HomeMy WebLinkAbout04/22/1913 Board of Public Works Minutesi
782
Tuesday April 22nd.1913.
Board met in regular session at 10:00 A.I. All members present.
Bids were received opened and read for improvements on the follo*i.ng streets, and the
same were all referred to the City Engineer for tabulationgto be reported back Friday
Ap ri l 25t h. 91913. at 10 : 00 - A. M.
t/Pipe serer on Quincy Street from Portage ,Avenue to Blaine Avenue, under Improvement
Resolution No. 222.
A"Grade, curb and walk on Olive Street from Elwood Avenue to Keller Street, under Improve-
ment Resolution No. 225.
Grade, curb and walk on Johnson Street from Vassar Avenut to N. line df Mayr!s Mich .
Avenue Addition, Under Improvement Resolution No. 224.
Petition received read and placed on file for a sewer on Tonti Avenue from Lafayette
St. west to Iroquois ,Street. The same was referredto the engineer for investigation.
(Petition filed with the Board and read for grade, curb and walk on North St. Louis
Street from East Howard Street to St. Vincent Street. The same was referred to the
City Civil Engineer for investigation.
✓ Petition filed lith the Board and read for a sewer on Parkovash Avenue from Lafayette
Street to Iroquois Street.. The same was referred to the City Civil Engineer for
investigation.
t/ Bond of excavation for One Thousand ($1,000. 00) Dollars signed by Thos. Williams as
priniopal and United States Fidelity & Guaranty Co. of Baltimore,md. as sureties, was
approved by the Board.
Remonstrance was filed with the Board,by property owners remonstrating against vacation
of alley from Cushing to Van Buren Street.
t/Remonstranee was filed with the Board regarding grade, curb and walk on Division
Street.
In the matter of the hearing on assessment roll for grade, curb and walk on South
Eleventh Street, under Improvement Resokution No. 170. All action was deferred on the
same until Wednesday April 23rd. 1913- at 10:00 A.M.
Contracts were awarded on the following Improvements.
/ Concrete pavement on Howard Street, under Improvement Resolution No. 217 awarded to
C. H. De Frees. at the amount af..........................:.................3333,,20
✓Pavement on College Street,under Improvement Resolution No.218 awarded to Hoban &
0
Roach, with Wabash Clay on gravel foundation at amount of..... -....,.. .�4 ;
Pavement on Pine Street, under Improvement Resolution No. 219. awarded to C.1%
DeFrees,with Wabash Clay laid on a gravel foundation at amount of ......... $3,225.90
/iavement on Ottowa Court, under Improvement Resolution No. 220.. awarded to C.H.
De Frees,witth Po ston laid on gravel foundation,at amount of ................ 718.30
Pavement on Kemble Avenue,under Improvement Resolution No. 226. awarded to Harry N.
Barnes, with Wabash Clay,laid on a gravel foundation at the amount of.....22,375.15
President.