Loading...
HomeMy WebLinkAboutChange Order No 2 - SBFD Training Center Classroom Building Project No 117-127 - Brown & Brown General Contractors Inc1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOI ITH BEND. INDIANA 46601-1930 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDU LIC WORKS August 13, 2019 Eric Brown Brown & Brown General Contractors, Inc. 124 S. Elkhart Street Wakarusa, IN 46573 PHONE 574/235-9251 FAx 574/ 235-9171 RE: Change Order No. 2 - South Bend Fire Department Training Center Classroom Building —Project No. 117-127 Dear Mr. Brown: The Board of Public Works, at its meeting held on August 13, 2019, approved the above referenced Change Order for an increase of $6,140, bringing the current contract amount to $658,228. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure r FY9I /Yk Mb`p CITY OF SOUTH BEND, INDIANA : DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER ma DATE: 8/13/2019 PROJECT NO: 117-127R PROJECT NAME: SBFD Trainin Center Classroom Buildin ° CONTRACT DATE: 12/11/2018 CHANGE ORDER NO: 2 ............. SUBJECT OF CHANGE ORDER: PCR #12-Add Exit Door Only PCR #13-Delete Drywall on East Wall PCR #14-Delete Gable Louvers PCR #15-Add Stoop and Asphalt Walk The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time „a l u •Ills I Printed Narne and Title Brown & Brown General Contractors, Inc. Company Name 124 S. Elkhart Street Address Wakarusa, IN 46573 City, State, Zip O Increased D Decreased 9/30/2019 20 daysmm 0 da s-.... — 10/20/2019 $ 649,937.00 $ � 2,151.00 $ 652„088.00 40.00 $ 658,228.00 0.94 % 1.28 % CONSTRUCTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date ry A. Gilot, President Genevieve E. Miller, Member A E izabeth A. aradik, Membe11 r µ� The.. �"� .., r se m. Do auu, Membr L a L. O 'Sullivan, T e 4 . DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Number: 117-127R Project Name: sBFD Training Center classroom Building Change Order #: 2 DATE INITIATED:7-30-19 BPW DATE: 8-13-19 Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Various items were requested to be changed by end user. Some items were deleted to help reduce costs. Attachments: (List documents support change — required) Items include adding and exit door (+$6,779.00), deleting drywall finish on CMU (-$2,554.00), deleting gable louvers (-$303.00), and adding a concrete stoop and walkway (+$2,218.00). Amount of Blncrease / El Decrease: $ 6,140.00 ...... Categories (Pick One): Previously approved Change Order(s): It 0'00 _ A Scope of Work ............... El Differing Site Conditions, Changed Conditions Current Percent of Change: 0'94%❑ Conflicted Specifications and Drawings El Failed Materials 658,228.00 New Total Amount: $m_ ❑ Error mmmm—...._.._.._. ❑Omission Total Percent of Change. 1.28 % El Final Quantity Adjustment �° ❑ Funding Secured From: (filled out by PM) RECOMMENDED BY: Dan Jones L' Project Inspector (Print Name) (Signature) (Date) c REVIEWED BY: Toy Villa �- • �9 — Construction Manager (Print Name) (Signature) (Date) APPROVED BY: Alicia Czarnecki Engineering Project Manager (Print Name) (Signature) (Date) APPROVED BY: Aa Kara Boyles � City Engineer (Print Name) (/ixfu e) (Da e) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 08/06/19 Name Alicia Czarnecki Department En incern _.._ BPW Date 08/13/19 Phone Extension 5903 m�iiiiiiiimm �� MMMMMH�N�� mi � ww Re�ec1 Prior to Submittal to Board BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing _ Check the A propriate Item Type — lie to Professional Services Agreement Contract EJ Open Market Contract El Amendment/Addendum E] Bid Opening Bid Award [:] Quote Opening Quote Award Proposal Opening ❑ C/O & PCA No. ® Chg. Order, No. 2 Traffic Control Other: Regired Information All Submissions H Proposal Special Purchase, QPA Req. to Advertise Reject Bids/Quotes ❑ PCA �] Resolution Ease./Encroach ❑ Title Sheet Company or Vendor Name Brown & Brown General Contractors„ Inc, New Vendor Yes If Yes, Approved by Purchasing E] No MBE/WBE Contractor WBE Completed E-Verify Form Attached Yes No mm . g Project Name South Bend Fire Department Training Center Classroom Buildin Project Number 117-127 Funding Source 2018 Fire Station #9 Capital Account No. 451-0901-422.42-02 Amount Terms of Contract Purpose/Description Amount of El Previous Amount A new 3000 sf building with SBFD classrooms on the site of the FirE Training Center For Chanke, Orders OnIv 6 0 Increase 1w400_ Decrease ($ ) $ 2151.00 Increase Current Percent of Change: Decrease New Amount $ 658,228.00 Increase 0.94% 1.28% Total Percent of Change: Decrease ( %) Time Extension Amount; New Completion Date: