HomeMy WebLinkAboutOpening of Bids - Century Center Parking Lot Entry Gate Improvements Proj No 118-035A - Selge ConstructionCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Century Center Parking Lot Entry Gateway Improvements Project No. 118-035A -- .m ---------------- — ----------- ......... For Bids Due September 24, 2019 PART I (Must be completed for all bids. Please type or print) Date: 9/24/19 Bidder (Firm): Selge Construction Co., Inc. Address 2833 S . 11 th Street City/State/Zip: Niles, MIa� 49120 r� Telephone Number: ( 269 ) 684-0842 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Ce t _y 'nPar —C t ewa _. the City of South Bend, Indiana, in accordance with plans and specifications prepared by: (JPR) Jones Petrie Rafinski and dated August 29, 2019 for the sum of (enter the Total Bid as shown on the Proposal) One Hundred Ninety Fi tit Tbousand Thirty One Do7.la s & $ 198 031 .25 ..... ........... ._)_m. (Enter sum of Total Base Bid plus Alternates shown on Proposal) Twenty Five CeRWerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a s p rate attachment. Y The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member Laura L. O'Sullivan, Member (Signature) _. .. R t_µE ' f Pnrii" ncNzr (Prin ed Name of Person -Signing) ACCEPTANCE day of Genevieve E. Miller, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk 20 Version 4/2/2019 Contractor's Bid for Public Works - 2 BID/PROPOSAL���.� CITY OF SOUTH BEND' t Project Name: Century Center Parking Lot Entry Gateway Improvements Project Number: 118-035A px For Bids Due: September 24, 2019 Contractor _ Name: oInc. Selcge Constructin Co., _ _ �......�.__ . BASE QUOTE Item ......_ ..M..._. o. Description Quantit i tion ._....._- Y Unit ......_-- ......_....... Unit Price i ..._ ..-. Total Amount _ ...._-... 1 Construction Engineering 1 LS r y p $ �I r c} 2 Mobilization & DemobilizationWWWWWYY 1 LSITmmm r} 3 Excavation, Common 222 .. mµn CYS _ C �� 160 4 Pavement, Remove 12 SYS 5 Curb, Concrete, Remove 150 �._.._ _...... _._ LFT _ mm n / �_. ........ 6 ..........� Attendant Booth, Remove 1 LS ��.. 7 Protective Bollard, Remove 5 EAR o 8 Sign, Relocate 1 WW EA uWWWWWWW 0( _ _.. 9 Temporary Inlet Protection p rY 3 EA / 10 Compacted Aggregate, No 53 110 -� _ TONy a 11 Curb, Concrete 420 LFT .- 06 12 _ __ Concrete, Reinforced 6IN 468 _ m'mm _Sin SYS WWWWITmnX j 13 ...... le Swing Barrier g g Gate 4 _ LS... e_$1q CV0, 14 Misc. Electrical 1 LSD '00,00 15 Electrical Handhole 5 _...... _ EA c000 ` 60. 16 Wire, No. 4 130 LFT ®_ r 17 Conduit, PVC, Schedule 80,2 IN 108 LFT �y � n �� � 18 Conduit, PVC, Schedule 80, 3 IN 26 LFT / r' 19 Conduit, PVC, Schedule 80 4 IN 42 LFT / 1 @ 6 20 Line, Thermoplastic, Crosswalk Solid White„ 6 IN 102 LFT s a o 21 Line, Thermoplastic, Solid, White, 46 LFT 22 Line, Epoxy, Solid, White, 6 IN 96 LFT 23 Parkin Lot g attendant Booth 1 EA y� , OO 24 Protective Bollards 4 EA v , 25 Hardwood Mulch, 3 IN Depth 14 _. CYS 26 Irrigation Allowance 1 ALLOW $400 1�00, 27 Irrigation Sleeve, PVC 41N 45 LFTno-, � e BASE QUOTE TOTAL $ / Version 4/2/2019 Contractor's Bid for Public Works - 7 BID/PROPOSALsurN� CITY OF SOUTH BEND" Project Name: Century Center Parking Lot Entry Gateway Improvements _u ..m,. _.- ,,.....,........ MAC Project Number: 118-035A, _........ _. .... .............................. ... s For Bids Due: September 24, 2019 p� . Contractor Name: �QQP-aicn--I-rtc. ALTERNATE A — TRAFFIC SIGNAL HEAD REPLACEMENT ALTERNATE A TOTAL ALTERNATE B - INTERSECTION SIGNAL MANHOLE CASTING, ADJUST TO GRADE Item Description No. Quantity Unit Unit Price Total Amount 1 Intersection Signal Manhole Casting, 1 LS r Adjust to Grade ( $ ALTERNATE B TOTAL $1'���y��� Bidder (Firm): Selge Construction Co., Inc. Address: 2833 S . 11 th Street City/State/Zip: Niles, ITMI 49120 Telephone Number: 684-0842 By P. i (Signature) )bgrt Kuhns, Project Engineer (Printed Name of Person Signing) Version 4/2/2019 Contractor's Bid for Public Works - 8 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF MICZiIGA1V ) ......................... SS: BERRIEN COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 4/2/2019 Contractor's Bid for Public Works - 4 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project, will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 4/2/2019 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 24th ,__..,_.., day of m w 2019 Subscribed and sworn to before me this 24th My Commission Expires . 07/25/2020 Construction Co., Inc. Contractor/Bidder (Firm) i� • K" Signature of Contractor/Bidder or Its Agent Robert. Kuhns Proiect Engineer Printed Name and Title day ofi M ...__, 20 1.9 t...._ ,4 .m.. ,. Notary Public County of Residence Berrien a ......... , pp a ;k 1+✓� �+W� 'f A 0. C ,, Version 4/2/2019 Contractor's Bid for Public Works - 6 MERCHANIT77%k BONDING COMPANYTM MERCHANTS BONDING COMPANY (MUTUAL) P.O. BOX 14498, DES MOINES, IOWA 50306-3498 PHONE: (800) 678-8171 FAX: (515) 243-3854 Bid Bond Bond Number: CONTRACTOR: SURETY: (Name, legal status and address) (Name, legal status and principal place Selge Construction Co., Inc, ofbusiness) 2833 S I l th Street Merchants Bonding Company (Mutual) Niles, MI 49120 A COr�p, ration 6700 Vesta. wn Parkway, West Des Moines, IA 50266 OWNER: (Name, legal status and address) City of South Bend, Indiana, Board of Public Works County -City Building Room 1316 This document has important legal 227 West Jefferson Blvd consequences. Consultation with South Bend, Indiana 46601 an attorney is encouraged with BOND AMOUNT: Five Percent (5%) of Accompanying Bid respect to its completion or modification. PROJECT: Any singular reference to (Name, location or address, and Project number, if any) Contractor, Surety, Owner or CENTURY CENTER PARKING LOT GATEWAY IMPROVEMENTS other party shall be considered Project No. 118-035A plural where applicable The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 24th day of September, 2019. Selge Construction a"x)Iptc, �. (Principal) (Seal) (Witness) eci- Engineer (Title) Merchants BondingCom an Mutual" dsw (Surety) I/ (Seal) (Witness) aj Ai t (Title) F,Jaine-K.`Millet`, Attorney-in-Fat;t: CON 0657 (2/15) Printed in cooperation with American Institute of Architects (AIA). The language in this document conforms exactly to the language used in AIA Document A310-Bid Bond-2010 MERCHANTS BONDING COMPANY. POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Connie J Messer; Dawn M Pequignot; Elaine K Miller; Harold E Everett; J Kevin Hughes; Jada M Karst; Jessica K Callahan; Marie E Comparet; Melinda Jagger; Thomas J VanDyck; Tom McGovern their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 14th day of July 2017 *www.wwwww **.. *rr ..0 ** MERCHANTS BONDING COMPANY (MUTUAL) „.":":+ MERCHANT NATIONAL BONDING, INC. '. 2003 * 11)33 By ,�..^' ** President STATE OF IOWA COUNTY OF DALLAS ss. On this this 14th day of July 2017 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. " ALICIA K. GRAM Ai, " Commission Number 767430 " My Commission Expires April 1, 2020 Notary Public (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 24th day of September 2019 CM -0 :p3 * "* 1. * Secretary pyyyy�� * *% n POA 0018 (3/17) ww*wwwwwwwww**+ Now 5741235-9251 1316 Cot,NuTY-CITY BUILDING ca;l 227 W. JGI'I'ERSON BOULEVARD , ��" �� +�^ FAX 574! 235-9171 Soya BE ND.IND1ANA46601-1830 $65 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS October 2, 2018 Mr. Robert Kuhns Selge Construction Co., Inc. 2833 S. I I"i St. Niles, MI 49120 RE: Pre -Qualification Verification Dear Mr. Kuhns: This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete applica.lion for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this mattcr, please call this office at (574) 235-9251. Sincerely, Linda M. Martin. Clerk GARY A. G1t,OT DAVID P. RELOS E1.17AE3E r1i A. MA.RADIK JAMEs A. MUELLER T1-ERESE• J. DORAU t'Mir'f`dd ti CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Century Center Parking Lot Entry Gateway Improvements Project No. 118-035A For Bids Due September 24,2019 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted X Form [MWBE-2.1]. X Acknowledge Receipt of Addendum(s) included with the bid. X All required additional information is included with the bid, Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Selge Consruction Co., Inc. Date: 9/24/10 By Authorized Representative: Signature: g Print Name & Title: Robert Kuhns, Project Engineer Version 4/2/2019 Contractor's Bid for Public Works - 1 PART 11 (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. See attached. 