HomeMy WebLinkAboutChange Order No 1 - SRTS LaSalle Intermediate and Marquette Project No 116-040 - INDOT1316COUNTY-CITY BUILDING] PHONE 574/235-9251 227 W. JEFFERSON BOULEVARD FAX 574/ 235-917I SOUTH BFND. INDIANA 46601-I 930 � 4 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD PUBLIC WORKS September 24, 2019 Scott Randle American Structurepoint, Inc. r 4a �c(1 ,i�stt trcttlE Agin eoti,i RE: Change Order No. 1 - Safe Routes to School: LaSalle Intermediate and Marquette Primary —Project No. 116-040 Dear Mr. Randle: The Board of Public Works, at its meeting held on September 24, 2019, approved the above referenced Change Order for an increase of six (6) additional days, bringing the current contract completion date to August 22, 2019. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU << DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING r�aa 116-040 'WOR*a" � �� � ,a;a �� ��� G �� ,��� � ���,anM r�W� 1 Project Number: Project Name: Change Order #: DATE INITIATED: 9/16/19 BPW DATE:9/24/19 Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Time Extension of 6 days due to utility delays by AEP. Attachments: (List documents support change — required) INDOT Change Order Form Amount of ❑ Increase / ❑ Decrease: $ NSA Categories (Pick One): Previously approved Change Order(s): $ N/A ❑ Scope of Work ............................. — ......... ®----® ❑ Differing Site Conditions, Changed Conditions Current Percent of Change: NSA % ❑ Conflicted Specifications and Drawings New 1,589, 000 ❑ Failed Materials Total Amount: $_ ❑ Error ❑ Omission Total Percent of Change: 0.00 ❑ Final Quantity Adjustment 17-11 Funding Secured From° _. .. (filled out by PM) RECOMMENDED BY. Project Inspector (Print Name) (Signature) (Date) REVIEWED BY: Construction Manager ( (nt Name) (Signature) (Date) APPROVED BY: Engineering Project Manager (Print Name) (Signatu (Date) APPROVED Y: City Engineer (Print Name) (Signs v ) (Date) Contract No:R -39514 Change Order No.: 001 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -39514 Letting Date:10/11/2018 District:LAPORTE DISTRICT AE:Forgey, Ryan PE/S:Randle, Scott Status:Draft Change Order Information Change Order No.: 001 EWA: N or Force Acct: N Date Generated: 00/00/0000 Date Approved: 00/00/0000 Reason Code: CHANGED COND, Utility Related Description: Time Extension Original Contract Amount $ 1,589,000.00 Current Change Order Amount $ 0.00 Percent: 0.000 % Total Previous Approved Changes $ 0.00 Percent: 0.000 % Total Change To -Date $ 0.00 Percent: 0.000 % Modified Contract Amount $ 1,589,000.00 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 6 SP Days Value $ 0.00 Previous Time Approved SS Days by AE: DCE:_ SCE: DDCM:-__ SS Days.__,_._ SP Days Value $ Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -39514 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Change Order No.: 001 Page: 2 AE: DCE: SCE: " DDCM: (-LE$250K-)(-LE$750K-)(--LE$2M--)(--GT$2M--) ( 50 SS days) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days) Y / N If Y, by Date Issued,---- Y / N If Y, Copy to Program Budget Manager, rv, Y / N If Y, Referred to Project Manager(PM) Date to PM Approval Authority Concurs with PM? Y / N If Y, Concurrence by If N,Resolution: Approved Date Returned Resolvedby_......-...........-_.._.._.. ........ ._ LPA Signatures Required? Y / N If Y, Date to LPA _ FHWA Signatures Required? Y / N If Y, Date to FHWA * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer wy mm mmm _ w wwwwww Date Comments: Date Disapproved Date Date Returned Date Returned Contract No:R -39514 Change Order No:001 INDIANA Department of Transportation Date:08/21 /2019 Contract: R -39514 Project: State: 160007600LC4 Change Order Nbr: 001 Change Order Description: Time Extension Reason Code: CHANGED COND, Utility Related CI„N IPON P11 v _ . «....,.. 'Commenter Amount.. �� "" Il�f Vlr�m f �ri II�InIt II Ptttt. Price CO Cilfy Change Milestone Time Adjustment MileStone Nbr: 02 Page: 3 Total Value for Change Order 001 = $ 0.00 Milestone Description: INTERMEDIATE COMPLETION DATE Original Completion dt: 08/16/2019 Adi comp) dt 08/22/2019 Adi No. of Days 6 Explanation: Before the start of the project AEP had several power poles along Hamilton between Olive and Brookfield. and along Keller between Olive and Johnson, which needed to be relocated and removed. Reith Riley started removing concrete on April 1. 