Scott Swartz
Precision Wall Systems, Inc.
3801 S. Main Street
South Bend, IN 46614
RE: Change Order No. 2 - Lafayette Building Exterior Renovation, Division A — Project
No. 117-1 OOR
Dear Mr. Swartz:
The Board of Public Works, at its meeting held on September 10, 2019, approved the above
referenced Change Order for an increase of $20,229, plus an additional sixty-six (66) days,
bringing the current contract amount to $237,812 and the revised project completion date to
September 30, 2019.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
yyy
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAu
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER
DATE:
PROJECT NO:
PROJECT NAME:
CONTRACT DATE:
CHANGE ORDER NO:
SUBJECT OF CHANGE ORDER:
8/10/2019
117-10OR
Lafa ette Building Exterior Renovation Division A
10/18/2018
2
PCR #2-Exterior Curb Wall Reinforcement
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
SCOT � /neiz -�k'VJ.1716,e.
Printed Name and Title
Precision Wall Systems, Inc.
Company Name
3801 S. Main Street
Address
South Bend, IN 46614
City, State, Zip
$
213,900.00
$
3,683.00
$
217„583.00
X Increased
Decreased
$
20,229.00
$
237m,812.00
9.30 %
11.18 %
5/1 /2019
86 days
66 day;
9/30/2019
PP
CONSTR
ON MANAGER
CITY OF SOUTH BEND
BOARD OF PUBLI WO 'IDS
proved Date: /
w
�M
Gary A. Gilot; President
Genevi ve E. Miller Member
tf&L ul—
Elizabeth A. Maradik, Member
LAFAYETTE BUILDING SKYLIGHT
Pricing for curb repairs/added bracing/roofing rework
Subcontractor Description
Ziolkowski New top plates, bracing, sheathing
Slatile Modify existing roof, new Densdeck, new TPO roof
PWS New interior curb fascia panels, sealant, trim
Amount
$28,389.00
$11, 840.00
$5,000.00
Total $45,229.00
Precision's Allowance $25,000.00
[Mffeureiunce -$2 ,229 00
Precision will submit a change order for the difference above plus markup
Due current production schedules, work will begin 2-3 weeks after approval to proceed
Page 1 of 1
�DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
1 1 7-1 OOR lffeyrtrtde BUMing Extewr PenoyraVon (Dwisi`on Ate
Project Number: Project Name: Change Order #: 2
DATE INITIATED.8m23-19 BPW DATE:9-10-19
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.).
Curb wall reinforcement is needed to structurally secure the new skylight. Interior bracing options
were suggested, but DCI does not want visual obstructions for the new skylight. An exterior
bracing option was planned which involves some reconstruction and roof membrane work. A 66
day extension was included for design delays and new subcontractor scheduling.
Attachments: (List documents support change — required)
Attached price breakdown
........ _-
Amount of B Increase / ❑ Decrease $.20, 229.00
Categories (Pick One):
Previously approved Change Order(s): $ 3,683.00 ❑ Scope of Work
............."" .....
— - 8 Differing Site Conditions, Changed Conditions
Current Percent of Change„ 9'30
❑ Conflicted Specifications and Drawings
New Total
..Amount: $237,812.00 ❑ Failed Materials
❑ Error
11 18 _ ❑omission
Total Percent of Change: -___ % ❑ Final Quantity Adjustment
Funding Secured From; 324-\�Q_460 -Z,o2
(filled out by PM)
RECOMMENDED BY:
Dan Jones 8-�� l f.
Project Inspector (Print Name) (Signature) (Date)
REVIEWED BY:
Toy Villa , �q
_.
_.
Construction Manager (Print Name) (Signature) (Date)
APPROVED BY:
Kyle Silveus 9'
Engineering Project Manager (Print Name) (Signs e) (Date)
APPROVED BY:
Kara Boyles, f°
City Engineer (Print Name) (Sigrttf+re) (Date)
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 9/3/19 Department Public Works
Name Kyle Silveus.,.��...._..................................................................�.�_...�. Division/Bureau �- Engineeri.n�g....................................._._—�.
BPW Date �_...9/.1..0/1...9 Phone Extension 9.....a....6666
083
!u�wwwwwwuwuuuwmrcu�;m �m�wummm�omomomomm wwwwmuwu��w�w�u�mnmrri�c�n mmmm�umuuuuuuuuuummmmmuuummuuuuuuuuuuuuuuuuuuuuuuwr.�.�w,w�nir� v�u�irm�o�m uimuwiur�w� �
lo.guired Prior to Submittal to Board
Legal ❑ Attorney Name: Clara McDaniels
Controller ❑ Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing Michael Schmidt
Check the
�❑ Agreement Amendment
Professional Services
❑ Bid Opening
F' Quote Opening
® Change Order No. 2
❑ Ease/Encroach.
Other:
r tqt item Type -
El Contract
Resolution
0 Bid Award
Quote Award
0C/O &PCANo.
0 Traffic Control:
d for All Submissions
Proposal
❑ Req. to Advertise
Required Information
❑ PCA
Addendum
❑ Title Sheet
Company or Vendor Name Division A: Precision Wall Systems Inc.
_�._.......�.......... _...........
New Vendor Yes No If Yes _......
�I ❑ _❑t�.P�'�ve� b� Purchasing
MBE/WBE Contractor MBE [:] WBE
------------
MBE/WBE Contractor Requested F� No ❑ Yes Name of Como
Project Name Lafayette Building Exterior Renovation (Division A)
Project Number 117-100R, Division A
Funding Source RWDA
Account No. 3241050-
60- - 442.02
Amount ...��2.0 22
2........_.....�........... �,,._A........................�.�.�.�.............................�..... 6�_
9.00
Terms of Contract
Purpose/Description Exterior curb wall reinforcement to support new
skylight load after
Uncoverin extaosin� the condition of the existing curb wall.
Dispersal After Approval
Copy