HomeMy WebLinkAboutChange Order No 1 - St Joseph Street Improvements Project No 118-008 - Walsh & Kelly Inc1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOI ITH BEND. 1NDIANA 46601-1830 Edward Pilipow Walsh & Kelly, Inc. 24358 State Road 23 South Bend, IN 46614 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDU LIC WORKS August 13, 2019 PHONE 574/235-9251 FAx 574/235-9171 RE: Change Order No. 1 - St. Joseph Street Improvements — Project No. 118-008 Dear Mr. Pilipow: The Board of Public Works, at its meeting held on August 13, 2019, approved the above referenced Change Order for an increase of $26,436.52, plus an additional ninety-two (92) days, bringing the current contract amount to $449,436.52 and the revised contract completion date to March 1, 2019. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 7/23/2019 118-008 St. Joseph Street Improvements 9/11 /2018 1 PCR #1-Add Line Item 'Borrow" PCR #3-Increase "Compacted Aggregate, No. 53" PCR #4-Increase "HMA Patching Full Depth" PCR #5-Final Quantity Ad ustment The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR Contractor Signature Printed Name and Title Walsh & Kelly,Inc. Company Name 24358 State Road 23 Address South Bend„ IN 46614 City, State, Zip $ 423,000.00 $ 0.00 $ 423,000.00 X Increased Decreased $ 26,436.52 $ 449,436.52 6.25 % 6.25 % 11 /29/2018 0 da s 92 days 3/1 /2019 CONS TION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Dates .;. hoo Gary A. Gil6t„ President Genevieve E. Mif r, Member Elizabeth AwMaradik, Member There J. orau, Me " „ " aura L. O°Su ua „ ember C C `u u r0 � L L L L 0) 01 O O c ++ C 0J a E E' O 0) N c C of u U f0 0 m m 7 ++ O. Q O' N L x +�+ 0J , u NJ N - 01 N 75 O O a Y y N 3 N N ++ 0J 0J N V m m L � f0 f0 p0 a+ fp m O c c C: L C ++ (V 01 m a) E E C L 0) w ` O Q CL � � C O C C 7 L' O O 7 +, O Y 'O '0 'L C Q Q > Ln N O Ln O 01 00 ) M N fv1 fvl M O1 N -j 0) 0 ' " 01 O1 N Ln u o O O N a` r, O o co m �= a;W m Ln c > z z o o 0 .� r m v LD C 00 cn N LL- +, 00 C 3 a c -0 p L E tv N u 7 E p a a � m Y C E a C p Z a) v - v C v, n - J N M m L cr 0J Ln 0) u + Cl M 'O u O 0) C 1<1S z c CIE DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Number: 118-008 Project Name: St. Joseph Street Improvement Change Order #: 1 DATE INITIATED: 7-11 mm19 BPW DATE: 7-23-19 Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc,). -Lack of survey points failed to identify a higher road elevation than shown on the plans. This created a need to perform more full depth patching and subgrade treatment in lieu of mill/surface to allow for a proper crown and proper drainage to the curb line. -Borrow was needed to establish a 4:1 slope along the backside of the western sidewalk. Attachments: (List documents support change - required) Price breakdown Amount of ®Increase / El Decrease: $ 26,436.52 ---- ` Categories (Pick One): Previously approved Change Order(s): $ 0.00 ❑ Scope of Work `®®®®®®".... """" "" .... ® Differing Site Conditions, Changed Conditions Current Percent of Change: 6.25 ❑ Conflicted Specifications and Drawings ..New ..Total ..Amo...0 .nt:"$................44._.............,,............................................. 9,436.52 ❑ Failed Materials ...............................� ®Error Total Percent of 6 25 ❑omission Change: ........_ % 8 Final Quantity Adjustment Funding Secured From: _ 3D-I450-Aj,�Oww,-wwqZ.w07 (filled out by PM) RECOMMENDED BY: Dan Jones—�� Project Inspector (Print Name) (Signatu ) (Date) REVIEWED BY: Toy Villa Construction Manager (Print Name) (Signature) (Date) APPROVED BY: Kyle Silveus Engineering Project Manager (Print Name) (Sigoat (Date) APPROVED BY: Kara Boyles City Engineer (Print Name) (Signatur (Dat ) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 8/6/19 Department Public Works Name Kyle Silveus Division/Bureau Engineering BPW Date S fis Phone Extension 9083 . . ........ - — --------- Re aired Prior �to Submittal to Board�_,_. . . ................. Legal El Attorney Name: Clara McDaniels Controller El Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing E] Michael Schmidt F_ Check the AwroDriate Item Twe - Required for All Submissions " Agreement Fj Professional Services E] Bid Opening F-1 Quote Opening M Change Order No. 1 F-1 Ease/Encroach. 0 Other: Contract ❑ Resolution El Bid Award El Quote Award C/O & PCA No. Traffic Control: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Proposal IFIX05154-mrs 0 Req. to Advertise El Title Sheet E] PCA )n St. Joseph Streetscape 118-008 ­­­­__ ........................ --- ... SOUTH SIDE DEVELOPMENT TIF ­­­ --- __ . ... .............. 430-1050-460-42.02 .................... $26,436.52 Purpose/Description Final Quantity Adjustment, Differing site conditions which r _fqquied additional full depth ptcNM2 n . .. . ... ........ _qd sbqrade treatment. . ..... u_____ ❑ Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) -777 -7"7 . ....... ... .. Amount of Incea se $26,436-52 .......... El eease Previous Amount $ 423,000.00 ..... - - - — — ------------ --------­­------ Current Percent of Change- 6.25% ...... . . . . . ........... New Amount $ 449,436.52 Total Percent of Change-, 6.25% Disoersa,l After Ao oro va I Copy Original 1:1 1:1 1:1 El n 1:1