HomeMy WebLinkAboutAward Bid - Main St and Wayne St Garage Improvements Project No 119-066 - Majority BuildersINTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Linda M. Martin, Clerk
Board of Public Works
FROM: Kyle Silveus
SUBJECT: Main St./Wayne St. Garage Improvements, Project 119-066
DATE: October 15, 2019
IMINIMUM YUIUIYUIUIWWWWIIDI@VEM
On October 24th, 2019, the Board of Public Works opened and read bids for the above project.
There was one bidder for the project:
Base Bid + Alternates 1 2 5 811
Bidder Bid Amount
1. Ma'ori___--Builders, ......___ .................. m.___........
t ty Inc. _ $428,914.00
The Division of Engineering has reviewed the bid and recommends that the Board award the
base bid, plus the following alternates:
• Base Bid: $281,929
• Alternate 1: Replace Northeast Elevator Tower Roof — $20,225.00
• Alternate 2: Repair Elevator Towers — $106,630.00
• Alternate 5: Repair Portion of Storefront — $4,840.00
• Alternate 8: Repair Sealants around all Storefronts — $9,560.00
• Alternate 11: Repair Exposed Brick — $5,730.00
Majority submitted an acknowledgment of the addendum,.
Engineering recommends award of a contract for $4428 9�0 to the lowest responsive /
responsible bidder, Mgjority Builders Inc.
Sufficient funds from RW TII 324-1050-460-42.02 have been appropriated.
Please call with your questions.
Enclosure
1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOI ITH BEND. INDIANA 46601-1 930
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARDOF PUBLIC WORKS
October 22, 2019
Rick Slagle
Majority Builders, Inc.
62900 US 31 South
South Bend, IN 46614
RE: Award Bid — Main St./Wayne St. Garage Improvements
Project No. 119-066
Dear Mr. Slagle:
PHONE 574/235-9251
FAX 574/235-9171
The Board of Public Works, at its meeting held on October 22, 2019, awarded the above referenced
project to you in the amount of $428,914 for the Base Bid plus Alternates 1, 2, 5, 8, and 11. Enclosed
please find a signed Bid/Proposal form.
Please forward the following documents in one submittal by November 5 2019 to my attention for
Board of Public Works approval:
1) One (1) original of the Public Works Contract (enclosed)
2) Labor & Material Payment Bond
3) Performance Bond (125% of Bid Amount)
4) Certificate of Insurance naming the City of South Bend as an additional insured
5) Item #4 for all subcontractors you use
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
Linda M. Martin, Clerk
Enclosures
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Main St./Wayne St. Garage Improvements
Project No. 119-066
For Bids Due September 24, 2019
PART I
(Must be completed for all bids. Please type or print)
Date: 9/24/19 Bidder (Firm): Majority Builders, Inc.
Address: 62900 US 31 South
City/State/Zip: South Bend, IN 46614 Telephone Number: 574 291-2091
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
City of South Bend Main St./Wayne St. Garalze Imnrovem&nts
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Epoch Architecture/Planning
and dated 8 20 19 for the sum of (enter the Total Bid as shown on the Proposal)
�� �r� & y�
(Enter sum of Total Base Bid plus Alternates shown on Proposal) ��, �i�r (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate attachment.
By
/ (Signature)
Rick Slagle / President
(Printed Name of Person Signing)
The above bid is accepted this d
Subject to the following conditions:
BOARD OF PUBLIC WOR
Gary A. Gilot,"Oresident
Elizabeth
th A. Maradik, Mem r
erase J ora�u„�Mem
ber
ACCEPTANCE
day of ".� 20
Lauri O'Sullivan, Member
r, Member
tte
st: Linda M. Martiru, dl6rk
Version 7/20/2018 Contractor's Bid for Public Works - 2
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Main St./Wayne St. Garage Improvements
Project Number: 119-066
For Bids Due: September 24, 2019
Contractor Name: Mai on tv Rui 1 ders . Tnr _
BASE BID
Item Description Quantity Unit Total Amount
No.