2. Attach a listing of public works projects currently in process of construction by your organization. See attached. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof.We have never failed to complete a project. 4. Attach references from private firms for which you have performed work. See attached. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) Work will be completed in an orderly manner, according to specifications and as best suits the Owner and its Engineer. 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. See Attached. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. See attached, subcontrtactors have all equipment necessary to perform their job. 4. Attach a listing of equipment you have available to use for the proposed project.Bond is not See attached. required. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. yes. SECTION III CONTRACTOR'S FINANCIAL STATEMENT See attached. Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 4/2/2019 Contractor's Bid for Public Works - 3 C fn } w G w U) w ag oc c) w M w 0 =Ua OZZ U) U) Om a O H w w V0W C z a O z_ 9 E N H z O a� �o m m o o IL ILoa c °_ ° a 0 0 ¢w �m o� 0 Ow0 oWdP O o o O � Mo 0 O r &�4 a m c � •o m }- Ea o � U as m 44 44 w o (D S 44 O a 0 0 N CL U U U �y co U Q c y N , W c o_ a OD co o CN U .4 m co M N EZ 1 .41 d LO LO U co co N H to m"" wv d' 0 Z H CD i3 M U Ei [� a� E � xw Z co IV R O 00 0 7 U) J N E (0 z c ,z :.. CITY OF SOUTH BEND'"�`° MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY " DEVELOPMENT PROGRAM' FORM MWBE-2.0'" EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: 118-035A .._ Date: 9 24 1.9_........ Project Name: Century/ Center Parkim Lot Entry Gateway Improvements Bidder: S:el e....0 n t, an Contact Person: Robert Kuhns —.. w Telephone: 269-684-0842 Address: 2833 S-1.1_th Sty City: Niles _ ............— State: MI Zip: _ 49120ITITmmmmmmmµ Email: bkubnSi s l.0 C:" Oni.._C 11.—w To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization o g als set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: _... ........ _ .............. EVIDENCE OF GOOD FAITH EFFORTS MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business PAC' Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South Lien r quires that all perspective bidders complete no less than 2 of the following: Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. b Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. 3 .,Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. **Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. _. �.._ SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) ._ ._. _...... _....._. ...._ _...... CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 4/2/2019 Contractor's Bid for Public Works - 10 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-2.1 MBEIWBE CONTACTED190 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. Project Number: 118-035A PAGE 1 OF 2 MBE/WBE Participation Goal 7.1 % Project Name: Century Center Parking Lot Entry Gateway Improvements Bidder: ..mlcre Constuction Co_, Inc B - y � Robert &bna... >' Qe, 4 1 (Signature) (Title) (Date) - MBE/WBE Firm State Brricading, Inc. Owner or Contact at MBE/WBE Firm h,,..,,... Telephone: 574-287-2078 Fax: 574-287-2078 Email: statebarricade1 @aol.corn TYPE OF WORK SOLICITED FOR THIS PROJECT: Intersecxtion and approach closure. RESULTS OF CONTACT WITH THE MBE/WBE FIRM: ................... Accepted Pro sal. MBE/WBE Firm V & R Truckin Owner or Contact at MBE/WBE Firm Vida Telephone: 574-234-1268 Fax: 574-234-0748 TYPE OF WORK SOLICITED FOR THIS PROJECT: for removals RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Accepted Proposal Email: fightingirish@aol.com Version 4/2/2019 Contractor's Bid for Public Works - 11 CITY OF SOUTH BEND° MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY Al uq DEVELOPMENT PROGRAM r�`w FORM MWBE-2.1 MBE/WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. Project Number: 118-035A PAGE_2—_OF 2 MBE/WBE Participation Goal 7.1 % Project Name: Century Center Parking Lot Entry Gateway Improvements Bidder: Selge Construction Co. Inca B .... _...... -.._........ Kuhns Project Engineer 9/24/19 (Signature) (Title) (Date) MBE/WBE Firm Bancroft Electric VOB Owner or Contact at MBE/WBE Firm Keith Telephone: 219-326-8090 Fax: 219-326-5216 Email:michele@bancroftelectric. TYPE OF WORK SOLICITED FOR THIS PROJECT: Electric and signal work. RESULTS OF CONTACT WITH THE MBE/WBE FIRM No bid submitted. MBE/WBE Firm Owner or Contact at MBE/WBE Firm Telephone: Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Email: Version 4/2/2019 Contractor's Bid for Public Works - 11 c C7 U -Q y m C O 3H O m Cam" L 0 `- m EL JOO� ° c" O _ 0 y a}N a+' <Ja O' ` piD�co U - -6 m a) ' m N O 7 Oca L V �,..0 C 9 TL m .s2. cc :O W= E Y ��>-NOf-6 .6 —U)aN ON°J .N.iE° LOI-aL. CO (o a) O °� U O`er - a) m D aiU2 C7 J� -E Q ' �r m .] c o U v v W cl) 2 L u�m L �.a �c� pmo (�,�a o E Urn Qc� om�cco om� °�a ac oa) m am -"- O c c-— o o - mol C N 07 D' C aS -N p p j m N U N'.E m 75 L= Q- � C 7 N� m co o m� 6� m 3 � —°o x m o o> -aoLca � _ZZ )>oo>a `maai �Lc;romacmm (OIL +-. U - a3 C L co ° �'QCaa)mco3(0rnovYoa>°a 3—m. o _nin bmoN s'i�cncTcao e a o) Oao a) oa ".6 a) Q6O N'9 ` 3� n c6c: N Ll �Uma �U:C L U ya a3>r O�mUSC U1]U a),�,_ N E m Q M a co Q o N O cq+:ac a a rn CO WO m� a) c �a;c C � of N , a= W' 0)' 7� 0 E N W y N Q E N OL ai3 E a� Q Zo oco 0 � jo n°i co A°D v a m M m v oLO _N T- rr,,,'�,w 0-2 f On-.9 co U,,O m L 0.2 -cN a)e > ° j O a) o ©3U 3`arn N a"� Q 00 in c LO' QNd N ® 7 c0 3 zi o 211 oU69 aocom 3c° r°n �m'cca c cl)y O N m c— f�� N Qm yod 2 O ilk? U LO O O 0 ID N Y m fV (A : O 4cC6 0 mcr �Uv 2<DoU`n c 0.- 0 a --za_2 a CO i maJ co'Dc= F o E E o -0 co 'i 'orn �L coo Q dQ 3 a a��s °' X 1 2 ,Q y i � a, iL � > co m �Y� H 'o Lo "ym N Opp a� Ua 0 c oc° O : 'T"k S O N ma �yQ o c • O U C r 3 m a aa3m oo c)- °zmEa-o co acTmam2m y 4 N 2 a- S ai �. 11 I �-LL c opwp cyzpwin ro °-c E E oU�z� E' a rn o 1! W ' U Cm N loin—W,m co c Q y LZ Q 0 N o°. U @ N o' QimaCC a`� cameo ac U N� CO �, _ : d C O (O O O 0- 7 N i-OI—W 2— ° m2 x c 0) cQ'. ��-0 c=• Q Omp U m8Z Q 9N= ��_ " U a`) o c° am�i-U�cio a: 3 E� m a� o �U�wo m 0 c'i m 9 Q N� Q N 2 N O N a T N U m m c 0 0 0 L� Q m "O V� QN O•.TOJ � o>u,� E catE`� Lv' O U a U L U'l � c°A 7 °� L � c N N N� ° a)-m �% CO 0-c Q (o° �� N NJ `i' rmN�UQG �~�O TOL O°8 (O C/) U)a � Ucc m'N, E� U 0)U N,mN ro m .Wam¢ ,° Qm gro►, N N m - Uca°;� 3 em UN Z«No .otFrnt20'o-rO — SPY E �ab�'m «� coro � t ,o maT., Y NL°� O I 2 S O�a9ocoa�o�mo damQ v al�mauom o�m coo 0 �' m as = � o ° L'9 m (6 � � E O > N -N N � O 3: O U U CA d'00_O� Ea-aU o"O - Otis-c �N L a3 a O'3 , N O 1ca 0 D*''OJmom°vim.- ��Nm �O =3:LcEE CO U. 0 ° Ir N (i-(n i 'C c L 26 T co n, J a3 co 0 ca U i U Ur Oc14 a.:. m 3 i c CQ30C amCmp ::roaCo3� io a ..rnOo C } p Eomwrom m N 26 or foE m O E wZ m J"o om .o ID .-a 0) U7C', aOE Ywm EC(n Z m� xM.m mON° a�a;nQ_U oo0_L WU>-O o(o�-O x m m =_w_ I_-" . �FOC OF- � Q LQ°m'ZNm.w °Io o= mo -06 L°°- _0 LL 3QXON v�LLQr6 _°OU Noa)0) C) o aCm E3 `)ao_ a) .o�a a)) C'I ooQ;mcoa�a CDT C o fTL0 m m xmm m UmJ WCJM a E O J a N O y i ++, C! •' m no C L C" T J f0 C m m C m m L O r Cororna mNa X C: QaQ tz(°�m- ��: »n. �p.� °r.L > O f0 c 0 O C a 0 m m CA m C N E ro m�F-Nro OON� 55ECOLW OY Q T �N.Q a.E Jm-coo x ID 25 D .- �m E o E i °� o c °Lm m � aai > m Qmo � m o°�jmao°wEc� off. rc�� moa�ro� oca��m o�ooY +, m m 0 IT a) p L c m Ch m° U �r ,..®. a,k Its a m x N C U mU � 0 3o U! OU o 3 m °Ca m � m ma 6)_ p iQ m-0 c ELg co:) � o� ccoo C 2 > m cw10-� o m � ', E _-E E 2 �� 3 m a� �Q a �m�mQ Lo> o��w>U� LL�c? ��v�a`> mm J Q OL CO Z C m>,.E 3 c �_� m �- mar J p Qom o W a o W C m rn C E ° O p- m �- p Z K, o Z. m 6 U � a c o) m m O pm m Eo m O.L p� LLJ' m- '" _ )MC_° >, QO. (ODom,' ..N O W _ w.� m N E U � >,.aro.O J. m d, iii,....._ \ Z W - m::0 m a) } cp= Ecn ° �= mo coo-,- a) a 0 -aU (O 3 m QE E 0- o m� 2 ° Qa� mdUo_6 roZ� cw o °, ���= m E E m;o c,.° o E =•o o c m o 0 o m o m c rn m :,a m rn �, E o f c a Z c)c) o 0-ECf)-0 ° } _ - - w o c aoa o`m a' m �O ,L ° ro a� o n ca ° ro�£ �a. m� c� ,c? o amiac o ro rn p m a)C a2? _m Q y7 w, o� o.� 1nm o m m oL°L ZI o fotYr� Lr O U m m-a U N,7 O r° U x f -p C Q C X °- E w O a m O 2i m j N i _ (D co c coc�2:m:oEU�iaa��o1 r0U_ ""ommmc°� Qf-=c°o�mm°No Lm,aE� U; QI- o ° N c m CV(pOU= ZO wmo at p [6m°<c 'o CT a� cam -pm co Uy� � � �`�I- o0 E°m ZifZJ;, `°wN�a Uom,oXT�aQ`�mo sw m(O L. m m._ C O- ,m J _> >, >F.c ro m p mF- To ° a ro��:ro °� E J , g�� E p OFF-- °rn m. w �,•�_ "�" QE,ct o �U c Q m c E c o J o E E J ,:� cn r c fy m Qy J of m mZ--a j, 0 O T 'O '�J .S im m m U �.