CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Century Center Parking Lot Entry Gateway Improvements
Project No. 118-035A
For Bids Due September 24, 2019
PART I
(Must be completed for all bids. Please type or print)
Date: 9/24/19 Bidder (Firm): Larson Danielson Const . Co . , Inc
Address: 302 Tyler Street
Cit /state/zi aPorte, IN 46350
y p L Telephone Number: _ (219 ) 3 62 —212 7
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Century Center Parking Lot Entry Gateway Improvements
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Jones Petrie Rafinski
rsand dated $ 2 9 19 forth e sum of (enter the Total Bid as shown on the Proposal)
ALk
der sum of Totdq l Base Bid pN Alt' r des sho d, on Prop N ($ r ca
�) ( ) ,
The undersigned further agrees to furnish a bond or ertified` heck with this bid for an amount specified in
>rd, the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
' with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the uniLs all be shown on a separate attac ent.
LARSONI DANIELS
�,�. ON By X
Timothy F . Si nature)
SF CO, INC. y La�s�on, President
s n � CONSTRUCTION
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. GNlot, President
Elizabeth A. Maradik, Member
ACCEPTANCE
day of
(Printed Name of Person Signing)
Genevieve E. Miller, Member
Therese J. Dorau, Member
Laura L. O'Sullivan, Member Attest: Linda M. Martin, Clerk
20
Version 4/2/2019 Contractor's Bid for Public Works - 2
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Century Center Parking Lot Entry Gateway Improvements
Project Number:
For Bids Due:
118-035A
September 24, 2019
' 4.44.t VkM1p;'7@
e
Contractor Name: Larson Danielson Construction Company,
nc.
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Construction Engineering
1
LS
\ '� ;
$
.
2
Mobilization & Demobilization
1
LS
3
Excavation, Common
222
CYS
4
Pavement, Remove
12
SYS
5
Curb, Concrete, Remove
150
LFT��
,
6
Attendant Booth, Remove
1
LS
9A-
7
Protective Bollard, Remove
5
EA
8
Sign, Relocate
1
EA
R SLA")
9
Temporary Inlet Protection
3
EA;,
10
Compacted Aggregate, No. 53
110
TON
3 `,
11
Curb, Concrete
420
LFT
12
Concrete, Reinforced, 6 IN
468
SYS"
..
k S�'(, s ��
13
Single Swing Barrier Gate
4
LS
r'
14
Misc. Electrical
1
LS
3 .: '"
-2-?--0
15
Electrical Handhole
5
EA
16
Wire, No. 4
130
LFT
S-,
6 a
17
Conduit, PVC, Schedule 80, 2 IN
108
LFT
?.Q, Jaa.
18
Conduit, PVC, Schedule 80, 3 IN
26
LFT:
19
Conduit, PVC, Schedule 80, 4 IN
42
LFT'
20
Thermoplastic, Crosswalk,
Sold Wh te6IN
102
LFT
21
LinN, Thermoplastic, Solid, White,
46
LFT
f.
22
Line, Epoxy, Solid, White, 6 IN
96
LFT
23
Parking Lot attendant Booth
1
EA
4
y.
24
Protective Bollards
4
EA
25
Hardwood Mulch, 3 IN Depth
14
CYS
26
Irrigation Allowance
1
ALLOW
$400
27
Irrigation Sleeve, PVC, 4 IN
45
LFT
BASE QUOTE TOTAL
$
Version 4/2/2019 Contractor's Bid for Public Works - 7
BID/PROPOSAL.
CITY OF SOUTH BEND
w
Project Name: Century Center Parkin Lot Ent Gateway Improvements
w
1 rY 9 Entry Y p
,JProject Number: 118-035A
For Bids Due: September 24, 2019
Contractor Name: Larson Danielson Construction -Company, Inc .
ALTERNATE A - TRAFFIC SIGNAL HEAD REPLACEMENT
Item Description
No. Quantity Unit Unit Price Total Amount
1 Traffic Signal Head Replacement 1 LS $ L�—
ALTERNATE A TOTAL I $o,�
ALTERNATE B - INTERSECTION SIGNAL MANHOLE CASTING, ADJUST TO GRADE
Item Description
No. Quantity Unit Unit Price Total Amount
Intersection Signal Manhole Casting,
1 Adjust to Grade 1 LS Q (� - $
ALTERNATE B TOTAL $ 5 -�
Bidder (Firm): Larson Danielson Construction Company, Inc.
Address: 302 Tyler Street
City/State/Zip: LaPorte, IN Telephone Number: 219 3 6 2 — 212 7
46350
By x
;n=
(Signature)
Timothy F. Larson, President
(Printed Name of Person Signing)
� LARSON DANIELSON
SEAL CONSTRUCTION CO, INC.
Version 4/2/2019 Contractor's Bid for Public Works - 8
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
LaPorte ) SS:
COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 4/2/2019 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or'contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or,any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 4/2/2019 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments,
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 2 4 t h dayof SepteTper, 2019
Larson Danielson Const. Cc., Inc.
Contractor/Bidder (Firm
LARSON DANIELSON X >
CONSTRUCTION CO,, INC. Signature of Contractor1XW4WX 1
Timothy F . Larson, President
Subscribed and sworn to before me this 2 4 t h
My Commission Expires
9/8/23
County of Residence
Printed Name and Title
day of September20 2019
Notary Public Michele C . Dzielinski
LaPorte
MICHELE CECELIA DZIELINSKI
a���r���l
Ewa
LaPodeCounty
My Commission Expires
C ,�� SoI��pJv�t7�C B, 2023
w
Version 4/2/2019 Contractor's Bid for Public Works - 6
OHIO FARMERS INSURANCE COMPANY
Westfield Group®1 Park Circle, P O Box 5001, Westfield Center, Ohio 44251-5001
Conforms to Document A310TM - 2010
Bid Bond
CONTRACTOR: SURETY:
(Name, legal status and address) (Name, legal status and principal place of business)
Larson -Danielson Construction Co., Inc OHIO FARMERS INSURANCE COMPANY
302 Tyler Street 1 Park Circle, PO Box 5001
La Porte, IN 46350 Westfield Center, OH 44251-5001
OWNER:
(Name, legal status and address)
City of South Bend, Board of Public Works
227 West Jefferson Blvd.
South Bend, IN 46601
BOND AMOUNT: Five Percent (5%) of the attached bid
PROJECT:
(Name, location or address, and Project number, if any)
Century Center Parking Lot Gateway Improvements (REBID)
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety
bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The
conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or
within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the
Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract
Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance
of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the
difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the
Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void,
otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor
to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding
sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor
shall obtain the Surety's consent for an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be
Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other le a "I �w - I Qgnn� ��,hII e Proj ct„ any provision in
this Bond conflicting with said statutory or legal requirement shall be dee d' detete �auf ' mrabons con rming to such
statutory or other legal requirement shall be deemed incorporated herein. trYpiwat'h�i Bond shall be
construed as a statutory bond and not as a common law bond. „11 Y
Signed and sealed this 24th day of September 2019
Terry A. Larson, retary-Treasurer(wrness)
era_ ....._... .
go�senur (4�Ir�9r��ssj._.
