HomeMy WebLinkAbout5A2 Budget Increase (Eagle Way Sewer Extension)
Redevelopment Commission Agenda Item
DATE: October 7, 2019
FROM: Kyle Silveus, Assistant City Engineer
SUBJECT: Budget Request – Eagle Way Sewer Extension
Which TIF? (circle one) River West; River East; South Side; Douglas Road; West Washington
PURPOSE OF REQUEST: Funding for professional engineering and construction of the improvements in
the amount of $300,000.
Specifics: In 2000, a temporary lift station was constructed to facilitate development along
Enterprise Dr./Eagle Way/Lone Wolf Drive to take sanitary flow. A sanitary stub
was also constructed and plugged at the end of Eagle Way, with the intent to bring
the flow south to Nimtz Pkwy by gravity in the future. The temporary lift station
has limited flow, causing maintenance issues such as freezing pipes in the wet well
in the winter and forcing our sewer department needs to pump it out regularly.
By bringing the sanitary flow by gravity to Nimtz Pkwy, we are able to eliminate
the temporary lift station. This project would work in coordination with the
current development of the property to the south with the 80/90 Distribution
Center and would take off from the stub at Eagle Way and extend south through
easement to the existing sanitary sewer in Nimtz Pkwy.
INTERNAL USE ONLY: Project Code: _______________________________________________;
Total Amount new/change (inc/dec) in budget: _$300,000_________; Break down:
Costs: Engineering Amt: ______________________; Other Prof Serv Amt_________________;
Acquisition of Land/Bldg (circle one) Amt: ___________; Street Const Amt ________________;
Building Imp Amt_________; Sewers Amt_________; Other (specify) Amt: ________________
___________________________________________. Going to BPW for Contracting? Y/N
Is this item ready to encumber now? ____ Existing PO#________ Inc/Dec $_____________