Loading...
HomeMy WebLinkAboutChange Order No 3 - LWE Corridor Improvements Project No 117-055A -Walsh & Kelly7 ;, 1316 COUNTY -CITY BUILDING � i '% " ' l ('HONE 574/ 235-9251 227 W. JEFFERsoN BOULEVARD I` "" �` r FAx 574/ 235-9171 Soi iTH BEND. INDIANA 46601-1830 *'-, ✓ ;;1 a rox CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDU LIC WORKS September 24, 2019 Edward Pilipow Walsh & Kelly, Inc. 24358 SR 23 South Bend, IN 46614 RE: Change Order No. 3 - Lincolnway East Corridor Improvements, Sample St. to Twyckenham Dr. — Project No. 117-055A Dear Mr. Pilipow: The Board of Public Works, at its meeting held on September 24, 2019, approved the above referenced Change Order for an increase of $8,025, plus an additional three -hundred, nine (309) days, bringing the current contract amount to $490,453.89 and the revised project completion date to September 7, 2019. Enclosed is a copy of the Change Order for your records, If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA* JG A DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: 8/21/2019 PROJECT NO: 117-055A LINCOLN WAY EAST CORRIDOR IMPROVEMENTS - SAMPLE PROJECT NAME: STREET TO TWYCKENHAM DRIVE CONTRACT DATE: 9/11/2018 CHANGE ORDER NO: 3 SUBJECT OF CHANGE ORDER: PCR #3-Install D ell to Resolve a Draina a Issue. The original contract sum $ 459,000.00 Net change by previously authorized change orders $ 23,428.89 The contract sum prior to this change order $ 482,428.89 By this Change Order, the project amount is X Increased The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time LOLOIZt1l,•: � �-= I -6e -- --- Contractor Signature Printed Name and Title Walsh,A_NI ro Inc. Company Name_ _.__ �_....� 24358 SR 23 Address South Bend, IN 46614 �._. _._._�_ _.................._,. City, State, Zip 8,025.00 El Decreased $....._490,453.89 1.66 % 6.85 % 11 /2/2018 0 da s 309 da 9/7/2019 _.. R9CQMMf• •APE!ROVAL ANAGER IV r w CITY OF SOUTH BEND BOARD OF PUBLl WOR S Approved Date: ' >a, ary A Gil President Genevi ve E. Miller, M Tnber ,5 Elizabeth A Maradik, Member a"'C 11) & m DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Number: 117-055A Project Name: Lincolnway East corridor Improvements Change Order #: 3 DATE INITIATED: 8�21/19 BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.).. Install Drywell to Resolve a Drainage Issue. Attachments: (List documents support change - required) Contractors Cost. Amount of elncrease / ❑Decrease: $ 8,025.00 Categories (Pick One): Previously approved Change Order(s): $ 23,428.89 8 Scope of Work .......... ❑ Differing Site Conditions, Changed Conditions Current Percent of Change: 1.66 % ❑ Conflicted Specifications and Drawings 49045389 ❑ Failed Materials ,. New Total Amount: $ ................. ❑ Error .._ ....... .-....... El Omission Total Percent of Change: 6.85 ❑ Final Quantity Adjustment Funding Secured From: fit- \�o1-IT45Z-_fit O& (filled out by PM) RECOMMENDED BY: Josh Ehmer 8/21/19 Project Inspector (Print Name) (Signs )' (Date) REVIEWED BY: Construction Manager (Print Name) (Signature) (Date) APPROVED BY: Engineering Project Manager (Print Name) (Signa c) (Date) APPROVED BY: yR City Engineer (Print Name) (Signat�,�re) +.. (Dat ) Josh Ehmer From: Kyle Silveus Sent: Thursday, August 15, 2019 4:17 PM To: Edward J. Pilipow Cc: Josh Ehmer; Toy Villa Subject: RE: Office Staffing Does this include #8 stone and geotextile? Kyle Silveus, P.E. Assistant City Engineer C Division of Engineering 1316 County -City Building k M 227 West Jefferson Boulevard South Bend, Indiana 46601 (574) 235-9083 From: Edward J. Pilipow <epilipow@Walshkelly.com> Sent: Wednesday, August 14, 2019 5:33 PM To: Kyle Silveus <ksilveus@southbendin.gov> Subject: Office Staffing Kyle; Based on our recent conversation, we are submitting a price for a drywell. Our price for a drywell is $8,025 each. This price is identical to the price bid in a recently completed job in South Bend, see page 4 Item 11. This includes seed/blanket restoration., but does not include any asphalt restoration. Edward J. Pilipow, P.E. Estimator Walsh Et IKelly Inc. 24358 SR 23 South Bend, IN 46614 Mobile: 574-274-5545 Office: 574-288-4811 Email: epilipow@waishkelly.com DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING PROJECT CONTRUCTION CHECKLIST Project No. 117-055A NTP 9/28/2018 LINCOLN WAY EAST CORRIDOR IMPROVEMENTS - SAMPLE Project Name STREET TO TWYCKENHAM DRIVE Sub. Comp. 11/2/2018 Contractor Walsh & Kelly, Inc. Final Comp. 9/7/2019 Inspector JJE Today's Date 8/21/2019 PAY APPLICATIONS & CHANGE ORDERS CHART 8200.000 00 ,; 100 u9 ,J7) r70 4 111 /2018 1 /1 /2019 3/1 /2019 ;, '9 ' 9 7/1 /2019 9111201 rr' PAYMENT APPLICATION SUMMARY End Date Total Deductions Sub Total Prev. Pmts Amount Prev Pmt Error 1 11/13/18 $234,846.75 $11,742.34 $223,104.41 $0.00 $223,104.41 - 2 12/31/18 $456,666.35 $22,833.32 $433,833.03 $223,104.41 $210,728.61 3 4 S - - - - $223104.41 $433�833.02 CHANGE ORDER SUMMARY Date Pry. Contract Chan a Amt. New Contract Change % Total % Added Da s 1 11/27/18 $459,000.00 $16,385.00 $475,385.00 3.57% 3.57% 0 2 5/28/19 $475,385.00 $7,043.89 $482,428.89 1.48% 5.10% 0 3 8/21/19 $482,428.89 $8,025.00 $490,453.89 1.66% 6.85% 309 4 _- 5 S - - $31453.89 _1 6.85% 7/12/2020 POST -CONSTRUCTION DOCUMENT CHECKLIST Items Notes Date Rec'D Final Pay Application Project Completion Affidavit Final Waiver of Lien Final Change Order Complete Certified Pa rolls As -Built Documents Testing Reports Warranty Informati Signature: W\,11111, �� Date: 91 ��� BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 9/16/19 Department Public Works Name Kyle Silveus� Division/Bureau Engineering BPW Date 9/24/19 Phone Extension 9083 rm ri � rr... a�mmw oum�m oiooiooimMuwmmmmmmmuiui. uw ou mm.... +.. r 000mm MPMMmmmmmmuuuuuuuummmmmmm o i e uir ..v_.. _.__.. edgPrior to Submittal to Board Legal El Attorney Name: Controller Ei Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing Check the _J Agreement El Professional Services E] Bid Opening Quote Opening ® Change Order No. 3 El Ease/Encroach. Other: Wopriate Item Tyre o _j [� Contract ❑ Resolution ] Bid Award Quote Award �]C/O &PCA No. ❑ Traffic Control: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Required Infor for All wSubmissions Q Proposal Addendum Ej Req. to Advertise ❑ Title Sheet on ❑ PCA Lincoln Way East Corridor Improvements 117-055A TIF ..�.. Park Bond... 452-1101-452.31-06 $ ,025.00 Install drywell to resolve drainage issue Copy Original ® Patrick Sherman