Loading...
HomeMy WebLinkAboutAward Bid - Century Center Parking Lot Entry Gate Improvements Project No 118-035A - Larson Danielson1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD � �4 PEACE ;b-� SOUTH BEND. INDIANA 46601-1830 i x CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR October 08, 2019 Timothy Larson Larson Danielson Construction Co., Inc. 302 Tyler St. LaPorte, IN 46350 PHONE 574/235-9251 FAx 574/235-9171 RE: Award Bid — Century Center Parking Lot Entry Gateway Improvements — Project No. 118-035A Dear Mr. Larson: The Board of Public Works, at its meeting held on October 8, 2019, awarded the above referenced project to you in the amount of $155,948.44. Enclosed please find a signed Bid/Proposal form. Please forward the following documents in one submittal b Ocwtober 22 2019 to my attention for Board of Public Works approval: 1) One (1) original of the Public Works Contract (enclosed) 2) Labor & Material Payment Bond 3) Performance Bond (125% of Bid Amount) 4) Certificate of Insurance naming the City of South Bend as an additional insured 5) Item #4 for all subcontractors you use If you have any further questions regarding this matter, please call this office at (574) 235-9251, Sincerely, Linda M. Martin, Clerk Enclosures GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK a„ Project Name Century Center Parking Lot Entry Gateway Improvements Project No. 118-035A For Bids Due September 24, 2019 PART (Must be completed for all bids. Please type or print) Date: 9/24/19 Bidder (Firm): Larson Danielson Const . Co . , Inc Address: 302 Tyler Street City/State/Zip:LaPorte, IN 46350 Telephone Number: (219 ) 362-2127 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Century Center Parking Lot Entry Gateway Improvements the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Jones Petrie Rafinski ,,;,,sand dated 8 / 2 9 / 19 for the sum of (enter the Total Bid as shown on the Proposal) I s Alt a e show on Proposal) ter sum of Total' Base Bid p rp (Numerical) ,vim _lt� The undersigned further agrees to furnish a bond or ehified'- heck with thIis bld tor an amount specified in �v/the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance ._. l ? with the notice. Any addendums attached will be specifically referenced at the applicable page. i,, If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the unils all be shown on a separate attac ent. CARBON DANIELSON By ' (60 st ��e Si nature) *4AL,CONSTRUCTION CO,, INC Timothy F. LaTM, President (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this day of C 20 Subject to the following conditions: BOARD OF PUBLIC-W I Gary Gilot Presi eot .Cliz beth A. Maradi!k0 er 'Laura L. O'Sull vars, Merri6 " Genevieve ieve E. Miller, Member Therese 401orau, Me mber test: Linda M. M',a in, Clerk Version 4/2/2019 Contractor's Bid for Public Works - 2 BOARD OF PUBLIC WORKS CITY OF SOUTH BEND, I DIANA. PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 8th day of October, 2019, by and between, Larson Danielson Construction Company, Inc. 302 Tyler St. LaPorte, IN 46350, HEREINAFTER called the "Contractor", and the Board of Public Works herein called the 'Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid Proposal, all of which are set forth as a part of this Contract, for: PROJECT NO.: 118-035A DESCRIPTION: CENTURY CENTER PARKING LOT ENTRY GATEWAY IMPROVEMENTS COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: $155,948.44 FUNDING: HOTEL/MOTEL TAX; TRAFFIC SIGNAL MAINTENANCE The total bid for this improvement were those prices as received and accepted by the Board on the September 24, 2019. The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. BOARD OF PUBLIC WORKS LARSON DANIELSON i CONSTRUCTION CO., INC. Gary A. ilot, President Eli .abet] I mach Member Printed Name Genevieve E. Miller, �iWa era L � ;�..