HomeMy WebLinkAboutOpening of Quotes - Northwest Fence Replacement - Custom Fence CompanyQUOTE/PROPOSAL
CITY OF SOUTH BEND
PROJECT NAME FENCE NORTH WEST
.......................... .................... ..... ............
PROJECT NO. _
QUOTES DUE :00 PM SEPTEMBER .n..._....�.... _.
18TH, 2019
Item
No. Description
Cr��, f �oilIAGVIc
2
Firm:
Address:
Y p: NI � u�11
City/State/Zip: i
nit Unit Price TotalpA� ...
$
Total Amount of Quote $
Telephone Number: 3(01 ) G 2I1 /b 1 I
Fax Number: _. __........ .. !..014f,
By_................
(Signature)
A
(Printed Nanie e w Signing) )
00 in�' V�►� uA-Peg, 4V1 a 6o W
pl F110w,
-1:,kLKA Ram- v-feN (,oa�f �Cwh�
�2r' a ' Fla�va[AI ��� tinarl�C?tf(,XA : t 5 5� 6�0 ,2�
�jvgmj: 13 4 80.00
Version 4/2/2019 Page - 10 Public Works Quote
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT,
CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY
VERIFICATION, NON-DISCRIIWIINATION COMMITMENT AND CERTIFICATION OF USE
OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF )
) SS:
COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that:
1. Contractor has not, nor has any other member, representative, or agent of the firm,
company, corporation or partnership represented by him, entered into any combination, collusion
or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent
any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made
without reference to any other bid and without any agreement, understanding or combination with
any other person in reference to such bidding. Contractor further says that no person or persons,
firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift,
commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any Federal department or agency;
and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment
activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency or
instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from
time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is
engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty million
dollars ($20,000,000) or more in value in the energy sector of Iran; or
ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty
million dollars ($20,000,000) or more in credit to another person for forty-five (45)
days or more, if that person will (i) use the credit to provides goods and services in
the energy sector in Iran, and (ii) at the time the financial institution extends credit, is
a person identified on list published by the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the Contractor subsequently learns is an unauthorized
alien. Contractor agrees that helsheht shall enroll in and verify the work eligibility status of all of
Version 4/2/2019 Page - 7 Public Works Quote
have an affirmative duty to notify the City in my bid that my proposal does not include the use of
steel products or foundry products made in the United States. I understand it is my sole obligation
and responsibility to provide a justification to the City, subject to review and approval, why the
cost of United States made steel or foundry products is unreasonable. Prior to award and upon
submission of bid which does not use steel products or foundry products made in the United States,
the City, through its director of public works, shall make a determination if the price of United
States made steel or foundry is unreasonable. I understand that violations hereunder may result in
forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public
works are true and correct.
Dated this aL `�,, � day of 20L
t
Contclor/Bidder (Firm)
S r1r., ture of CI t ctor/Bidder or Its Agent
.� w DNA
Printed Name and Title
Subscribed and sworn to before me this day + e/ 20 L
My Commission Expires 7 �
Notary Public
County of Residence & I
SAMUELCOURTNEY
NOTARY PUBLIC - MICHIGAN
CASS COUNTY
MY COMMISSION EXPIRES 04/27/2024
ACTING IN BERRIEN COUNTY
Version 4/2/2019 Page - 9 Public Works Quote
City of South Bend
Wastewater Treatment Plant 3113 Riverside Drive
South Bend, Indiana 46628
September 6, 2019
To: Vendors Quoting on Fencing WWTP Northwest
Re: Install 72 inch fencing with 3 strands of barbed Wire
From: Ken Smith
Director of Wastewater Maintenance
South Bend Wastewater
574-235-5787
NOTICE
Quotes are to be submitted sealed to: Clerk of the Board of Public Works
1316 County -City Building
227 West Jefferson Boulevard
South Bend, Indiana 46601
By: 9:30 AM September 24, 2019
Please enclose quote sheet
Must complete and return Seller's Quote for Sale or Lease of Material and Non -
Collusion form
Reference all questions to Ken Smith: 574-235-5787 email- .���j�r,jp�,�, or. Gary Muston 574-235-5789 email:
wwoncetwullibDAbuony
SOUTH BEND WASTEWATER TREATMENT PLANT 574-277-8515
SCOPE OF WORK
PROJECT NAME: FENCE NORTH WEST
PROJECT NO.
QUOTES DUE
PROJECT DESCRIPTION
A. The project includes the furnishing of all equipment, material, insurance, and labor for within the
City of South Bend, IN.
II. PREVAILING SPECIFCIATIONS AND DESIGN & CONSTRUCTION STANDARDS
A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN S
CONSTRUCTION STANDARDS, most recent version, are to be used on this project.
B. Each Quote provider is specifically instructed to become completely familiar with the most recent
version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION STANDARDS
prior to submitting a quote.
C. Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the 2018
INDOT Standard Specifications for the letting effective after September 1, 2017.
D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" W the PREVAILING
SPECIFICATIONS and are to be used only In conjunction with the PREVAILING SPECIFICATIONS.
E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS,
the SPECIAL PROVISIONS will govern.
III. TERM "OR EQUAL"
A. Prevailing Specifications: None
B. Additions
1. Where the term "or equal" is used in these specifications, the Quote provider deviating from
specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its
proposed article or equal. The City of South Bend shall be the sole judge in determining if the "or
equal" offered meets the specification.