-'-- ca -o° N.0<(D C o_L-oU� m� m > 0 mJ0 •� o -t N � va J .mL �v) � O-> o Qco o�� m0 ro �L o aci aQi 2 m c i�AW U Q LLJ oaQ� 3 oQ- a)..E c a) U ro E m o c: G_ 3 WQ ((U m :..m a)NOm aa`>�,-cc coN+�,Q�p-0 Q m� o aa�C3a °-n'oQ o� Q w o� o m y o C E w J= m 3LvM, C)w U x L -TO CTNO-�O m=xN Cy=ym mm :6 T �..a f/J• C m,-- NCQ CLL ro� o cN U��P•) 07«L- 7 y m 00 -0 ro p m 0 o c m o 0- a) a) mc 3 m� m aaim - m-� c E °'y� o c-_ T� o 2mao� �co 0 0 0 0 o�'Qroycrn c`�mc~co �� o Jt E�w000 m a' Q��mc oEofc\oov�mo��a� �>-EL�nlmo� �o °'mom o��.Nv mo mraoc° nr)r Q a - c o m o- o c m E m 3 0 E co(LS C- m ro m O 4-- .O O m S4 (/ice, a '� _° C m U, m N; o 0§ (If 9 CO Y d U l C Q o (OD m a' m 0 0, c m co p m (a) Q Q-c mm�. mmrormL- �E m-C-cma0m;'ro Eg aa)i C m cu a Q a) is -C_ a) . , m - > � z t m , . F,. g o � CO CO�QwL O] J�.'"�I�,w„�>,N U.=,> 6'•�L C O-O >WCO ro U m-2 .0 -, m-, `Q C, O m Q m m rq -D `) 'C - +.. O C m_ m O CO O +- C m m ww ca '� o >, �.. ma) t° m L N p a " C E N T �;O m N m .a N U Q- L C r0 (CJE 11 ` C a CO C.. .7 m (� E°_6 OC m a m o, C C L a:5 0 E Z C m Z - N i J m m rN(J cr lf)(O Cw C O py,} E U i m 0)-0-� 0L,0 O O E:50- (a6 o m x 0} o 0 c m2 m m Q cJi O p-0 o= cU 6 E 0 m� c mo morn >• c ?L oeo ° _ mL m C) a) m15a �`L mw)c om'mw o o>m ° U co m QQ C) ro E 8)Q co a m m c ro�m �._ m O vU E E E C'T '6-Q i O 0 O� m L ° N,C) O J °) U C (D SQ Cu) °' m �.S c o o)� ma m� Q�; E m� w�� ���I� a �o m m o QE r m o ca �o_ m p�-..,E m Em C Jc� �o m o a� �0-6S0,o E _> m Q -O Q -O .- C_ a C 0 X m (O C 0. r �a Q� m j ro Q m,p m',"E�'�E� �.UU ° U o m2 m Q� U .-C, m� 0 a) u)CQ-`°m ° o °Q 'cQ _ `n = u-ic> Eo---Z�Ewami 4���E E E o co m �� C E CO m c� aci+ c N os Uom Qa�i oLm ao �U,�� o� �p Eo ma 0 0 0 O Q m O Q m Q a) -0 -? co cA-6. E ;."bm= N L p O LL p (O O- C @ a 3k M m- m a) m� co E F m E � o m aa)i' o° � L u owU c m� ami c 5 c ao:F E m O r_ 0 9 Q Q^ m p ".' m,>„�' `I al C (n ro m m iE m ,.E J (n "+• -4 : N .0 a m~ E E N m U E £ a) E 3" T m; o> 'r c o3 }� m ro, °i o o; w Q,� v� in Q w mvo o f Crm e Tm c a°i. L m. >L o roY m p C m _w m o o j w a (nU c�0 EOQQO OF .- �ii,3 E :" p _� .,...:pia co m'a>) (oo= `o cNZ=a o T N - c m. m >, m c T� � r p) " m � >'(n � o4 .N rn E>� o-� U'zmcy9--0 m°Inc SEE . a E. Co �°) c Q p p a Tmo m> o m p Tm m m Tmro m c, UU wadi COro o�cJ- EC .�(D > c LL .«L. Co. C U 0) N C :d`J O �, -O v ,;, m L Q N II ` �-,,JO E E U c0 U CJ m a Q 0) C- C C J > m m co _ O Z N C' C a) r o 2 05 E W m ''""; N O c Q •°('- 0 3 c N N C a . I���SE ro:w> ma ocflZ QQ Er mm m o m a fit C o ° > Q, Z m> m c O N m [3)L O m L"�_",� - m m m m m O m o O Q m p C Lu Q CJ --O QN,� Or C'L-' C�-'(� Q J ,m p_Co '= m CL m W'=.�.-- ma 5 ro ernEpp>.n (MD a) mm-0mC, �F-o�j6a-„J°)coo LEcc> � C)m3 QO ca o�,o: mm m a a- maw m o, .O c ro �� o QJ o L (~i)� a� ��8cl) op°ro mo°L '� ro°' E° U(LcaEa om m �� J o m Eo o m `m Ea ro �' m� o Z.maa c o OA- crn ro Q� v) Em L° LU aLL C/) co � J m mLQ iQ > _ Qma m co UU �ro aro m E JL J C y Ch p .N m d) Q m L m a m U m .� 0 F• ;U m L m N C mC d r 3 ro 0 L U Q J U O OCJNU.EQ o�co a3w mY °' E E E -UJ,� °' ° Z o tiaH o m TQo m°� I- c o ._ u3�.0 3 oco � ca oQ J C D ro E coBa.S o CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC ''FORK RESPONSIBLE BIDDER CHECKLIST Project Name Century Center Parking Lot Entry Gateway Improvements Project No. 118-035A For Bids Due Sept .....m_w� September 24, 2019 Contractor Name: CQt7 Q Tray The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 315t for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 5/16/2019 General Conditions - 6 POST BID SUBMISSIONS. Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 5/16/2019 General Conditions - 7 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) W By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) X List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) X For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 5/16/2019 General Conditions - 8 PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) _ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments:. (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) List identifying all former business names. (iii) Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 5/16/2019 General Conditions - 9 (ix) Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date; September 24, 2019 (Sign Here) Robert Kuhns Project En ineer (Print Name Here) Selge Construction Co., Inc. (Name of Company) 2833 S. 11th Street (Address of Company) Niles (City) Michigan (State) 269-684-0842 (Telephone Number) Version 5/16/2019 General Conditions - 10 State of Indiana of the Secretary of State To Whom These Presents Come, Greeting: I, CONNIE LAWSON, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana, the custodian of the corporate records and the proper official to execute this certificate. I further certify that this is a true and complete copy of this 2 page document consisting of the following records filed in this office: Certification Date: September 18, 2019 Business Name: SELGE CONSTRUCTION CO INC Business ID: 197203-307 Transaction Date Filed j No. of pages Business Entity Report 02/08/2018 2 Total No of pages 2 U In Witness Whereof, I have caused to be affixed my signature and the seal of the State of Indiana, at the City of Indianapolis, September 18, 2019 CONNIE LAWSON SECRETARY OF STATE A 197203-307 / 12178641 All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate Expires on October 18, 2019. Page 1 Of 3 CertificateID:12178641 APPROVED AND FILED CONNIE LAWSON f INDIANA SECRETARY OF STATE 02/08/2018 03:00 PM ,,�„ / , c, r�. „n... h r -✓x , %r ri ,% r %r/ ,/� r r /.., :,air / / /./ r %�"� , . ,ii / r r/ %i"T"' .� ....... dr.. BUSINESS ID BUSINESS TYPE BUSINESS NAME ENTITY CREATION DATE JURISDICTION OF FORMATION PRINCIPAL OFFICE ADDRESS YEARS 197203-307 Foreign For -Profit Corporation SELGE CONSTRUCTION CO INC 03/15/1972 Michigan 2833 S. I lth Street, NILES, MI, 49120, USA 2018/2019 r / r ,�...., .,,M ..��.� .�.:.�.F�„�_.,....�.�w..�.,...a.a,..�.,..�.��.�,.�»!,�,,,,,u��_.u..�....,��.�,..,.�...,d!..�.�a.,.�.�.�G,�,�.. �p,R µu,.„,..«..��„�,u...,,.� ,_., ...,,,.,,�, �..�.� �. � �..�..�.:.,.,,�a �.�.w.r!�.. way. ✓L ��. �.ir„�.✓�,.Mc.��. NAME BRENT E. INABNIT ADDRESS 210 S. MICHIGAN AVE, SOUTH BEND, IN, 46624, USA SERVICE OF PROCESS EMAIL brenti@sni-law.com I acknowledge that the Service of Process email provided above is the email address at which electronic service of process may be accepted and is publicly viewable. 's �y � 9 ;,d r�}ri /r�r�/ r:/ ,,, ,, ,,;. / JH�/// //,`/%/�J �y�/�f o�,,. r//r fr err /?Ca/ r✓ID ' / Ilij�/ � !%/rJ b/rr TITLE President NAME SELGE.MARVIN, Jr. ADDRESS 2833 S I ITH ST., NILES, MI, 49120, USA TITLE Secretary NAME VICKI A. PRIEST ADDRESS 2833 S. I ITH STREET, NILES, MI, 49120, USA Page 2 Of 3 CertificateID:12178641 APPROVED AND FILED CONNIE LAWSON l 1: ! ! F#' THE SIGNATOR(S) REPRESENTS THAT THE REGISTERED AGENT NAMED IN THE APPLICATION HAS CONSENTED TO THE APPOINTMENT OF REGISTERED AGENT. IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE STATEMENTS CONTAINED HEREIN ARE TRUE, THIS DAY February 8, 2018. SIGNATURE Vicki A. Priest TITLE Secretary Business ID : 197203-307 Filing No.: 7829899 Page 3 Of 3 CertificateID:12178641 Selge Construction Staffing Capabilities and Employee Statement At Selge Construction we are proud to be part of the Christian Labor Association (CLA) Local Union 10. Being part of the CLA provides an organized workforce that has gone through rigorous training and provides premium pay and benefits to everyone on staff. Our team is comprised of 75 individuals (15 office members and 60 field personnel). The team is made up of male, female, and minority members. The average employee at Selge Construction has been with the company for 14 years. Each person on your project will be properly classified as an employee under all applicable state and federal laws and local ordinances. There will not be any temporary laborers on this project Selge has never defaulted on a contract and we do not bid any work that we cannot complete. Based on our current schedule and capabilities, we will utilize 100% Selge employees and equipment for your project We do not foresee any issues being able to complete the project within the designated schedule. Let there be no doubt that Selge Construction has sufficient employees and resources to complete the work we are bidding. SELGE CONSTRUCTION CO., INC. COMPLETED PROJECT DESCRIPTIONS Description: Mishawaka Bodine Valve #2 Replacement — Owner: Indiana Department of Natural Resources. Remove asphalt surface, install 10 each 4" gate valves with boxes & 4" SCH 80 PVC riser pipes, Install 10" SCH 80 PVC between tanks #5 & #6 on east & west ponds, excavate & replace yard hydrant, backfill full depth trench, restore surface areas with 6" concrete pavement. $115,135 Year Completed: 2017 Description: New Buffalo Lighthouse Creek Drain #298 — Owner: Berrien County Drain Commission. Open channel cleanout/channel clearing and shaping, plain & heavy slope & scour protection, boulder revetment, ledge Stone access Stairs, 12" ductile water main, 10" sanitary sewer main replacement, 16' RCP box culvert & wingwall/headwall. $1,273,288 Year Completed: 2017 Description: South Bend Western Avenue Corridor Improvements — Owner: City of South Bend Board of Public Works. Construction of a streetscape project including earthwork, pavement milling, concrete overlay, concrete pavement, asphalt pavement, permeable pavers, concrete curb, and sidewalks, landscaping, storm sewer, lighting, and pavement markings and other appurtenant work. $2,860,242 Year Completed: 2017 Description: Elkhart CR26 Biopad Force Main — Owner: City of Elkhart Board of Public Works. Install approximately 974 feet of 4" HDPE Force Main and restoration along County road 26. $62,785 Year Completed: 2017 Description: Mishawaka Linden Area LTCP Division A Phase II — Owner: City of Mishawaka Board of Public Works. Repair damaged section of sanitary sewer, CIPP lining in Brykit Ave, install storm sewer, manhole rehabilitation and sanitary laterals. $981,453 Year Completed: 2017 Description: Niles 2017 Water main Replacement Sassafras Ln Section A — Owner: City of Niles. Installation of a PC 350 DI/C900 PVC water main, multiple. connections to existing water mains, reconnection of existing water services, install valves & hydrants, relocate existing storm and sanitary sewers, disinfection and pressure testing of water main, landscape and pavement restoration. $319,218 Year Completed: 2017 Description: Cassopolis Wastewater Collection System Improvements — Owner: Village of Cassopolis. Lift Station #3, Spencer St Lift Station, Second St Lift Station, Sherman Ln Lift Station, Depot St Lift Station, Reed St. Lift Station, Rowland St Lift Station Rehabilitations and Grinder Station Rehabilitation. In Place Generator for Lift Station #3 and Reed St Lift Station. Remove and replace fencing and gates. Replace all control panels, outdoor lighting. 60 linear feet of 8" sanitary sewer and manholes, 165 linear feet of 2" forcemain. 230 square yards concrete pavement & sidewalk replacement. $1,316,160 Year Completed: 2017 Description: Elkhart ADA RR Depot Parking Lot Improvements — Owner: City of Elkhart. Creating section of the parking areas around the RR Depot to be accessible and ADA compliant by installing (1) curb ramp and 125 square yards of stamped concrete and 20 feet of retaining wall. $23,865 Year Completed: 2017 Description: Warsaw Osborn Stormwater Pump Station — Owner: City of Warsaw Board of Public Works/Safety. Perform upgrades to pump station per engineer's specifications. $197,240 Year Completed: 2017 Description: Lansing MSU/Spartan PV 1/ Inovateus Solar Array Project — Owner: Spartan PV 1. Develop an approximately 13.8 MW-DC electric power generating facility using solar photovoltaic modules on five (5) parking lots located on the campus. $8,434,889 Year Completed: 2017 Description: Mishawaka Bodine Fish Hatchery — Owner: Indiana Department of Natural Resources. Installation of a small valve and inlet piping replacement on rearing ponds west 1, 2, 7 and 8 and east 2 and 7 ponds. $115,135 Year Completed: 2016 Description: Middlebury 2016 WTP Backwash Pump Station — Owner: Town of Middlebury. Installation of new backwash holding tank influent lift station, various modifications to the existing backwash holding tank effluent pump station; installation of a new control panel to service both the existing backwash effluent pump station and new backwash influent lift station. $363,165 Year Completed: 2017 Description: New Carlisle Development Area 1 Sanitary and Water Improvements — Owner: St. Joseph County Board of Commissioners. Installation of approximately 14,000 linear feet of 16" and 12" water main extension and 12,000 linear feet Sanitary Sewer Extensions, 15"-30" along Walnut Rd., Smilax Rd., and US 20. Install new Water Main & Sanitary Sewer includes: approximately 1,100 feet of trenchless installation under railroad crossing and US 20, Roadway reconstruction, construction of a water pressure reducing valve vault, installation of approximately 20,000 linear feet fiber optic conduit and hand -holds, and other work. $4,655,327 Year Completed: 2017 Description: Village of Paw Paw 2016 SRF Lift Station & Force Main Contract #3 — Owner: Village of Paw Paw, Michigan. Rehabilitation and replacement of 4 Sanitary Lift Stations located within the Village of Paw Paw including installation of new grinder/debris auger, building improvements, and force main directional boring. $1,652,481 Year Completed: 2017 Description: North Webster Lakeland RSD Wastewater Collection "B" — Owner: Lakeland Regional Sewer District. Installed 988 each grinder pump stations, 390 each grinder pump flood protection kits, 74 each extended grinder pump stations 2 feet with rail, 25 each traffic rated grinder pump station covers, 988 each control/alarm panel installed, 69,980 linear feet force main, 29,300 linear feet service line, 90 linear feet casing pipe, 50 linear feet gravity sewer, 72 each flushing connection, 21 each air release valve & structure, 990 each curb stop assembly, 69 each isolation valves. $6,163,664.31 Year Completed: 2016 Description: Mishawaka Brick & Fir Road Water Main Improvements — Owner: City of Mishawaka. (7) trees removed, removed curb gutter and structures, temporary erosion and sediment control, 4 cubic yards river rocks, 1,050 cubic yards common excavation, 1,186 ton #53 compacted aggregate, 210 ton HMA type b for patching, 19 square yards for approaches, 3,606 square yards milling asphalt, 1,361 ton HMA type b, 6 ton asphalt for tack coat, 265 linear feet combined concrete for curb & gutter, 585 square yards PCCP approaches, 27 square yards concrete sidewalk, 11,850 square yards hydromulch, 8,238 linear feet ductile iron pipe, 27 each ductile iron tee, 15 each 45/90 degree ductile iron 12 each ductile iron MJ plug, 39 each gate valve with valve box, 86 linear feet water service piping, 16 fire hydrant assembly, 132 linear feet pipe, landscaping, $1,490,854.00 Year Completed: 2016 Description: Syracuse Turkey Creek RSD Buttermilk Force Main Improvements No. 2 — Owner: Turkey Creek Regional Sewer District. Cleanout (13) manholes, 15,540 linear feet of force main, 1,500 linear feet directional drill force main, (28) plug valves installed, 1,300 cubic yards special backfill, 2,200 square yards aggregate base for pavement, 200 cubic yards #53 aggregate base, 570 ton bituminous materials, 180 square yards concrete drive, Buttermilk, Marineland, Willow Grove pump station improvements, 25,000 square yards seed & mulch area. $1,218.351.00 Year Completed: 2016 Description: Goshen Wastewater Lift Station Controls Upgrade Ph I — Owner: City of Goshen. Brookside lift station, Showalter lift station, Clinton lift station, Berkey lift station, Carter lift station, Kercher lift station, Starcraft lift station, Parmley lift station, Maplecrest lift station, and CR 28 lift station control panel improvements. $641,406.00 Year Completed: 2016 Description: South Bend Noble Americas Ethanol Plant — Owner: Noble Americas. Clearing and obstruction removal, relocate 6" fire protection water line, 18" WWR cross under 48" RCP. 8" water main crossover, 13, 800 cubic yards common excavation for detention basin, 100 cubic yards structure backfill, 320 tons HMA Type b surface, 420 ton HMA Type b intermediate, 1680 ton HMA type b base, bypass pumping for storm sewer improvements, cast in place concrete diversion structure, detention basin liner, 3005 linear feet of storm sewer piping, 14 manhole structures, pump station modifications, mulched seeding & topsoil. $1,818,027.95 Year Completed: 2016 Description: Dowagiac Pokagon Band of Indians Rodgers Lake Wastewater Treatment Lagoon — Owner: Pokagon Band of Indians. Removal of debris, Erosion control, 300 cubic yards of earthwork, install (2) recirculation tanks & equipment, install (1) lift station & meter pit, install influent tank & equipment, install (5) treatment pods, install 430 linear feet of 3" force main, 350 linear feet 4" force main, directional drill 1,150 linear feet 1.5" water main, 150 cubic yards clean pond #3, 420 tons pea gravel in pond #3, restoration. $510,690.00 Year Completed: 2016 Description: Goshen Colonial Manor ADA — Owner: City of Goshen. 60 ton #53 compacted aggregate for base, 80 square yards concrete curb ramp, 120 square yards 4" concrete sidewalk, 50 linear feet roll curb & gutter, 100 square yards erosion control blanket, 200 square yards mulched seeding. $64,000.00 Year Completed: 2016 Description: South Bend UPV Noble Americas Ethanol Plant — Owner: Noble Americas. (1) Sanitary manhole, 125 linear feet 15" sanitary sewer, (1) 15" end section, 320 linear feet 10" underdrain, 3000 cubic yards common excavation, (1) manhole repair, pond liner. $161,100.00 Year Completed: 2016 Description: South Bend Noble Americas Ethanol Plant Sanitary Sewer Improvements — Owner: Noble Americas. Clearing and obstruction removal, septic tank removal, temp erosion & sediment control, 50 cubic yards structural backfill, #53 compacted aggregate for base, #73 compacted aggregate for surface, asphalt for pavement restoration, concrete pavement patching, 519 linear feet HDPE DR11 service laterals, 1,133 linear feet HDPE DR11 1 1/4 force main, 1,589 linear feet HDPE DR11 2" force main, (6) grinder pump stations, (10) vacuum excavation for utility $365,881.00 Year .Completed: Description: South Bend & Mishawaka Meijer Store Snow Plowing — Owner: DJ Landscaping, Inc. Provide snow removal to (2) South Bend Meijer stores and (1) Mishawaka store. $80,000.00 Year Completed: 2016 Description: LaGrange Dometic III North Area Improvements — Owner: Dometic. 216 square feet pavement with sealing, 960 square feet pavement. $96,694.00 Year Completed: 2016 4 Description: Niles 2016 Sewer Improvements — Owner: City of Niles. 15" sewer repair, 8" sewer repair, remove (7) 12" cross connection pipes, 12" flowable cross connection, replace manhole cover. $92,815.00 Year Completed: 2016 Description: Niles Township Manhole Repairs — Owner: Niles Township. Casting adjustments on 93 various manholes throughout the township. $62,590.00 Year Completed: 2016 Description: South Bend IN/Tek IN/Kote Sanitary Sewer Improvements — Owner: City of South Bend. Install 12" thick concrete base slab for storage tank & feed pumps, provide and install HD cross - linked polyethylene chemical storage tanks, install dual bellows type chemical metering pumps, suction pipes, discharge PVC piping to lift station wet well, install fill station & piping, provide 115 VAC electric service to each pump with 20 amp breaker within lift station, 8 hours training to staff. $167,850.00 Year Completed: 2016 Description: Elkhart Downtown Parking ADA Improvements — Owner: City of Elkhart. 28 square yards ADA curb ramp, 25 square yards ADA sidewalk, 7 square yards 9" concrete, 40 linear feet concrete curb and gutter. $14,435.00 Year Completed: 2016 Description: Elkhart Indiana Flight Center Apron Upgrades — Owner: Elkhart Municipal Airport. 539 cubic yards common excavation, 465 tons #53 recycled concrete, 1382 square yards 8" concrete pavement, restored area. $143,730.00 Year Completed: 2016 Description: Middlebury East Warren St. Sidewalk Improvements — Owner: Town of Middlebury. Clear area to be improved, 20 ton HMA for pavement patching, 2,010 square yards 4" sidewalk, 60 linear feet concrete curb & gutter, 134 square yards concrete ramps, 1,850 square yards mulched seeding on topsoil, site grading, accent lighting. $299,880.29 Year Completed: 2016 Description: South Bend St. Paul's Senior Center Parking Lot Improvements — Owner: Trinity Continuing Care Center. Slope reconstruction with 1200 square feet of erosion protection system with 160 cubic yards of structural backfill, 50 square yards of sod, 112 linear feet 15" ADS HP storm sewer, 195 linear feet 18" ADS HP storm sewer, (4) storm manholes, riprap on geotextile at pipe discharge, 90 linear feet of 6" concrete curb. $166,333.00 Year Completed: 2016 Description: Mishawaka Bodine Fish Hatchery — Owner: Bodine State Fish Hatchery. Remove existing asphalt surface, excavate pits for valve insertion and water main taps, install (2) 12" gate valves, install (6) 4" gate valves with box, install 40 ton 6" #53 aggregate base, restore surface areas with 100 square yards 6" concrete pavement. $100,970.00 Year Completed: 2016 Description: Precision Wall Systems Storm Sewer & Lot Upgrades. Owner: Precision Wall Systems. 825 linear feet of storm sewer, 6 each 30" catch basins, remove 40 linear feet of retaining wall, remove 350 square yards of pavement, 1,000 cubic yards of retention pond, 350 square yards concrete drive 6", 160 linear feet concrete curb, 80 linear feet concrete retaining wall, 1890 square yards grading for HAC and concrete areas, 1,540 square yards HAC pavement. $137,694.74 Year Completed: 2015 Description: South Bend Edison Rd LS Access Road Construction. Owner: City of South Bend Board of Public Works. 174 square yards aggregate #53 6" base depth, 175 square yards geosynthetic fabric, 175 square yards B borrow 12" depth, adjust casting to grade. $15,659.25 Year Completed: 2015 Description: South Bend Geyer Ditch LS Access Road Construction. Owner: City of South Bend Board of Public Works. Adjust casting to grade, concrete collar, 4,700 square yards compacted aggregate #53 at 6", 4,700 square yards Geosynthetic fabric. $72,410.00 Year Completed: 2015 Description: Cassopolis Lift Station #1 Renovation. Owner: Village of Cassopolis. Lift station #1 rehabilitation, restoration, masonry and concrete structure rem, chamfer removal, concrete surfacing 2", standby generator LS #1. $131,550.00 Year Completed: 2015 Description: Goshen 321 South V Street Parking Lot. Owner: City of Goshen. Remove 270 square yards full depth concrete, remove 18 square yards concrete sidewalk, remove existing storm sewer structure, 115 ton 453 recycled concrete base, 40 linear feet 4" concrete sidewalk, 315 square yards 6" concrete, landscape restoration. $53,525.53 Year Completed: 2015 Description: Warsaw Central Park Storm Sewer Cleaning project. Owner City of Warsaw. Install & remove inflatable plug, clean & video 36" diameter storm sewer, install manhole over existing storm sewer. $42,050.00 Year Completed: 2015 Description: South Bend 2015 Curb/Sidewalk Construction Div. B. Owner: City of South Bend Board of Public Works, IN. Remove 3,000 linear feet curb & 395 square yard sidewalk, 3,000 linear feet new curb & 395 square yards new sidewalk, remove & replace I 1 trees, grade/sod 998 square yards. $257,718 Year Completed: 2015 Description: Mishawaka Front St Roundabout Reconstruction. Owner: City of Mishawaka Board of Public Works, IN. 826 square yards QC/QA PCCP, 581 linear feet concrete curb, 14 square yards topsoil. $105,701.04 Year Completed: 2015 Description: LaGrange Dometic Corp Site Improvements Ph H. Owner: Dometic Corporation LaGrange, IN. 3,739 square feet asphalt repairs, 4,029 square feet asphalt, 3,281 #53 gravel, 38,425 square feet concrete pavement. $29,218 Year Completed: 2015 Description: South Bend Chase Plastics Facility. Owner: City of South Bend Board of Public Works, IN. 2,043 linear feet of sanitary sewer, 200 cubic yards "B" borrow, 621 linear feet of storm sewer, 75 ton #53 compact aggregate, 188 square yards concrete sidewalk and approaches. $118,817.40 Year Completed: 2015 Description: Mishawaka 2015 CDBG ADA Infrastructure Improvements. Owner: City of Mishawaka, IN Clearning right of way, 3,240 square yards concrete sidewalk, ramp approaches, 2,000 linear feet concrete curb, 1,253 cubic yards excavation, borrow, topsoil, 88 ton HMA patching, 100 ton #53 compacted aggregate. Description: MDOT #123212A Cass County Gumwood Rd to Stateline. Owner: Michigan Department of Transportation / Cass County, MI.40 feet Culv, CIA 12", 240 ton aggregate for shared path, 1,231 square yards concrete for shared path, 1,100 feet grading, 1,500 square yards slope restoration. $74,889.41 Year Completed: 2015 Description: Goshen Theatre Sewer Repair. Owner: City of Goshen, IN. Clearing of right of way, 20 linear feet sanitary sewer pipe, 620 ton "B" borrow, 350 cubic yards soil stockpile, 175 square yards polyethylene sheeting, 30 linear feet concrete curb, 28 ton #53 compacted aggregate, 20 ton HMA base/surface, 17 ton #73 compacted aggregate, landscape. $30,339.21 Year Completed: 2015 Description: South