�...:......._..... �w_� .. ...... ...._ ......... ' I� u rvan, Member Signature rlAlierese J. ors Member ttest: Linda. M Clerk CERTIFICATION (To be completed if Contractor is a Corporation) I, _M .. , certify that I am Secretary of the Corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor was then _ of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. Secretary Corporate Seal BID/PROPOSAL �r° CITY OF SOUTH BEND ' Project Name: Century Center Parking Lot Entry Gateway Improvements Project Number: 118-035A For Bids Due: September 24, 2019 Contractor Name: Tarson Danielson Construction Company, Inc. Item No. Description Quantit Unit Unit Price Total Amount 1 Construction Engineering 1 LS 1 �4 $ 2 Mobilization & Demobilization 1 LS a" , 3 Excavation, Common 222 CYS 4 Pavement, Remove 12 SYS Ll 5 Curb, Concrete, Remove 150 LFT 6 Attendant Booth, Remove 1 LS ;> 7 Protective Bollard, Remove 5 EA 8 Sign, Relocate 1 EA &LA--)) y.�p 9 Temporary Inlet Protection 3 EA 10 Compacted Aggregate, No. 53 110 TON 3 `` cl, 4;,)) S 11 Curb, Concrete 420 LFT, 12 Concrete, Reinforced, 6 IN 468 SYS ..--I k 13 Single Swing Barrier Gate 4 LSjca 14 Misc. Electrical 1 LS_=w,.� 15 Electrical Handhole 5 EA -1 16 Wire, No. 4 130 LFT-. a Lk (9 a 17 Conduit, PVC, Schedule 80, 2 IN 108 LFT 18 Conduit, PVC, Schedule 80, 3 IN 26 LFT ,. -),,rd s 19 Conduit, PVC, Schedule 80, 4 IN 42 LFT \ F'T D 20 Line, Thermoplastic, Crosswalk, Solid, White 6 IN 102 LFT — 21 Line, Thermoplastic, Solid, White, 46 LFT y 22 Line, Epoxy, Solid, White, 6 IN 96 LFT, - 23 Parking Lot attendant Booth 1 EA y .v y - y r .) 24 Protective Bollards 4 EA 25 Hardwood Mulch, 3IN Depth 14 CYS 26 Irrigation Allowance 1 ALLOW $400 0 27 Irrigation Sleeve, PVC, 4 IN 45 LFT = BASE QUOTE TOTAL Version 4/2/2019 Contractor's Bid for Public Works - 7 BID/PROPOSAL II",it CITY OF SOUTH BEND'! Project Name: Century Center Parking Lot Entry Gateway Improvements � 1 Project Number: 118-035A � For Bids Due: September 24, 2019 Contractor Name: Larson Danielson Construction .Company, Inc. ALTERNATE A — TRAFFIC SIGNAL HEAD REPLACEMENT Item Description No. Quantitv Unit Unit Price Total Amount 1 Traffic Signal Head Replacement 1 LS 4 V? () - $ � v� ALTERNATE A TOTAL $ ALTERNATE B — INTERSECTION 'SIGNAL MANHOLE CASTING ADJUST TO GRADE Item Description No. Quantity Unit Unit Price Total Amount Intersection Signal Manhole Casting, 1 Adjust to Grade LS Q $ ALTERNATE B TOTAL $ Larson Danielson Construction Company, Inc. Bidder (Firm): Address: 302 Tyler Street City/State/Zip: L aP o rt e, IN Telephone Number: 219 3 6 2— 212 7 46350 By X (Signature) Timothy F. Larson, President (Printed Name of Person Signing) LARSON DANIELSON J� sEn )CONSTRUCTION CO,INC. w Version 4/2/2019 Contractor's Bid for Public Works - 8 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 10/1/2019 Name Becca Plantz Department Public Works BPW Date 10/08/19 Phone Extension 5998 ammmmmmmrvmoommmmm mmmmm Required Prior to Submittal to Board BPW Attorney ® Attorney Name Clara McDaniels Dept. Attorney Attorney Name Purchasing ❑ Check the Appro riate Item Ty y �] Professional Services Agreement ❑ Contract Open Market Contract Amendment/Addendum Bid Opening FJ Bid Award [� Quote Opening Quote Award '❑ Proposal Opening C/O & PCA No. ❑ Chg. Order, No. Traffic Control Other: q liy All Submissions Proposal [� Special Purchase, QPA ❑ Req. to Advertise E] Reject Bids/Quotes PCA Resolution Ease./Encroach _.. __. _.._._.........__._ ❑ Title Sheet Company or Vendor Name Larson Danielson Construction Company, Inc. ❑ Yes ❑ If Yes, Approved by Purchasing New Vendor ❑ No MBE/WBE Contractor MBE Completed E-Verify Form Attached Yes WBE E] No Project Name Ccnttrr outer Pawling Lot End Gateway Improvements Project Number 1 -0 Funding Source Hotel Motel Tax Fund & Traffic Signal Maintenance Account No. 7304.42010.000.0099 & 251-0608-431.36-67 ...... .............w.w _.. Amount $155,948.44 ... ... . ...................................................................................................... Terms of Contract Lump SumandUnit Prices .............. _......._...................._................._._._._......_____............................................................................_........................................wmw_�_� �__ .... Purpose/Description Renovate the existingCentu Center west arkin lot entrance off momf Dr. Martin Luth r &Jiq&jr. Boulevard, __ For Change Orders nl:......._ Amount of ❑ Increase Decrease ($ ) _ ,..... .,. ....... ...A........