter for the release. Ms. A n Kolata Augusl 14, 2012 Page 7 of 9 If results of the FSI completed as part of Task I indicate that the soil and groundwater contan inant concentration do not exceed residential default closure standard then a NFA letter will be requested as part of the FSI and the overall project will be deemed complete unless IDEM indicat s otherwise. IDEM may want additional quarterly monitoring to occur. Tasks 2 -4 will not be ecessarv. Task 5 — Project Management In support of the activities described additional communications (telephone, email, facsimile, and in-person, either on -site or off -site) between Weaver Boos, City, IDEM personnel, and subcon ractors will occur to effectively manage the project. A cost estimate for the completion of this task follows. SCHEDULE Task 1 can be completed within 60 days of authorization. Due to the several factors including the proposed redevelopment of the site, Weaver Boos will expedite the investigation where possible include immediately scheduling the fieldwork upon authorization. An estimate schedule to complete the remainder of the tasks outlined (if deemed necessary) is entirely dependent upon the ext( Weaves accord comple known, been cc For inf( Tasks 2 high pri confine ground) then a I complel of subsurface impacts identified. COST ESTIMATE Boos proposes to perform the FSI as outlined in Task I on a time and material basis in ice with our fee schedule included with this proposal. We estimate the work can be ;d for $ 26,952.00 as summarized below. Since actual site conditions are not presently i specific cost estimate to complete the remaining tasks will be provided once Task I has npleted. .mation purposes, however, Weaver Boos has provided a general cost estimate range for 5 assuming that no emergency response is required to address the release, the site is not a )rity (to date the site has been classified as low priority), and the contamination is largely to the site. Also, if the FSI completed as part of Task 1 indicates that the soil and 'ater contaminant concentration do not exceed RISC Residential Default Closure Levels TA letter will be requested as part of the FSI and the overall project will be deemed unless IDEM indicates otherwise. Tasks 2 -5 will not be necessary. Ms. Ain Kolata August 14, 2012 Page 8 of 9 Ta sk/Item Cost Estimate Fu her Site Investigation (FSI)) $ 26,952.00 Prepare Corrective Action Plan, (CAP) (if necessary) $ 5,000.00 - $ 10,000.00 Implement CAP (if necessary) $ 15,000.00 — 100,000.00 Re uest Closure/No Further Action (NFA) $ 0 - $ 10,000.00 Project Management $ 0 - $15,000.00 Attached to this proposal is an itemized cost estimate for Task 1. Payment for services rendered is due n accordance with our attached General Terms and Conditions. The estimated cost and proposed Scope of Work are based on information available to Weaver Boos at this time. If conditions change, work extends beyond the scheduled completion date, unforeseen circumstances are encountered, or work efforts are redirected by the client, our cost estimate may require modification. For projects of this nature, we have found that investigation and reporting require nents, revisions to draft deliverables, and work scopes are sensitive to project objectives and th preferences of individual reviewers. As a result, our estimates do not provide for revisions of deliverables for content, approach, or style. We full expect to complete the outlined tasks described above for the stated sum, and this cost will not be exceeded without your prior authorization. You will be invoiced on a unit -rate basis only for the work actually performed. AUTHORIZATION If this proposal meets with the City's objectives, please indicate authorization to proceed by signing the attached Proposal Acceptance Sheet and returning one complete copy of this proposal to us f r our files. We propose that the outlined work be performed in accordance with the Revised General Terms and Conditions, dated August 20, 2009, and Fee Schedule, which are attached and incorporated herein by reference. Any modification to this proposal or the attached General Terms and Conditions or Fee Schedule must be accepted by both parties. This proposal is valid if accepted within 30 days of issuance. Ms. A n Kolata Augusi 14, 2012 Page 9 of 9 We ap reciate this opportunity to be of service and are looking forward to working with you on this pi• ject. If you should have any questions or comments concerning this proposal, please do not hesitate to contact our office. Weaver Boos Consultants, LLC Edward B. StefaneYa Senior roject Man ents: Table 1 - Cost Estimate Proposal Acceptance Sheet General Terms and Conditions Fee Schedule Table 1 Cost Estimate for Further Site Investigation (Task 1) Former Studebaker Museum 520 South Lafayette Blvd South Bend, Indiana Total Total Category Rate* Unit Sub -Task ] -A Sub -Task 1 -B Sub -Task 1 -C Hours Cost Principal $170 hr. 0 0 0 0 $0 Sr. Project Manager $130 hr. 18 14 4 36 $4,680 Staff Eng. /Ge 1. $85 hr. 32 40 0 72 $6,120 Engineer/Scientist $70 hr. 8 0 0 8 $560 CAD/Technician $75 hr. 0 15 0 15 $1,125 Admin Support $50 hr. 2 2 0 4 $200 Total Hours 60 71 4 135 Total Labor Cost $5,720 $6,445 $520 $12,685 SUBCONTRACTOR EXPENSES Total Category Rate Unit Task 1 Task 2 Task 3 Units Cost Laboratory Subcontractor $0 Totol and Di solved Lead (12 water samples) $40 ea. $480 12 $480 TPH -GRO (9 soil samples) $60 ea. $540 9 $540 TPH -ERO (S soil samples) $60 ea. $540 9 $540 Total Lead (9 soil samples) $20 ea. $180 9 $180 VOCs G 3 w ter samples) $100 ea. $1,300 13 $1,300 VOCs (9 soil samples) $115 ea. $1,035 9 $1,035 PNAs (21 soi 1 and water samples) $112 ea. $2,352 21 $2,352 Moisture (6 s it samples) $0 ea. $0 6 $0 Drilling Subc tractor $0 Mobilization $460 LS $460 $460 Probing/WellInstallation $1,610 day $3,220 2 $3,220 Materials* $3,410 LS $3,410 $3,410 Total Subconttactor Expenses $13,517 $0 $0 $90 $13,517 REIMBURSE BLE EXPENSES Total Category Rate Unit Task 1 Task 2 Task 3 Cost Mileage $0.50 mi. $0 $0 $0 Photoionizatio Detector $100 day $200 $0 $0 $200 Data Logger to Aquifer Testing $500 day $500 $500 Sample Suppli s, Bailers, etc. LS $0 $0 $0 $0 Sample Shippir Reproduction & g Postage LS $0 $0 LS $0 $50 $0 $0 $0 $50 Total Reimburseable Expenses $700 $50 $0 $0 $750 TASK TOTALS $19,937 $6,495 $520 $90 $26,952 Sub -Task Desc i tions: ation 3 - Project Management I - Field Invest i 2 - Report Prep rration * includes liner , drums @ $ 50 /each, well screens, riser pipe, well plugs, sand, bentonite, and six manhole covers Page 1 of I Description of Services: Propel y Address: Project City /State: Weave • Boos Proposal No WEAVER BOOS CONSULTANTS, LLC 4085 Meghan Beeler Court South Bend, Indiana 46628 Voice: 574 - 271 -3447 Fax: 574- 271 -3343 PROPOSAL ACCEPTANCE SHEET Further Site Investigation — Former Studebaker Museum 520 S. Lafayette Blvd South Bend, IN 001 -17 -12 Date: August 14, 2012 For approval and payment of charges, invoices will be charged to the account of: Firm: City of South Bend Attention: Ann Kolata Street Address 1: Community/Econ. Develop Telephone: 574- 235 -9374 Street Address 2: 227 W. Jefferson Blvd. Fax: 574- 235 -9021 City/State: South Bend, IN Zip Code: 46601 This A13REEMENT is subject to the attached General Terms and Conditions and the following special provisions/payment schedule: Weaver Boos Consultants, LLC Proposal Number 001 -17 -12 dated August 14, 2012 and any attachments . by: Client By (Sig ature) By (Tyre/Print) Title 120 the Terms and Conditions Weaver Boos Consultants, LLC i By (Signature) Edward B. Stefanek By (Type /Print) Sr. Project Manager Title Accepted Acknowledge the Ter ins and Conditions MONROE STREET f, r'. jjELL t AP IANCES I PARTS AL (A x + rn m PA,*k NG 3' LOT �. r rn O Fp < n Am owl v .r rr. SOUTH S -T*EET PROXIMATE GRAPHIC SCALE 20 0 10 20 40 WELL LOCATION MAP IN FEET FORMER STUDEBAKER MUSEUM 1 inch = 20 ft. 520 S. LAFAYETTE BLVD SOUTH BEND, INDIANA APPROXIMATE MONITORING WELL LOCATION Beaver Boos Consultants 400 I EOM BMER 00LW PROPOSED MONITORING WELL LOCATION WM4D1-16 28 PMWi 7 DRAWN BY: JLES I DATE; 1/12/10 SOURCE: GOOGLL EARTH A R14 IMFS REVIEWED BY. EBS I cAD% SREMAP.Dn FIGURE 1 MONROE ST Pfa W - - -- _ Ii mw^' pmw 8 6 PROPOS0$WLOWG - I I PMW —o , pVV' .Kam•,•, --tea .i p PROXIMATE GRAPHIC SCALE 20 0 10 20 to PROPOSED SITE PLAN WELL LOCATION MAP ( IN FEET) FORMER STUDEBAKER MUSEUM 1 inch = 20 & 520 S. LAFAYETTE BLVD SOUTH BEND, INDIANA APPROXIMATE MONITORING WELL LOCATION Weaver 8008 Consultants toes MEG" OMER OOURf PROPOSED mm BORING WELL LOCATION south ems. IN 47 (apt) x7t —sttT Pa e;es DRAWN 6Y: dLLS I DATE 1/12/10 -372-0, SOURCE: GOOGLE EARTH A MAL MAPS REVIEWED HYS ms I CAD: Sf ow.DWO I FIGURE 2 I I II L------ PAW i - - AREA Q I 4 I II � l I 1 ppWl- 4 Pfa W - - -- _ Ii mw^' pmw 8 6 PROPOS0$WLOWG - I I PMW —o , pVV' .Kam•,•, --tea .i p PROXIMATE GRAPHIC SCALE 20 0 10 20 to PROPOSED SITE PLAN WELL LOCATION MAP ( IN FEET) FORMER STUDEBAKER MUSEUM 1 inch = 20 & 520 S. LAFAYETTE BLVD SOUTH BEND, INDIANA APPROXIMATE MONITORING WELL LOCATION Weaver 8008 Consultants toes MEG" OMER OOURf PROPOSED mm BORING WELL LOCATION south ems. IN 47 (apt) x7t —sttT Pa e;es DRAWN 6Y: dLLS I DATE 1/12/10 -372-0, SOURCE: GOOGLE EARTH A MAL MAPS REVIEWED HYS ms I CAD: Sf ow.DWO I FIGURE 2 I. II. III. IV. WEAVER BOOS CONSULTANTS, LLC ANNUAL FEE SCHEDULE — PROFESSIONAL SERVICES (Effective July 1, 2007) tESSIONAL STAFF U.S. a) Principal /Corporate Consultant .................................................... ............................... Hr 170.00 b) Project Director ............................................................................. ............................... Hr 150.00 c) Senior Project Manager ................................................................. ............................... Hr 130.00 d) Senior Project Engineer/ Scientist .................................................. ............................... Hr 120.00 e) Project Manager ............................................................................ ............................... Hr 110.00 f) Project Engineer /Geologist/Environmental Scientist .................... ............................... Hr 95.00 g) Staff Engineer /Geologist/Environmental Scientist ........................ ............................... Hr 85.00 h) Engineer /Geologist/Environmental Scientist ................................ ............................... Hr 70.00 HNICAL STAFF U.S. a) Union Engineering Technician- Journeyman ................................. ............................... Hr 90.00 b) Union Engineering Technician ...................................................... ............................... Hr 85.00 c) Construction Superintendent ......................................................... ............................... Hr 85.00 d) Construction Manager ................................................................... ............................... Hr 75.00 e) Union Apprentice Technician ....................................................... ............................... Hr 75.00 f) System Specialist ........................................................................... ............................... Hr 70.00 g) System Technician ........................................................................ ............................... Hr 65.00 h) Senior Environmental Engineering Specialist ............................... ............................... Hr 55.00 i) Environmental Engineering Specialist II ...................................... ............................... Hr 50.00 j) Environmental Engineering Specialist I ........................................ ............................... Hr 40.00 PORT STAFF U.S. a) CAD Designer Ill ........................................................................ ............................... Hr 85.00 b) CAD Designer lI ......................................................................... ............................... Hr 75.00 c) CAD Designer I ........................................................................... ............................... Hr 55.00 d) Technical Assistant ...................................................................... ............................... Hr 50.00 e Clerical/Word Processing ................................. ............................... Hr 50.00 IERAL EXPENSES a) Automobile Transportation ........................................................... ............................... Mi. 0.55 b) Subcontract Service or Rental ....................................................... ............................... Cost + 15% c) Report Preparation (outside services) ............................................ ............................... Cost + 15% d) Outside Services (e.g. photographer, film processing, overnight delivery, etc.)....,..... Cost+ 15% e) Per Diem (food and lodging) ......................................................... ............................... $120 /day f) Per Diem (no lodging) ................................................................... ............................... $30 /day g) Transportation by Commercial Carrier or Rental Car ................... ............................... Cost +15% h) Travel Expenses ............................................................................ ............................... Cost +15% PRICE NOTES: .All professional, technical, and support staff time and expenses spent in furtherance of the client's work will be billed. This includes, but is not limited to, proposal, field, travel, research, technical review and reporting, project management, client meeting, and project - specific administrative time and expenses. An overtime rate of 1.4 times the regular rate is billed for technical and support staff services for work in excess of 8 hours per day, work between 7:00 p.m. to 5:00 a.m., and work on Saturdays. This overtime rate is increased to 2.0 times the regular rate for work on Sundays and holidays. A minimum 4 hour onsite charge applies to all Union Technicians. Time and mileage are charged portal to portal. Minimum charge for the pickup of concrete cylinders is $50. Unless otherwise agreed to in writing, a monthly interest charge of 18% per annum, will be charged accruing from the date of invoice, on all invoices not paid within 30 days. The unit rates are subject to periodic modification (typically annually). These rate modifications will be incorporated into long -term projects, unless otherwise addressed in the project contract. Deposition and testimony services are charged at 1.5 times the regular billing rate. GENERAL EXPENSE NOTES: I . Rates quoted are for expenses only, equipment purchased on the client's behalf is marked rip 25% Personnel rates are billed separately from general expenses. 