Loading...
HomeMy WebLinkAboutChange Order No 3 - Historic Leeper Park Improvements Project No 118-010A - Ancon Construction1316 COUNTY -CITY BUILDING I I ;", PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD - �, �) FAX 574/ 235-9171 SOIJTH BEND_ INDIANA 46601-1 830 w mw 196 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDU LIC WORKS September 24, 2019 Sean Welty Ancon Construction 2146 Elkhart Road Goshen, IN 46526 RE: Change Order No. 3 - Historic Leeper Park Improvements — Project No. 118-010A Dear Mr. Welty: The Board of Public Works, at its meeting held on September 24, 2019, approved the above referenced Change Order for an increase of $27,017.29, bringing the current contract amount to $1,372,814.36. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. G1LOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 8/19/2019 118-010A Historic Leeper Park Improvements 4/23/2019 PCR #3-Quantity & Scope Adjustments The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR -V- ' - t Con ra or Signature Printed Name and itle Company Name Address City, State, Zip X Increased Decreased 11/1/2019 19 days 0 days 11/20/2019 1,308,129.03 37,668.04 1,345,797.07 27,017.29 1,372,814.36 2.01 % 4.94 % CONSTRUCTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC VVORKz Approved Date / Gary A. Gilot, resident GenevievP E. Miller, M mber IL Elizabeth, A. aradik, Member ere._..w J. k1brau, Me j Z6ra O"Sullivan M&-mber Ancon_Leeper_Change Order 3 ADDITIONS Contract Unit Overage 27 - Borrow 1383 CYS 527 28 - Compacted Aggregate 509 CYS 44.67 29 -Variable Milling 93 SYS 156 30 - Asphalt Surface 10 TON 10 38 - Curb & Gutter 311 LFT 9 107 - 4" White Thermoplastic 1180 LFT 455 110 - 24" White Thermo. STOP Line 26 LFT 34 3" Drain Relocate 0 Security pole and electrical 0 Panel upgrade at Pump House 0 CREDIT'S Interpretive Signs 3 EA Unit Cost Extra $23.83 $12,558.41 $59.59 $2,661.89 $35.75 $5,577.00 $715.03 $7,150.30 $51.24 $461.16 $2.38 $1,082.90 7.15 $243.10 $2,610.62 $2,016.00 $1,305.00 $2,88103-$8,649.09 TOTAL CO3 $27,017.29 DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING /yµM Project Number: 1 18-010A Project Name: Historic Leeper Park Improvementfs Change Order #: 3 ...... ������ DATE INITIATED: 9/16/19 gPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Contract quantity additions, credit, and scope adjustments. Attachments: (List documents support change - required) Amount of Blncrease / ❑Decrease: $ 27,017.29 Categories (Pick One): Previously approved Change Order(s): $ 37,668.04 ® Scope of Work - ❑ Differing Site Conditions, Changed Conditions Current Percent of Change: 2.0 1 % ❑ Conflicted Specifications and Drawings 1,372,814.36 El Failed Materials New Total Amount: $❑ Error ............ .._._._._. A 94 ❑ Omission Total Percent of Change: m % ❑ Final Quantity Adjustment Funding Secured From: 11p1 -y�-ja -31.0 (filled out by PM) RECOMMENDED BY: Greg McGowan 9/17/19 Project Inspector (Print Name) (Signature) (Date) REVIEWED BY: 1 Construction Manag (Print Name) (Signature) (Date) APPROVED BY: Engineering Project Manager (Print Name) (Sign re) (Date) APPROVE B, .R City Engineer (Print Nana) (Signature) (Date) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date Name BPW Date 9/17/19 Kvle Silveus 9/24/ 19 Department Phone Extension Engineering 9083 Rewired Prior to Submittal to Board. Legal Attorney Name Clara McDaniels Controller Controller review is required for all Contracts $5,000.00 or more anc greater than one year in length per the City Purchasing Policy Purchasing F-1 Michael Schmidt Check the Agreement Professional Services [:] Bid Opening ❑ Quote Opening ® Change Order No. 3 [l Ease/Encroach. F 1 Other: iropriate Item Type Contract F] Resolution ❑ Bid Award ❑ Quote Award El C/O & PCA No. _ ❑ Traffic Control I )r AH Submissions Proposal ❑ Addendum ❑ Req. to Advertise ❑ Title Sheet ❑ PCA on Company or Vendor Name Ancon Construction Company, Inc. New Vendor ❑ Yes ❑ No ❑ If Yes, Approved by Purchasing MBE/WBE Contractor ❑ MBE ❑ WBE MBE/WBE Contractor Requested ❑ No ❑ Yes Name of Company Project Name Historic LeeperwPark Improvements — Bid Package 1 18-010A Project Number 1.�.�.....____....... w.�. .......... m�. Funding Source RW TIF Bond wwwwwwwwwwwww��w�w....wwwwwwwww ,,._. Account No. 452-1101-452-31.02 Amount $ 27,017.29 Terms of Contract Purpose/Description Security Pole, Panel Upgrade. and Quantity Adjustments ❑ Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify+„ Iran, etc. fired Foriu Qrders Oni Increase $ 27„017 29 Amount of wm .... ..................................................... �.. ❑ Decrease $ Previous Amount $ 1,345,797.07 Current Percent of Change: 2.01 % ...................................................................... New Amount $1,372,814.36 Total Percent of Change: 4.94% Dispersal After Approval Copy Original ® ❑ Kyle Silveus ® ❑ Patrick Sherman __...... --�------------- _..�..�.�...�......---------