HomeMy WebLinkAboutOpening of Proposals - Road Reconstruction for Olive St in LaPorte District - United Consultingletter of interest
TO PROVIDE PROFESSIONAL SERVICES
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
Des #1400637
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
September 18, 2019
Board of Public Works
227 W Jefferson Blvd., Suite 1316
South Bend, IN 46601
RE: Road Reconstruction, for Olive Street from Prairie Avenue to the railroad south of Tucker Drive, in the City of South Bend,
St. Joseph County, Indiana (Des # 1400637) in LaPorte District
Dear Selection Committee,
UNITED CONSULTING is a proven leader in Consulting Engineering Services throughout Indiana. Our approach to every project
centers around extensive communication and providing the highest level of service to our clients. Our team has been assembled
to match our expertise with your project so you can gain the highest value through protecting the City's investment in this project.
We have chosen Bret Smiley as our Project Manager for the reconstruction of Olive Street. Bret is sought after by many of our
clients throughout the State. His engaging personality creates an atmosphere in the field as well as the conference room during
meetings where things get done. He is able to establish an environment where the entire team --client, designer, inspection team,
and contractor --can collaborate to easily and quickly solve any problem that may arise on the project. His leadership ability saves
time and money, which results in on -time and on -budget projects.
Bret has plenty of backup within UNITED. Our principal contact, Bill Hall, our Department Manager, Brian Miller, and our Field
Operations Manager, Chris Miller have over 87 years of combined hands-on experience in the construction of high -profile and
complex projects. This support team brings value through the extensive relationships built with City Officials, contractors, INDOT,
and regulatory agencies.
UNITED would like to thank you for an opportunity to share our story and for the opportunity to partner with you on this important
project. We are confident that a team consisting of the City and UNITED will bring success and will result in a rewarding experience
for everyone. We respectfully ask that you select our firm for this project. We look forward to working with you.
Sincerely,
UNITED CONSULTING
Terry Minix
Business Development
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES ! UNITED CONSULTINGPAGE 1
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
TEAM ORGANIZATION
South Bend
ALICIA CZARNECKI, Ell
Project Engineer
Department Manager
BRIAN MILLER
Construction Inspection
.......................................... .....:.......... .......... ........................
. ..
Quality Control Project Manager
CHRIS MILLER BRETSMILEY
Field Operations Manager Construction Inspection
Inspector Inspector
RESOLUTION GROUP JAY NIEDERHAUSER
DBE Construction Inspection
TEAM MEMBER SERVICE DBE? %
United Consulting 13.1 97%
Resolution Group, Inc, 13.1 3%
CLIENT LIAISON
TERRY
I
Business Development
CELL: 574-207-3543
EMAIL: Terry.Minix@ucindy.com
PRINCIPAL CONTACT
BIL,L IU
PE
Vice President
8440 Allison Pointe Blvd..
Suite 200
Indianapolis, IN 46250
OFFICE: 317-895-2585
CELL: 317-501-7491
EMAIL: Bill.Hall@ucindy.com
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES I UNITED CONSULTINGPAGE 2
Road Reconstruction of Olive Street
ahCE...��^� � FROM PRAIRIE AVENUE TO TUCKER DRIVE
��
PROJECT MANAGER
BRET I
Project Manager
Bret's role on this project will be a hybrid of
onsite project management, cost -saving ideas,
project liaison, inspector, and communications
expert. His experience will allow him to identify
project issues before they become problems
and communicate timely recommendations
for cost-effective solutions. Bret will keep all
stakeholders informed of any project impacts
to ensure the project stays on schedule and is
completed to the City's vision.
RELEVANT EXPERIENCE
,t6TLf TTTTE".T REC0HSTAUCTi,C)N ISTPRiLtWtillll......
