Loading...
HomeMy WebLinkAboutAward Bid - Vested Interest Building Roof Repair Project 119-049 - Midland Engineering Company1316 COUNTY -CITY BUILDING 1=k Ezf' PHONE 574/ 235-9251 PEACE E 227 W. JEFFERSON BOULEVARD"'r FAX 574/ 235-9171 901ITH BEND. INDIANA 46601-1 930 g t� CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDU LIC WORKS September 24, 2019 Michael Frahm Midland Engineering Company, Inc. 52369 State Road 933 North South Bend, IN 46637 RE: Award Bid — Vested Interest Building Roof Repair — Project No. 119-049 Dear Mr. Frahm: The Board of Public Works, at its meeting held on September 24, 2019, awarded the above referenced project to you in the amount of $226,800 for the base bid only. Enclosed please find a signed Bid/Proposal form. Please forward the following documents in one submittal by October 8 2019 to my attention for Board of Public Works approval: 1) One (1) original of the Public Works Contract (enclosed) 2) Labor & Material Payment Bond 3) Performance Bond (125% of Bid Amount) 4) Certificate of Insurance naming the City of South Bend as an additional insured 5) Item #4 for all subcontractors you use If you have any further questions regarding this matter, please call this office at (574) 235-9251.. Sincerely, Linda M. Martin, Clerk Enclosures GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO:. Linda M. Martin, Clerk Board of Public Works FROM: Charlotte Brach SUBJECT: Vested Interest Building Roof Repair, Project 119-049 DATE: September 17, 2019 fW!wl0liouWwlilililiWm!w01i�LLNY0101010101i1�ili@. t�glh,WIpWWWMIWUUW'JdeINrvN,NitlJU�Y00000WOW'mNWG�11N uu';,mmii b;AYNu4�9Mi��N/ Nd4Y4.,nuumu nr�dux mmuumu l�""»'u'uuwmm�mmlm�w�ullll!';rv0uuw Iililililili00100i1 ,. p�W�u,MHfiU 001BA00°J9°Jf0000iWdM0�qu0uuw¢U�Wtl �nd�ramamvPSAYmw.whxwe�nfwWu�pv�Yurytil�Wrt&m�g On September 10, 2019, the Board of Public Works opened and read bids for the above project. The bidders ranked as follows: The Base Bid for this project specified Sikaplan roofing material, or approved equal. The addendum added another option: Carlisle Sure -Flex KEE HP roofing material, or approved equal. This was added to provide the City with another option for potential cost savings, but it was not considered equal to the Base Bid. Bidders were not required to bid on both the Base Bid and the Alternate. Joe Dzierla reviewed the bids and recommended awarding the Base Bid to Midland Engineering. The Sika Corporation has a track record of proven performance of over 50 years. The Carlisle System is a newer product and does not have a track record of proven performance. There is no equal to the longevity and performance of the Sikaplan Systems, and these systems come with a 15 year warranty, which adds long-term cost savings. Joe Dzierla provided a recommendation letter, which is attached. Engineering recommends award of a contract for 226 00.00 to Midland Engineering, contingent on approval of additional funding to be requested by the Redevelopment Commission on September 26, 2019. The Department of Public Works has appropriated funds from RWDA TIF 024.1050.460.42.02 Please call with your questions. Enclosure South Ih uu'A, lf"I tld`ra`n�� Phonic 77d-..r 4't 8 9 September 12, 2019 N Charlotte Brach, Project Engineer City of South Bend 227 W. Jefferson Blvd., Ste 1316 South Bend, Indiana 46601 RE: Project No. 119-049 Vested Interest Building Roof Repair Charlotte, after reviewing the bids I have the following comments for you to consider upon selecting a roof system and a contractor to do the roofing work for the Vested Interest project. We specified the Sikaplan-Rhinobond metal retrofit systems because they are the best PVC systems on the market; there is no equal to the longevity and performance of these systems. The Sika Corporation has a track record of proven performance of over 50 years. The Carlisle Sure -Flex KEE HP system, although a good system was specified to provide the City with another bid for the intended work. The Carlisle system is a new product with a quality manufacturer with no track