Larson -Danielson Construction Co., Inc
(Principal) (Seal)
B:
Timothy F. Larson, President .(Title)
OHIO FARMERS INSURANCE COMPANY
(Srrret
�
B
Christine A. Allen Attorney -In -Fact 'Title)
Printed with permission from The American Institute of Architects (AIA) and the Surety & Fidelity Association of America (SFAA) by
Westfield Group®. Westfield Group vouches that the language in the document conforms exactly to the language used in AIA
Document A31 OW 2010.
BD5084 OFWWN (10/2010)
THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME
POWER # AND ISSUED PRIOR TO 02/28/19, FOR ANY PERSON OR PERSONS NAMED BELOW,
General POWER NO. 1304762 01
Power Westfield Insurance Co.
of Attorney Westfield National Insurance Co.
CERTIFIED COPY Ohio Farmers Insurance Co.
Westfield Center, Ohio
Know All Men b These Presents, I'liat WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURAN6E COMPANY, corporations, hereinafter referred to individually as a "Company" and coilectively as "Companies," duly
organized and existing under the laws of the State of Ohio, arid having its principal office in Westfield Center, Medina County, Ohio, do by these
�resents make, constitute and ap oint
ONALD L. ROSENBAUM, MELZA M, YATES, CHRISTINE A, ALLEN, CATHERINE E. MYERS, BETHANI MORRIS, KATHY D.
HENRICH, JENNIFER S. SALAT, CASSANDRA LEMLEY, DEBORAH E. BELL, JOINTLY OR SEVERALLY
of LA PORTE and State of IN its true and lawful Attorney (s) - in- Fact, with full power and authority hereby conferred in its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship- . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
Z;UARANTCE OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed bi� the President, sea led, with the corporate
seat of Me applicable Company ands (Jul attested by its Secretary, hereb ratifying and iat the said Attorney(s)-in-Fact may do in
the promises, Said appomtrn6nt is m2le undier and b authorit of the CO
resolution ad0ted, by the Beard of Directors of each of the
WESTFIELD INSURANCE COMPANY, wESTFIELD NATI&AL IN8RANCE COMPAIY and OHIO FARMERS INSURANCE COMPANY:
"Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shelf
be and is here, vested with full power and authority to appoint any one or more suitable persons as Attorney(s) -in- Fact to represent and act for
allic 7the Company subject to the foRowjnq provisionsti
The Attorney -in -Fact, may be given full Power ant: authority for and in the name of and on behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of incle"'mnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or le
Attorney 'T Company
I'l" sp�,giy, -1 of
n1hn' the
-in-Fact shall be as binding upon the a
"Be it Further Resolved, that the si� mature 11 do y
such
designate Jur �omipan�
- g a of '1y ac_ IL
power of altorne or any certificate relating therto by f, simile, and e
'on,pa C y with respL �ct to r
S d )inding upon the n
held on February 8, 2000),
9
In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed try their National Surety Leader and Senior Executive arid their corporate seals to be hereto
affixed this 28Ih day of FEBRUARY A 0�, 2019
Corporate ......
- IJAA WESTFIELD INSURANCE COMPANY
Seals
WESTFIELD NATIONAL INSURANCE COMPANY
Affixed
OHI FARMERS INSURANCE COMPANY
M
SEAL
Z
'oz 1IB48
F
:
le ?.
State of Ohio By.
P. Baus, National Surety Leader and
County of Medina ss,; Senior Executive
On this 28th day of FEBRUARY A.D., 2019 , before me personally came Dennis P, Batas to me known, who, being by me duly sworn, did
depose and say, that he resides in Wooster, Ohio; that he is National SuretyLeader arid Senior Executive of WESTFIELD INSURANCE
COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS NSURANCE COMPANY, the companies described in and which
executed the above instrument; that he knows the seals of said Companies; that the seals affixed to said instrument are such corporate seals; that
they were so affixed by order of the Boards of Directors of viid Companies; and that he signed his name thereto by like order.
Notarial
Seal \A L
Affixed
State of Ohio 0
County of Medina ss,.
David A. Kotnik, Attorney at Law, Notary Public
My Commission Does Not Expire (Sec.. 147.03 Ohio Revised Code)
1, Frank A, Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and 01-110 FARMERS
INSURANCE COMPANY, do hereby certify thal the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Corrmanies, which is still in full force and effec( and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are
iri full force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this 24th day of
Septernbg---6u�-Q;-,%2019
"0 ,
N,Nxl�f A 4, �"
...
'o j%", V�
%
SEAL
SEAL"'
.0-
Secrdary
Frank A, Carrino, Secretary
BPOAC2 (combined) (06-02)
H
a
W
w
to
w
�W O
G
W Z Q Q
mW0 ra
xv)a Wc)
W I m H
��
O�w �Q
Oma 0:W
O Om
V LU 2 ; LL LU
W
m
ow
�
C
z
a
H
O
z
9
w
00
3
0
LO
w
m
ME
0
0
w
Zm
w
m
2
+' 0
ci Q
� m
C CU
O
E U
cu
Z
a) 41
o W
O
U
ri
O
L
m .11
O r,,
OD rd
� Q
r0^
VJ
� a
7
Z
U i-
N �
� m
0
a)
N
d
U
H
a) m
m o
Cl
U EL
ao�
m
—�
o =
0
a
Ey E
EU
Q w
�m
0°m
a)
U
a
N
C
-O O
ll
of m
a�
aa)
0
0 0
S,
0 a)
O )
C)
N
U
a
O
U
N
d cfJ
L
U
\
U
a7
0
IL o
L
U a
m d
c a)
o
U a)
M m
EZ
IL
w
w
m
O
N
Q
a)
E
a)
Z
a)
m
0
m
U
Z
Z
coco
C,
11l Q
u
Z Of
o co
j z
jr
w
ark • µ.r,
17
v7
Y
>O
IL
0
m
0
U
cu
O
U
Ol
N
al
GU
CITY OF SOUTH BENDu
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY �o
DEVELOPMENT PROGRAM
FORM MWBE-2.0 �}
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: 11 B-035A Date: 9 / 2 4 / 19
Project Name: Century Center Parking Lot Ent Glateway Improvements
Bidder: Larson Danielson Construction Company, Inc.
Contact Person: Timothy F .
Larson, PresidentTelephone: 219-362-2127
Address: 302 Tyler Street
City:
Email:
LaPorte State: Indiana Zip: 46350
tfl@ldconstruction.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http://www.in.gov/idoa).
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and
subcontracting opportunities.
2. Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBE/WBEs reasonable time to respond.
Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBEMBE firms.
**Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBEANBEs,
including providing such MBE/WBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE/WBE was unqualified to perform the job.
*Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 4/2/2019 Contractor's Bid for Public Works - 10
IRLARSON
302 Tyler Street - LaPorte, Indiana 46350
Construction nvxi % b7c. (219) 362-2127 - Fax (219) 362-2848
GII!ALFTY CONS1"9t1. MON SIME 1908
PROJECT: South Bend, City of -Century Center Parking Lot
Gateway Improvements (REBID)
BID DATE: 9/24/ 19
CERTIFICATION REQUIREMENT: 7% MBE 5% WBE
9/ 16/ 19-Invitations to Bid sent via GradeBeam
(see attached Call Sheet)
9/ 16/ 19-Posted on Plan Rooms: Bid Clerk, Bid Tool, Builder's Exchange,
CMD Group, DataBid, F.W. Dodge, Indiana Planroom, isgft, MACIAF &
Reed Business
9/ 18/ 19-Reminder to Bid sent via GradeBeam e-mail
9/23/ 19-Reminder that Bids are Due sent via GradeBeam e-mail
www.ldconstruction.com Equal Opportunity Employer
9
Call' Sheet
Package: South Bend, City of -Century Center
Parking Lot Gateway Improvements
(REBID)
Total Records: 28
Status: Not Sent
,No Response ,Will Bid ,Will Not Bid
,Bidded ,UnDecided
FO3000.1 - Concrete Suppliers
Organization
Attention Work Mobile
Fax
Email
Status
Certification -
Name
Phone Phone
Agency-
Number-
ExpirationDate
Carter
Dru Previs (574) (574)
(574)
dprevis@carter-waters.com
No
Waters
231- 876-
231-
Response
9000 6780
9188
Carter
Joe Fields (574) (574)
(574)
jfields@carter-waters.com
No
Waters
231- 340-
231-
Response
9000 0192
9100
ext.
4130
Kuert
Tim Miller (574) (574)
(574)
tim@kuert.com
No
Union- Agency
Concrete
232- 971-
232-
Response
Not Provided--
9911 6024
9977
Ozinga,
Cecil (574) (574)
(574)
cecilspencer@ozinga.com
No
Union- Agency
Central
Spencer 533- 536-
534-
Response
Not Provided --
Region
0415 3496
4528
ext.
2133
Ozinga,
Scott (574) (574)
(574)
scott.underwood@aggregate- No
Union- Agency
Central
Underwood 299- 536-
534-
us.com
Response
Not Provided --
Region
4351 9371
4528
032000 - Concrete Reinforcing
Organization
Attention Work
Mobile
Fax Email
Status
Certification -
Name
Phone
Phone
Agency-
Number-
ExpirationDate
Carter Waters
Dru Previs (574)
(574)
(574) dprevis@carter-
No
231-9000
876-6780
231- waters.com
Response
9188
Carter Waters
Joe Fields (574)
(574)
(574) jfields@carter-
No
231-9000
340-0192
231- waters.com
Response
ext.4130
9100
260000 - Electrical
...
Organization
Attention Work Mobile
...... . __ _.._ _
Fax Email
Status
........
Certification -
Name
Phone Phone
Agency-
Number-
ExpirationDate
Brite
Steve (574) (574)
(574) szornig@briteelectric.net
No
Union- Agency
Electric, Inc.
Zornig 272- 220-
272-
Response
Not Provided--
2615 7702
2616
Elite
Brian (574) (574)
(574) bwrobleski@fourway.net
No
Electrical
Wrobleski 968- 334-
855-
Response
LLC
0227 0259
3592
H & G
Bill Suter
(800)
(219)
(574)
bsuter@HGServices.com
Will Not
Services -
528-
898-
283-
Bid
South Bend
1696
1851
4900
Herman &
Bill Suter
(574)
(574)
bsuter@HGServices.com
No
Goetz, Inc.
282-
282-
Response
2596
2645
Koontz-
Corey
(574)
(574)
cnoland@kwservices.com
Will Not
Wagner
Noland
280-
287-
Bid
Construction
2573
6613
Services,
LLC
Koontz-
Jason
(574)
(574)
(574)
jcioch@kwservices.com
Will Not
Wagner
Cioch
232-
261-
288-
Bid
Construction
2051
3550
8510
Services,
LLC
Martell Electric,
Anjie
(574)
(574)
estimating@martellelectric.com
Will Bid
DOT -MI - State
LLC
Reeves
271-
271-
of Michigan-
5000
5400
-,Union- Agency
Not Provided--
McMann
Steve
(574)
(574)
terrimcmann@mcmannelectric.com
No
WBE-IN - State
Electric, Inc.
McMann
674-
674-
Response
of Indiana-
5748
5739
-,Union- Agency
Not Provided --
Pemberton-
Mike Taff
(574)
(574)
mtaff@pembertondavis.com
Will Bid
Davis
277-
204-
Electric
7001
2565
Schwartz
Mark
(574)
(574)
markc@schwartzelect.com
Will Not
Union- Agency
Electric
Carter
862-
862-
Bid
Not Provided--
4221
3915
Schwartz
Jon
(574)
(574)
jhubanks@schwartzelect.com
Will Not
Union- Agency
Electric
Hubanks
862-
862-
Bid
Not Provided--
4221
3915
Shaum Elec
Deb
(574)
(574)
deb@shaumelectric.com
No
Union- Agency
CO Inc
Bradley
264-
262-
Response
Not Provided--
4189
5186
..
310000 - Earthwork
Organization
Attention
Work
Mobile
Fax
Email
Status
Certification -
Name
Phone
Phone
Agency-
Number-
ExpirationDate
G.E. Marshall,
Eric Cannon
(219)
(219)
ericc@gemarshall.com
No
Union- Agency
Inc.
462-
462-
Response
Not Provided--
3415
3964
G.E. Marshall,
Doug
(219)
(219)
doug.malackowski@gemarshall.com
No
Union- Agency
Inc.
Malackowski
462-
462-
Response
Not Provided--
3415
3964
G.E. Marshall,
Eric Cannon
(219)
(219)
eric.cannon@gemarshall.com
No
Union- Agency
Inc.
462-
462-
Response
Not Provided--
3415
3964
G.E. Marshall,
Roy Darnell
(219)
(219)
royd@gemarshall.com
No
Union- Agency
Inc.
462-
462-
Response
Not Provided--
3415
3964
Indiana
Jimmy
(574)
(574)
jkabelearth10@yahoo.com
Will Bid
Union- Agency
Earth, Inc.
Kabel
674-
674-
Not Provided--
6488
6480
Ritschard
Don
(574) (574) (574)
ritl204@datacruz.com
Will Bid
WBE-IN - State
Brothers,
Ritschard Jr.
288- 360- 288-
of Indiana-
InC.