IROAD TO WTt"1�i TITAiD), CARMEL, 04, Construction Project
Manager. This project consisted of nearly one mile of both roadway
reconstruction and new road construction over new terrain. The
project included construction of a new roundabout configuration
located on a new alignment near the existing 146th Street and Ditch
Road intersection. In addition to the roundabout, 146th Street was
reconstructed from Springmill Road to the new roundabout alignment.
A new pavement section was constructed to support the growing
traffic demands in the area. Bret assisted the County in defending
a very difficult situation created by pavement policy changes by
INDOT during the project. As part of Bret's hard work and detail in
documentation, he saved Hamilton County approximately $550,000 on
a change order claim
on the 146th and
Ditch Road project.
New multi -use paths
and concrete curbs
enhanced the area
for pedestrian use
and made the area
safer for all modes
of transportation.
The new terrain
roadway project
incorporated
approximately
500,000 cubic yards
of borrow material
obtained from two
on -site borrow pits.
I�1ANGELINE ROAD R10LJ N TA B,110LJT,
T'ARMELa, P4. Construction Project Manager.
The project consisted of the reconstruction of a
two-lane urban bridge over Little Cool Creek and
roundabout intersection of Rangeline Road and
Smokey Row Road. A cemetery, located within
close proximity of the project, created special
concerns for limited right-of-way access for
the construction of the project as well as major
existing utilities including a power substation
which required constant communication and
supervision. Additionally, as the first component
of future Rangeline Road updates, this "Fast
Track" project was completed in 12 months.
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES ] UNITED CONSULTING PAGE 3
r"
Ile
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
TECHNICAL UNDERSTANDING
The existing site conditions consist of several businesses throughout
the project limits. Most of these businesses are located on the northern
portion of the project, while the south end is mostly residential, with a
few scattered businesses. The roadway to be reconstructed is currently
Portland Cement Concrete Pavement (PCCP), except for the very south
end which is asphalt.
Currently, the project is slated for a November 10, 2020 letting. The
scope of the work will include the reconstruction of the pavement on
Olive Street from 100 feet north of Prairie Avenue to approximately 390
feet south of Tucker Drive. The typical roadway will consist of two 11-
foot travel lanes with a 12-foot auxiliary turn lane along the centerline. A
majority of the roadway cross-section will be composed of 10-inch QC/
QA PCCP on compacted stone subbase on Type III treated subgrade. In
order to accommodate street parking, the plans include an eight -foot
parking lane along the west side of the roadway from Ewing Avenue
to Calvert Street. Upgrades to the existing traffic signal located at the
Prairie Avenue (SR 23) intersection will help to improve traffic flow.
In addition to the roadway improvements, the project will coordinate
with Norfolk Southern Railroad contractors as they replace the at -grade
crossing. Additional railroad work will include the installation of new
signal arms and a pedestrian gate and handrail system.
Pedestrian -friendly improvements include a newly constructed concrete
shared -use path which will be eight-feett in width, allowing it to
accommodate multiple forms of pedestrian traffic. The existing concrete
sidewalk will be replaced with a new five-foot concrete sidewalk. ADA-
compliant ramps and crossings will be placed in planned locations.
For added safety, new ornamental light poles with LED lighting will
be installed from Prairie Avenue to just north of the Norfolk Southern
Railway crossing.
Supplementary construction items of note are the total length of the
project is slightly less than % of a mile and construction will take place
in two phases, while maintaining one-way traffic. Multiple driveway
approaches, including both residential and commercial will be affected
by both phasing and when the drives are reconstructed. To increase
the necessary site drainage, just over 6,300 feet of storm sewer will be
installed, helping to illuminate combination sewer concerns.
Due to the significant roadway construction, erosion control and site
drainage must be monitored, anticipated, and controlled at all times. We
expect multiple temporary erosion control measures will be implemented
and maintained throughout construction. Silt fence, riprap, check -dams,
rock berms and sediment traps, temporary seeding and mulching, and
dewatering stations will be incorporated throughout the project limits.