3 Standard non- disposable protective outer -wear or equipment damaged or contaminated by site conditions are billed at replacement cost plus 15 %. 4 General expense mark -ups may be negotiated based upon contract size and payment terms. 5 The per diem rates set forth above are the standard rates we typically use for our technical staff on projects. We reserve the right to modify these rates in high cost areas. Any modification to Otis fee schedule requires the written approval of Weaver Boos Consultants, LLC Pagel oft V. WEAVER BOOS CONSULTANTS, LLC ANNUAL FEE SCHEDULE - PROFESSIONAL SERVICES (Effective July 1, 2007) Senior Professional Land Surveyor ................................................... ............................... Hr 125.00 Professional Land Surveyor .............................................................. ............................... Hr 1 10.00 SurveyParty Chief ............................................................................ ............................... Hr 80.00 Survey Party - 2 Man/ Conventional .................................................. ............................... Hr 125.00 Survey Party - 3 Man /Conventional ................................................. ............................... Hr 165.00 Survey Party - I Man /GPS or Robotic ............................................ ............................... Hr 125.00 Survey Party - 2 Man/GPS or Robotic ............................................. ............................... Hr 165.00 Survey Party - 3 Man /GPS or Robotic .............................................. ............................... Hr 205.00 Hand -Held Field GPS /G15 ............................................................... ............................... Day 150.00 LaserLevel ....................................................................................... ............................... Day 75.00 VI. I EQUIPMENT RENTAL FEES a Well Sampling Equipment (includes items B through E below) ...... ............................... Day 125.00 pH, Specific Conductance and Temperature Meter .......................... ............................... Day 40.00 c Groundwater Filter Pump ................................................................... .I............................. Day 25.00 dElectric Purge Pump .......................................................................... ............................... Day 40.00 ePVC Bailer ........................................................................................ ............................... Day 10.00 GrundfosPump Control Box ............................................................ ............................... Day 60.00 gWater Level Indicator ....................................................................... ............................... Day 30.00 hFilter and Hose (for pump) ................................................................ ............................... Ea 20.00 i Modified Level "D" (Tyveks, Boots, Gloves) /per person/per chg of clothing ................ Ea 50.00 j Photoionization Detector Meter ........................................................ ............................... Day 110.00 kNuclear Density Gauge ..................................................................... ............................... Day 60.00 1 Air Sampling Equipment, per pump ................................................. ............................... Day 50.00 rr Hand Operated Field Probe Equipment ............................................ ............................... Day 110.00 nExplosimeter ..................................................................................... ............................... Day 30.00 o GA90 /GEM 500 /GEM 2000 Gas Analyzerr ...................................... ............................... Day 175.00 p Flame Ionization Detector ................................................................. ............................... Day 110.00 qInterface Probe .................................................................................. ............................... Day 50.00 rATV .................................................................................................. ............................... Day 25.00 sCompany Truck ................................................................................. ............................... Day 75.00 TESTING AND RENTAL NOTES: 1. Rates for testing and equipment not listed above are available on request. 2. Testing and equipment rental costs are negotiable for specific projects and for on -site laboratory programs. 3. Laboratory unit prices cover equipment and labor costs to perform standard test procedures and laboratory reports with normal turn- around times. Non - standard testing requirements, supervisory and project management costs, data evaluation costs, and environmental sample disposal costs are not included in the testing unit prices and are billed separately. 