Redevelopment Commission Claims September 12, 2019 for approval and ratify
324 RIVER WEST DEV.ELOPMENTAREA
Environmental Glass Inc. 153,728.34 Liberty Tower Exterior Renovations -Division C
Transpo 100,000.00 Semi -Annual Pymt for Main and Colfax Garage Lease
Aecom 43,180.53 South Shoreline Station Alternatives Study
CBS Service, LLC 190,900.00 Berlin Place No. 2 Electrical, Mechanical & Plumbing
422 WEST A HINGTON DEVE PMENTAREA
Paul's Welding, Inc.
429 FU ND RIVER EAST DEV E LOPM ENT TIF
Precision Wall Systems
Skyline Plastering, Inc.
Ritschard Bros., Bros. Inc
Northern Indiana Construction Co., Inc.
452 TIF PARK BOND CAPTIAL
Smithgroup, Inc.
Total
62,939.00 Gemini at Washington-Cofax apartment Masonry & Stair Repairs
40,704.64 Three Twenty at The Cascade -Glazed Assemblies
28,075.00 Three Twenty at The Cascade -Exterior Insulation & Finish System
2,674.35 Three Twenty at The Cascade -Site Utilities (Sanitary
47,294.10 East Bank Sinhole Repairs
68,088.06 Seiltz Park Prelim & Final Eng.
737,584.02
Total Both Columns 737,584.02