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES f UNITED CONSULTINGPAGE 4
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
MAINTENANCE OF TRAFFIC
UNITED
Consulting —
The most current plan set details three phases of construction. Access to all homes, businesses and Calvert Street are to
be maintained at all times, along with emergency vehicles and postal access. All truck traffic, except deliveries to local
businesses, are to use Prairie Avenue/SR 23 from the south during Phase I and Phase II construction.
Phase I includes the reconstruction of Olive Street and the installation of new storm sewer main and structures in the
northbound half of Olive Street from Prairie Avenue to the Norfolk Southern Railroad south of Tucker Drive. One-way traffic
northbound on Olive Street will utilize the existing southbound section of pavement during this phase. During this phase,
traffic will utilize the posted detour route along Sample Street and Prairie Avenue/SR 23.
Phase III includes the reconstruction of the southbound half of Olive Street and the installation of new storm sewer structures
from Prairie Avenue to the Norfolk Southern Railroad south of Tucker Drive. One-way traffic northbound on Olive Street will
utilize the newly constructed northbound section of pavement during this phase. The intersection of Indiana Court will also
be constructed in multiple phases to allow access to Olive Street from the west. During this phase, traffic will utilize the
posted detour route along Sample Street and Prairie Avenue/SR 23.
Phase III Olive Street shall be open to traffic in both directions. This phase includes any remaining work that was not
required to be completed in phase I and 11, but will be completed under traffic.
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES I UNITED CONSULTINGPAGE 5
p 4CE
_1865
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
PROJECT (MANAGEMENT IDEAS
E S T () 14 E M E E TINGS
Bret will conduct Milestone Meetings which will offer an opportunity for City representatives to stay abreast of
critical events. City representatives will be invited to join the contractor's superintendent along with Bret to tour
the project site upon completion of key milestone events. By offering Milestone Meetings, City personnel are
given the flexibility to save valuable time in their busy schedules which would otherwise be tied up by frequent
attendance at weekly or bi-weekly progress meetings.
At each meeting, the contractor will present an updated schedule and communicate when the next key milestone
will be completed. These milestones will be determined when the contractor submits the construction schedule
for review. The proactive field checks keep the City informed of real-time progress and allows representatives
to discuss any trouble areas, areas of concern, or recommended change in the field.
SCHEDUI 1111,14G I) T E SIj !D j E N T I j C T j f'°,f' f O C014CERNS
Bret will provide a schedule overview analysis on a bi-weekly basis to the Project Engineer, Alicia Czarnecki, and
the contractor to identify anomalies in the construction schedule and allow project personnel to quickly identify
scheduling and budget issues. A comparison of planned versus actual time and any differences, positive or
negative, can be reviewed, assessed, and mitigated before becoming an issue.
The following chart illustrates an example of a schedule analysis.
Subbase
z
o Subgrade
Backfill
w
a
O Pipe Install
Schedule Analysis Example
0 O.5 1 1.5 2 2.5 3 3.5
WEEKS
Difference N Actual A•' Planned
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES I UNITED CONSULTINGPAGE 6
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
PROJECT MANAGEMENT IDEAS
5 Key Steps to Successful Project Management
I. Conduct an overall constructability review (identify key components)
® Review the contractor's schedule of operations
® Analyze key periods when inspection is most critical
® Identify when testing and DBE assistance will be necessary
5. Review and turnaround of project -critical submittals
Upon Notice -to -Proceed, UNITED will work with the awarded contractor to obtain a preliminary schedule
of operations. Our assigned project manager, Bret Smiley, will then begin to work on scheduling staff and
managers to create a support staff schedule. Identifying critical construction periods will allow Bret to know
when inspection and testing services will be needed most. This ensures the inspection budget is utilized in the
most effective and cost-efficient way to maximize the benefits realized from each dollar spent.
The following chart illustrates an example of a support staff schedule.