Bend Demolition of Abandoned & Vacant Houses Division A. Owner: City of South Bend, IN. Demolition of 21 houses/garages/sheds/fences, including proper disposal of all asbestos materials. $396,064.00 Year Completed: 2015 Description: New Buffalo US 12 Booster Station Reconstruction. Owner: New Buffalo Twp, MI. Pumping, chlorine equipment, meter valves and piping, building structure, electrical, control system, entry drive & site work, (2) 4' dia leaching basin, spare chlorination equipment, HMA drive & parking $470,682.00 Year Completed: 2015 Description: Elkhart 2014 ADA Curb & Sidewalk Replacement program. Owner: City of Elkhart Engineering Department, IN. 2917 square yards concrete sidewalk & driveway improvements. $150,048.51 Year Completed: 2015 Description: Buchanan Bertrand Twp Foundation Dr. Owner: Saratore Co., Inc. Excavation, CIP Basin 32,000 cubic yards, excavation CIP building pad topsoil strip for embankment areas 5,500 cubic yards, Excavation, CIP, building pad drive & parking 2,000 cubic yards, excavation CIP road 2,540 cubic yards, berm & swale 625 linear feet, 2,837 ton #22A gravel base, 735 ton #23A compact aggregate, 210 ton #23A gravel for approaches, 4,570 linear feet sewer pipe, 3,650 linear feet concrete curb, gutter, and driveway; 2,082 linear feet water main, 2,865 cubic yards topsoil and subgrade treatment. $695,238.00 Year Completed: 2015 Description: Middlebury Water Treatment Plant Upgrades. Owner: Town of Middlebury, IN. 72 linear feet of 8" ductile iron pipe, Valve & flow meter relocation, 8", 12" butterfly valves $112,681.00 Year Completed: 2015 Description: Lagrange Dometic Corp Improvements Ph I.Owner: Dometic Corp, Lagrange, IN. Remove 4,325 square yards of asphalt, remove 1,035 square yards of concrete, 300 ton of #53 aggregate base, 225 ton asphalt patching, 3,428 square yards 8" PCCP, 3,715 square yards 10" PCCP. $29,218.70 Year Completed: 2015 Description: Mishawaka Ave Improvements Phase I.Owner: City of Mishawaka, IN, Board of Public Works. Clearing right of way, 6,239 ton hot mix asphalt, 5,266 linear feet concrete curb & gutter, 4,608 square yards concrete sidewalk, 3,273 linear feet storm sewer pipe, 780 linear feet water main pipe, 7,483 linear feet CIPP sanitary sewer pipe, 710 linear feet 8" SDR 35 sanitary sewer. $4,128,388.84 Year Completed 2015 Description: Winona Main Wastewater Pumping Station Replacement. Owner: Town of Winona, IN. Clearing right of way, 17 linear feet of 8" D.I. force main, 101 linear feet 18" PVC sanitary sewer, 900 GPM Triplex lift station, 210 cubic yards structural backfill. $546,689.00 Year Completed: 2015 Description Cassopolis Peavine St. Lift Station Improvement., Owner Village of Cassopolis, Cassopolis, MI. Renovation of the Peavine Street lift Station, 12" extension for 72" wet well, plugging leaks, Chamfer removal, new floor in wet well. $45,815.00 Year Completed: 2015 Description: INDOT R36481A Twin Branch/Vistula Dr. Sidewalk Improvements. Owner IN Dept of Transportation.,Mishawaka, IN. Sidewalk improvements along Vistula Rd and Elder Street at the Twin Branch Elementary School. $285,393.12 Year Completed: 2015 Description: INDOT R33572A, Gumwood Ph II Added Travel Lanes, Bike, and Pedestrian Facilities. Owner IN Dept of Transportation., Mishawaka, IN. Added travel lanes, bike, and pedestrian facilities on Gumwood Rd from Brick Rd to Michigan State Line. Concrete curb, driveways, and sidewalk/bike paths, retention pond basin, storm sewer, 1 round about at Gumwood & Adams Rds, streetscapes and landscaping. $4,463,899.63 Year Completed: 2015 Description: INDOT R30291A, Gumwood Ph I Added Travel Lanes. Owner IN Dept of Transportation., Mishawaka IN. Added travel lanes from Mishawaka Corp limits to Candy Lane, Completed clearing of right of way, 39,203 cubic yards. 31,996 square yards of subgrade treatment, 1,686 ton of compacted aggregate no. 73, 27,572 ton QC/QA HMA, 260 square yards PCCP, 10,153 square yards concrete sidewalk, 15,207 linear feet concrete curb & gutter, 726 square yards PCCP, 25,391 linear feet of sanitary/water main pipe, retention pond basin, water main, 1 round- about at Gumwood & Brick Rds, streetscapes and landscaping $3,819,947.67 Year Completed: 2015 Description: INDOT R34218A,12t' St. Added Travel Lanes. Owner IN Dept of Transportation, Mishawaka, IN. Added travel lanes on 12'h St from Capital Avenue to Blackberry Road. Completed clearing of right away, 23,366 cubic yards, 4,001 tons of compacted aggregate no. 53, 4,389 square yards of concrete sidewalk, 197 square yards of concrete curb ramp, 11,115 linear feet of concrete curb & gutter, 1,174 square yards of PCCP for approaches, 16,938 linear feet of storm pipe $3,707,799.63 Year Completed: 2015 Description: Fort Wayne Leo Cedarville `'D" RSD. Owner Leo Cedarville Regional Sewer District, Fort Wayne, IN. Replacement of the existing pump station with new wet wells, valve vaults, pumps, piping and control panels. $360,427.69 Year Completed: 2015 Description: Howard Township Lift Station Upgrade Project. Owner: Howard Township, Niles, MI. Installed 6 Lift Stations, 10 Arborvitae and various apprtances. $130,41.5.00 Year Completed: 2014. Description: Jefferson Boulevard Streetscape / Main to Eddy Streets. Owner: City of South Bend, Indiana Department of Public Works. Construction of streetscape project, including approximately 5500 SY of asphalt, 2300 LF concrete curb, 2650 SY concrete sidewalk, 470 SY pervious pavers,. Storm sewer structures and 2250 LF storm sewer. Install and replace light pole assemblies, trees and various plants and signage. $1,603,688.00. Year Completed: 2014. INDIANA DEPARTMENT OF TRANSPORTATIONS Driving Indiana's Economic Growth 100 North Senate Avenue PHONE: (317) 233-2412 Eric Holcomb, Governor Room N750 Joe McGuinness, Commissioner Indianapolis, Indiana 46204 February 6, 2019 Bruce Dickie EEO Officer Selge Construction Re: 2019 OJT Training Program Agreement Selge Construction: Enclosed you will find a copy of the approved 2019 OJT Program and Partnership Agreement. The primary objective of the program is to provide training and advancement opportunities to minorities and women toward journey level positions in all phases of the highway construction industry. Thank you in advance for your participation in the Program and I look forward to working with you this year. Please feel free to contact me at 317-233-2412 or kdaniels2Qndot.inQov if you have any questions. Respectfully, µ ti Katie Daniels Contract Compliance Specialist Indiana Department of Transportation - Economic Opportunity Division Enclosure www.in.gov/dot/ An Equal Opportunity Employer 11.I -Annual Trains tC�'opl Calculatio and Eartlrnteirsbiii A,gree`rneh Step 1: Determine the total number of hours worked in the highway construction trades on INDOT federal -aid contracts (either as a prime contractor or subcontractor) during the past three years.. Do not include hours worked on state -funded and private work. HOURS WORKED DURING 2016 HOURS 2017 HOURS 2018 HOURS TOTAL 122 2526-- 3596 Step 2: Add the total number of hours from each year and divide by three (3): mm 122 + E2526 3596 = = G244 � 3 — 2081 2016 2017 2018 Average Hours Step 3: Multiply the "Average Hours" by five percent (5%): 2081 X 05 = 104 Average Hours 2019 Training Goal .l hereby agree to all of the terms and conditions contained herein and affirm under penalty and perjury that the information stated above is true and accurate. FOR CONTRACTOR USE Selge Construction Co-, Inc. r Bruce A. Dickie, EEO Officer/ Manager of Safety & Resources 574-292-8917 bdickie@selgeconstruction.com FOR INDOT USE _ k- 2/5/19 Kntie Niniels, o.rr ]'ropam Lead Please detach Section 1.16 and return to INDOT c% Katie Daniels at Iccai r. t"e?lslci7do i. i uj, o . Please submit your approved OJT training program documentation as well. 8 2. Attach a listing of public works projects currently in process of construction by your organization. ..._. �_....... _. mm _ _ _. .... .. ..... Contract Amount Class of Work Expected Name and Address of Owner Completion Date ._..... 4 ] S0 000 „Streetscapes Fa11201.9 _ of f Elkhart ( 87)_ _. $4.41 , 5Q7� _ Sewer Installation _ Spring 07f1� ..,,Ci � . LaG 4.ngp � 9 8 1 000 WWII in Fall 2019 Steuben Lakes RSD 610) 1 836 21......_W a1 S rstern C`llrMa— _ l"ail 2019 1 a6�a�rt� � ���a�1tw 1t` 66 1 .... _ ..�...._ 18 1 1��......... 