HomeMy WebLinkAboutChange Order No 1 - Olive Water Treatment Plant Improvements Project No 118-024 - Bowen Engineering1316 COUNTY -CITY BUILDINGi �
} PHONE 574/ 235-9251
227 W. JEFFERSON BOULEVARD 4 PEACE,
� a FAX 574/ 235-9171
SOI JTH BEND. INDIANA 46601-1 830
f 4
W �
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
October 22, 2019
Patrick Stanford
Bowen Engineering Corporation
8802 N. Meridian St.
Indianapolis, IN 46260
RE: Change Order No. 1 — Olive Water Treatment Plant Improvements — Project No.
118-024
Dear Mr. Stanford:
The Board of Public Works, at its meeting held on October 22, 2019, approved the above
referenced Change Order for a decrease of $418,361, bringing the current contract amount to
$1,378,109.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER
DATE:
PROJECT NO:
PROJECT NAME:
CONTRACT DATE:
CHANGE ORDER NO:
SUBJECT OF CHANGE ORDER:
10/22/2019
118-024
City of South Bend Olive Water Treatment Plant Improvements
10/8/2019
PCR #1-Value En ineerin Deductions
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
K010 • e
.. Rok —
Contractor Sign re
Printed Name and Title
Bowen En ineering Corporation
Company Name
8802 N. Meridian St
Address
Indianapolis, IN 46260
City, State, Zip
$ 1,796,470.00
$ 0.00
$ 1,796,470.00
HIncreased
X' Decreased $ 418,361.00
$ 1,378,109.00
-23.29 %
-23.29 %
........
10/2/2020
0 days
0 days
10/2/2020
tON MANAGER
CITY OF SOUTH BEND
BOARD OF PUBLIC 79RIKS
Approved Date: /aa -c
Gary A. Gil6t, President
JII tt Ir, Member
Elizabeth A. Maradik, Member
T4�11u6U, iiv n, P ilember , _ .
October 10, 2019
Heather Cheslek P.E.
Black & Veatch
125 Ottawa Avenue
Grand Rapids, MI 49503
RE: South Bend, Olive WTP Value Engineering Proposal
Heather,
Per your request I have listed the cost saving ideas that the Owner has selected from the previous
proposal.
Delete Gravel Staging Area.
Credit $3,460.00
Bowen does not anticipate needing to disturb this area. Minimal space will be require for storage as most
equipment will be installed on delivery. Bowen will work with the City to find alternative parking areas
that will not interfere with the operation of the plant.
Delete Erosion Control, Seeding and Site Restoration
Credit $7,917.00
Since the site will require minimal soil disturbance silt fencing will not be provided as shown on the
drawings. A small amount of inlet protection if necessary will be provided. Areas disturb by excavation
will be rough graded. No seeding or restoration of the gravel drive has been included.
Reuse Chemical Unloading Station
Credit $4,306.00
If the new chemical lines can be rerouted so that the existing unloading station can remain intact and the
old lines can be abandon in place then a credit will be provided.
Reuse Existing Man Doors.
Credit $5,243.00
Existing man doors are in good shape and are fire rated. Existing doors will receive two coats of paint.
Delete Water Heater, Appurtenances and Piping
Credit $14,833.00
The hot water system and piping will be deleted. A pressure tank will be substituted (size to be
determine) to provide tepid water to the safety showers.
r o c°rim rye- wim-
8802 North Meridian St. • Indianapolis, IN 46260. 317.842.2616 phone • 317.841.4257 fax • www.BowenEngineering.com
Reduce Overhead Door Size, Delete Electric Operators
and change to Galvanized Slats
Credit $15,965.00
The Overhead door height for the Chlorine room will be reduced to 12' high. Electric operators
have been eliminated and the slates will be galvanized.
Fire Value Engineering of the Fire Protection System
Credit: $146,867.00
The fire protection system will meet the requirements of NFPA 13 and will include schedule 10
black pipe, class 125, 175 pound fittings, firelock fittings, and mechanical joint couplings.
Labeling of sprinkler pipe has been in included in lieu of painting. Strainers are not included and
are not approved by NFPA 13. The wet riser will have an individual butterfly valve in lieu of an
OS&Y valve.
Value Engineering of HVAC System
Credit: $79,275.00
Changes include allowing for the acceptance of a Greenheck make-up unit, aluminum ductwork,
and a NEMA-1 control panel. Painting of ductwork has not been included.
Delete the ladders, cable restraints and PE stamp for the chemical tanks
Credit: $11,819.00
Chemical tanks will still meet the requirements in the specifications less these items.
Chemical Pumps
Credit: $4,000.00
Change scale manufacturer to Scaletron. Start-up services will be as specified.
Remove Chemical Pump Pads
Credit: $4,083.00
Delete equipment pads for the bulk and day tanks.
Painting Scope Modifications
Credit: $32,600.00
Delete containment coating of the walls and steps. Paint the floor at elevation 100, existing man
doors and the masonry walls in the chemical room to elevation 120. No piping or ductwork
painting has been included. Owner and Engineer will consider alternate for the containment
coating system.