4. Equipment rental rates are for equipment costs only. Transportation, calibration and personnel costs are billed separately. 5. Daily and weekly rates cover a maximum of 10 and 50 hours respectively. 6. SAMPLES WILL NOT BE RETAINED beyond classification and testing unless other arrangements are agreed to in writing. Environmental samples remain the property ofthe client. Arty modification to this fee schedule requires the written approval of Weaver Boos Consultants, LLC Page 2 of 2 13:€}O0t9 Oc WS.X.T�'�'AIV! 7C'S August 20, 2009 Proposal M90500 Mr. Robert A. Nichols, EI City of South Bend 131 County -City Building 227'W. Jefferson Blvd. Sout Bend, IN 46601 Re: Revised General Terms and Conditions Proposal for Environmental Consulting Services Former Studebaker Museum 520 S. Lafayette Blvd. South Bend, IN 46601 FID # 24951 LUST # 200702503 Dear Rob: Wea er Boos Consultants, LLC. (Weaver Boos) appreciates the opportunity to provide environmental consulting services in relation to a leaking underground storage tank (LUST) release that occurred at the referenced site (Site). Weaver Boos has received and reviewed the co cents made by Ms. Cheryl Greene regarding the General Terms and Conditions submitted with Proposal M90500 on January 19, 2009. Weaver Boos has agreed to modify said General Ten s and Conditions accordingly for this project. The revised General Terms and Conditions now 4pplicable to Proposal M90500 are attached. We ppreciate this opportunity to be of service and are looking forward to worldng with you on this roject. If you should have any questions or comments concerning this correspondence, ple do not hesitate to contact our office. Weaver Boos Consultants, LLC Edward B. Stefanek Senior Project Manag4- / Attadlunents: General Terms and Conditions for Proposal M90500 - - F085 Meghan Beeler Corny • South Bend, Indiana 4662,) ^ Phone: (574) 271 -3447 . Fax: (574) 271 -3343 my w. %veaverboos.com These Gene into the fc constitute tl by Weaver shall remai Proposal. Terns and Conditions are incorporated by reference ;oing Proposal and shall along with the Proposal Agreement under which services are to be performed as Consultants, LLC ( WBC) for Client. The Proposal valid for 90 days unless othenvise stated in the a. It is u hderstood that the scope of services and time schedule clefined in the Proposal are based on the information provided by Client and certain assumptions. If this information is incomplete or inaccurate. or if unexpected site conditions are discovered, the scope of services may change, even as the nvork is in piogress. b. The scope of services shall include all services provided by WBC in its discretion, which are reasonably necessary and appropriate for the effective and prompt fulfillment of WBC'S obligations under the Agreement and all services shall be subject to the provisions of the Agreement, including these GenerE I Terms and Conditions and any Supplemental Terms or Conditions incorporated herein. All such services provided shall invoiced and paid for in accordance with Section 3 below. C. All ad itional or subsequent work performed for client, shall be subject[ to these Genernl Terns and Conditions. unless oiherw se superseded or modified by mutual agreement of WBC And Client. SECT ON : CLIENTDISCLOSURES n. It shall be the ditty of the Client before and during the project to promptly notify WBC ol•any known or suspected hazardous substances which are or may be related to the services to be provided. Such hazardous substances shall include but not be limited to any substance which posed or may pose a present or potenti I httwrd to human health or the environment. whether contained in product, material, by- product, waste or sample and whether it exists in a solid, liquid, semisolid or gaseous form. b. Following any disclosure as set forth in the preceding panigreph, or if an), hazardous substances are discovered or reason bly suspected by WBC alter its services are undertaken. and which substantially change the costs and risks of the projectl then WBC mny, at its discretion. discontinue its c. Client shall notify WBC of potential health hazards or nuisances which might arise out of the work by WBC and its contra ors and /or subcontractors (hereinafter referred to as subcon ractors), and thereafter WBC shall take necessary and reason ble measures to protect its employees against such possiblu health hazards or nuisances. The reasonable direct costs o such measures shall be borne by die Client. d. The CI eat shall notifv WBC of any other conditions, of which Client is or should reasonably be aware oC which might signifi Or affect the efficiency or safety of work of WBC. a. Unless otherwise specifically provided in die Agreement, billings will be