BOARD OF PUBLIC WORKS
October 8, 2019
Gary Fisk
DLZ Indiana, LLC
2211 East Jefferson Blvd.
South Bend, IN 46615
RE: Supplemental Agreement No. 3
Dear Mr. Fisk:
The Board of Public Works, at its meeting held on October 8, 2019, approved the above
referenced agreement regarding staking the right-of-way and inspecting utility relocation
before the street reconstruction contract is awarded by INDOT, and services during
construction in the amount of $22,500 for a new total of $557,750.
Enclosed please find a copy of the agreement for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
O-kt��
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
SUPPLEMENTAL AGREEMENT NO. 3
This Supplemental Agreement No. 3 is made and entered into thist—dayof o , 20f,
by and between the City of South Bend, Indiana, acting by and through the Board of Public Works,
hereinafter referred to as the "LPA", and DLZ Indiana, LLC, 2211 East Jefferson Blvd., South Bend, IN 46615,
hereinafter referred to as the "CONSULTANT".
WITNESSETH
WHEREAS, the LPA and CONSULTANT did, on February 10, 2015 enter into an agreement for the
preparation of construction documents for the construction of the Road Reconstruction on Bendix Drive,
Designation Number 1400634.
WHEREAS, during the course of design, certain additional services not included in the original
contract dated February 10, 2015, Supplemental Agreement Number 1 dated April 11, 2017, and
Supplemental Agreement Number 2 dated December 20, 2018 have become necessary; specifically:
Right-of-way staking in preparation for relocation of a high-pressure gas main,
Limited part-time utility relocation observation and coordination with the gas utility
company to provide the location of the relocated gas main,
Additional construction phase services.
NOW THEREFORE, the LPA and the CONSULTANT desire to amend the above referenced Design
Contract as follows:
Delete Section IV Compensation of the LPA-Consulting Contract and replace with the following:
SECTION IV COMPENSATION. The LPA shall pay the CONSULTANT for the Services performed
under this Contract as set forth in Appendix "D" which is herein attached to and made an
integral part of this Contract. The maximum amount payable under this Contract shall not
exceed $557,750.00.
Add Subsection II.T.7. to Appendix "A" as follows:
Stake the east right-of-way line of Bendix Drive within the limits of the high-pressure
gas main relocation construction from the intersection of Boland Drive to the
intersection of Nimtz Parkway, approximately 2,400 lineal feet.
III. Add Subsection II.U.7. to Appendix "A" as follows:.
The CONSULTANT shall provide part-time Construction Observation services for the
duration of the high-pressure gas main relocation construction, up to 10 hours per
week for 13 weeks. The gas main relocation construction is located along Bendix
Drive, from the intersection of Boland Drive to the intersection of Nimtz Parkway,
approximately 2400 lineal feet. Also, the CONSULTANT shall coordinate with the gas
utility company to obtain the X, Y, Z coordinates, if available, approximately every
100 feet along the newly relocated gas main for the LPA.
1of5
Supplemental Agreement No. 3
IV. Revise Subsections I.A. and I.B. of Appendix "D"' as follows:
Amount of Payment
A. The CONSULTANT shall receive as payment for the work performed under this Agreement
the total fee not to exceed $557,750.00 unless a modification of this agreement is
approved in writing by the LPA.
B. The CONSULTANT will be paid for the work performed under Appendix "A" of this
Agreement on a Lump Sum basis in accordance with the following schedule, except as
noted in the items below:
(The remainder of this page intentionally left blank)
2 of 5
Supplemental Agreement No. 3
Design Phase Items
1 Total Fee
a. Topographic Field Survey
-b.
$39,000.00
GeotechnicalInvestigation*
�._..............._....... .
..............c..........Projec..
$19,200.00
�.
Ma.n.a...__.._
Bement & LPA/INDOT Coordination
$10,000.00
d.
Roadway Design and Plans, Including Signing and Pavement Markings
$233,400.00
e.
Pavement Design Analysis, Hourly Rate * _...__..... .... ........... _
$16,800.00
................. ...._. _.
f.
Preparation of Categorical Exclusion (CE-1)
$15,000.00
.....................................................................................
g.
... _................
IDEM Rule 5 Erosion Control Permit
$3,800.00
h.
Utility Coordination
$15,200.00
L
Storm Sewer Assessment
$6,800.00
j.
Additional Information for the Environmental
w.w..._..____..._...................®................................ __ .. _..
$8,900.00
._............................__....
k.
Traffic Signal Design and Plans at Bendix Drive and Boland Drive
$2,400.00
I..
Traffic Signal Modification at Bendix Drive and Sugar Maple Lane/Court
$2,400.00
. _......�±....
Traffic Signal
g I Design and Plans at Bendix Drive and Nimtz Parkway
$9,000.00
n.
Detail Curb Ramps
$4,700.00
o.
Scope Deleted .... ..... _ ............................... ...
......... $0.00
p.
Evaluation for Adding Sidewalks Along Four Lane Bendix Drive _
mfor mmAdding mmSidewalks
$8,650.00
q..mmmmmmm
Evaluation Along a Three Lane Bendix Drive
$9,850.00
r.
Conceptual Alignment Alternatives for Three Lane Typical Section
$4,500.00
s,
Traffic Study ...................................................
$14,000.00
t.
Traffic Signal Warrant Analysis (2 @ $1,190), as needed
$2,380.001,
u.
Landscape Design and Plans
$12,000.00
Abandoned Design and Plans for Stage 2 and 15% of Stage 1 and PFC
V.
Plans
$36,520.00
R/W Engineering
Last Deed of Record (8 @ $50)
$400.00
. �.._.._...�..... �.... ............................._...................._._. �.