CO-INF: ACTIrO w Or, 1-1101 E'
8802 North Meridian St. • Indianapolis, IN 46260 - 317.842.2616 phone • 317.841.4257 fax • www.BowenEngineedng.com
Project Instrumentation and Control
Credit: $13,808.00
Delete the RSlogix studio license and spare parts from the project requirements.
Relocate Generator and Transfer Switch
Credit: $36,120.00
Relocate the Generator and transfer switch to the southwest side of the building. The feed for the
existing 480 volt panel will be ran underground. Required separation between the MAU and the
building will be maintained.
Demolition, equipment installation and process piping labor savings
Credit: $12,783.00
Division 1 project oversight
Credit: $24,082.00
Bowen will still meet the requirements of the specifications as it relates to project oversight.
Delete Bollards
Credit: $1,200.00
Delete four (4) new bollards from the project. Existing bollards to remain.
Clarifications:
- Bowen has assumed the facility can be taken out of service and no temporary piping is necessary.
- Bowen has assumed contract award and notice to proceed will be issued before the end of the year.
- Bowen has not included a jobsite office trailer or temporary facilities other than sanitary facilities.
- Concrete supplied shall be from the local ready mix supplier and will be their standard 4000 psi air
entrained mix design. No special testing for mix design approval has been included.
- Bowen has assume vent piping penetrations and through wall piping can be reused if feasible.
Please review and if you have any questions, please let me know. Thank you for your consideration.
Respectfully„
Patrick Stanfor
Project Manag
y'n, rix tit.' um
8802 North Meridian St. • Indianapolis, IN 46260 • 317.842.2616 phone • 317.841.4257 fax • www.BowenEngineering.com
DEPARTMENT OF PUBLIC WORKS
kk Cr
DIVISION OF ENGINEERING
118-024 �w,.���A,����� 1
Project Number: Project Name: Change Order #:
DATE INITIATED 10-9-19 BPW DATE: 10-22-19�
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc,).
Various value engineering items were incorporated to decrease the overall
Attachments: (List documents support change — required)
Breakdown of all deduct items attached
Amountof ❑Increase/ BDecrease: $418,361.00
Categories (Pick One):
Previously approved Change Order(s): $ �'R Scope of Work
❑ Differing Site Conditions, Changed Conditions
Current Percent of Change: -23.29 % ❑ Conflicted Specifications and Drawings
New Total Amount:1 � 378109.00 El Failed Materials
❑ Error
El Omission
Total Percent of Change: 3.49
❑ Final Quantity Adjustment
Funding Secured From; El
(filled out by PM)
RECOMMENDED BY:
Dan Jones
Project Inspector (Print Name) (Signature) (Date)
REVIEWED BY:
Toy Villa
...........
Construction Manager (Print Name) (Signature) (Date)
APPROVED BY:
&I
•IS�I
Engineering Project Manager (Print Name) (Signature) (Date)
APPROVED BY:
Kara Boyles �0•�h• ��
tur) City Engineer (Print Name) (Sign(Date)
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date
Name
Tour Villa
Is
Department Engineering
BPW Date 10/22/2019 Phone Extension 5920
@INQIN@IIPIoI@NIIWIM@@ImmmmmmIWWIWI'NIIIIIIIIIIIIIIIIIIIIIIW NN9NWWI N
..............w..W..........7................—.........�...,.�,m. ....---- .... ----------------
Required Prior to Submittal to Board
BPW Attorney Attorney Name
Dept. Attorney n Attorney Name
Purchasing E]
Check the Appropriate Item Tv e .-
[l Professional Services Agreement [:] Contract
Ej
Open Market Contract
❑ Amendment/Addendum
E]
Bid Opening
❑ Bid Award
Quote Opening]]'
Quote Award
❑ Proposal Opening
C/O & PCA No..
® Chg. Order, No. 1
0
Traffic Control
Other:
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
_Required Information
?dl fr° All Submissions
❑ Proposal
EJ Special Purchase, QPA
El Req. to Advertise
Reject Bids/Quotes
PCA
❑ Resolution
Ease./Encroach
❑ Title Sheet
Bowen I ngrL..`orfaoration �...................... aw
❑ Yes ❑ If Yes, Approved by Purchasing
No
MBE Completed E-Verify Form Attached ❑ Yes
WBE ❑ No
Olive Water Treatment Plant Improvements
---- __w P _........................... ...........
118-024
324.1,050.460.42.02
Approval of C.O.1
For Cane Or ders Onlry
::... .mom_..... � .......��w�� —..................... ........�
Amount of ❑ Increase $ �._ .............................
Decrease 0
Previous Amount $ 1,796,470.00
Increase _ %
Current Percent of Change: Decrease (23.29% o
New Amount $ 1,378,109.00
Increase
Total Percent of Change: Decrease (23mm29w%
Time Extension Amount:
New Completion Date:._._....