2019 and had to start in the middle of the project were power poles were not in conflict. Rieth Riley was able to remove and pour concrete in as many intersections as possible before the power poles would be an issue. AEP was on -site June 19 20 t 9 to start removing and relocating the power poles along Hamilton and Keller AEP crews were onsite for only 10 days before being called off on antherjob, their work was not complete. While AEP was on -site they completed placing the new poles along Hamilton but not relocating their cables or removing the old poles along Hamilton and Keller. Since the power poles were still in place Rieth Riley could not remove or pour any concrete at those intersections due to utilities, which caused Reith Riley several days of delays. AEP was back onsite Aug 5 2019 and was able to remove the power poles along Keller between Olive and Johnson on Aug 9, 2019 Once the poles were removed Rieth Riley complete removal and concrete work at those intersections. Due to AEP delay in removing those poles along Keller. Reith Riley had delays, and is requesting an additional 6 days be added to the contracts intermediate completion date due to utility delays. I have reviewed Rieth Rileys request for those 6 days and spoke with the City of South Bend regarding the time extension request. Upon talking with the City we agree on allowing the contractor 6 extra days be added to the intermediate completion date due to utilities. The contract has an intermediate completion date of August 16, 2019. By adding those additional 6 days that would make the new intermediate competition date be Aug 22 2019. 1 have attached Rieth Riley letter requesting the time extension. Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation Before the start of the project AEP had several power poles along Hamilton between Olive and Brookfield, and along Keller between Olive and Johnson, which needed to be relocated and removed. Reith Riley started removing concrete an April 1. 2019 and had to start in the middle of the project were power poles were not in conflict Rieth Riley was able to remove and pour concrete in as many intersections as possible before the power poles would be an issue, AEP was on -site June 19, 2019 to start removing and relocating the power poles along Hamilton and Keller. AEP crews were onsite for only 10 days before being called off on antherjob. their work was not complete. While AEP was on- site they completed placing the new poles along Hamilton but not relocating their cables or removing the old poles along Hamilton and Keller Since the power poles were still in place Rieth Riley could not remove or pour any concrete at those intersections due to utilities, which caused Reith Riley several days of delays. AEP was back onsite Aug 5 2019 and was able to remove the power poles along Keller between Olive and Johnson on Aug 9, 2019. Once the poles were removed Rieth Riley complete removal and concrete work at those intersections. Due to AEP delay in removing those poles along Keller, Reith Riley had delays, and is requesting an additional 6 days be added to the contracts intermediate completion date due to utility delays. I have reviewed Rieth Rileys request for those 6 days and spoke with the City of South Bend regarding the time extension request. Upon talking with the City we agree on allowing the contractor 6 extra days be added to the intermediate completion date due to utilities. The contract has an intermediate completion date of August 16, 2019. By adding those additional 6 days that would make the new intermediate competition date be Aug 22 2019. 1 have attached Rieth Riley letter requesting the time extension. Change Order Explanation for Specific Line Item It is the intent of the parties that this change order is full and complete compensation for the work describe above Notification and consent to this change order is hereby acknowledged Contractor: Rieth Ril Da tt=: 8/21 /19 Construction Co., Inc. "Signed Contract No:R -39514 INDIANA Change Order No:001 Department of Transportation NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system, Date:08/21/2019 Page: 4 Contract No:R -39514 INDIANA Change Order No:001 Department of Transportation ................................ I ..................................................................................... 4)z, q PPROVED FOR LOCAL PUBLIC AGENCY . ........ . .... (SIGNAT RE) (TITLE) (SIGNATURE) (TITLE) A t SUBMITTED FOR CONSIDERATION P Ej Sf� kt (DATE) Of APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION 4�ro"'va--1,L"e,,V'e"l' -"""N,'a"m''-e" "o, f"Ap-p-r-o',v-e-r- ",_—ate- Date:08/21/2019 Page: 5 100% Quality April 24, 2018 Scott Randle INDOT Project Supervisor American Structurepoint Project: INDOT R-39514-A / JAh 100% Employee Owned Lasalle Safe Routes to School Intermediate Completion Time Extension Request Dear Mr. Randle, Over 100 Years Rieth Riley is requesting an intermediate completion time extension to the INDOT R-39514-A, Lasalle Safe Routes to School project. The time extension is due to utility delays by AEP and extra work added along Bergan Street to the contract. In the beginning of the project we encountered several AEP power poles which were to be removed and or relocated before the project started. These power poles had not been and still have not been relocated or moved as of today. These utilities delayed us approximately 3 days in the beginning during our removal phase of the project. Also, during construction of the sidewalk and curb ramps for the project, the power poles were in our way as we tried to complete our work. We were ordered to leave out small pockets of concrete adjacent to the power poles so AEP could move them more easily. In the last few weeks of the project it was determined that the poles would most likely not be relocated by the intermediate completion date and the City decided we should go back to these areas without concrete and rework them the best we could. This extra work caused us another 3 days of coordination and work around, and the power poles are yet to be relocated to this day. Lastly, there was some additional sidewalk work along Bergan Street requested to be performed. This extra sidewalk work, which was requested towards the end of the project, caused for an additional day of work. For the reasons listed above, we are requesting an additional 7 days of time extension to the intermediate completion date. If you have any questions, do not hesitate to contact us. Respectfully, RIETH-RILEY CONSTRUCTION CO., INC. Ruben Alvarado, P.E. Project Manager P.O. Box 1775 • 25200 S. R. 23 • South Bend, IN 46634 Phone: (574) 288-8321 • www.rieth-riley.com CONTRACT NO. ( R-39514-A DATE OF SUBMISSION August 15, 2019 PROJECT DESCRIPTION Lasalle SRTS (route / intersection / bridge no(s).) CHANGE ORDER REQUEST SUMMARY Intermediate Completion Date Time Extension due to utility delay and extra DESCRIPTION work PROPOSED SOLUTION SUMMARY Time extension for 7 days i NOTE, Upon request from Engineer, enter detailed description on page 2 ONSET DATE OF CHANGE August 15, 2019 � CHANGE ORDER TYPE � 104 02 Changed Conditions COST COST INCREASE / (DECREASE): $ $ 0.00 The cost adjustment shall include lump sum and estimated totaled unit -priced item costs. Attach a separate sheet of unit price items including item description, unit of measurement, estimated quantity and unit price. CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF COST CHANGE: ❑ 109.03 Altered Quantities ❑ 109.05(a) Agreed Price ❑ 109.05(b) Force Account ❑ 109.05.02 Delay Costs PROPOSED COST CHANGE INCLUDES: ® Labor ® Material M Equipment ® Lease Agreement ❑ Subcontractor Addition 7 day TIME ADJUSTMENT INCREASE / (DECREASE): (work days) time extension CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF TIME CHANGE: -Z 108.08(a) Excusable, Non-Compensable ❑ 108.08(b) Excusable, Compensable NOTE: If Compensable, attach details based on 109.05.1(a) Allowable Delay Costs. SUPPLEMENTAL INFORMATION Additional information may be entered by the contractor, CHANGE ORDER ORIGINATION: DOCUMENTS AFFECTED: ❑ Contract Specifications (ref. doc name/no.) ❑ Contract Plans (ref. doc name/no.) ❑ INDOT / LPA ® Contractor CHANGE ORDER AFFECTS DBE PARTICIPATION: ❑ yes Z no (if yes, attach details) Vi, 101,3P7 CHANGE ORDER REQUEST FORM CONTRACT NO. R-39514-A i i UPON WRITTEN REQUEST FROM THE ENGINEER,VI ADDITIONAL DETAIL f DATE RECEIVED REQUEST FOR August 15, 2019 SUBMITTAL DATE OF August 16, 2019 ADDITIONAL DETAIL ADDITIONAL DETAIL DETAILED DESCRIPTION / JUSTIFICATION: (Include location(s), actions of contractor, owner, and other stakeholders, key events and related cause(s), discoveries, discussions, meetings, and effect on the contract if no action is taken. Also include references to key documents attached or available to support this change order request.) Refer to attached letter and meeting agenda notes PROPOSED SOLUTION — ADDITIONAL DETAILS: (Include proposed scope of work, means & methods, materials, equipment, utility relocation required, subcontracted scope and the effect on the contract schedule. Also include references to attached documents including, but not limited to, sketches, calculations, photos, material information, and submittals and meeting minutes.) Refer to attached letter SIGNATURES Contractor: Name: (print) Ruben Alvarado k ✓�.