1 MAIN ST./WAYNE ST. GARAGE IMPROVEMENTS 1 LS ,Z $/ , 92-.9 -' `
TOTAL BASE BID I $ 2,Srf, 929"r
ADD ALTERNATES (SEE ADD ALTS. ON SHEET GO-003 FOR ADDITIONAL INFO.)
Item
No.
Description
Quantity
Unit
Total Amount
1
REMOVE AND REPLACE NORTHEAST
1
LS
$ 20, 225.00
ELEVATOR TOWER ROOFING.
REMOVE UNSOUND CONCRETE, PATCH, AND
2
NEW PAINT AT EXISTING STAIR/ELEVATOR
1
LS
$ 106, 630.00
TOWERS.
REMOVE PEELING PAINT, AND NEW PAINT AT
3
EXISTING STREET LEVEL VERTICAL
1
LS
$ 5,575.00
CONCRETE ELEMENTS.
PROVIDE NEW PAINTED FINISH AT EXISTING
4
BRICK.
1
LS
$ 1,520.00
REMOVE CORROSION FROM EXISITNG BRICK
5
LINTEL, REMOVE CRACKED GLAZING, REPAIR
1
LS
$ 4,840.00
DAMAGED STOREFRONT WINDOW HEAD JAMB,
AND REPLACE GLAZING.
REMOVE AND CAP EXISTING ROOF DRAIN RAIN
6
LEADERS.
1
LS
$ 1,950.00
REMOVE CORROSION AND PROVIDE NEW
7
PAINTED FINISH AT EXISTING STEEL GATES.
1
LS
$ 2,780.00
REMOVE ALL FAILED SEALANTS AROUND
8
EXISTING STOREFRONTS AND FIXED
1
LS
$ 9,560.00
WINDOWS. PROVIDE NEW SILICONE SEALANT
WITH BACKER ROD.
REMOVE EXISTING STOREFRONT SYSTEM AND
9
PROVIDE NEW SYSTEM TO MATCH EXISTING.
1
LS
$ 6,025.00
REMOVE CORROSION AND PROVIDE NEW
10
PAINTED FINISH AT EXISTING ROLL UP DOOR.
1
LS
$ 1,210.00
PREPARE EXISTING EXPOSED BRICK AND
11
CLEAR LOOSE MORTAR FOR NEW STEEL
1
LS
$ 5,730.00
FRAMING AND ALUMINUM BREAK METAL.
Version 7/20/2018 Contractor's Bid for Public Works - 7
Project Name:
Project Number:
For Bids Due:
BID/PROPOSAL
CITY OF SOUTH BEND
Main St./Wayne St. Garage Improvements
119-066
September 24, 2019
Contractor Name: Majority Builders, Inc.
REMOVE EXISTING STOREFRONT SYSTEM AND
12
CORRODED METAL PANELS ABOVE. FILL ALL
1
LS
$ 4,000.00
HOLES IN EXISTING BRICK AND CONCRETE AS
REQUIRED.
REPAIR CRACKED CONCRETE CURB ALONG
13
PARKING GARAGE ON MAIN STREET SIDE.
1
LS
$ 8,875.00
REPAIR DAMAGED CHAIN LINK FENCING AND
14
SECURE TO CONCRETE WALLS.
1
LS
$ 5,287.00
REMOVE TEMPORARY ORANAGE
CONSTRUCTION FENCING AND PLYWOOD
15
BARRIERS. PROVIDE NEW CHAIN LINK
1
LS
$' 11,644.00
FENCING, POST, PIPE, AND ASSOCIATED
FITTINGS TO MATCH EXISTING.
LOCKABLE GROUND LEVEL STAIR
16
::PROVIDE
TOWER DOORS WITH PANIC HARDWARE
1
LS
$ 15, 670.00
CONTROLLED BY KEYCARD LOCKING SYSTEM,
TOTAL ADD ALTERNATES
$ 211, 521.00
TOTAL AMOUNT BASE BID + ADD ALTERNATES $ 70"/
Bidder (Firm): Majority Builders, Inc.