record of proven performance for their specified PVC system. The base bid total for the best product available in the market with proof of performance is less than seven thousand dollars over the alternate system price, which under a warranty period of 15 years equates to cheap insurance for the reliability of the roof system. It is my recommendation that the City of South Bend approve the base bid price for the proven performance of the Sika Sarnafil roofing system and hire Midland Engineering to do the work. Should you have any questions feel free to give me a call. Sincerel Joseph A. Dzierla, AIA President Joseph A. Dzierla AIA & Associates Inc. o cn O Q M O G! c O7 E A 3 d amZ ui _ d � d o m E a v �m N O LL m d � d � c w � 07 E L N � � w c O U IL` m 0 0 A o C 0 m CD c y E N N C d C y) IA W C) C a> p O U p a` W 04 C N 7 � la F O Z m a Q a7 C c W L f0 m O (a L U 0 m IL CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name VESTED INTEREST BUILDING ROOF REPAIR .IT ....... _... ...— .......... --....................................... ____.... __... _. Project No.119-049 ITITITmm-IT-ITITITITITITITITITITITITITITITITIT For Bids Due September 10, 2019 ... _ .............................._................................ ........................................... PART (Must be completed for all bids. Please type or print) Date: .-..�........_.9.�10f 1„9 -.... Bidder (Firm): Midland Engineering Company, Inc. Address: 52369 State Road 933 North City/State/Zip: South Bend, IN 46637 Telephone Number: _�_ 574 J 272-0200mmmm„_mmmmm ITITmmm mmmmmmmm Agent of Bidder (if Applicable): n�.a............ m ._-._............ __ ........ Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: City of South Bend, Board of Public Works the City of South Bend, Indiana, in accordance with plans and specifications prepared by: loseph A. Dzierla, ALA & Associates, Inc. and dated May 16, 2019 for the sum of (enter the Total Bid as shown on the Proposal) TWO HUNDRED TWENTY-SIX THOUSAND, EIGHT HUNDRED $ 226,800.00 _..__._._.__ ...... ......... (Enter sum of Total Base Bid plus Alternates shown on Proposal) DOLLARS (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment, By............ (signature) Michael W. Frahn CPA - President CEO CFO .mmm (Printed Name of Person Signing) The above bid is accepted this Subject to the following conditions: nARD,OF PU LAC MIS Gar A aillrt, Pre id.. t �ne,vRrt, maranwzapip�mbe r Version 4/2/2019 ACCEPTANCE day of 1 , 20 li Genevieve E. Miller, Member ,--,Therese J. D rau, ember " W ttest. Linda M. Ma (n, Clerk Contractor's Bid for Public Works - 2 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Vested Interest Building Roof Repair Project Number: 119-049 _........... . For Bids Due: September 10, 2019 Contractor Name: Midland Engineerin�wCompan, Incw BASE BID . ........ Item Description Quantity Unit Unit Price Amount _.. ......................_.� _ _ ....... 1 Sikaplan-Rhinobond Metal Retrofit & 1 LS Mechanicaliv Fastened Roof Repair 226,800.00 BASE BID TOTAL 226,800.00 ALTERNATE #1 . ....... al Item Description Quantity Unit Unit Price Amount ............... ................................._......................................._ ... . 1 Carlisle Sure -Flex KEE HP Roof Repair _.................. �..... 1 LS 241,800.00 ALTERNATE #1 TOTAL 241,800.00 UNIT PRICING Item No. Description Unit Unit Price 1 Wood Decking .................... ........... .............. .............SF_._._. 7.50 2 Wood Blocking ............................... .. -------------------.___...__.. 