1 ta�N Lxp ansior Fa11IT 01 it o i1cs14 jC r . _.... )9 678 1 i mit Station 1r �,Provements lull 2019 _.. City^ of Mishaw, (t,I 7) yawccas ,�)ewer I�eja a,.r _ _._t �tl_I2019 .._ t Ity l Goshen §2j4 _ _IT R 072 673Lmwwwww _ IT&w��r�Im Qyements _ Fall 2019wwwwww St. Jose h�Cty IN 62� 5) .._ 715 ewa Sidewalk ln�ro✓en�e IT „ .._..... -..$2Sfl,k 0 ?__... S.idewalk I�ycinenlL Fall 2Q19 560 _ _ .... Cam of Mk art aka C560 $417 000 ... ..scat de, Sewer WM ..__ Sprin2 2020 _ AEP (Niles 628 2019 _u...C.ihof Elkha,.... 6 9 _Fal_l.. S n- 2020 ......_.. City of MishawalutJ I0Q) 5OT000 Boat Launch Reconstruction_ 11me_ of,South 63 1..... 52 0 .. � _Fal12019 i►2019 _Ci ,Bend 633).l "�,-00 �F �Vc'l aw'wl [ cl atrs ac�tea• 201� Civ of E 1k1taf6341...... _. �.. Fall 2019 Ci Selge Construction Co., Inc. Equipment List QUANTITY DESCRIPTION AND CAPAC'tTY OF ffEMS YEAR 1 1 IMPACT CONSTRUCTION TRAILER DUAL SOCK TRACKER FOR JD EXCAVATOR 2020 2019 1 YANMAR V1035 MINI EXCAVATOR 2019 2 JOHN DEERE 544K 11 4WD LOADERS 2018 2 IJOHN DEERE 624K 11 4WD LOADERS 2018 1 2"-8" DIP BUTT FUSION MACHINE 2018 1 DCI FS FALCON LOATING SYSTEM 2018 1 VERMEER D40X55 S3 DIRECTIONAL DRILL 2018 2 HAMM H101 SMOOTH DRUM COMPACTOR/ ROLLER 2018 1 2018 BOMAD BW 120 COMPACTOR / ROLLER 2018 1 GODWIN CD150M TRASH/BY-PASS PUMP 2018 1 1 YANMAR V1055 MINI EXCAVATOR ROFHDR ROADWIDENER 2018 2017 1 1 JOHN DEERE 344K LOADER MULTIQUIP CONCRETE MIXER 2017 2017 5 ARTIC HD 17 SNOW PLOWS 2017 1 1 1 ARTIC HD14 SNOW BOX ROAD WIDENER W/DUAL REMOVE VS 63-20-D Grout Machine 2017 2017 2016 1 1 YANMAR V1080 MINI EXCAVATOR KENWORTH T-800 CUMMINS TRACTOR 2016 2016 1 DITCH WITCH TRACKER WITH BEACON/DISPLAY 2016 9 CATERPILLAR COMPACT TRACK LOADERS 2016 1 McLAUGHLIN VX30-500 VACUUM EXCAVATOR 2016 1 2 PERCUSSION DRILL YANMAR Vio35-6 MINI EXCAVATORS 2016 2016 1 YANMAR Vio45 MINI EXCAVATOR 2016 1 1 1 MACK DUMP TRUCK MODEL GU813 ETNYRE TRAILER WITH 4TH FLIP AXLE JOHN DEERE 245 LC EXCAVATOR 2015 2015 2015 3 ARTIC SNOW PUSHER PLOWS W/QUICK COUPLERS 2015 2 YANMAR V1055 MINI EXCAVATOR 2015 3 1 2 WESTERN PLOWS ISCO FUSION MACHINE JOHN DEERE 245 LC EXCAVATOR 2015 2014 2014 1 2 JOHN DEERE 544K 4WD LOADER MOVAX-SP60 HAMMERS 2014 2013 1 1 1 1 KOMATSU PC49OLC-10 EXCAVATOR KOMATSU PC390LC-10 EXCAVATOR JOHN DEERE 700K DOZER JOHN DEERE 650K DOZER 2012 2012 2012 2012 3 jJOHN DEERE 544K LOADERS 2012 1 2 CATERPILLAR CH 85E TRACTOR ROME SCRAPER PANS 2010 2010 1 1 12" - 36" BUTT FUSION MACHINE VERMEER D100 X 120 NAVIGATOR W. ATTACHMENTS 2009 2009 1 YANMAR V1075 EXCAVATOR 2008 QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR, 1 CHAMPION 730A VHP MOTOR GRADER 1999 1 CMI SF3002 SLIPFORM PAVER 1999 1 FORD F800 DUMP TRUCK 1998 1 1 1 CLEAN EARTH SFE-JET-VAC MCELROY #412 HYDRAULIC FUSION UNIT BELSHE T9 TRAILER 1998 1998 1998 2 928G CATERPILLAR WHEEL LOADERS 1998 1 NPK 8XA HYDRAULIC HAMMER 1998 1 IEX750 - HITACHI EXCAVATOR 1998 1 FELCO VIBRATORY COMPACTOR BUCKET 1998 1 JCB 411 TOOL CARRIER, WITH FORKS 1998 1 INTERNATIONAL 4900 6 X 6 WATER TRUCK 1998 1 MACK CL713 TRACTOR 1997 1 VERMEER D-24x40 NAVIGATOR DIRECTIONAL BORE SYSTEM [FINN 1997 1 HYDROSEEDER W/ ATTACH., GROUNDHOG 1997 1 IMACK CL713 DUMP TRUCK 1996 1 MACK RD68 TRACTOR 1996 1 MACK TRACTOR MODEL CL713 1996 1 CATERPILLAR MODEL CS433 COMPACTOR 1996 1 PEMBERTON 72" DITCH CL. BUCKET FOR CAT 30OLE 1996 1 PC200-6 KOMATSU EXCAVATOR 1996 1 MACK TRACTOR, MODEL CL713 1995 1 VERMEER 4" LW HAMMERHEAD MOLE 1995 1 VERMEER 3" HAMMERHEAD MOLE 1995 1 DITCH WITCH DIRECTIONAL BORE SYSTEM 1995 1 MELROE 853C BOBCAT 1995 1 CATERPILLAR HYD. EXCAVATOR MODEL 325L 1994 1 CATERPILLAR HYD EXCAVATOR MODEL 330L 3CY 1994 1 IJOHN DEERE 624G LOADER 3 1/2 YD. 1994 1 JOHN DEERE 955 4WD TRACTOR W/TILLER AND BROOM 1994 1 FELCO BEDDING CONVEYOR, STAND. SLIDER, W/2' EXTENSION 1994 1 FORD TRACTOR MODEL LN 8000 1993 1 GMC WHITE TRACTOR TRUCK 1993 1 CATERPILLAR D5C DOZER 1992 1 JOHN DEERE 955 TRACTOR W/TILLER, BOX SCRAPER, BROOM 1991 1 1 FELCO ROLLER BEDDING CONVEYOR W/6 CY HOPPER JOHN DEERE 544 RUBBER TIRE LOADERS 1991 1990 1 JOHN DEERE 455G CRAWLER LOADER 1989 1 KOEHRING 6644 HYD. EXCAVATOR 3 1/2 YD. 1988 1 FORD F800 UTILITY TRAILER WITH HI RANGER 1985 1 JOHN DEERE 570A ROAD GRADER 1980 1 KOEHRING 866 HYD. BACK HOE 4 YD. 1979 1 CATERPILLAR D4C DOZER SERIES 3 1979 1 FERGUSON TANDEM DRUM VIBRATOR ROLLER 1979 1 1 HARTMAN FABCO CONVEYOR EARTH BORING MACHINE 48" AND ACCESSORIES 1979 1975 "Attachment 4. List references of private firms for which you have performed work. Environmental Restoration 1668 Fabrick Drive St. Louis, MO 63026 Siemens Medical Solutions Diagnostics Mr. Tom Lienczewski 3400 Middlebury Street Elkhart, IN 46516 South Bend Orthopedics Elm Road Medical Campus 53880 Carmichael Drive South Bend, IN 46635 Brandywine Community Schools John H. Jarpe, Ed. D., Superintendent 1830 S. Third Street Niles, MI 49120 Gateway Development Mr. Dan Brekke 56199 Parkway Ave., Suite 1 Elkhart, IN 46516 Palisades Park Country Club 79336 Ravine Way Covert, MI 49043 Jimmerson Shores Cooperative 4508 Denali Cove Ft. Wayne, IN 46845 Remington Park Subdivision Wagner Land Development 3325 Middlebury Elkhart, IN 46516 Augustine Lakes Subdivision c/o Miller Builders PO Box 229 Granger, IN 41530 Geocel Holding Corporation PO Box 398 Elkhart, IN 46516 AM General Rolland Miller 13200 McKinley Highway Mishawaka, IN 46545 Noble Americas South Bend Ethanol 3201 W. Calvert Street South Bend, IN 46613 Dometic Corporation Glenn Kimmerly 509 S. Poplar Street LaGrange, IN 46761 Notre Dame Federal Credit Union Bob Green PO Box 7818 Notre Dame, IN 46556 Arbor Lakes Apartments Edward Rose Development 6100 Newport Rd Kalamazoo, ml 49003 Chicago Trail Farms Robert L. Runkle 27551 US 12 Edwardsburg, MI 49112 Flaherty & Collins Art Smith One Indiana Square, Suite 3000 Indianapolis, IN 46204 Aeroplex FM Stone Real Estate 421 S. Second St. Elkhart, IN 46516 ENGINEERING REFERENCES Selge Construction Rich Zielinski Kenneth Jones 317-547-5580 574-293-7762 American Structurepoint Jones, Petrie, Rafinski, Inc. 7260 Shadeland Station, Suite 100 200 Nibco Parkway Dr Indianapolis, IN 46256 Elkhart, IN 46516 Jeremy Roschyk 574-288-4580 Donahue & Associates 100 N. Michigan, Ste 510 South Bend, IN 46601 Andy Lemberis 574-236-4400 DLZ Indiana, LLC 2211 East Jefferson Blvd, South Bend, IN 46615 Paul Hummel 574-234-3167 Lawson Fisher Associates, P.C. 525 West Washington Avenue South Bend, IN 46601 John Olsen 269-428-4424 Merritt Engineering, Inc. 4568 Red Arrow Highway Stevensville, MI 49127 Rick Keller 574-272-3525 Keller Engineering, Inc. 54365 30th Street South Bend, IN 46635 Matt Davis 269-927-0100 Wightman and Associates, Inc. 2303 Pipestone Road Benton Harbor, MI 49022 Jason Durr 574-282-8001 Christopher B. Burke Engineering, LLC 220 West Colfax Avenue, Suite 500 South Bend, IN 46601 John Linn 574-232-8700 Abonmarche Consultants of IN, Inc. 750 Lincolnway East South Bend, IN 46601 David Harvey Fleis & Vanderbrink Engineering, Inc. 2960 Lucerne Drive, S.E. Grand Rapids, MI 49546 SECTION II - PLAN AND EQUIPMENT QUESTIONNAIRE 2. (SUBCONTRACTORS LIST WORK PERFORMED. Bailey Aggregates Aggregate Trucking 12609 Indianapolis Rd Yoder, IN 46798-9733 Brusky Construction Aggregate Trucking 70569 Elizabeth St Niles, MI 49120 V & R Trucking Aggregate Trucking 1845 Elmer St South Bend, IN46628 Niblock Excavating, Inc. Asphalt Construction PO Box 211 Bristol, IN 46507 Rieth-Riley Construction Co., Inc. Asphalt Construction PO Box 477 Goshen, IN 46527-0477 Walsh & Kelly, Inc. Asphalt Construction 1700 E. Main St. Griffith, IN 46319-2999 Michigan Paving & Materials Co. Asphalt Construction 2300 Gendenning Kalamazoo, MI 49003 Baker Corporation ByPass Pump Rental 2205 E. Lincoln Hwy Chicago, IL 60411 Concrete Sawing & Coring, LLC Concrete Coring Cutting PO Box 907 Niles, MI 49120 Abonmarche Consultants, LLC. Construction Engineering 750 Lincolnway East South Bend, IN 46601 1 SUBCONTRACTOR LIST WORK PERFORMED Acorn Landscaping, LLC Landscape/Restoration 24930 Kern Rd. South Bend, IN 46614-9787 Fuerbringer Landscaping & Design, Inc. Landscape/Restoration 25530 Brick Road South Bend, IN 46628 Slussers Green Thumb, Inc. Landscape/Restoration PO Box 33 Logansport, IN 46947-0033 Turf Services Landscape/Restoration 57780 Sink Road Dowagiac, MI 49047 Ferguson Waterworks #1934 Lift Station Installation 1077 Oliver Plow Ct South Bend, IN 46601 Best Sweeping Specialists, Inc. Road Sweeping/Dust Control 632 S. Sixth Street Goshen, IN 46526 A-1 Striping Service, Inc. Road Striping 56825 Spirea Rd. New Carlisle, IN 46552 The Airmarking Co., Inc. Road Striping 1544 North State Road 25 Rochester, IN 46975 Michiana Contracting, Inc. Traffic Signal Work PO Box 929 Plymouth, IN 46563 Rathco Traffic