��a (signature) _ _ Date: 8/15/19 Project Engineer/ upervisor: (signature is to acknowledge receipt of the document and does not signify agreement of the change order) Name: (print) ' _......... m (signature)�� .are± Date: NOTE: The Contractor and PE/S should retain a signed copy of this documentfor record. CONTRACT NO. R-39514-A ATTACHMENT: UNIT PRICE ITEMS DETAIL Attach or paste a unit price item detail. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 9/10/19 Department Public Works Name Kyle Silveus..�.�.�........._,,,,, �............................-..�...�.�.�...�.�.�.._.�._.._�........�..._ .�..._....____.... Division/Bureau Engineering BPW Date 9/24/2019 Phone Extension 9083 N _Be uired Prior to Submittal to Board Legal ® Attorney Name: Clara McDaniels Controller Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Michael Schmidt Check the AMRpriate Item Type — Required for All Submissions g � 0 Proposal M Addendum Agreement Contract [� Professional Services [:] Resolution Bid Opening E] Bid Award Req. to Advertise ❑ Title Sheet j Quote Opening El Quote Award Change Order No. 1 0 C/O & PCA No. ❑ PCA F] Ease/Encroach. ❑ Traffic Control: El Other: Roquired Information Company or Vendor Name Indiana Dewrtment of Transportation New Vendor ❑Yes H No If Yes,wA�a rove Purchasing _... MBE/WBE Contractor ❑ MBE W B E MBE/WBE Contractor Requested ❑ No [] YesNameoCom an �r Safe Routes to School near LaSalle Intermediate and Marquette Project Name Primary Project Number ENG: 116-040 DES No: 1600076 Funding Source LOIT Ma'ot r Projects Account No. 257.0608.431.42.96 Amount $1,589,000 Terms of Contract .�........... ...... ............... � �6 - - 80% Federal- 20% Local Purpose/Description This change order is a time extension of 6 days only due to utility delays by AEP. When this change order is approved, it is to be sent to Scott Randle at American Structurepoint at srandlestructurepoint.com Disoersal After Copy Original ® ❑ Kyle Silveus aitlin Stevens, MACOG ❑ ❑ BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 9/10/19 Department Public Works Name Kyle Silveus Division/Bureau Engineering BPW Date 9/24/2019 Phone Extension 9083 rnum'udu'r,�rr�. �'�r' '.�nuimrnx, muomuioi.m ..... muuuuuuuuuuuuumwuuuuvirvunm�u.... u,N r� _� N� hired Prior to "Submittal to Board_ m _� Legal ® Attorney Name: Clara McDaniels Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Michael Schmidt H Agreement Professional Services Bid Opening ❑ Quote Opening ® Change Order No. 1 Ease/Encroach. Other: LJ Contract ❑ Resolution ❑ Bid Award ❑ Quote Award E' C/O & PCA No. E Traffic Control: Proposal Addendum Company or Vendor Name Indiana Department of Transportation New Vendor [ Yes Noo ifYes, Aved by Purchasing MBE/WBE Contractor MBE^m�mmm /W MBEBE Contractor Requested � an s l� '� q No ❑Ye. Nameof Com.,�..near Safe Routes to School arquette LaSalle Intermediate and M Project Name Prima Project Number ENG: 116-040 DES No: 1600076 FundingSource LOIT Mafor .... _.���_ _w ....�...._...���� _..._�.���.�......._. ,_m Protects Account No. 257.0608.431.42.96�............. Amount .....� ....... ..... $1,589,000 m.����.�.� ..�w ....... .... Terms of Contract �0�/ 20% Local Purpose/Description This change olyder s time extension of 6 days only due to utility delays by AEP. When this change order is approved, it is to be sent to Scott Randle at American Structurepoint at srandle@structurepoint.com L Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) „�, �'� Amount of _._,, Increase $ 6 Additionals Da E] Decrease $ Previous Amount .... ��_...��... .....-. ...._�............... . ..... 1,89,000 Current Percent of Change: �..... 0 New Amount $ $1,589,000�.. Total Percent of Change: o.�.........ww ..,,.... m...... 0 /o Dispersal After Copy Original ® Kyle Silveus ® El Caitlin Stevens MAC OG