Loading...
HomeMy WebLinkAbout03/14/1913 Board of Public Works MinutesBoard met in regular session at 10:00 A.M. All members present. Remonstrance placed Nefore the Board by Mr. CHas. W. Arnold against Trunk Sewer on Michigan Street, Under Improvement Resolution No. 216. The same was referred to the Mr. Romig, City Attorney. Bids were received and opened on the following improvements. r Pipe sewer on Frances Street, Under Improvement Resolution No. 210. ✓ Pipe sever on St. Peter Street, Under Improvement Resolution No. 211. \ ✓Pipe sewer on Euclid Avenue " "" "" No. 212. Pipe sewer can. Van Buren Street, No. 213. ,/Pipe sewer on Marietta Street, No. 214 Pipe sewer on Studebaker Street " "n "" No. 215 All of the bids on the foregoigg imrovements were referred to the City Civil Engineer for tabulation to be reported back Tuesday Larch 19th.. 1913. �n� i provet tsngineer filed with the Board the following estimates on the follow Quincy Street pipe sewer improvement from Portage Ave. to Blaine Ave. for the amount of .................................... ..... ......... too ... ...................1,700.00 f Pavement on Kemble Ave. from Prairie Ave to Ewing Ave. at.....................27:520.0 Pavement on Ottowa Court from Vistula Ave. to the L. S. &M. So. R. R. at.......... 900.00 Concrete pavement on South Bend Ave. from Ed-2 y St. to City Limits,.at.... ...$12,700.0 ,/ Pavement on Pine Street from Napier Street to L. S. &M. S. R. R. at .............. $42000.00 Concrete pavement on Howard Street from Leeper Ave. to Niles Avenue at....... 39900.00 i/pavement on College Street From Washington Avenue to Michigan Avenue .......$282240.00 Grade, curb and walk on Johnson Street from Vassar Ave. to N. end. of Yayr' s Michigan Avene Addition at ....................,...... E............ ....... 2,000.00 ✓ Pavement on Prairie Avenue from _Webster. Street to Grant Street, at.......:..23,000.00 J/ Grade, curb and walk on Olive Street from Elwood Avenue to Keller Street at.$ 5,090.00 President. W Board met in regular hearing at 7:45 P.M. All members present. ,"Hearing given on assessment Roll and final estimate -for Pipe sewer on Sorin Street, unri from.Eddy Street to Arthur Street, under Improvement Resolution No. 201. In the City South Bend, Indiana. In the above matter remonstrators appeared, but no remonstrances. were filed. The Board therefore find that tl* property assessed in said rolls filed January 24th. 1913 is benefited in the amount of assessments . as shown on said rolls, and the Board further find that the assessment roll filed January 24th.. 1913 and the final estimate allowed January 24th. 1913. should be and the same are hereby in all things ratified, confirmed and approved. � Hearing given on assessment roll and final estimate for Pipe .Sewer bti, Stl.. Louis" Street -from SoUt. h,'13#.AA eia Ltd Corby Street, under 1 14 mve-m*nt"Nsolilt ion- <- ATo. 209. "Ifi_'.the City Indiana. J In the above matter no remonstrators appeared and no remonstrance was filed. The Board therefore find that the property assessed in said roil filed - January 28th. 1913 is benefited in the amount of assessments as shown on said rolls, and the Board further find that the assessment roll filed January 28th. 1913 and the final estimate allowed January 29th. 1913 should be and the same are hereby in all things ratified, confirmed and approved. k-- Hearing given on Assessment roll and final estimate for Pipe sewer on Linden,Carlisle and Sadie Streets, from --Olive Street to 'Washington Avenue, under Improvement Resolution No. 1€ 8. In the City of South Bend, Indiana. In the above matter remonstrators appeared but no remonstrances were filed. The Board t erefore Bind that the property assessed in said roll filed January 24th. 1913 is benefited in the amount of assessments as shown on said rolls and the Board further find that the assessment roll filed January 24th. 1913 and the final estimate allowed January 24th. 1913 should be and the same are hereby in all things ratified, confirmed and approved. r/Hearing given -on Asse"ssment :-roll and final estimate for trunk sewer on -South Fain Street from Indiana Avenue to Ewing Avenue, under Improvement Resolution No. 176. In the City of South Bend, Indiana. In the above matter no remonstrators appeared and no remonstrances were filed. The Board therefore find that the property asse ssed in said roll filed January 29th. 1913 is benefited in the amount of assessments as shown on said rolls, and. the Board further find that the assessment roll filed January 28th. 1913 and the final estimate allowed January 28th. 1913 should be and the same are hereby in all things ratified, confirmed and approved. Hearing given on Assessment roll and final estimate for Pipe Sewer on Witwer Avenue from Indiana Avenue to bubail :venue, under improvement Resolution No. 197. In the City of Sout:a Bend, Indiana. In the above matter no remonstrators appeared and no remonstrances were filed. The Board therefore find Vat the property assessed in said roll filed January 24th. 1913 is benefited in the amount of assessments as showh on sai rolls, and the Board' further find treat the assessment roll filed January 24th. 1913 and the final estimate allowed January 24tA. 1913 should be and the same are hereby in all things ratified, con- firmed and approved. no Hearing given on Assessment roll and final estimate for Pipe sewer on St. Louis Street from Madison Street to Cedar Street, Under Improvement Resolution No. 207., In the City of South Bend, Indiana. In the above matter remonstrators appeared but no remonstrances were filed. The Board after due consideration deferred all action until March Tuesday the 18th. 1913 at 10:00 A.M. Hearinf given on Assessmnnt Roll and final estimate for Grade, Curb and Walk on Eleven h Street from Mishawaka Avenue to Pleasant Street, under Improvement Resolution No. 170. In the City of South Bend, Indiana. In the above matter remonstrators appeared but no remonstrances were filed. The Board after due consideration deferred all action on the same until Tuesday March the 18th. 19113 at 10:00 A.M. ✓ Hearing given on Assessment roll and final estimate for Pipe sewer on Puerbringer Street from Cotta a Grove Avenue to Sherman Avenue, Under Improvement Resolution No. 199- In the CRy of South Bend, Indiana. .In the above matter remonstrators appeared, but no remonstrances were filed. The Board after due consideration deferred all action on the same until Tuesday March the lSth. 1913 at 10:00 A.M. Hearing given Assessment roll and final estimate for Pipe Sewer on Cottage Grove Avenue from Oak Street to 1st. alley South of Oak Street, Under Improvement Resolution No. 204. In the City of South Bend, Indiana. In the above matter .remonstrators appeared but no remonstrances were filed. The Board after due consideration deferred all action until Tuesday March l8th. 19130 at 10:00 A.M. / Hearing given on Improvement Resolution No. 216. for the Trunk sewer on Michigan Street from LaSalle Avenue to Monroe Street, In the"C ty, of7. South_Bend -,Indiana In the above matter remonstrators appeared but mo further remonstrances were filed. The Board after due consideration deferred all action until Tuesday April lst.,. ;,1913 at 10:00 A.M. President.