30
25
CU
a 20
0 15
10
0 5
0
Slchpdulp Onalvcic FYamnla
Paving Concrete Subgrade & Storm Sewer Excavation
Subbase & Drainage
CONTROLLING OPERATION
Primary NI Testing 9 DBE
Inspection
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES I UNITED CONSULTINGPAGE 7
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
RAILROAD COORDINATION
�TVNITED
t onsufff - :.
Coordination with the railroad is a large component of any project involving a roadway crossing over a railway. The two
most important issues that typically need to be resolved when constructing a project within railroad jurisdiction are:
® Direct coordination with the railroad
2. Communication with their onsite representatives
According to the most recent available plan sheets, this project will be required to work with the Norfolk Southern Railroad
(NSRR).
UNITED has extensive experience in managing projects which are directly impacted by the various railroads. UNITED has
designed, inspected, and managed numerous projects which require our personnel to work directly with railroads and
their representatives. Some examples of projects involving railroad coordination are: Shadeland Avenue and Post Road
Rehabilitation projects in Indianapolis, Avon Avenue Bridge in Avon, and CR 200 in Columbus.
Our recent experiences have taught us that coordination will be required for all contractor equipment crossings and
material deliveries.
A few major coordination issues will include:
➢ Any railroad drainage ditches must remain open and functional throughout construction.
➢ All means and methods of work performed within the project site must conform
to railroad standards.
➢ A railroad representative requires 72 hours advanced notice and a flag person
must be scheduled two weeks in
advance.
COST -CONTAINMENT
Project Cost Control - Un!Aed's Pan of Acdorli
Keep change orders below 3°i° UNITED will research all claims and will
Presents Alicia with solutions instead of
help provide effective solutions
problems
Quick turnaround on Shop Drawings and Identify all required documents and work
Keeps construction on schedule and
Approvals with the contractor to deliver submittals
eliminates potential construction delays
ahead of schedule
Eliminate construction delays Solve construction related issues at the
Reduces the time South Bend staff has to
project level through communication and
commit to project -related concerns
information
Protect the project budget Verify all project quantities weekly
South Bend will know where the budget
and discuss at all progress meetings,
stands at all times, empowering city
especially major items such as sub -base,
representatives to make informed
bituminous HMA items, and PCCP
decisions
Coordination with railroad and utilities UNITED will assist the contractor
Protects the project schedule by making
with coordination efforts and invite
sure conflicts or project impacts are
all impacted utilities and NSRR
discovered early and resolved quickly
representatives to all progress and
coordination meetings
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES I UNITED CONSULTINGPAGE 8
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
COMMUNICATION PLAN
UNITED understands that while performing construction inspection services for the Olive Street Corridor project, our client
is you, the city of South Bend. As the onsite representative for the City, it is our responsibility to ensure the project is built
to your intended vision while safeguarding the budget and public perception.
One of the keys to success is how the public perceives a project. Success is not only measured in how the project
looks and functions after it is completed, but how the project was handled during the entire construction process. Our
assigned project manager, Bret Smiley, and his past experience of working around projects surrounded by both business
and residential areas will enable our team to anticipate potential problems before they arise and offer viable solutions to
address any issues before they can escalate.
UNITED will continue the excellent quality of communication that our clients have come to expect. In order to accomplish
our goal, we will execute the following communication plan.
UNITED will offer to hold an open meeting in a facility in the vicinity of the project immediately
after the successful bidding of the project. The agenda for the meeting will include the following: W
➢ Identify the expected schedule of activities and when they will likely begin.
➢ Provide an overall concept of how the construction process will proceed.
➢ Introduce the project manager (Bret Smiley) to the businesses, residents, and school
representatives and provide direct lines of communications to contact him with questions.
➢ Answer public questions.
Bret Smiley will personally make contact with neighboring property owners and businesses that might be impacted by the
project or construction traffic. Bret will communicate the construction schedule with the property representatives and
send monthly updates showing project progress and any changes. Our team will make sure the contractor is aware of any
streets that are restricted to oversized loads/weight limits in the area and any other nearby streets.
