HomeMy WebLinkAboutChange Order No 1 - Gemini at Washington Colfax Apartment Improvements Project No 118-080A - Dudeck Roofing and Sheet Metal1316 COUNTY -CITY BUILDING J
227 W. JEFFERSON BOULEVARD ".�',
k
MACE
SOI ITH BEND_ INDIANA 46601-1 930 t*
ro�
186
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARDOF PUBLIC WORKS
September 10, 2019
Stan Peak
Dudeck Roofing and Sheet Metal
1634 S. Franklin Street
South Bend, IN 46613
PHONE 574/235-9251
FAx 574/235-9171
RE: Change Order No. 1 - Gemini at Washington -Colfax Apartment Improvements —
Project No. 118-080A
Dear Mr. Peak:
The Board of Public Works, at its meeting held on September 10, 2019, approved the above
referenced Change Order for an increase of $4,475, bringing the current contract amount to
$133,295.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
INIA Do�cume:nt G741"'m - 201_5
Change Order for a Design -Build Project
...................
(Name and address) CHANGE ORDER NUMBER: 1
Gemini at Washington -Colfax DATE: 11/30/18
617 West Colfax Street
South Bend, IN 46601
TO DESIGN -BUILDER: (Name and OWNER'S PROJECT NUMBER:
address)
DESIGN -BUILD CONTRACT DATE:
DESIGN -BUILD CONTRACT FOR: reroof
OWNER ❑
DESIGN -BUILDER ❑
ARCHITECT ❑
FIELD ❑
OTHER ❑
The Design -Build Contract is changed as follows:
(Include, where applicable, any undisputed amount attributable to previously executed Change Directives)
Deck and rafter repairs
Walk pads
The original ontract S (Guaranteed Maximum Price) was $ 128,820.00
The net change by previouslyauthorized Change Orders _ 00
The <Conus u� (Guaranteed Maximum Price) prior to this Change Order was $ 128, 820.00
The4 ontract Sto (Guaranteed Maximum Price) will be increase (decreased) (unchanged)
by this C ange Order in the amount of $ 4,475.00
The new ontract S (Guaranteed Maximum Price), including this Change Order, will be $ 133,295.00
The Contract Time will be (increased) (decreased) 0nchange by ( 0 ) days.
The date of Substantial Completion as of the date of this Change Order, therefore, is
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time, or Guaranteed Maximum Price
that have been authorized by Change Directive until the cost and time have been agreed upon by both the Owner and
Design -Builder, in which case a Change Order is executed to supersede the Change Directive.
When executing this Change Order, the Design -Builder represents that all changes to Project design implemented by this
Change Order have been reviewed and approved in writing by the Architect or other licensed design professional(s) of
record for the Project.
NOT VALID UNTIL SIGNED BY THE DESIGN -BUILDER AND OWNER.
DESIGN -BUILDER (Firm name)
Dudeck Roofing and Sheet Metal
ADDRESS
1634 S. Prank in Street
BY (Signature)
s
(Typed name)
Stan Peak
DATE e / ` 2 (r 9
OWNER (Firm name)
ADDRESS
BY (Signature)
(Typed name)
AlA Documont+G'741'1 —2015. olpyri ht 201a by The Arserfcan Institute of Architects, All righA_ hNf 'M t�ge AU0I1Da 11.11 h®irut ie -
protected by US. Copyright Low and Internallonal TraatWs. U natlhorixert roprodaactpon or rtish'ibuatiomn of'ti is Ate E)ocuurneuri, or, any p cr°tloirr of
tt, may resuppt In severe cNsti anoirt crime Inal peeafties, and amenl be prosecuted to tho man prnuni extent posslbte under the law, To report copyright
violations of AfA Contract Documents, e-mail The American: Institute of Archhects" legal counsel, copyr1gh1 aia,org..
�1 ,
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
118-080A 05MIMAt WASHNG�7a��� N,C0r��AX ROOF I MPROVEME.Nt^ 1
Project Number: ,Project Name: Change Order #:
DATE INITIATED: 11/30/2018 BPW DATE:
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.).
Deck and Rafter Repairs on Roof.
Attachments: (List documents support change - required)
Contractor cost email.
Amount of B Increase / ❑ Decrease: $ 4,475.00
Categories (Pick One):
Previously approved Change Order(s): $ 8 Scope of Work
-......-_ ❑Differing Site Conditions, Changed Conditions
Current Percent of Change: 3.47
❑ Conflicted Specifications and Drawings
5.00 ❑Failed Materials
New Total Amount: $ ❑ Error
....... .............
_. -.
❑ Omission
Total Percent of Change: 3.47
❑ Final Quantity Adjustment
Funding Secured From: 4"-2-'tQ50 * LA fo0 - 4Z.03
(filled out by PM)
RECOMMENDED BY:
Josh Ehmer 8/14/19
Project Inspector (Print Name) (Signs/ �69 (Date)
REVIEWED BY:
p ® b
i�
Construction Manager (Print Name) (Signature) (Date)
APPROVED BY:
Ic,
t
Engineering Project Manager (Print Name) (Signs e) (Date)
APPROVED BY:
City Engineer (Print Name) (Signatc� )" (Date
Josh Ehmer
From: Stan Peak <stan@dudeckroofing.com>
Sent: Tuesday, November 20, 2018 10:58 AM
To: Josh Ehmer
Subject: Gemini Apartments Extras
Josh,
Below is what I sent to Pat. We put some bracing up for the masonry wall in courtyard also. The labor and material is
included in the deck repairs.
