Loading...
HomeMy WebLinkAbout04/24/1908 Board of Public Works MinutesFriday April _24th,__.1.905._____. F The Board met in regular session at 10 A. 174. All members present. Michigan Central Railroad Company ordered to place a light at Catalpa avenue. The following Contractor Bonds were filed and approved: Jos. Szweda, Plike '1bmaszewski, Frank G. Stanley, John Baer and B. T. Vanderkarr & Son. Contracts were signed and bonds approved of W. H. Burize & Co for Steam Heating and Plumbing for No. 10 Hose House. Hearing on Condemnation Resolution No. 43,,for the opening of a thoroughfare along the slOuth side of the C. I. Ec S. R. R. was deferred until Friday May 15th, 19082 at 10 A. M. Hearing on Declaratory Resolution for pipe serer on Edgard street was deferred until May 15th, 1908, at 10 A. M. Contract awarded to Feser Robarge for Grade, Curb -fie Walk on St. Peter street. PETITION. To the. Board of Pub. Wks. So. Bend, Ind. The.undersigned property owners on West Washington street respectfully petition for the repsovement of said street 'with Asphalt, from Michigan. street to Walnut street in accordance with the arrangement made by said Board with'the Barber Asphalt Co., and details of which are set forth in the statement attached hereto. Your petitioners ask that the work be done Yhth the least possible delay: (Signed) P. O'Brien and 50 others. ,T Referred to the City Engineer. Engineer filed Assessment Rolls and final estimates for Pipe Sewers on Niles avenue from Howard street to St. Vincent street; Howard street'from Michigan avenue to LaPorte ;.avenue; Blaine avenue and LaPorte avenue; Lindner street from Michigan avenue to LaPorte avenue; Allen street, Birner street and Harvey street; Wood street from Michigan avenue to Marion street, all under Improvement Resolutions Nos. 510, 512, 5157 5169 519 520 respectively. Resolved, that notices as.to the amounts of assessments be published for six consecutive days in the South Bend Daily Times, commencing*on the 25th'day of April 1905, stating that this Board will give a hearing on the amount of such assessments at its office in the City Hall on the 12th day of May, 1909, at 7:15 P. M. Resolved further, that the entire work under the above contracts .be accepted _and. approved and the Final estimate thereon allowed. Notice of this resolution shall be published on the 25th day of April, 1909, in the South Bend Daily Times, stating that this Board will give a hearing on theacceptance of such work at its office in the City Hall on the 12th day of May, 19091 at 7:15 P. M. ` (see next page) 84 Friday April 24th, 1908. CONDEMNATION RESOLUTION NO. 48. Resolved by the Board of public works of the city of South Bend, Indiana: That the following described property be appropriated for the use of said city: Begin at the intersection of the west line of Carroll street and the north line of the right of way of Lake Shore & Michigan Southern Railway Co., thence south on said west line of Carroll street produced, to the north lineof Tutt street, thence east on the north line of Tutt street eighty -tiro and one half (92 1/2) feet to the east line of Carroll street, produced south, thence north on said east lineof,Carroll street, to the north lineof right of way of Lake Shore & Michigan Southerni Railway, thence north westerly on said right of Tray to the place of beginning. The following described property may be injuriously or beneficially affected by such appropriation: Description, Lot 73 Lot 74 Lot 75 Lot 76 Lot 77 Lot 75 Lot 79 Lot 80 Lot 51 Lot 82 40 ft. off E Lot 811 10 ft off W.; Lot 83 Lot A. Lot Be Lot c. Lot D. Lot E. Lot F. Lot G. Lot H. Lot Z. Lot K. Addition. Taylors Field 2nd Add. DO. DO. DO. DO. DO. DO. DO. DO. Side DO. ide DO. DO. Sample's Sub.Div. of Lots 261,272 25 Denniston h Fel- lows addition. DO. DO. DO. DO. DO. DO. DO. DO. DO. Lot L. DO Lot M. DO. Lot N. DO. Lot O-N 1/2 DO. Lot 0.-S 1/2 DO. Lot 29 Denniston & Fellows Add. Roadway 100 feet wide s The Birdsell Mfg. Co. DO. D0: D0. DO. DO. DO. Lewis H. Webster DO. Harry H. Keller Samuel R & Flora S. Thomas Do. Mary Ann Zeller. Edward C. Peak for Lige Rem. to C.C.& Julia Trump Frederika Sieg Jacob & Mary Bucheit Chas. J.& lena Spohnholz Birdsell Mfg. Co. Do. James J.& Calista J.K1ine Alvin D. Hodson Maria M.Ingersoll Life est Rem. to Frederick J. & Geraldine M. White. M aranda G Norris Maranda G. Norris William Grabowski Alice C. Ward Wilbert Wardrkstate Birdsell Mfg. Co. Lake Shore & Mich S: Ry Co. Tract bounded on N.E. by L.S.& M.S. RY Co. on W. by 1st alley E. of Mich St. on S by lots 3101 & 32 Denniston & Fellows Addition. Ind. Lbr. & Mfg. Co. Lot 30 Denniston & Fellows Add. Charles Bemis. Lot 31- E 1/2 of E. 1/2 IDo. Emma Ford Lot 31 W. 1/2 of E. 1/2 DO. Paul E. Walter Lot 31-E 1/2 of W. W. 1/2 DO Miles & Emma Bassett Lot 31-W 1/2 of W 1/2 Do. Thomas Simonton ThE purpose of such appropriation to extend Carroll street southward from the N. line of L. S. & M.S. Right of Way to N. lineof Tutt street. Notice of this resolution shall be published on the 25th day of April and on the 5th day of May, 190£5, in the South Bend Daily Times. This Board, at its office in the City Hall on the 19th day of May, 1905, at 7:15 P. M. will hear and receive remonstrances from all persons interested in or affected by these proceedings. Adopted this 24th day of April,1908. BOARD OF PUBLIC WORKS. 9 PRESIDENT.