A few critical areas of communication include:
➢
New Life Ministry
➢
Residential Properties
ry
➢
Belle Way Service
➢
SR 23 Intersection
➢
Warehousing and Logistics Property
Bret will conduct weekly progress meetings at the construction field office and will make meeting
minutes available to interested parties. During each meeting, Bret will update everyone on work
completed to date and discuss the upcoming schedule. Any impacted utilities will also be asked to attend until their
work is complete or no longer in conflict. UNITED will maintain continuous communication with Alicia Czarnecki through
meetings, phone calls, and emails. The purpose of this communication is to ensure we clearly understand and execute
your expectations.
WP re cortfideint the extra steps outLinedthis l uau will go a Long
way towards addressing fand, eLiminating difficuLt situations that wouLd,
otherwise aris(I., due to cori�vlinunicatlon issues,
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES I UNITED CONSULTINGPAGE 9
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
RELEVANT PROJECT EXPERIENCE
10 PH 'R. E E' IIRECONs i ituc rION
MIND W111DIIENING
CITY OF JEFFERSONVILLE, INDIANA
This project included the reconstruction and widening
of 10th Street in Jeffersonville from four to five lanes.
The fifth lane was turned into a center turn lane. The
improvements extended from Dutch Lane/Penn Street to
Reeds Lane along 10th Street.
UNITED performed the construction inspection which
included the installation of new curb and gutter, storm
sewer system, sanitary sewer, retaining walls, new
pedestrian -friendly and aesthetically pleasing sidewalks
on both sides of the road, new ADA-accessible curb ramps,
drive approaches, four new intersections with decorative
traffic signals, decorative street lighting, and signage.
Special attention had to be given to maintain the high
volume of pedestrian traffic on this major thoroughfare
throughout the duration of the project.
NSTI TI COST: $15 million
E NUE III F DWIDG E AND
ItOU11HDABOUT
TOWN OF AVON, INDIANA
UNITED provided limited plan review, construction
management, and inspection services for this locally -
funded project featuring the following items:
➢ Two-lane bridge over CSX Railway
➢ Roundabout configuration at Avon Avenue and CR 25 S
➢ 3/4 a mile of new concrete pavement
➢ Sidewalks and ADA-accessible ramps
➢ 879 feet of MSE retaining wall
➢ New turn lane and signal modification at US 36
The bridge, roundabout, and mainline pavement were
constructed and open to traffic in just under eight months,
thanks to an acceleration initiative implemented by the
Town. Project challenges included constructing the
south end of the project under traffic and maintaining
access to residents, businesses, and Avon Schools during
construction throughout the project limits. Portions of
the projects were coordinated with Avon Schools to be
constructed during spring, summer, and fall breaks, as to
not disrupt bus schedules or afterschool activities.
CONSTRUCTION COST® $10 million
ii
AndY Crouch ��Ryan Cannon
City of Jeffersonvillef,
f / Town of Avon
City Engineer �0���%%/%�� Public Works Manager
i/% ,% 317.272.0948
812.285.6476
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES I UNITED CONSULTING PAGE 10
Road Reconstruction of Olive Street
FROM PRAIRIE AVENUE TO TUCKER DRIVE
RELEVANT PROJECT EXPERIENCE
M TIZEET EXTENSION
FROM "TO IIBODEN ROAD
HAMILTON COUNTY, INDIANA
The project included the extension of 146th Street from
SR 37 to Boden Road. It was designed as a four -lane urban
section to allow for a future six -lane urban expansion
including a landscaped median, rnuifi-use paths, and curb
and gutter. The project included three miles of new roadway
combined with pavement reconstruction and widening and
the construction of two new bridges, This new roadway
serves as a corridor connection between SR 37 and I-69.
The project was a fast -track project that was completed in
18 months as a joint -venture between Hamilton County and
the city of Noblesville.