Control 6742 Lovers Lane Portage, MI 49002 Give `Em A Brake Traffic Control 2610 Sanford Ave Grandville, MI 49418 91 V OIL III JWULIUII 1 CAIA:11 :III.0 L,LUt;b LIUIIII411C 0%'nr.NULG O 1 1. What public works projects has your organization completed for the period of five (5) years prior to the date of the current bid? CONTRACT WHEN NAME AND ADDRESS AMOUNT CLASS OF WORK COMPLETED OF OWNER $174,636 25 CLABAUGH LIFT STATION REPLACEMENT 2014 CITY OF KNOX / 101 W WASHINGTON, KNOX, IN 46534- 574-772-3032 $611,083.30 FEDCO SANITARY SEWER 2014 FULTON COUNTY / 815 MAIN, ROCHESTER, IN 46975/ 574-223-2911 $1,833,255,44 LEO-CEDARVILLE "B" RSD 2014 CITY OF LEO / LEO-CEDARVILLE RSD, PO BOX 197, LEO, IN 46765 $862,914 17 INDOT- MONROE STREET 2014 INDOT# 34072 /LOCATED: GOSHEN. IN $286,223.48 INDOT- SIDEWALK REHAB 2014 INDOT # 34775 /LOCATED: NORTH LIBERTY, IN $579,190.98 SAGE/POPPY ROADS LIFT STATIONS 2014 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $307.177,50 GUMWOOD SANITARY SEWER 2014 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1616 $809,763.01 FULMER RD DRAINAGE IMPROVEMENT 2014 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $1,199,446,00 CEDAR LAKE WW SYSTEM 2014 CASS CTY/ 120 N BROAD, CASSOPOLIS, MI 49031 $57,535.92 M-51 GATE VALVE INSERTION 2014 CITY OF NILES/ 1345 E. MAIN ST., NILES, MI 49120- 269-683-4700 $130,415.00 HOWARD TWP LIFT STATION UPGRADE 2014 HOWARD TWP/ 1345 BARRON LK RD„ NILES, MI 49120 / 269-684-0072 $90.068.75 RIVERSIDE DR SEWER EXTENSION 2014 CITY OF ELKHART 1229 S. 2ND ST,, ELKHART, IN 46516 574-294-5471 $938,479.70 BLUE JAY DRAIN DIV III 2014 BERRIEN CTY DRAIN COMM/ 701 MAIN, ST. JOSEPH, MI 49085 / 269-983-7111 $1.180.671.74 MIAMI COMMUNITY RSD WASTEWATER 2014 MIAMI CTY/ 25 N. BROADWAY, PERU, IN 46970 / 765-472-3901 $868,079.00 UNIVERSITY DRIVE LS IMPROVEMENTS 2014 CITY OF MISHAWAKA 1600 E 3RD ST., MISHAWAKA. IN 46545 - 574-258-1618 $1,603,688.20 JEFFERSON BLVD STREETSCAPES 2014 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $279,762.26 INDOT- NORTH LIBERTY SIDEWALK IMPRC 2014 INDOT R34775 / LOCATED: NORTH LIBERTY, IN $867,252.60 MIDDLEBURY'C' LIFT STATION 2014 TOWN OF MIDDLEBURY, 418 N. MAIN ST_ MIDDLEBURY, IN 46540 / 574-825-1499 $801.658.08 FULMER RD AREA DRAINAGE 2014 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $39,950.00 PEAVINE ST LIFT STATION 2014 VILLAGE OF CASSOPOLIS, 117 S, BROADWAY, MI 49031 $204,576.00 CITY SIDEWALKS & CURBS 2014 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $596,566,00 EAST GATE LIFT STATION 2014 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $430,763.00 HOUSING DEMOLITION 2015 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $285.393.00 INDOT - TWIN BRANCH SIDEWALK IMPROV 2015 INDOT # 36481/ LOCATION: MISHAWAKA, IN $547,827.00 WASTE WATER PUMP STATION INSTALL 2015 TOWN OF WINONA LAKE, PO BOX 338, WINONA LAKE, IN 46590 $670,879.00 BIKE PATH CONSTRUCTION 2015 CITY OF ELKHART / 229 S, 2ND ST., ELKHART, IN 46516 574-294-5471 $112,681.00 WATER TREATMENT PLT UPGRADES 2015 TOWN OF MIDDLEBURY, 418 N. MAIN ST., MIDDLEBURY, IN 46540 / 574-825-1499 $150,048.00 ADA CURB/SIDEWALK REPLACEMENT 2015 CITY OF ELKHART 1229 S. 2ND ST,, ELKHART, IN 46516 574-294-5471 $470.682.00 BOOSTER STATION RECONSTRUCTION 2015 NEW BUFFALO TWP./ 17655 CLAY ST_ NEW BUFFALO, MI 49117 $3,895,111.00 DRAINAGE AND TRAVEL LANES 2015 INDOT 34218 / LOCATION: MISHAWAKA, IN $4,156.813 00 ROAD IMPROVEMENTS 2015 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $30,340.00 SEWER REPAIR 2015 CITY OF GOSHEN, 220 S, MAIN ST., GOSHEN, IN $290,715 00 ADA INFRASTRUCTURE IMPROVEMENTS 2015 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $118,817,00 MANUFACTURE INFRASTRUCTURE 2015 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD,, SOUTH BEND, IN 46601 -574-235-9216 $105,701.00 ROAD/ROUNDABOUT INSTALLATION 2015 CITY OF MISHAWAKA 1600 E 3RD ST,, MISHAWAKA. IN 46545 - 574-258-1618 $1.564,622,00 WATER MAIN INSTALLATION 2015 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $257,718,00 CURB/SIDEWALK INSTALLATION 2015 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $42,050.00 SEWER CLEAN OUT 2015 CITY OF WARSAW / PO BOX 817, WARSAW, IN 46581 - 574-372-9545+ Part II, Section I Experience Questionnaire SCHEDULE B 3 1. What public works projects has your organization completed for the period of five (5) years prior to the date of the current bid? CONTRACT WHEN NAME AND ADDRESS AMOUNT CLASS OF WORK COMPLETED OF OWNER $2,071.944.00 WASTEWATER COLLECTION SYSTEM 2017 TOWN OF NORTH WEBSTER, PO BOX 95, NO. WEBSTER, IN 46555 $635,773.00 ROAD AND SIDEWALK 2017 CITY OF STURGIS, 130 N. NOTTAWA ST,, STURGIS, MI 49091 $362.165,00 WTP BACKWASH PUMP STATION 2017 TOWN OF MIDDLEBURY, 418 N, MAIN ST., MIDDLEBURY, IN 46540 $126,000.00 SEWER AND PARKING LOT REPAIR 2017 SOUTH BEND CLINIC, 211 N. EDDY ST., SOUTH BEND, IN $1,652.481.00 LIFT STATION & FORCEMAIN 2017 VILLAGE OF PAW PAW, 111 E MICHIGAN, PAW PAW, MI 49079 $4,655,327.00 SANITARY & WATER IMPROVEMENTS 2017 TOWN OF NEW CARLISLE/ PO BOX 6, NEW CARLISLE, IN 46552 / 574-654-3733 $981,453.00 LINDEN LTCP PHASE II 2017 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $62,785.00 FORCEMAIN 2017 CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $8,434,889,00 SOLAR POWER INSTALLATION 2017 SPARtAN PV111NOVATEUS SOLAR / MICHIGAN STATE UNIVERSITY $197,240.00 OSBORNE STORM WATER PUMP STATION 2017 CITY OF WARSAW / PO BOX 817, WARSAW, IN 46581 - 574-372-9545+ $2,860.242.00 WESTERN AVE STREET/SIDEWALK 2017 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $23,865,00 ADA RR PARKING LOT AND WALKS 2017 CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $1,316,160.00 WW COLLECTION SYSTEM 2017 VILLAGE OF CASSOPOLIS / 117 S. BROADWAY. CASSOPOLIS, MI 49031 $1,273,288.00 DRAIN / CREEK 2017 NEW BUFFALO TWP./ 17655 CLAY ST., NEW BUFFALO, MI 49117 $250.000.00 MANHOLE & SEWER UPGRADES 2017 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $115.000.00 VALVE #2 REPLACEMENT 2017 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $1,116,500.00 SITE IMPROVEMENTS 2018 CITY OF ELKHART 1229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $179.295.00 CREEK EMERGENCY REPAIR 2018 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $37,400.00 STREET CALMIING/ NOISE REDUCTION 2018 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD,, SOUTH BEND, IN 46601 -574-235-9216 $107,000.00 WATERMAIN REPLACEMENT 2018 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $810,075,00 SIDEWALK REPAIRS/REPLACEMENT 2018 CITY OF MISHAWAKA / 600 E 3RD ST„ MISHAWAKA. IN 46545 - 574-258-1618 $592.000.00 PEDESTRIAN TRAILS 2018 INDOT R37501 / LOCATED IN SOUTH BEND IN $585.000.00 WATERMAIN EXTENSION 2018 CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $292,250.00 LIFT STATION 2018 VILLAGE OF CASSOPOLIS, 117 S. BROADWAY, MI 49031 $144,256.00 CONCRETE REPAIR/INSTALL 2018 INDIANA FLIGHT CENTER, ELKHART IN $1,975,950,00 SIDEWALKS 2018 INDOT R39513 ; STUDEBAKER SCHOOL, SOUTH BEND, IN $1,205,769.00 SEWER REHABILITATION 2018 CITY OF WARSAW / PO BOX 817, WARSAW, IN 46581 - 574-372-9545+ $898,381.00 LANDSCAPE, PAVEMENT 2018 SUB: FLAHERTY & COLLINS/ ELKHART IN $502,300.00 PEDESTRIAN TRAILS 2018 INDOT R38061 / LOCATION: SOUTH BEND, IN $288,000,00 WATERMAIN 2018 CITY OF NILES/ SECOND STREET., NILES, MI 49120- 269-683-4700 $98.240,00 CREEK IMPROVEMENTS 2018 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $91,735.00 LOW PRESSURE SEWER INSTALL 2018 CITY OF NILES/ SECOND STREET., NILES, MI 49120- 269-683-4700 $359,600.00 LIFT STATION 2018 CITY OF BRIDGMAN, 9765 MAPLE, BRIDGMAN, MI 49106 $93,000,00 MISC GRADING 2018 ELKHART COUNTY FAIR GROUNDS, GOSHEN, IN $61.185.00 THROTTLE REPLACEMENT 2018 CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $20.000.00 PEDESTRIAN PATH 2O18 NILES CHARTER TOWNSHIP, BELL ROAD, NILES MI 49120 269-684-0870 $233,230,00 WATERMAIN 2018 BENTON CHARTER TOWNSHIP, BENTON HARBOR, MI $240.000.00 LIFT STATION 2018 SUB/ CITY OF WARSAW, IN $158,500,00 LIFT STATION REPAIRS 2018 LaGRANGE COUNTY REGIONAL UTILITY DISTRICT, LAGRANGE, IN $2.347.947.00 STREET RECONSTRUCTION 2019 CITY OF WARSAW / PO BOX 817, WARSAW, IN 46581 - 574-372-9545+ $98,240.00 CREEK REPAIR 2018 CITY OF SOUTH BEND / 227 W, JEFFERSON BLVD_, SOUTH BEND, IN 46601 -574-235-9216 $1,434.441,00 TURN AROUND LANES 2018 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $1,198,500...00 ROAD IMPROVEMENTS 2018 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $62.000,00 THROTTLE REPLACMENT 2019 CITY OF ELKHART / 229 S. 2ND ST.., ELKHART, IN 46516 574-294-5471