Stan Peak
Dudeck Roofing and Sheet Metal, Inc.
1634 S. Franklin Street
South Bend, IN 46613
574-234-7912 fax 574-234-2471
From: Stan Peak <stan@dudeckroofing.com>
Sent: Friday, November 02, 2018 2:41 PM
To: 'Pat Lynch' <patlynch@sbheritage.org>
Subject: RE: RE: RE:
Below is what I came up with for extras.
We should be done with any I think. Deck and rafter repairs, shoring up the wall and the walk pads.
Deck Replacement:
Rafter Repairs:.
Material: (32) shts plywood w/ 15% mark-up = $970.00
Labor: (20) hrs @ $78.00/hr = $1,560.00
Total: $2,530.00
Material: 580' 2x6 w/ 15% mark-up = $575.00
Labor: (9) hrs @ $78.00 = $702.00
Total: $1,277.00
Walk Pads: (30) @ $22.25 each = $667.50 + 15% mark-up = $768.00
Grand Total of $4,
Stan Peak
Dudeck Roofing and Sheet Metal, Inc.
1634 S. Franklin Street
South Bend, IN 46613
574-234-7912 fax 574-234-2471
From: Pat Lynch <p 4t1'ynch@ bheritaRe.oEg>
Sent: Friday, November 02, 2018 11:18 AM
To: sta0@dudeckroofin .corn
Subject: Re: RE: RE:
Stan -
Can you give me a potential change order for that to review? How about a summary of any change orders to
date. Thanks.
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
PROJECT CONTRUCTION CHECKLIST
Project No.
118-080A
NTP
10/9/2018
Project Name
GEMINI AT WASHINGTON-COLFAX ROOF IMPROVEMENTS
Sub. Comp.
11/16/2018
Contractor
Dudeck Roofing and Sheet Metal
Final Comp.
5/31/2019
Inspector
JJE
Today's Date
8/14/2019
PAY APPLICATIONS & CHANGE ORDERS CHART
Pay App Contract EVA
$1503000 00
S100.
S 50 iCil l; r 010
11 /1 /2018 1 /1 /2019 3/1 /2019 5/1 /2019 7/1 /2019
PAYMENT APPLICATION SUMMARY
End Date Total Deductions Sub Total
1 10/31/18 $102,346.00 $5,117.30 $97,228.701
2
I Prev. Pmts Amount Prev Pmt Error
$0.00 $97,228.70 -
3
4
5
S
-
-
-
-
$0.00
$97,228.70
CHANGE
ORDER SUMMARY
Date
Prv. Contract
Change Amt.
New Contract
Change %
Total %
Added Da s
1
_2
8/14/19
$128,820.00
$4,475.00
$133,295.00
3.47%
3.47%
0
3
4
5
S
-
_
$4,475.001
3.47%
5/31/2019
POST -CONSTRUCTION DOCUMENT CHECKLIST
Items Notes Date Rec'D
1 Final Pay Application
2 Project Completion Affidavit
3 Final Waiver of Lien
4 Final Chanae Order
5 Complete Certified Payroll
6 As -Built Documents
7 Testing Reports
8 Warranty Informati 0
Signature, 11i 1, .r Date: A
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 09/3/2019
Name Kyle Silveus Department Engineering
BPW Date 09 / 10/2019 Phone Extension 9083
iuummmmmm000mmmuu imi r mmm mmmmmmmmoEPPPPuomomm�mommmmmmmmmmmmmmmmmow �rvnmmvmm�muuuuuuuuuuuuuumumumuuuuu mr
Re uired Prior to Submittal to Board
Legal ❑ Attorney Name Clara McDaniels
Controller ❑ Controller review is required for all Contracts $5,000.00 or more anc
greater than one year in length per the City Purchasing Policy
Purchasing ❑
Check the
Agreement
Professional Services
❑ Bid Opening
❑ Quote Opening
® Change Order No. 1
❑ Ease/Encroach.
F-1 Other:
Michael Schmidt
C_....1 Contract
❑ Resolution
❑ Bid Award
❑ Quote Award
❑ C/O &PCANo.
❑ Traffic Control
Company or Vendor Name Du
egulre ' for All Submissions
❑ Proposal
❑ Req. to Advertise
and Sheet Metal
❑ PCA
New Vendor ❑ Yes ❑ No ❑ If Yes, Approved by Purchasing
MBE/WBE Contractor ❑ MBE [:] WBE
MBE/WBE Contractor Requested ❑ No n Yes Name of Company
Project Name Gemini Washington Colfax Apartment Improvements
Project Number 118-080A
Addendum
❑ Title Sheet
Funding Source West Washington TIF
.._............................W............_..............
.......
Account No. 422-1050-460-42.03
..._....
Amount $ 128,820.00
.......
Terms of Contract �Base �b.i... w... �����.................................................. _.
Purpose/Description Repair of Apartment Building
Ralong
_......_
Roof 1 Washington St.
❑ Required Contractor's Certification Form Attached (Non -
Collusion, Non -Discrimination„ Non -Debarment, E-Verifv. Iran, etc.
Amount of ® Increase $ 4,475.00
❑ Decrease $
Previous Amount $ 128",820.00
Current Percent of Change: 3.47%
New Amount
Total Percent of Change
Copy
Original
❑
$ 133,295.00
3.47%
Dispersal After Approval