4777 5201 5438
-,DBE-IN - State
of Indiana-
-,Union- Agency
Not Provided-
-,EDGE- Agency
Not Provided--
.............�__
323100 Fences And Gates
Organization
Attention
Work
Mobile
Fax Email
Status
Certification -
Name
Phone
Phone
Agency-
Number-
ExpirationDate
Mike's Fencing Mike
(574)
(574) info@mikesfencing.com
No
Union- Agency
Estimating
862-
862-
Response
Not Provided--
2006
1227
Milestone
Chris
(574)
(574)
(574) chris@milestonefence.com
No
Union- Agency
Fence
Loftus
259-
532-
287-
Response
Not Provided --
Company
3101
1477
0504
ext. 110
Northwest
Damon
(219)
(219)
(219) damcolby@aol.com
Will Not
Union- Agency
Indiana
Colby
464-
405-
465-
Bid
Not Provided --
Fence- Lynn
4207
9430
1747
Pin.. Include [seen-Denl.han Con.trucdon ComP.ny, Ina ...et.pting quot.. on th. tollowMg pr.j..t(.):
PROJECT: South Bend, Clty ol-Ca ury Center Puking Lot G.t.w.y improvement. (REIBD)
BID
� DATE: 9/24/19
Y
'.±yJlt.
Project. can be viewed end/or dewnloed.d .t ygy,C,aj,l Alftoo_ggT,,;„gpo Publh:lobo,
quet.e to b. rm.11ed Le@vaa�tivStSl27aacUs'OIa.MSrdllChor r...d to 219-962-2tr48
Thank you,
MOW. C, MhAl-ki
E.11—W a -10.0
Lausonu--OauwMson Cwntyucdoot Co, Mc,
r>z�«.atuas'zata� eI.3x: 2114.xz-2�0
R8k® 29.ittc: 219 35-6047
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM, ^64N X
FORM MWBE-2.1
MBE/WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE 1 OF 1
Project Number: 118-035A MBE/WBE Participation Goal % MBE/ 5% W E
Project Name: Century Center Parking Lot Entry Gateway Improvements
Bidder: Larson Danielson Construction Company, Inc.
By: Timothy F . Larson, President 9/24/19
(Signature) (Title) (Date)
MBE/WBE Firm �, � � LARSON DANIELSON
Owner or Contact at MBE/ ONSTRUCTION CO,, INC,
Telephoner mail;
TYPE OF WORK SOLICITED FOR THIS PROJECT:
See attached Good Faith Effort
& GradeBeam Call Sheet
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
MBE/WBE Firm
Owner or Contact at MBE/WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
1:7�c1�1�� • • ►:�iC�r�i�/:::r:a�l T�1�i�lY��f:7�:
Version 4/2/2019 Contractor's Bid for Public Works - 11
RSO
DANIELSON
,fistruef on Compaq)?, Inc.
QUALITY CONSTRUCTION SINCE 1908
302 Tyler Street • LaPorte, Indiana 46350
(219) 362-2127 • Fax (219) 362-2848
EQUAL EMPLOYMENT OPPORTUNITY AFFIRMATIVE ACTION PLAN
To further the provisions of equal employment opportunity to all persons without
regard to their race, color, religion, sex, or national origin, and to promote the full
realization of equal employment opportunity through a positive continuing
program it is the policy of Larson Danielson Construction Co., Inc. to assure that
applicants are employed and that employees are treated during employment
without regard to their race, color, religion, sex, or national origin. Such action
shall include: employment, upgrading, demotion, or transfer; recruitment or
recruitment advertising, lay-off or termination; rates of pay or other forms of
compensation; and selection for training, including apprenticeship, pre -
apprenticeship, and/or on-the-job training.
»w dw, • #w
Timothy F. Larson will personally oversee the program and will appoint Terry A.
Larson as the Equal Employment Opportunity Officer (hereinafter referred to as
the EEO Officer) to carry out the program. The EEO Officer is hereby given full
authority to carry out the program and is given the responsibility to:
(1) Develop policy statements and internal and external communication
procedures.
(2) Assist line management in collecting and analyzing employment data,
identify problem areas, set goals and timetables and develop programs to
achieve goals. Such programs shall include specific remedies to eliminate
any discriminatory practices discovered in the employment system.
(3) Design, implement and monitor internal audit and report systems to
measure program effectiveness and to determine where progress has
been made and where further action is needed and, if necessary, to
assure that such action is taken.
(4) Report, at least quarterly, to Larson Danielson Construction Co., Inc. on
progress of each unit in relation to company goals.
(5) Serve as liaison between company, government regulatory agencies,
minority and women's organizations, and other community groups.
(6) Assure that current legal information affecting affirmative action is
disseminated to responsible officials.
www.ldconstruction.com Equal Opportunity Employer
A. All members of the Company's staff who are authorized to hire, supervise,
promote, and discharge employees, or who recommend such action, will be
made fully cognizant of, and will implement, the company's equal
employment opportunity policy and contractual responsibilities. To insure that
the above agreement will be met, the following actions will be taken as a
minimum:
(1) Periodic meetings of supervisory and personnel office employees will be
conducted not less than every six months, at which time the Company's
equal employment opportunity policy and its implementation will be
reviewed and explained. The meetings will be conducted by the EEO
Officer or other knowledgeable Company official.
(2) All new supervisory or personnel office employees will be given a
thorough indoctrination by the EEO Officer or other knowledgeable
Company official covering all major aspects of the Company's equal
employment opportunity obligations within thirty days following their
reporting for duty with the Company.
(3) The EEO Officer or appropriate Company Official will advise all
employees through supervisory personnel engaged in the direct
recruitment of employees relative to the methods followed by the
Company in locating and hiring minority and female employees.
(4) Larson -Danielson Construction Co., Inc. will maintain a working
environment free of harassment, intimidation, and coercion at all sites and
in all facilities at which Larson Danielson Construction Co., Inc.
employees are assigned to work. The Company shall specifically insure
that all foremen, superintendents, and other onsite supervisory personnel
are aware of and carry out Larson Danielson Construction Co., Inc.
obligation to maintain such a working environment, with specific attention
to minorities or women working at such sites or in such facilities.
B. In order to make the Company's equal employment opportunity policy known
to all employees, prospective employees, and potential sources of
employees, i.e., schools, employment agencies, labor unions, college
placement officers, etc., the Company will take the following action:
(1) Notices and posters setting forth the Company's equal employment
opportunity policy will be placed in areas readily accessible to employees,
applicants for employment and potential employees.
(2) The Company's equal employment opportunity policy and the procedures
to implement such policy will be brought to the attention of employees by
means of meetings, employees' handbooks, or other appropriate means.
(3) The company will send each labor union or representative of workers with
which it has a collective bargaining agreement or other contract or
understanding, a notice advising the labor union or worker's
representative of its commitments under Executive Order 11246.
4. Utilization of Minorities and Females
The Company will make good faith effort in meeting the designated goals as set
forth by the Office of Federal Contract Compliance Programs, as it relates to
utilizing minorities and females in the various crafts on all construction jobs
during which time this contractor has a direct federal or federally assigned
construction contract.
5. Recruitment
A. When advertising for employees, the Company will include in all
advertisements for employees the notations: "An Equal Opportunity
Employer." The Company will insert all such advertisement in newspapers or
other publications, having a large circulation among minority and female
groups in the area from which the Company's workforce would normally be
derived.
B. The Company will conduct systematic and direct recruitment through public
and private employee referral sources likely to yield qualified minority group
applicants, including, but not limited to, state employment agencies, schools,
colleges, and minority group organizations. To meet these requirements, the
Company will, through the EEO Officer, identify sources of potential minority
and female group employees and establish with such identified sources
procedures whereby applicants may be referred to the Company for
employment consideration.