based on the fee schedule reterenced in the propos I. WBC shall submit invoices monthly for services perforn ed and expenses incurred and not previously billed on tiny pre ions invoice. Payment is clue upon receipt. WEAVER BOOS CONSULTANTS, LLC General Terms and Conditions Version 2006 -AI Pagel of 3 b. The Client shall provide WBC with a clear written statement within fifteen (15) days after receipt of the invoice of any objections to the invoice or any portion or element thereof. Failure to provide such a written statement sha11 constitute acceptance of the invoice as submitted. Only the disputed sums may be withheld from payment. Further, WBC and Client agree to promptly address and resolve invoice disputes. c. The Client's obligation to pay for the services performed under this Agreement is in no way contingent upon other events; including but not limited to Client's ability to obtain financing, zoning, approval of governmental or regulatory agencies, final adjudication of n lawsuit in which WBC is not involved, complete a transaction or success8dly complete the project. No deduction shall be made from any invoice on account of penalty, liquidated damages or other sums withheld from payment to WBC. d. If timely payments are not received, then WBC may commence collection activities. It is agreed that all expenses incurred by WBC in obtaining liens. obtaining judgments or collecting any amounts due under the Agreement including the time of WBC employees. at full billing rates. all associated costs. and reasonable attorney's fees shall be recoverable from the Client. SECTION 4: RIGHT OF ACCTSS a. If services to be provided under this Agreement require the agents, employees. or subcontractors of WBC to enter onto the Project site. Client shall provide timely right of access to [lie site to WBC. its employees, agents and subcontractors, to conduct the planned field observations and services. WBC shall take reasonable precaution to reduce damage to the site due to its operntions. but is not responsible for the cost of restoration for any damage resulting from its operations, unless otherwise provided for in the Proposal. SECTION $: SAMPLING OR TEST LOCATION a. If the scope of services includes performance of soil borings, or other subsurface excavations by WBC, it is understood that the Client will furnish WBC with a diagram indicating the location and boundaries of [lie site. and all subsurface structures and utilities. WBC reserves the right to deviate a reasonable distance from the proposed boring location(s). Client recognizes that drilling equipment is large and heavy and understands the risk of site damage. At Client's request and cost. WBC will restore the site to the conditions existing prior to WBC operations if practicable, WBC shall not be liable for dtunage or injury to or resulting from damnge to subterranean structures (pipes. tanks. cables. wires or other utilities and subsurface structures, etc.) which are not called to WBC's attention in writing and correctly shown on the dingram(s) furnished or correctly marked at the site, b. Unless otherwise stated, the tees in this proposal do not include costs associated with surveying of the site for the accurate horizontal and vertical locations of tests. Field tests or boring locations described in our report or shown on sketches are based upon infomation furnished by others and/or estimates made in the Field by our representatives. Such dimension and elevations should be considered as approximations unless otherwise stated. C. This agreement may be terminated if site conditions prevent soil borings or other subsurface excavations by WBC nt or near the designated locations. because of either obstructions or safety us nri additi the fe d. Any rsiderations, and these conditions were not revealed to to acceptance of this Agreement. If, in order to borings, or other subsurface excavation. to their T depths, additional work is necessitated by ing impenetrable subsurface objects, this and all work will be charged for at the appropriate rates in ment lost or damaged due to site surfnce or conditions, and not the negligence of WBC or its ors, will be invoiced at cost plus 15 percent. a. All materials and samples will be discarded immediately after testing unless the Client advises WBC in writing to the contra I» such ease, the samples will be delivered, shipping charges collected, or stored at owner's expense. b. Client shall have the sole responsibility to dispose of any hazardous substance or regulated contaminant whether the result of or a by- product of sampling or not, in accordance with applicable law. Client shall bear all costs and liabilities associated therewith. C. Client grees to indemnify, defend and hold harmless WBC from smy claims made or asserted against WBC arising out of or rela ed to collection, storage or disposition of samples or materif Is alleging a failure to comply with any