_ ......... Previous Amount $ Current Percent of Change New Amount Total Percent of Change: Time Extension Amount: New Completion Date: Increase % Decrease Increase % Decrease ( % INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Y. TO: Linda M. Martin, Clerk Board of Public Works FROM: Rebecca Plantz, Engineer I SUBJECT: Award Project No. 118-035A Century Center Parking Lot Entry Gateway Improvements DATE: October 1, 2019 Nu:I����IW�I ooi0u0 IM"PI'�W�I'MWIIIIMIIOIIIIIIIIIIIII�INI�IMWtl406tluu�uMG➢IWUW'�yNO(4tlifoMq'p OOOIIIN�N�IIIII�4NIOIf d�'ippp�ptiNIWU�!UXIIYWIMI IV!W.WIWi41yIIIIIIlY011�pN011YU10101000NUN 0I�tlIobPo00YINOMm Y IIIpIIIIpIpOWOWI010f10 rvp On September 24, 2019 the Board of Public Works opened and read bids for the above project. I have reviewed them and found that the lowest bid was not pre -qualified according to the requirements of the Responsible Bidder Ordinance. Therefore, the next lowest responsive bidder was considered. The bidders ranked as follows: Bidder Base Bid Alternate A Alternate B 1. R. Yoder Construction, Inc. $143,528.95 $3,600.00 $2,850.00 2. Larson -Danielson Construction Co., Inc. $148,168.44 $4,180.00 $3,600.00 4. Selge Construction Co., Inc. $187,431.25 $3,600.00 $7,000.00 5. Walsh & Kelly, Inc. $236,000.00 $3,600.00 $4,820.00 I recommend award of a contract for the Base Bid, Alternate A, and Alternate B for the Century Center Parking Lot Gateway Improvements to the lowest responsive / responsible bidder, Larson Danielson Construction Company, Inc. in the amount of $155,948.44. Sufficient funds have been has appropriated from Hotel Motel Tax Fund (7304.42010.000.0099) and Traffic Signal Maintenance (251-0608-431.36-67). Please call with your questions (5998). Enc. Bid Tabulation § F2 ol", 10, 0 o c o M JJ?rr 0 i.J .. . v. . ..... . n 0 8 8, Is I., g 8 S, lUlw. aq dF 81 S 1. 8 rr 53 In 61 81 .1 g 8 8 2, IN 1316 COUNTY -CITY BUILDING ? 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1930 r'F r CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR October 8, 2019 Jason Yoder R. Yoder Construction, Inc. 27453 CR 150 PO Box 69 Nappanee, IN 46550 PHONE 574/235-9251 FAx 574/235-9171 RE: Bid Award — Century Center Parking Lot Entry Gateway Improvements — Project No. 118-035A Dear Mr. Yoder: The Board of Public Works, at its meeting held on October 8, 2019, awarded the above referenced project to Larson Danielson Construction Company, Inc., in the amount of $155,948.44. Please note, you were the low bidder but were found non -responsive to the responsible bidder ordinance. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, ry G Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU ry µ�r:. 1316 COUNTY -CITY BUILDING tJ� C ,� PHONE 574/ 235-925 1 227 W. JEFFERSON BOULEVARD MUIR'(' FAX 574/ 235-9171 SOI ITH BEND. INDIANA 46601-1 930 w m CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDU LC WORKS October 8, 2019 Dustin Hilary Walsh & Kelly, Inc. 24358 SR 23 South Bend, IN 46614 RE: Bid Award — Century Center Parking Lot Entry Gateway Improvements — Project No. 118-035A Dear Mr. Hilary: The Board of Public Works, at its meeting held on October 8, 2019, awarded the above referenced project to Larson Danielson Construction Company, Inc., in the amount of $155,948.44. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, l.,Inila M. Martin, Clerk Enclosure GARY A. G[LOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULL[VAN THERESE J. DORAU 1316 COUNTY -CITY BUILDING PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD l M SCE FAX 574/ 235-9171 SOUTH BEND_ INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDU LIC WORKS October 8, 2019 Robert Kuhns Selge Construction Co., Inc. 2833 S. 111h Street Niles, MI 49120 RE: Bid Award — Century Center Parking Lot Entry Gateway Improvements — Project No. 118-035A Dear Mr. Kuhns: The Board of Public Works, at its meeting held on October 8, 2019, awarded the above referenced project to Larson Danielson Construction Company, Inc., in the amount of $155,948.44. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, Linda M. Martin, Clerk. Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAMA L. O'SULLIVAN THERESE J. DORAU