HomeMy WebLinkAbout3A Claims Submitted 8.22.2019429 FUND RIVER EAST 1) EVE LOP_MENIT
Precision Wall System
Skyline Plastering, Inc.
Ritschard Bros, Inc.
430 FUND SOUTH SIDE TIF AREA #1
HRP Construction
Walsh & Kelly, Inc.
Arcadis
G.E Marshall, Inc.
439 FUND) CERTIFIED TECH N0LDGY PARK
Majority Building, Inc.
452 PARK BOND TIF FUND
Lawson -Fisher Associates
Tota I
Total Of Both Columns
168,625.00 Three Twenty at The Cascade -Glazed Assemblies
74,679.50 Three Twentv at The Cascade -Exterior Insulation & Finish Svstem
50,812.65 Three Twentv at The Cascade -Site Utilities (Sanitarvl
24,383.18 Miami St. Basin Drainaee Imorovements
30,604.16 St. Josenh Streetscaoe
Utilitv Manaeement GIS/Eneineerine Assistance 12,575.05
Small Drainaee Design and Renair - Div. A (Hawbaker) 117,106.53
90,649.57 Technoloev Resource Center 0 Catalvst 2
West Bank Corridor Imorovements Final Deien 816.00
1,003,058.16 1,157,690.21
2,160,748.37
Items added
Claims Explanation cf Project
after Agenda
REDEVELOPMENT COMMISSION
submitted
Distributed
Redevelopment Commission Claims August 22, 2019 for approval and ratify
324 R1 VER WEST DEmnaPMENTAREA
Walsh & Kelly, Inc.
306,706.72 Michiean St. Pavement RPnlacement
Kolata Emprises, LLC
540.00 Profe.ssinnal Services
Epoch
3,155.00 Technology Resource Center
Barnes & Thornburg LLP
9,600.00 TIF Realignment Plan
Abonmarche
2,400.00 Western Ave Streetscape from Falcon to Dundee St
Precision Wall System
168,625.00 Lafayette Building Skylight
United Consulting
2,641.50 Coal Line Trail Ph 1
11,118.31
United Consulting
24,656.38 Coal Line Trail Ph I & II
10,428.31
GLC
44,979.50 Main St. Wayne St. Garage Improvement
Black & Veatch Corporation
Olive WTP Improvements
23,160.35
Joseph A Dzierla & Associates, Inc.
Vested Interest Building Roof Repair
8,300.00
Troyer Group
Brick Pavement
10,121.00
Walsh & Kelly, Inc.
Michigan St Pavement Replacement
471,625.03
Indiana Earth, Inc.
Western Ave Streetscape - Phase III
312,507.22
Milestone Fence, LLC
1MS Parking Lot Improvements
18,411.40
Ritschard Bros, Inc.
Unity Gardens
68,083.51
Rieth Riley Construction
Berlin Place
93,437.50
429 FUND RIVER EAST 1) EVE LOP_MENIT
Precision Wall System
Skyline Plastering, Inc.
Ritschard Bros, Inc.
430 FUND SOUTH SIDE TIF AREA #1
HRP Construction
Walsh & Kelly, Inc.
Arcadis
G.E Marshall, Inc.
439 FUND) CERTIFIED TECH N0LDGY PARK
Majority Building, Inc.
452 PARK BOND TIF FUND
Lawson -Fisher Associates
Tota I
Total Of Both Columns
168,625.00 Three Twenty at The Cascade -Glazed Assemblies
74,679.50 Three Twentv at The Cascade -Exterior Insulation & Finish Svstem
50,812.65 Three Twentv at The Cascade -Site Utilities (Sanitarvl
24,383.18 Miami St. Basin Drainaee Imorovements
30,604.16 St. Josenh Streetscaoe
Utilitv Manaeement GIS/Eneineerine Assistance 12,575.05
Small Drainaee Design and Renair - Div. A (Hawbaker) 117,106.53
90,649.57 Technoloev Resource Center 0 Catalvst 2
West Bank Corridor Imorovements Final Deien 816.00
1,003,058.16 1,157,690.21
2,160,748.37