3.50 Bidder (Firm): Midland En eering Com an Inc. Address: 52369 State Road 933 Notth City/State/Zip: South Bend, IN 46637 Telephone Number: ( 574 ) 272-7400 BY__ ..: _....................... (Signature) Michael W. Ftahn, CPA - President/CEO/CFO (Printed Name of Person Signing) Version 4/2/2019 130ARD 01�'puB1 ic W ORKS C—ITY, OF SOUTH. BEND 1 61A1' A PUBLUC WORKS CONTRACT THIS AGREEMENT, made and entered into this 24th day of September, 2019, by abetween, Midland Engineering Company, Inc., 52369 State Road 933 North, South Bend,nd IN 46637, [JEREINAFTER called the "Contractor", and the Board of Public Works herein called the "Board WITNESSETH: That tile Contractor covenants and agrees to jnake the 1"bilowing improvement, as Fully Set Out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid proposal, all Of which are set tbrth as a part of this Contract, Jbr: PRQJECT No. - 119-049 5_Lils _" I I-MIt Q N VESTED INTERESTBUILDING ROOF REPAIR QQ_MPLETIONDAT� L �r,, S ,jIqC,jjlONS A N: F. $226,800; BASE BID ONLY F, I N G: Q N �D RWDATIF The total bid for this improvement were those prices as received and accepted by the Board on September 10, 2019. The Contractor further agrees to notify the Engineer when this improvement is completed, This notification shall be in the form of a Completion Affidavit, signed by the Contractor, LJpo,n final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy Of the Completion Affidavit and one (1) copy of F1 Waiver of Lien, BOARD OF PUBLIC WORKS Gary A. .11lot, President Genevieve E. M_i1_1er,_ Member — e Ti4reej , (,� — ­­_­ , k )ra Member MIDLAND EN(JINEERING COMPANY, INC, fl",fibeth A. Mal ember Printed Name arrr L. O'Sullivan, Mern&er­ Signature M. Mart n, "A est: -Lin Clerk CERTIFICATION (To be completed if Contractor is a Corporation) 1, Contractor herein; that..., certify that I am Secretary of the Corporation named as was then who signed this Agreement on behalf of the Contractor of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, corporate powers. and is within the scope of its Secretary Corporate Seal BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date Se tember 1.7 11191 Name Charlotte Brach Department Engineering BPW Date Se tembr 4 2019 Phone Extension 9246 u wIliimmmmmmmmmmom" Re uired Prior to Submittal to Board BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing❑ _ Check the pprit Item �.�F�-.Re rzi El Professional Services Agreement ❑ Contract Open Market Contract ❑ Amendment/Addendum El Bid Opening ® Bid Award F-1 Quote Opening ❑ Quote Award f Proposal Opening C/O & PICA No. Chg. Order, No. El Traffic Control E] Other: l�uite Information llbr Submissions Proposal E] Special Purchase, QPA El Req. to Advertise E] Reject Bids/Quotes ❑ PICA ❑ Resolution Ease./Encroach ❑ Title Sheet Company or Vendor Name Midland Engineering a .................. �, ❑ Yes❑ If Yes, Approved by Purchasing New Vendor No MBE ❑ Yes MBE/WBE Contractor Completed E-Verify Form Attached WBE ❑ No Project Name Vested Interest Building Roof Repair Project Number m.�,�,. .......... ww_ 119-049 Funding Source RWDA TIF Account No. 324-1050-460-42.02 Amount $226,800 Terms of Contract ..�.Base..........................................._w................................................w _� ....� Bid Purpose/Description Award subject to RDC approval _ of amended agreement w�i.t..h. ............ Ziker Sample Street, LLC. For Chan em Orders Onl Amount of ❑ Increase $ ❑ Decrease $ Previous Amount $ ...................................................................................... ......................................%. ......................w�w�ww..__ Increase �, _.._ Current Percent of Change: Decrease ( / New Amount $ Increase �m...... /o Total Percent of Change: Decrease ( .............%) _....... aa_.— �� Time Extension Amount: New Completion Date: M 1316 COUNTY -CITY BUILDING PHONE 574/ 235-925I 227 W. JEFFERSON BOULEVARD !"" �� FAX 574/ 235-9171 SOUTH BEND. INDIANA 46601-1930 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS September 24, 2019 Gerald Longerot Slatile Roofing and Sheet Metal Co., Inc. 1703 S. Ironwood Drive South Bend, IN 46613 RE: Bid Award — Vested Interest Building Roof Repair — Project No. 119-049 Dear Mr. Longerot: The Board of Public Works, at its meeting held on September 24, 2019, awarded the above referenced project to Midland Engineering Company, Inc., in the amount of $226,800 as the sole bidder for the base bid only. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely,, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU