Loading...
HomeMy WebLinkAbout3A Claims Submitted 8.22.2019429 FUND RIVER EAST 1) EVE LOP_MENIT Precision Wall System Skyline Plastering, Inc. Ritschard Bros, Inc. 430 FUND SOUTH SIDE TIF AREA #1 HRP Construction Walsh & Kelly, Inc. Arcadis G.E Marshall, Inc. 439 FUND) CERTIFIED TECH N0LDGY PARK Majority Building, Inc. 452 PARK BOND TIF FUND Lawson -Fisher Associates Tota I Total Of Both Columns 168,625.00 Three Twenty at The Cascade -Glazed Assemblies 74,679.50 Three Twentv at The Cascade -Exterior Insulation & Finish Svstem 50,812.65 Three Twentv at The Cascade -Site Utilities (Sanitarvl 24,383.18 Miami St. Basin Drainaee Imorovements 30,604.16 St. Josenh Streetscaoe Utilitv Manaeement GIS/Eneineerine Assistance 12,575.05 Small Drainaee Design and Renair - Div. A (Hawbaker) 117,106.53 90,649.57 Technoloev Resource Center 0 Catalvst 2 West Bank Corridor Imorovements Final Deien 816.00 1,003,058.16 1,157,690.21 2,160,748.37 Items added Claims Explanation cf Project after Agenda REDEVELOPMENT COMMISSION submitted Distributed Redevelopment Commission Claims August 22, 2019 for approval and ratify 324 R1 VER WEST DEmnaPMENTAREA Walsh & Kelly, Inc. 306,706.72 Michiean St. Pavement RPnlacement Kolata Emprises, LLC 540.00 Profe.ssinnal Services Epoch 3,155.00 Technology Resource Center Barnes & Thornburg LLP 9,600.00 TIF Realignment Plan Abonmarche 2,400.00 Western Ave Streetscape from Falcon to Dundee St Precision Wall System 168,625.00 Lafayette Building Skylight United Consulting 2,641.50 Coal Line Trail Ph 1 11,118.31 United Consulting 24,656.38 Coal Line Trail Ph I & II 10,428.31 GLC 44,979.50 Main St. Wayne St. Garage Improvement Black & Veatch Corporation Olive WTP Improvements 23,160.35 Joseph A Dzierla & Associates, Inc. Vested Interest Building Roof Repair 8,300.00 Troyer Group Brick Pavement 10,121.00 Walsh & Kelly, Inc. Michigan St Pavement Replacement 471,625.03 Indiana Earth, Inc. Western Ave Streetscape - Phase III 312,507.22 Milestone Fence, LLC 1MS Parking Lot Improvements 18,411.40 Ritschard Bros, Inc. Unity Gardens 68,083.51 Rieth Riley Construction Berlin Place 93,437.50 429 FUND RIVER EAST 1) EVE LOP_MENIT Precision Wall System Skyline Plastering, Inc. Ritschard Bros, Inc. 430 FUND SOUTH SIDE TIF AREA #1 HRP Construction Walsh & Kelly, Inc. Arcadis G.E Marshall, Inc. 439 FUND) CERTIFIED TECH N0LDGY PARK Majority Building, Inc. 452 PARK BOND TIF FUND Lawson -Fisher Associates Tota I Total Of Both Columns 168,625.00 Three Twenty at The Cascade -Glazed Assemblies 74,679.50 Three Twentv at The Cascade -Exterior Insulation & Finish Svstem 50,812.65 Three Twentv at The Cascade -Site Utilities (Sanitarvl 24,383.18 Miami St. Basin Drainaee Imorovements 30,604.16 St. Josenh Streetscaoe Utilitv Manaeement GIS/Eneineerine Assistance 12,575.05 Small Drainaee Design and Renair - Div. A (Hawbaker) 117,106.53 90,649.57 Technoloev Resource Center 0 Catalvst 2 West Bank Corridor Imorovements Final Deien 816.00 1,003,058.16 1,157,690.21 2,160,748.37