Federal. State or local ci ivironmental law, regulation or ordinance. a. With the exception of WBC reports to Client, all documents, includi ig field data. field notes. laboratory test data_ cnlcula ions and estimates are and remain the property of WBC. Client igr= that all reports and other -wort: furnished to the Client u1 not paid for in full will be returned to WBC upon demon and will not be used for design. construction. permits. licensing, or any other purpose. b. Documents, including but not limited to, technical reports. field data, field notes, laboratory test (into. calculations. and estimates furnished to the Client or its agency pursunnt to this agreement are not intended or represented to be suitable for use by third parties or reuse by the Client or to the extensions of the Project or on any other project. Any use or reuse without WBC's written consent will be at Client's sole risk and without liability or legal exposure to WBC or to 1VBC's subcont actor(s). Client shall indemnify and hold harmless WBC aid WBC's subcontractor(s) from all claims, damages, losses aid expenses including attorneys' fees arising out of or resultin therefrom. n. WBC a ecs to indemnify. hold harmless. and defend Client from anJ against any loss. damage, iniury, claim, and linbility arising and caused by the negligent acts or omissions of WBC. its agen s and subcontractors, but subject to the limitations of liability et forth in Section I 1 of this Agreement. a. WBC resents that the services perfomhcd under this Agrcem nt will be performed with the care and skill ordinndly exercise by reputable members of the profession practicing WEAVER BOOS CONSULTANTS, LLC General Terms and Conditions Version 2006 -A1 Page 2 of 3 under similar conditions at the some time in the same or similar locality. Client recognizes that subsurface conditions may vary from those encountered at the locations where the borings. surveys, or explorations are made by WBC and that the data interpretations and recommendations of WBC's personnel are based solely on the information available to them. WBC will be responsible for those dots, interpretations, and recommendations, but shall not be responsible for the interpretation by others ofthe information developed. NO OTHER WARRANTY, EXPRESSED OR IMPLIED, IS MADE OR INTENDED BY RENDITION OF CONSULTING SF.RViCES OR BY FURNISHING ORAL OR WRITTEN REPORTS OF THE FINDINGS MADE. SECTION 10: INSURANCE a. WBC represents dint it and its agents, consultants, nail subcontractors employed by it, is and are protected by Worker's Compensation insurance and that WBC has coverage under liability insurance policies which WBC deems reasonable and adequate, WBC shall furnish certificates of insurance upon request. If the Client requests specific inclusions or limits of coverage that are not present in WBC's insurance, the cost of such inclusions or coverage increases, if available, shall be at the expense of the Client. SECTION 11: LIMITATIONS OF LIABILITY IT IS AGREED THAT, TO THE FULLEST EXTENT PERMITTED BY LAW, CLIENT WILL LIMIT WBC's TOTAL AGGREGATE LIABILITY TO CLIENT TO $50,000 OR THE AMOUNT OF WBC's FEE. WHICHEVER IS LESS, FOR ANY AND ALL INJURIES. CLAIMS. LOSSES EXPENSES OR CLAIM EXPENSES (INCLUDING ATTORNEY'S AND EXPERT WITNESS FEES) ARISING OUT OF THIS AGREEMENT OR THE SERVICES TO BE PERFORMED PURSUANT TO THIS AGREEMENT FROM ANY CAUSE OR CAUSES. SUCH CAUSES INCLUDE, BUT ARE NOT LIMITED TO. WBC'S NEGLIGENCE, ERRORS. OMISSIONS. STRICT LIABILITY, BREACH OF CONTRACT. STATUTORY LIABILITY, BREACH OF WARRANTY, NEGLIGENT MISREPRESENTATIONS, ENVIRONMENTAL LIABILITY OR OTHER ACTS GIVING RISE TO LIABILITY BASED UPON CONTRACT, TORT OR STATUTE. IT IS EXPRESSLY AGREED THAT THE REMEDY STATED HEREIN IS THE CLIENT'S EXCLUSIVE AND SOLE REMEDY FOR ANY DAMAGE(S) ARISING OUT OF THIS AGREEMENT OR SERVICES TO BE PERFORMED PURSUANT TO THIS AGREEMENT, �. WBC will increase our limitation of linbility up to the limits of our available insurance coverage or otherwise to $250,000, whichever is greater, upon client's written request. Said request must be received within 14 days of the date of execution of the Proposnl and be before nny claim arises, The Client further agrees to notify any contractors or subcontractors who cony perform work in connection with any design. report or study prepared by WBC of such limitation of liability for breach ofcontract. errors, omissions or negligence and require as a condition precedent to their performing their work a like limitation of liability on their part ns against WBC. d. The Client and WBC agree that neither will be liable to the other for consequential damages incurred due to the fault of the other. Said damages include, but tine not limited to, loss of use and lost profits. e. With a exception of actions pertaining to materialmen or mechanic's liens, and if lawful, causes of action between the parties o this Agreement pertaining to nets or