Address: 62900 US 31 South
City/State/Zip: South Bend, IN 4661Telephone Number: (574 } 291-2091
By
(Sgnature)
Sick S.' le President
(Printed Name of Person Signing)
Version 7/20/2018 Contractor's Bid for Public Works - 8
BOARD OF PUBLIC WORKS
Cl"I"Y OF SOUTH BEND INDIANA,
PUBLIC WORKS CONTRACT
THIS AGREEMENT, made and entered into this 22nd day of October, 2019, by and between,
Majority Builders, Inc., 62900 US 31 South, South Bend, IN 46614, HEREINAFTER called the
"Contractor", and the Board of Public Works herein called the 'Board".
WITNESSETH: That the Contractor covenants and agrees to make the following improvement,
as fully set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid
Proposal, all of which are set forth as a part of this Contract, for:
PROJECT NO.: 119-066
DESCRIPTION: MAIN ST./WAYNE ST. GARAGE IMPROVEMENTS
COMPLETION DATE: SEE SPECIFICATIONS
AMOUNT: $428,914; BASE BID PLUS ALTERNATES 1, 2, 5, 8, and 11
FUNDING: RWDA TIF
The total bid for this improvement were those prices as received and accepted by the Board on
September 24, 2019.
The Contractor further agrees to notify the Engineer when this improvement is completed. This
notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final
acceptance of the improvement by the Engineer, the Contractors final estimate will be presented
to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of
a Waiver of Lien.
B ARD OF PUBLIC WORKS MAJORITY BUILDERS, INC.
Gary A. Gilt President f liz�tli A. Mamd1` ' o , � lQ0ember Printed Name
Genevieve E. Miller,
J. Dbra ti, Member
L. O'Sullivan, Member
Attest: Linda
Clerk
CERTIFICATION (To be completed if Contractor is a Corporation)
I certify that I am Secretary of the Corporation named as
Contractor herein; that _ who signed this Agreement on behalf of the Contractor
was then of said Corporation; that said agreement was duly signed for and in
behalf of said Corporation by authority of its governing body, and is within the scope of its
corporate powers.
Secretary ......m. Corporate Seal
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date
Name
BPW Date
10/15/19
Kyle Silveus
10/22/19
Department
Phone Extension
Engineering
..................
9083
Re�uired Prior to Submittal to Board
Legal ❑ Attorney Name
Controller El Controller review is required for all Contracts $5,000.00 or more anc
greater than one year in length per the City Purchasing Policy
Purchasing 1:1
J_J Agreement
F-1 Professional Services
F-1 Bid Opening
El Quote Opening
F] Change Order No.
0 Ease/Encroach.
F] Other:
Contract
Resolution
Bid Award
El Quote Award
F1 C/O & PCA No.
D Traffic Control
'Re' ullred In
Company or Vendor Name Majority Builders, Inc.
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Proposal
Addendum
El Req. to Advertise El Title Sheet
[:1 PCA
on
Yes JZJ No L] If Yes, Approved by Purchasing
MBE F-1 WBE
Main St. & Ap )y!L1!1 its
119-066
. ............................ . . . . . .........................................
RWDA
324-1050-460-42.02
428,914.00
Base Bid plus Alternates ............. .......... . . . .....
Repairs to the Existing Parking Garage
F-1 Required Contractor's Certification Form Attached (Non -
Collusion, Non -Discrimination, Non -Debarment. E-Verifv, Iran, etc.)
Amount of El increase $
El Decrease $
Previous Amount $
_ ....................
Current Percent of Change: --- �',_
New Amount
Total Percent of Change:
Copy
Original
11
El
0
R
El
11
. . ... . ................... ... . . . ................... . ...... ...
Dispersal After Approval