IV, TAX EXEMPT
A. Prevailing Specifications: None
B. Additions
1. Materials and properties purchased under contract with the Owner that becomes a permanent part
of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax).
The exemption number will be fumished to the Contractor upon award.
V, INDEMNIFICATION
A. Prevailing Specifications: None
B. Additions
1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents,
officers and employees, from all costs, losses, claims and sups, including court costs, attorney fees,
and other expenses, arising from or out of the negligent performance of this Contract by Contractor,
or because of arising out of any defect in the goods, materials or equipment supplied by the Quote
provider.
VI. INSURANCE
Version 4/2/2019 Page - 1 Public Works quote
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108
B. Additions
1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the
Contract Time shall be based on written notice delivered to the Department of Public Works within
seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent
of the claim with supporting data shall be delivered within fourteen (14) calendar days after such
occurrence unless an official of the Public Works Department allows an additional period of time to
ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost
to delays beyond the control of the Contractor if a claim is made in accordance with this provision.
Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor
disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God.
2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An
extension is granted for weather conditions significantly more severe than normal if the Contractor
demonstrates to the satisfaction of the City that the delay in the progress of the work was due to
such weather. The basis to define normal weather with be the data compiled by the United States
Department of Commerce, National Oceanic and Atmospheric Administration (NOAA).
3. No extension of time will be granted if the Contractor, by hislherlits own action or inaction, including
fault or negligence of Contractor's subcontractors, caused the delay, or for which any remedies are
provided under any other provision of this agreement.
4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of
any rights or remedies existing under this contract at law or in equity.
XI. DEFAULT AND TERMINATION
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108
B. Additions:
1. Events of Default shall include Contractor's failure to perform any of its obligations under this
contract including failure to commence work at the time specified, failure to perform the work in
accordance with these specifications, unauthorized discontinuation of the work, failure to cant' out
the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or
regulations, and failure to comply with any other term of this contract.
2. If an Event of Default occurs, the City shall provide Contractor written notice and may permit
Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is
not cured within the ten (10) day cure period, the City may at any time thereafter terminate this
contract in which case the termination shall be final and effective.
3. Upon an Event of Default, the City may invoke the following remedies in addition to those remedies
provided under separate provisions of this contract, the right of set-off against any payments due
or to become due to the Contractor against the retainage, the right to take over and complete the
Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that
the Contractor has in order under Contractor's subcontracts are assigned to the City, subject to the
City's right to take assignment of all or only selected subcontracts at the City's discretion. The sole
obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed
after the date of the assignment In the event a conditional assignment has not been executed, the
Contractor shall execute or cause to be executed any assignment, agreement, or other document
that may be necessary in the sole opinion of legal counsel to the City's Board of Public Works to
evidence compliance with this provision. The Contractor shall promptly deliver such documents
upon the City's request. In the case of such assignment, unless otherwise agreed in writing, The
Contractor remains liability to subcontractors for any payment already involved, and for any claim,
suit or cause of action based upon or resulting from any error, omission, negligence or other breach
of contract by the Contractor, its officers, employees, or agents arising prior to the date of
assignment to the City.
XII. LIQUIDATED DAMAGES
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108
B. Additions:
Version 402019 Page - 3 Public Works Quote
with construction. It shall also be the Contractor's responsibility to contact any other utility that is
not contacted by Indlana811 and verify the utility locations.
2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone,
etc. in order to assure that all utilities that need to be replaced or relocated can be done with a
minimum disturbance to service. The Contractor shall also be responsible for coordinating
schedules with the various utilities such that they can proceed with their relocation work as
efficiently as possible.
3. If the odor of natural gas is detected in a work area at any time during the course of work, the
Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also
Immediately notify the residents of adjacent properties. The Contractor shall advise the residents
to evacuate their homes immediately if the odor is present within the dwelling.
4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the
Contractor at no additional cost to the City or the Owner of the system.
XVI. MAINTENANCE OF TRAFFIC
A. Prevailing Specifications: 2018, INDOT Standard Specifications Sections 105 & 801
B. Additions:
1. Maintenance of traffic during construction shall conform to the "Indiana Manual on Uniform Traffic
Control Devices" and the City of South Bend Design and Construction Standards.
2. The attached "Traffic Closure Request" form is to be used for any lane restrictions or closures and
required to be filled out and sent to the Department of Public Works
3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner
that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve
the method of traffic control. No construction equipment, vehicles, materiels, supplies or temporary
facilities shall be left unattended in the right-of-way of any street or left parked overnight without
proper marking and lighting.
4. After the award of the contract and before beginning the work, the Contractor shall submit his/her/its
proposed schedule of operations for the review of the Engineer. The schedule of operations as
reviewed by the Engineer shall be maintained at all times.
5. There will be no direct payment for this work.
XVII. DESCRIPTION OF WORK
A. Prevailing Specifications: None
B. Additions
1. Work to be performed shall include furnishing all labor, services, materials, insurance and
equipment to within the City of South Bend.
2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and
their property from damage caused by the Contractor's operations.
XVIII. PLANS
A. Prevailing Specifications: City of South Bend Design and Construction Standards
B. Additions:
1. The plans consist of Sheets.
2. The work shall conform to the plans.
3. The drawings are schematic in nature.
4. The CONTRACTOR Is responsible for estimating dimensions and quantities of materials.
5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern.
Version 402019 Page - 5 Public Works Quote