failures to act shall be deemed to have accrued and the applicable statutes of limitations shall commence to run on the date the alleged act or failure to act occurred. f. Not withstanding the above, all claims, whether based upon contract, tout, breach of watTanty, professional negligence (including errors, omissions or other professional acts), or othenvi e, shall be deemed waived unless made by the Client in writing and received by WBC within one (1) year after Client reasons 31y knew or should have known of its existence, but in no event, shall such claim be asserted by Client later than two (2) yeats after WBCs completion of services with respect to which tl ie claim is made. n. Claims, disputes or other matters in question between the parties to this Agreement arising out of or relating to this Agreem nt or the breach thereof shall be subject to and decided by first mediation between parties involved. b. In the event thnt mediation is unsuccessful to resolve dispute and saic dispute now results in litigation. it is agreed that the prevailinsultam's g party shall be entitled to recover nil reasonable costs incart in the deibnse of the claim, including staff time, court costs, fees, attorney's fees, and other claim- related C. Resolution shall be final. and judgment may be entered upon it in accordance with applicable law in any cows having jut-isdiclion thereof. SECTION 13: TERMINATION a. This Agreement may be terminated by either party upon at least seven O days written notice in the event of substantial failure by the Alver party to perform in accordance with the terms hereof ittrough no fault of The terminating party. Such termination shall not be effective if the substantial failure has been renedied before expiration of the period specified in written notice. b. WBC r WBC's through c. This At party up d. if this P perform plus ten costs all re -assig to terms SECTION 1 D, in the e or unen full fore ty terminate this Agreement if the Client suspends services for more than sixty (60) consecutive days o fault of WBC's. eement may be terminated without cause by either n at least sixty (60) days' written notice. reement is terminated. WBC shall be paid for services 1 prior to the termination date set forth in the notice ination expenses. Terminndon expenses shall include butable to personnel and equipment rescheduling and nent and all other costs incurred directly attributable ent that any provision herein shall be deemed invalid 3rceable, the other provisions hereto shall remain in and effect, and binding upon the parties hereto. WEAVER BOOS CONSULTANTS, LLC General Terms and Conditions Version 2006 -A1 Page 3 of 3 b. The heading or title of a section is provided lbr convenience and information and shall not serve to alter m• affect the provisions included herein, c. All obligations arising prior to the termination of this Agreement and all provisions of this Agreement allocating responsibility or liability between the Client and WBC shall survive the completion of set-vices and the termination of the Agreement. d. Unless otherwise provided. the substantial law, of the State of Indiana will govern the validity of this agreement, its interpretation and performance, and remedies for contract breach or any other claims related to this agreement. e. WDC shall apply professional judgment in determining the extent to which WBC shall comply with any given standard identified in WBC's documents. Unless otherwise indicated, such compliance, referred to as "General Compliance" specifically excludes consideration of any standard listed as a reference in the text of those standards cited by WBC. f. Unless specifically stated in WBC's Proposal, it is understood the costs for implementation ofthe work are based on privately owned projects utilizing merit (non - union) wages and employees. Government funded or publicly owned projects that require prevailing wages will have specific tees identified in the Proposal. Any job action, strike, or other requirement to use union represented employees will require renegotiation of the costs for performing the work. g. In the event that WBC borrows or uses equipment or machinery, including but not limited to stationary. mobile and non -road mobile equipment, from the Client, it is agreed that the equipment is being rented for the stun of $1.00 and other considerations unless a specific rental agmemeol is executed by the parties. h. This Agreement may be assigned by WBC to an affiliate company. in whole or in part. WBC may also retain persons or entities not in WBC's employ without Client's prior specific consent when such retention is appropriate and customary, including, but not necessarily being limited to. surveyors, drilling subcontractors. testing laboratories, remediation contractors, and specialized consultants. Client shall not assign its duties and obligations hereunder without the prior written consent of WBC.