C. The Company will encourage its present employees to refer minority and
female group applicants for employment by posting appropriate notices or
bulletins in areas accessible to all such employees. In addition, information
and procedures with regard to referring minority and female group applicants
will be discussed with employees.
6. Personnel Actions
A. Wages, working conditions, and employee benefits shall be established and
administered, and personnel action of every type, including hiring, upgrading,
promotion, transfer, demotion, layoff, and termination will be taken without
regard to race, color, religion, sex, or national origin. The following
procedures will be followed:
(1) Periodic inspections of project sites will be conducted to ensure that
working conditions and employee facilities do not allow discriminatory
treatment of project site personnel.
(2) The spread of wages paid within each classification will be periodically
evaluated to determine any evidence if discriminatory wage practices.
(3) The Company will periodically review selected personnel actions in depth
to determine whether there is evidence of discrimination. Where evidence
is found, the Company will promptly take corrective action. If the review
indicated that the discrimination may extend beyond the actions reviewed,
such corrective action shall include all affected persons.
(4) The Company will investigate all complaints of alleged discrimination
made to it in connection with its obligations under its contracts and will
attempt to resolve such complaints, and will take appropriate corrective
action. If the investigation indicates that the discrimination may affect
persons other than the complainant, such corrective action shall include
such other persons. Upon completion of each investigation, the Company
will inform every complainant of all of his avenues of appeal.
7. Training and Promotion
A. The Company will assist in locating, qualifying and increasing the skills of
minority and female employees and applicants for employment.
B. Consistent with its manpower requirements and as permissible under Federal
and State regulations, the Company will make full use of training programs,
i.e., pre -apprenticeship, apprenticeship, and/or on-the-job training programs
for the geographical area of contract performance.
C. The Company will advise employees and applicants for employment of
available training programs and entrance requirements for each to the extent
that this Company is aware of such training programs and entrance
requirements.
D. The Company will periodically review the training and promotion potential of
minority and female group employees and will encourage eligible employees
to apply for such training and promotion. Minority and female groups are
referred to as "protected groups".
8. Unions
The Company will use its best efforts to obtain the cooperation of the unions with
which it has contracted relations to increase "protected group" opportunities
within the unions and to effect referrals by such union of "protected group"
employees. Actions by the Company, either directly or through its association
acting as his agent, will include the procedures set forth below:
(1) Use its best effort to develop, in cooperation with the unions, joint training
programs aimed toward qualifying more protected group members for
membership in the unions and increasing the skills of protected group
employees so that they may have the opportunity to qualify for higher
paying employment.
(2) Use its best efforts to encourage the incorporation of an equal
employment opportunity clause into all union agreements to the end that
such unions will be contractually bound to refer applicants without regard
to their race, color, religion, sex, or national origin.
A. When required by contract the Company will use its best efforts to utilize minority
group subcontractors, suppliers, and vendors. The Company, however, reserves
the right to determine if the firm is a bona fide Minority Business Enterprise.
B. The Company will use its best effort to assure subcontractor compliance with
their equal employment opportunity obligations.
10. Records and Reports
A. The Company will keep such record as are necessary to determine compliance
with its equal employment opportunity obligations. The records kept by the
company will be designed to indicate:
(1) The number of minority and non -minority and female group member
employees in each work classification.
(2) The progress and efforts being made in cooperation with unions to
increase protected group employment opportunities.
(3) The progress and efforts being made in locating, hiring, training,
qualifying, and upgrading group employees.
(4) The progress and efforts being made in securing the services of minority
group subcontractors.
B. All such records will be retained for a period of three years following completion
of the contract work and shall be available at reasonable times and places for
inspection by authorized representatives of the State and Federal governments.
The Company reserves the right to require these representatives to show proper
credentials.
C. The Company will submit all reports required by Executive Order 11246 and
appropriate State and Federal agencies, and will permit access to its books,
records, and accounts by the appropriate governmental agencies, and the
Secretary of labor for purposes of investigation to ascertain compliance with the
rules, regulations, and orders of the Secretary of Labor promulgated pursuant to
Executive Order 11246.
11. Other Work
The Company agrees that it will be bound by the equal opportunity clause
required by Executive Order 11246 with respect to its own employment practices
when it participates in non-federal construction work during which time it also has
direct federal or federally assigned contract.
12. ,assistance in Compliance
The Company agrees it will assist and cooperate actively with the appropriate
governmental agencies and the Secretary of Labor in obtaining the compliance of
13
14.
15
contractors and subcontractors with the equal opportunity clause and the rules,
regulations, and relevant orders of the Secretary of Labor and will furnish such
information as they may require for the supervision of such compliance.
'Non-segregated'Facilities
All employee facilities provided by us shall be non -segregated. These include but
are not limited to such items as rest areas, parking lots, drinking fountains, and
all other such common facilities. Toilet and necessary changing facilities will be
such that privacy is offered to both males and females.
The Company shall not discriminate against any employee or applicant for
employment because of a physical or mental handicap in regard to any position
for which the employee or applicant for employment is qualified. We agree to
take affirmative action to employ, advance in employment, and otherwise treat
qualified handicapped individuals without discrimination based on their
physical or mental handicap in regard to any position for which the
employee or applicant for employment is qualified. We agree to take affirmative
action to employ, advance in employment, and otherwise treat qualified
handicapped individuals without discrimination based upon their physical or
mental handicap in all employment practices.
Disabled Veterans and Veterans of the Vietnam Era
The Company shall not discriminate against any employee or applicant for
employment because he or she is a disabled veteran or veteran of the
Vietnam Era in regard to any position for which the employee or applicant is
qualified. We shall take affirmative action to employ, advance and otherwise
treat qualified disabled veterans and veterans of the Vietnam era without
discrimination based upon their disability or veteran's status in all employment
practices.
It is understood that an agency may review our employment practices as well
as any subcontractors' we have employed during the performance of the
contract. If the goals set forth in the affirmative action program are being met, we
and our subcontractors will be presumed to be in compliance with the
requirements of Executive Order 11246 and 11375, as amended, unless it comes
to the agency's attention that we or our subcontractors are not providing equal
employment opportunity. In the event of failure to meet the goals, we shall be
given an opportunity to demonstrate that we have made every good faith effort to
meet our commitment.
For the purpose of this plan, the term minority means, Black, Hispanics, Asian,
Pacific Islanders, American Indian, and Alaskan Natives.
For the purpose of this plan, bona fide Minority Business Enterprises shall be
those businesses, firms, or corporations which are at least fifty percent owned
and operated by a minority person or persons.
The purpose of our commitment to specific goals is to minority and/or female
work force utilization is to meet our affirmative action obligations under the equal
employment opportunity clause of the contract. This commitment is not intended
and shall not be used to discriminate against any qualified applicant or employee.