R/W Engineering and Descriptions (10 descriptions @ $950
Temporary..Parce.l.s.Only)..�..........._._..._._......._......._._�..._._._.
$9,500.00
w,
___ _.........
R/W Staking (7 @ $550)
$3, 850.00 $18,000.00
APA (7 @ $250)
$1,750.00
Additional R/W staking for Gas Main Relocation
$2,500.00
Bid Phase Services, Pre -Construction Conference, Construction
x.
Phase Office Services, Limited Utility Relocation Observation,
Hourly Rate*
$25,000.00
y.
Subsurface Utility Engineering .. ..............._._
..�.........-... $40,250.00
* Items A.2.b., e. and x. will be invoiced on an hourly rate basis, as defined below, and/or as
reimbursable/Subconsultant Items. The amounts are estimated only, and the final amount shall
not exceed their respective amounts, without prior written approval from the LPA, in
accordance with Section VI, paragraph 6 of this Agreement and/or a subsequent approved
amendment to the Agreement. If a right of way acquisition Subconsultant is utilized, the
CONSULTANT shall receive as payment the actual cost incurred by the CONSULTANT.
3 of 5
Supplemental Agreement No. 3
V. Replace Section I. D. of Appendix "D" with the following:
D. For those services performed by the CONSULTANT, which are included in the itemized
costs, as shown herein in Appendix "D", Section 2 as an "Hourly Rate", the CONSULTANT
will be paid on the basis of an Hourly Rate in accordance with the Rate Schedule
attached as Exhibit 3. The basis for payment includes the direct salary and wages of
each employee, PLUS a provisional overhead rate of 157.82%, PLUS a 15.00% profit,
PLUS the cost of money at 2.01%, PLUS direct non -salary costs as approved by the LPA.
Profit will only be applied to direct salary and wages plus applicable overhead. The
provisional overhead rate will include the cost of customary and statutory benefits
including, but not limited to, social security contributions, unemployment, excise and
payroll taxes, worker's compensation, health and retirement benefits, sick leave,
vacation holiday pay and other group benefits.
VI. Replace Exhibit 3 referenced in Section I.D. LEA. and I.I. of Appendix "D" with the attached revised
Exhibit 3.
VII. Amendment:
Supplement Agreement No. 3 increases the current contract fee of $535,250.00 by $22,500.00 to
$557,750.00 and incorporates all other terms and conditions as set forth in the original Agreement dated
February 10, 2015. The original Agreement dated February 10, 2015, Supplemental Agreement Number
1 dated April 11, 2017, and Supplemental Agreement Number 2 dated December 20, 2018 shall remain in
full force and effect, except as herein modified.
The undersigned attests, subject to the penalties for perjury, that he is the contract party, or that he is
the representative, agent, member or officer of the CONSULTANT that he has not, nor has any other
member, employee, representative, agent or officer of the firm, company, corporation or partnership
represented by him, directly or indirectly, to the best of his knowledge, entered into or offered to enter
into any combination, collusion of agreement to receive or pay, and that he has not received or paid, any
sum of money or other consideration for the execution of this Contract other than that which appears
upon the face of the Contract.
(The remainder of this page intentionally left blank)
4of5
Supplemental Agreement No. 3
IN TESTIMONY WHEREOF, the parties hereto have executed this Supplemental Agreement No. 3.
DLZ INDIANA, LLC
Bv: a, �--' -��
Gary K. Fisk, P.E.
Vice President
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
B
Gary A. Gilot, P.E., Board President
B: - //' 44.:: � 3
Genevieve E. Miller, Member,
B LA ell,
Lau"r 'O'Sullivan, Member,
B
Elizabeth A. Maradik, Member,
B
Therese 1. I au, Member
ATTEST:
Lund M. Martin, Clerk � �.
X:\Projects\SB\PROJ\1561\2278 - Bendix Drive\Agreement\SA 3\SA3-2019-9-03.docx
5 of 5
Supplemental Agreement No. 3
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date September 30, 2019
Name Roaer Nawrot
Department Public Works
BPW Date October 8,2019 Phone Extension 5932
i�imuwwwmuw�umwummm�uw �wu�www iwm� ar:�wm��!�wwwir.Hww�wmuw�a � �mamsw�mmimmm;�w�arum w�ummommmmm�aawummnmm ;�;�iummwm!mu
_.
Submittal to Board Re �,u�rPrior to Sed _�� ..............�............._.
Legal Attorney
Clara McDaniels
Controller E] Controller review is required for all Contracts $5,000.00 or more anc
greater than one year in length per the City Purchasing Policy
Purchasing !,
Check the A
LJ Agreement
Professional Services
❑ Bid Opening
Quote Opening
( Change Order No.
Ease/Encroach.
Other: Amendment #3
Company or Vendor Name
New Vendor
MBE/WBE Contractor
MBE/WBE Contractor
Requested
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
rrrriat Item Types —fit
❑ Contract
❑ Resolution
El Bid Award
El Quote Award
l C/O & PCA No.
❑ Traffic Control
fired" for All Submissions
Proposalmmmmm m w
Required Information
DLZ Indiana, LLC
[� Yes No
7MBE I I WBE
Req. to Advertise
❑ PCA
Addendum
❑ Title Sheet
If Yes, Approved by Purchasin
Stakinq right of wav and inspecting utilitv relocation before the stree
reconstruction contract is awarded by INDOT and services durina
construction.
❑ Required Contractor's Certification Form Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Vrifv, Iran„ etc.)
equired For Change Orders On
Amount of Increase $
Decrease
Previous Amount $
Current Percent of Change -
New Amount $
Total Percent of Change:