Loading...
HomeMy WebLinkAboutOpen Market Quote Award - JW Werntz & Son Inc - Century Center Mall Door Repair1316 COUNTY -CITY BUILDING MAC PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD ; FAX 574/ 235-9171 SOUTH BEND. INDIANA 46601-1 Ran y,p� ar x CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS September 10, 2019 Patrick Werntz J.W. Werntz & Son, Inc. 1002 Kerr Street South Bend, IN 46601 RE: Open Market Quote Award Dear Mr. Werntz: The Board of Public Works, at its meeting held on September 10, 2019, approved the above referenced award for the repair of the mall door at Century Center in the amount of $57,640. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU W� 4v INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING N TO: Linda M. Martin, Clerk Board of Public Works FROM: Becca Plantz, Project Engineer SUBJECT: Award Project No. 118-036D Century Center Mall Door Repair DATE: September 3, 2019 N tlNMMh'M�4q�IV IVNNd%'A:41:flf�'IJ �u VW'MW!01u'vFlWVY1911m 1.1J %bJPoNYYJdh@DJ....MUM A...... glfN',NYiWNJ W 11U01mNfr.V'ul��V@FUYiPFB.WN&WI'fMIAAIX�XMM�PINdV, NdY�Y�IN� �'�Mt%2W@OPYlV�VdWM�4SiMWpWtlOtlPWMI wnN�YlVgldu'Yi BO. a�NY.dY�Y�YAM�AMlfHINI1�GP�'FANIPMRVX�6 N4V YWe X4G.ti0dU @�N YNlWIX.I.SIN YfbU'i HX'l@FI'MtlPoM1l401MMFW� On March 12, 2019 the Board of Public Works opened quotes for the above project. The project received no quotes and was recommended for special purchasing. The quoters ranked as follows: Quoter Total Quote Amount 1. J.W. Werntz & Son Inc. $57,640.00 The Division of Engineering contacted J.W. Werntz & Son Inc. for their quote. I recommend award of a contract for the Century Center Mall Door Repair to the responsive / responsible quoter, J.W. Werntz & Son Inc._ in the amount of $57,640.00. Sufficient funds have been appropriated from Hotel Motel Tax Fund 7304.42010,000.0099. Please call with your questions (5998). Enc. Quote Tabulation J.W.WERNTZ & SON INC. WERNTZ SUPPLY / WERNTZ GLASS 1002 KERR ST. SOUTH BEND IN. 46601 574-232-4881, FAX 233-705 08/29/2019 Proposal for Glass and Glazing Project: CENTURY CENTER We propose to make repairs to the existing Kawneer doors. Remove all three doors and deliver to our shop in South Bend Install temporary wall using studs and plywood. Includes temporary Egress door. Please advise if fire treated material is required (additional cost) Remove, inspect and replace fasteners as needed to make like new function. Replace roller assemblies as needed. We are confident that these are not the tandem Rockwell 5533925. These rollers have to accommodate the curve In the track. The rollers are most likely the 91282 or 92172 Kawneer. This is an expensive roller assembly. Remove and refurbish panel line exit device, concealed door closers, deadlocks. We assume that the door closers and Exit devices do not need to be replaced. We are knowledgeable and have most repair parts needs. These are very expensive! Clean and repair top and bottom track. We assume the existing material is still in good condition. We not included an allowance for replacement. Replace thresholds and weatherstrip as needed. Material. Lift, lumber, sealants,rolIers,exit parts, closer parts, fasteners, thresholds, weatherstrip, tools, hinges. $ 12,890.00 Labor including shop fabrication $ 44,750.00 Total excluding sales tax $ 57,640.00 Excludes. Bond, liquidated damages. n t J )i!., BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 9/3/19 �.�.�........._. _�........._. Department Public Name Becca Plantz......................... �. Works ...............� ........._ BPW Date 9/10/19 Phone Extension 5998 muuuuuummmmuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum�o�mwwmwmu�m�imuwimwwuu �uwdmcewmawnmarmrnr�muv�www.�omommmmmmu�remmmwwwer�mmr�wiw�r.�nrao � � iwmuwrer�wu� umw�wimmmmmmmmmmmuiuiuiuiuwww� Re luired Prior to Submittal to Board _..... _ ............. _.. ..ttalw ........_------ ...... BPW Attorney ❑ Attorney Name Clara McDaniels Dept. Attorney Attorney Name ._.......� �.�...................�.....w ����..._..............._ Purchasing Check the Trial t, Item 'l r ceta mm''tessiona1 Services Agreement ❑ Contract YBi pen Market Contract ElAmendment/Addendum d Opening Bid Award Quote Opening' tart Proposal Opening C/O & PCA No. F-1 Chg. Order, No. ❑ Traffic Control Other: leq�iarcd Information All Submissions ❑ Proposal Special Purchase, QPA Req. to Advertise Reject Bids/Quotes ❑ PCA Resolution Ease./Encroach ❑ Title Sheet Company or Vendor Name J.W. Werntz & Son Inc. .�._.... w ............ ❑ Yes❑] If Yes, Approved by Purchasing New Vendor No MBE/WBE Contractor WBE Completed E-Verify Form Attached No Project Name Century Center Mall Door Repair Project Number 118-036D Funding Source Hotel Motel T.�.. _,,,,,,,�...�...�................. � �.... ..... .. �. �.�... ax Fund 2019 Account o 10 000.0099 Amount $574 d 00 Terms of Contract Lump Sum m Purpose/Description Rgpair of the Mall Door at the Centiir Center. w ..................�.......m. w�...�� W_ F�or Chan Orders Only, _.. Amount of Increase w $ R Decrease ($ Previous Amount $ ..�.�__ �.� Increase...._ ..�..�....�... ... .............. �... Current Percent of Change: Decrease %) New Amount $ Increase % .... Total Percent of Change: �.�...... mm_ Decrease %) Time Extension Amount: � _, New Completion Date: .............. �........ ... .._.. ... .......