Whenever it comes to the Company's attention that the goals are being used in a
discriminatory manner by the union, the Company shall report it to the agency's
Contract Compliance Officer in order that appropriate sanction proceedings may
be instituted.
Nothing contained in this plan shall relieve us form compliance with the
provisions of Executive Order 11246 and 11375, as amended, the Equal
Opportunity Clause of each respective contract, and any and all provisions as
they relate to the utilization of Minority Business Enterprises (MBE).
17. Refusal to Deal with Debarred. or Ineligible Contractor or Subcontractors
The Company agrees that it will refrain from entering into any contract or contract
modifications subject to Executive Order 11246 with a contractor or
subcontractor debarred from or who has not demonstrated eligibility for direct
federal or federally assisted construction contracts pursuant to the Executive
Order.
LARSON-DANIELSON CONSTRUCTION CO., INC.
Timothy F. Larson
President
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 4/2/2019 Contractor's Bid for Public Works - 3
i
051
3
4.
SECTION I EXPERIENCE QUESTIONNAIRE
What public works projects
has your organization
completed for
the period of one (1) year prior to the
date of the current bid?
Completion
Contract Amount
Class of Work
Date
Name and Address of Owner
14,000,000.00
GC
2018
Valparaiso Comm. Schools-HS Renovation
2,014,000.00
GC
2018
Valparaiso Comm. Schools -Porter Co. Career Center
6,900,000.00
GC
2018
Porter Twp. Schools - HS West Renovation
5,000,000.00
GC:::±
2018 .,.
hicago - Community Ctr, Site #1 & Site #2
City of East C_W
What public works projects
are now in process
of construction
by your organization?
Expected
Contract Amount
Class of Work
Completion
Name and Address of Owner
Date
18,820,000.00
GC
2019
City of South Bend - Howard Park Redevelopment
8,763,000.00
GC
2019
School City of Hobart - HS Natatorium
2,317,000.00
GC
2019
Tri-Co School Corp. - HS Pool Improv.
2,053,000.00
GC
2019
NICTD - Gary Compound Addition
Have you ever failed to complete any work awarded to you? NO If so, where and why?
List references from private firms for which you have performed work.
Wal-Mart Stores, Inc. 2001 SE 10th St. Bentonville, AR 72712
University of Notre Dame
IU Health LaPorte Hospital
Task Force Tips
The Boeing Company
200 Facilities Building
P. O. Box 250
2351 Industrial Drive
100 N. Riverside
Notre Dame, IN 46556
LaPorte, IN 46352
Valparaiso, IN 46383
Chicago, IL 60606
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
Explain your plan or layout for performing proposed work (Examples could includes a narrative of when
you could begin work, cornb)1ete the project, nurnber of workers, etc, and any other information which you
believe would enable the governmental unit to consider your bid.)
Larson -Danielson anticipates commencing project coordination upon receipt of a contract, Notice to Proceed
g g p orders based on sequence of work
or Letter of Intent. We will then begin awarding subcontracts and purchase ..
generally p g the
to be performed Work will be performed in common sequence of tasks as enerall accepted throughout
......ry.pertains �-project....._ �_ _.......T g _ skilled tradespeople,
constru
ction industry and as it to this Average crew sizes range from 5-6
although is subject to change based on schedule and the specific task(s) being performed.
2. Please .list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm
who have performed part of the work) that you have used on public works projects during the past five (5)
years along with a brief description of the work done by each subcontractor.
Please see attached list of subcontractors we have worked with on public works projects in the last five (5) years.
If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you will require a bond. However, if you are
unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. Until the completion of the proposed project, you are under a continuing obligation to
immediately notify the governmental unit in the event that you subsequently determine that you will use a
subcontractor on the proposed project.
Larson -Danielson does plan to utilize subcontractors. Subcontractor information will be provided as required
in the relevant bidding documents.
4. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
Larson -Danielson owns a wide variety of heavy equipment and mid to small sized equipment/tools,
including but not limited to equipment for earthwork, masonry, concrete, carpentry, access equipment and
transportation equipment. Specific lists of equipment will be provided as required by the relevant bidding documents,
5. Have you entered into contracts or received offers for all materials which substantiate the prices used in
preparing your proposal? If not, please explain the rationale used which would corroborate the prices
listed.
YES
1.35
"SECTION II, ITEM 2 — BELOW IS A LIST OF
SUBCONTRACTORS THAT WE HAVE USED
ON PUBLIC WORKS PROJECTS DURING
THE PAST FIVE (5) YEARS"
Earthwork/Sitework Hubinger Landscaping
D&M Excavating 11191 S. Broadway
9896 W. 300 N. Crown Point, IN 46307
Michigan City, IN 46360
Gypsum/Metal Studs/Acoustical
G. E. Marshall Huggett-Betten
1351 Joliet Rd. 3470 Little Castle Rd.
Valparaiso, IN 46384 Stevensville, MI 49127
Pavey Excavating Kleckner Interior Systems
2020 Ohio St. 1176 Damon Lane
LaPorte, IN 46350 Chesterton, IN 46304
Asphalt.Pavina & Strininin Floorina
Rieth-Riley Construction Midwest Tile & Interiors
7500 W. 5th Ave. 1805 N. Cedar Street
Gary, IN 46406 Mishawaka, IN 46545
Walsh & Kelly Interior Finishes
1700 E. Main St. 1616 W. 3rd St.
Griffith, IN 46319 Osceola, IN 46561
Fencing Master Tile
Milestone Fence 1205 W. Lincoln Hwy,
13399 McKinley Hwy. Merrillville, IN 46410
Mishawaka, IN 46545
Paintin
Northwest Indiana Fence Stan's Painting & Decorating
1758 W. Lincolnway 440 Sullivan St.
Valparaiso, IN 46383 Hobart, IN 46342
Security Industries Prism Painting
1000 Georgiana St. 368 Kennedy Ave.
Hobart, IN 46342 Schererville, IN 46375
Landscapina Elevators
Fuerbringer Landscaping & Design Otis Elevator
22530 Brick Rd. 1010 E. Jefferson Blvd.
South Bend, IN 46628 Mishawaka, IN 46545
T & J Landscape Service Concrete
12615 Wicker Ave. Hooks AV LLC
Cedar Lake, IN 46303 1041 Sheffield Ave.
Dyer, IN 46311
L:\Filing System\Office\FORMS\Estimating Assistant Forms\Bid Forms\96 96A\96 Subcontractor List Attachment 1_35.docx 2/12/18
1.35
Concrete Constructors
Fire Protection
684 N. 600 E.
Ryan Fire Protection
Westville, IN 46391
9740 E. 148th St.
Noblesville, IN 46060
C & S Concrete
7353 McConnell Rd,
Kropp Fire Protection
Lowell, IN 46356
59685 Market St.
South Bend, IN 46614
Structural Steel
Omega Structural Steel
F. E. Moran Fire Protection
1640 Main Street
2165 Shermer Rd., Suite D
Griffith, IN 46319
Northbrook, IL 60062
C & C Iron
USA Fire Protection
6409 Hendricks St.
28427 Ballard Dr.
Merrillville, IN 46410
Lake Forest, IL 60045
Munster Steel Co.
Mechanical
9505 Calumet Ave.
Circle R Mechanical
Munster, IN 46321
6620 Shepherd Ave,
Portage, IN 46368
Stevens Iron Works
6852 Mercedes Lane
D. A. Dodd, Inc.
DeMotte, IN 46310
14 E. Michigan Ave.
Rolling Prairie, IN 46371
Roofin
E. C. Babilla, Inc.
St. Johns Plumbing
3974 Harrison St.
P.0. Box 204
Gary, IN 46408
St. Johns, IN 46373
Korellis Roofing; Inc.
Bloomfield Mechanical
1333 16911 St.
6636 Melton Rd.
Hammond, IN 46324
Portage, IN 46368
Midland Engineering
Electrical
52369 US 33 North
Continental Electric Co., Inc.
South Bend, IN 46637
9501 E. 5th Ave.
Gary, IN 46403
storefront & Entrances & Glazing
Trout Glass & Mirror
EMCOR/Hyre Electric Co.
1579 S. Calumet Ave.
2655 Garfield Ave.
Chesterton, IN 46304
Highland, IN 46322
J.W. Werntz Supply
Circle R Electric
1002 Kerr St.
5740 Central Ave.
South Bend, IN 46601
Portage, IN 46368
Lazzaro Co.
5880 Broadway
Merrillville, IN 46410
L:\Filing System\Office\FORMS\Estimating Assistant Forms\Bid Forms\96 96A\96 Subcontractor List Attachment 1_35.docx 2/12/18
1.32
TGeneral Form No. 96-a.
Prescribed by the State
Board of Accounts of
Indiana. Revised 1949.
Standard Questionnaires and
Financial Statement for Bidders
Prescribed by
THE STATE BOARD OF ACCOUNTS OF INDIANA
For use in investigating and determining the qualifications of bidders on public
construction when the aggregate cost of any such work or improvement will be Five
Thousand Dollars or more.
These statements to be submitted under oath by each bidder with and as a part of his
bid, as provided by Chapter 306, page 1248, Acts of 1947.
Submitted to Citv of South Bend -Board of Public Works
By Larsen -Danielson Construction Co. Inc, _IT A Co -partnership
An Individual
Address 302 Tyler Street
LaPorte, IN 46350
Date submitted September 24 , 2019
Filed
L:\Filing System\Office\FORMS\Estimating Assistant Forms\Bid Forms\96 96A\96A Financial Statement Revised 19491_32.docx
2/14/18
Sec. 2 of an Act entitled "AN ACT concerning the awarding of contracts for the performance of public
work and authorizing the board of accounts to prescribe certain forms to be used in ascertaining the responsibility
of contractors who submit bids for the performance of such work, providing for plans and specifications,
providing for bids repealing certain laws and declaring an emergency." (Approved March 13, 1947.)
Sec. 2. Whenever the aggregate costs of any work or improvement will be five thousand dollars
($5,000.00) or more, for the purpose of enabling such board, commission„ trustee, officer or agent to ascertain
and determine which of the bidders submitting bids for the performance of any such public work is, in the
judgment of such board, commission, trustee, officer or agent, the lowest and/or best bidder and to exercise
intelligently the discretion hereby conferred on such board, commission, trustee, officer or agent each bidder
shall be required to submit under oath with and as a part of his bid a statement of his experience, his proposed
plan for performing such work and the equipment which he has available for the performance of such work and a
financial statement. The statements hereby required shall be submitted on forms which shall be prescribed by the
stated board of accounts. The forms so prescribed shall be designated, respectively, as the experience
questionnaire, the plan and equipment questionnaire and the contractor's financial statement, and shall be based,
so far as applicable, on the standard questionnaires and financial statement for bidders as approved and
recommended by the joint conference on construction practices, for use in investigating the qualifications of
bidders on public construction work, and the forms so prescribed are hereby prescribed as the forms which shall
hereafter be used by all such boards, commissions, trustees, officers and agents in obtaining the information
which is required in the administration of this act. If the information submitted by any bidder on the forms
herein prescribed is found, on examination, to be unsatisfactory, the bid submitted by such bidder shall not be
considered. (Burns Statutes 1933, Sec. 53-109) Sec. 2, Chapter 306, Acts of 1947.
2
TO THE BIDDER ---
The following forms of questionnaires and financial statement are prescribed
by the State Board of Accounts in conformity with the statute set out on the
preceding page.
These forms, properly filled out and attested, must accompany each bid of
five thousand dollars or more on any public work.
The forms are designed to cover all contracts for all kinds of work and the
bidder is required to answer such questions as are pertinent to the work upon which
his is bidding. The purpose of the questionnaire and financial statement, as set forth
in the law, is to enable the awarding body to determine the qualifications of the
bidder to carry out successfully the contract if the same is awarded to him.
The bidder will find it to his advantage to answer fully all questions coming
within the range of the work upon which he is bidding. Particular attention should
be given the "Financial Statement" and the details relative to the assets and liabilities
set out. This form is made in extensive detail to that the bidder may explain his
assets and liabilities in proper sequence and in a uniform manner.
T. M. HINDMAN,
State Examiner
3
Corporation
Submitted by Larson -Danielson Construction Co., Inc. A Co -Partnership
An Individual
Principal Office at 302 Tyler Street LaPorte, IN 46350
To City of South Bend -Board of Public Works
EXPERIENCE QUESTIONNAIRE
The signatory of this questionnaire guarantees the truth and accuracy of all statements and
of all answers to interrogatories hereinafter made.
1. How many years has your organization been in business as a general contractor under your
present business name? 111
1 How many years experience in General construction work has your organization
had: (a) As a general contractor 111 (b) As a sub -contractor
3. What projects has your organization completed?
Contract Amt.
Class of Work
When Completed
Name & Address of Owner
$14,000,000
General Const
2018
Valparaiso Comm HS Revov.
$2,014,000 Fm x m.
IT General Const.
201m8 .... W..m 4
µSchool
Valparaiso Comm. Schools — PorterxCo. -
Career Center
_._...._p
$6,900,000
_..w ... n ._
General Const.
2018
..........
Porter Twp. Schools — HS West Renovation
............ .....LLw _.
$5,000,000
_._.__ .. ,. __. _..
General Const.
_.._.._..__ _ .._ _m.___ ._ ...._._.
2018
_..............................-...
City of East Chicago — Community Ctr.,
Site # 1 & Site #2
3-A. What projects has your organization now in process of construction?
Q
5.
Contract Amt.
Class of Work
When to be
Completed ...w
Name & Address of Owner
$18,820,t)00
General Const.
20i
City of South Bend — Howard Park Redev.
_—. _ ....... ......m_m
$8,763,„000
General Const.
._.....
2019
...._.... _.. a..r '--___._. _._m.
School City of Hobart — HS Natatorium
...
$; 17,000
General Const
2019
Tri Co School Corp.T._HS Pool lrnpµ
...
$2,053,000
General Const.
2019
NICTD — ��lary Compound Addition ............