This roadway extension and added travel lanes project
necessitated the completion of an Environmental
Assessment. Major environmental services investigated
during the completion of this documentation included a
,oise analysis, wetland determination, and delineation. It
also included coordinating with the local MPO to ensure
compatibility with the Regional Transportation Plan and
air conformity analysis. The project resulted in extensive
coordination with the Indiana Department of Environmental
Management and the US Army Corps of Engineers due to
project impacts upon wetlands.
CO ,91NI" RucriOT' $6 million
�x�'��Itl�a
SPRING ILI � IIIP III EXTENS101114
CITY OF CARMEL, INDIANA
Spring Mill Road was reconstructed from Main Street
to 106th Street. The pavement was reconstructed into
a boulevard section with pedestrian facilities and a
new roundabout at the intersection of 111th Street. The
roadway Included new drainage features with complex
hydraulic modeling to account for the existing detention
ponds throughout the project limits. The project had an
accelerated schedule,
The reconstruction included short-term closures and one-
way traffic patterns during maintenance of traffic. The
project traversed numerous neighborhoods and several
key businesses. In order to build a positive project
perception, the project team met with the stakeholders to
communicate how the project was going to be constructed
and the duration of the phases. The early communication
allowed thieir concerns to be alleviated through creating an
understanding of why project decisions were made.
CONSTRUIC'TION COST. $15 million
/ �j 4 IIIII F"
REFI IIIlllli,jT��
i Joel Thurman Chris Ogg
Count �Hamilton t j r
Y tg City ' of Carmel
l/
Acting County Engineer! Assistant City Engineer
a317.773.7770 �r�
317.571.2436
LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES I UNITED CONSULTING PAGE 11
Standard RFP Form Ver. 8-22-18
(Rev. 06-27-18)
Des. #: 1400637
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified
by the State of Indiana's DBE Program and the Kentucky Transportation Cabinet (KYTC), DBE Program to participate as part of this,
proposal, An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their
respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.8 1 (e) and (f).
I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a
blank certification may cause the proposal to be rejected. I certify that f have consulted the following DBE websites to confirm that
the firms listed below are currently certified DBEs:
fNDOT: httlas:// rat<aI I'LS tilIalJn' �Ivll I [I'ocator�
KYM —Ll---piiLllllr), -L'
3 J,FYI reqQJY.� Ll- 3t�ineqs-Levelo
I certify that I have contacted the certified DBE's listed below, and if my company becomes the CONSULTANT, these DBEs have
tentatively agreed to perform the services as indicated. I understand that neithet, my company nor I will be penalized for DBE
utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be
applied toward the DBE goal must have prior approval by INDOT's Economic Opportunity Division.
I. DBE Subconsultants to be applied toward DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to
be Paid*
Resolution Group 13.1
3%
. . . .......... —.- . . .... . ... . .... . ..... % . . ... . . .......
. ............... . ..... . . ....... .. . .......... %
.................. %
11. DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to
Estimated Perce,
be Paid*
0
0,
0
0
. ..... . . ........ . ..... . ..... %
%
Estimated Total Percentage Credited toward DBE Goal: 3%
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal: n/a
Company Name: -71 United Consulting
Signature: Date:
It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result
of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these
or other certified and approved DBE firms.
C CD
G
O N
IV CD
v
•A Q
3
v
o p
0
CD v
3 3
cn �
1.
0 0
o 0
3 v
O
O
0
v m
Q �
ca v-
0.
Cn
0 CD
CD v
-L 0
=;; S
i0U
O
mm
0 N
=O c
ncP
• 3
C
-a (D
O
C 0
7
Fn• -
d
Ul
0.0
m
0
m0
0 �.
o
3• 0
� m
O�
N
O
O
C)
C N
�a
Eli
o
w
o �
v
v
CD
CD
CD
Q
C)
N
C.0
N
C)
N
0
O
CC)
CD
Q
0
s=
(D
C)
w
N
O
N
N
N
C)
CD CD
h
cD O
Q
m O
5, =3
G)
CD -1
O
v C:
CD _0
O