Have you ever failed to complete any work awarded to you? No If so, where and why?
Has any officer or partner of your organization ever been an officer or partner of some other
organization that failed to complete a construction contract? No If so, state name of
individual, other organization and reason therefore.
6. Has any officer or partner of your organization ever failed to complete a construction contract
handled in his own name? No If so, state name of individual, name of owner and reason
therefore.
7. In what other lines of business are you financially interested? N/A
4
8. For what corporations or individuals have you performed work, and to whom do you refer?
Wal-Mart Stores, Inc. Bentonville AID
Univer. Of Notre Dame South Bend IN
LaPorte Hospital LaPorte. IN
Task Force Tips Valparaiso, IN
The Boeing Company Chicago. 11,
9. For what cities have you performed work and to whom do you refer?
Cily
of Michigan City
Board of Public Works
City
of La Porte
City Plalaner
City
of Hammond
Board of Park Commissioners
Citv
of Hobart
Director of Develo naent
City
of South Bend
Dept. of Public Works
City of Mishawaka
Dept. of En ineerin
10. For what counties have you performed work and to whom do you refer?
La Porte County Board of Cornniissioners
Lake Coun Board of Commissioners
Porter Cogn1y Commissioners
St. Jo�ePl fount Board of Commissioners
Starke Counly Commissioners
11. _ For what State bureaus or departments have you performed work and to whom do you refer?
Division of Public Works & SqfM Director
State Arnior Board Commandant
Indiana Dept. t, of Transportation Chief Engineer
Indiana Port Commission John W. Hughes, P. E.
Indiana Dept. of Administration Westville Correctional Center
12. Have you ever performed any work for the U. S. Government?
1987 — U. S. Coast Guard Michigan City.,.IN
2003 — State of Indiana Military National Guard ArsnoKy Remington, IN
2005 — State of Indiana. National Guard A-niory Ga IN
2008 — State of Indiana Militga Army Aviation GM, IN
13. What is the construction experience of the principal individuals of your organization?
I ICLIL'LI WIN M10F4•\u I N
Tintot1.la F. Larson
Terry A. Larson
Thomas A Walter
Mark A. Danielson
mm. , _..m.__.._ ..._ .,.
David_J. Merkel
Patrick Lockwood
Ray Rehlander
PRESENT POSITION
OR OFFICE
President
V P/Design
V-P/Field Operations
V-P/Project Mgmt...
Asst, VP/Sr. Project Mgr,
Gen'l Sunermt.
YEARS
OF
CONST.
EXPERI
-ENCE
42
37
MAGNITUDE & TYPE
OF WORK
General Const.
IN WHAT CAPACITY?
Engineer/Est./PM
General Const. p Estimating/Project Mgr,
44
General Const
Engmeer/Est /PM
_.__..........
36
... ....... ...........
General Const.
... _..-.------•..
Field Officer
24
General Const.
Engineer/Est./PM
25 y
General Const.
Estimating/Project Mgr.
33
General Const.
Carnenter_
PLAN AND EQUIPMENT QUESTIONNAIRE
The Signatory of this questionnaire guarantees the truth and accuracy of all statements and of all
answers to interrogatories hereinafter made.
In what manner have you inspected this proposed work? Explain in detail.
parson- Danielson estimating staff have thoroughly reviewed and assessed the drawings
and specifications provided for bidd d
with subcontractors and, suppliers in evaluating the full scope of work for this oroiect.
2. Explain your plan or layout for performing the proposed work.
Larson-Danielsoii anticipates comniencingy project coordination upon receipt of a Contract
Notice to Proceed, or Letter of Intent, We will then bej.,,Ln.,51�« grc Litig subcontracts based on
sequence of work to be performed in order to begin on -site construction as soon as
possible. Work will be pper�fognedin common sequence of tasks as it relates to this pro ca
that provides for the best qualily end product,
3. The work, if awarded to you, will have the personal supervision of whom?
A Project Manager and. Su,) iptendem will be assigned to this project, following
Lgij_
notification of the bid results.
*4. Do you intend to do the hauling on the proposed work with your own forces?
If so, give amount and type of equipment to be used.
If hauling is needed, this is to be determined follonjqgpotification of bid results unless
stated otherwise in supplemental bid documents
*5. If you intend to sublet the hauling or perform it through an agent, state amount of sub-
contract or agent's contract, and if known, the name and address of sub -contractor or agent,
amount and type of his equipment and financial responsibility:
If hauling is needed, this is to be deterinined following notification of bid results unless
stated otherwise in sLipplemental bid documents.
Items 4, 5, 6 and 7 may not be applicable in all building contracts; if not, omit.
0
*6. Do you intend to do the grading on the proposed work with your own forces?
If so, give type of equipment to be used.
If radin is needed this is to be determined following notification of bid results unless
stated otherwise in su lemental bid documents
*7. If you intend to sublet the grading or perform it through an agent, state amount of sub-
contract or agent's contract, and, if know, the name and address of sub -contractor or agent,
amount and type of his equipment and financial responsibility.
If grading is needed this is to be determine(] followin a notification of bid results unless
stated otherwise in sunnlemental bid documents.
Do you intend to sublet any other portions of the work?
If so, state amount of sub -contract, and, if known, the name and address of the sub-
contractor, amount, and type of his equipment and financial responsibility.
Larson -Danielson does intend on subletting a portion of the work for this project.
Additional information will be provided as required.
9. From which sub -contractors or agents do you expect to require a bond?
Bonding will be required on sub -contractors or agents at Larson-Danielson's discretion.
10. What equipment do you own that is available for the proposed work?
If e' ui meat list is required at bid time for this project lease refer to supplemental lemental bid
documents.
11. What equipment do you intend to purchase for use on the proposed work, should the
contract be awarded to you?
We do not intend to purchase a e ui ment for this project.
12. How and when will you pay for the equipment to be purchased? Not Applicable
13. Do you propose to rent any equipment for this work?
This will be determined followit - „notification of bid r-estrlts, Additional information will be
provided as required.
14. Have you made contracts or received firm offers for all materials within prices used in preparing
your proposal? Do not give names of dealers or manufacturers. Yes
Dated at LaPorte IN this 24th day of September , 2019 .......,,
Larson -Danielson Constrttctroti Co. free.
„„�.� (Ntaromne of C�rg���rr°ei�rari��r�)
By. __.._.. BY..
le i A. fdarsot-Secreta�r Timothy F. Larson, President
(Name & Title of Person Signing) (Name & Title of Person Signira�)
_
STATE OF INDI,NA _. CARBON DANIELSON
_._ � .
SS: S. CONSTRUCTION CO., INC]
COUNTY OF LA PORTE^^ a99w
Timothy F. Larson being duly sworn, deposes and says that he is
President of the above Larson -Danielson Const. Co. Inc.
and that the answers to the questions in the foregoing questionnaires and all statements therein
contained are true and correct.
Subscribed and sworn to before me this 24th of Se tember , 2019.�
County of Residence LaPorte
My Commission Expires September 8, 202:
Michele C. Dzielirski, otary Public