HomeMy WebLinkAboutChange Order No 1 - Lafayette Building Drain Replacement Project No 119-042 - Niezgodski Plumbing Inc1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND. INDIANA 46601-1830
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC VAIRK-K--
August 13, 2019
David Niezgodski
Niezgodski Plumbing Inc
232 N Mayflower Road
South Bend, IN 46619
PHONE 574/235-9251
FAX 574/235-9171
RE: Change Order No. 1 - Lafayette Building Drain Replacement — Project No. 119-042
Dear Mr. Niezgodski:
The Board of Public Works, at its meeting held on August 13, 2019, approved the above
referenced Change Order for an increase of $20,745.60, bringing the current contract amount
to $57,872.60.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER
DATE:
PROJECT NO:
PROJECT NAME:
CONTRACT DATE:
CHANGE ORDER NO:
SUBJECT OF CHANGE ORDER:
7/9/2019
119-042
Lafayette Building Drain Replacement
5/14/2019
1
PCR #1-Add Line Item: Sub Floor Drain Replacement PCR #2-Add
Line Item: Backfill Trench
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
CONTRACTOR
Contractor ignature
,
lr�" r
P r i n t e I Name an itle
Niezgodski Company Name bin ,Inc.
232 North Mayflower Road
Address
South Bend, IN 46619
City, State, Zip
$ 37,127.00
$ 0.00
$ 37127.00
Increased
F] Decreased $ 20,745.60
$ 57,872.60
55.88 %
55.88 %
7/5/2019
0 days
0 days
7/5/2019
CONSTR ON MANAGER
CITY OF SOUTH BEND
BOARD OF PUBLIC W RKS
Approved Date:
m,
Gary A. Gilot, President
Genevi ve E. Miller, Member
!is OIL
Eliza eth A. Maradik, Member
Therese J. Dor u, M
aura L. O'Sulliv in-,-M leer
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Linda M. Martin, Clerk
Board of Public Works
FROM: Kyle Silveus
SUBJECT: Change Order No. 1 — 119-042 Lafayette Building Drain Replacements
DATE: August 8, 2019
The Lafayette building is being renovated to protect and secure the exterior of the building.
Work on the building includes masonry, skylight, and roof drain repairs interior to the building.
This drain replacement project has encountered an unforeseen condition that was not
reasonably foreseen during the design phase and is going beyond 20% of the contract value.
The sub floor drains were deteriorated to the extent that the top third of the metal pipe was gone,.
There was no way to tie in the replaced roof drains interior to the building without having a good
piece of pipe to attach to. The concrete floor needed to be cut and removed to chase the
existing deteriorated piping to the east end of the building to find a good section of pipe to tie
into. The trench was then backfilled with sand.
Change order 1 is the last change order for the project and is an increase of $20,745.60, or a
55.88% increase from the original contract value.
Please call with your questions,.
rwz. a aye Al*.
v
. DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
Project Number: 1 19-042 Project Name: Lafayette Building Drain Replacements Change Order #: �
...m....... ....
DATE INITIATED: 7-2-19mmm,�m.���
BPW DATE, 8-13-19
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.).
The sub floor drains were deteriorated to the extent that the top third of the metal pipe was gone.
There was no way to tie in the roof drains without having a good piece of piping to attach to. The
concrete floor needed to be cut and removed to chase the existing deteriorated piping to the east
end of the building in order to find a good section of pipe to tie into. The trench was then backfilled
with sand for possible future work.
Attachments: (List documents support change — required)
115 LFT of pipe replacement @ $151.94 = $17,473.10 (concrete removal and pipe work)
Backfill trench with sand LS @ $3,272.50 (102x 601b bags; 2 labors x 16 hrs)
Amount of A Increase / ❑ Decrease: $ 20, 745.6
Previously approved Change Order(s): $ 0.00
Current Percent of Change: 55.88
New Total Amount: $ 57, 872.6
Total Percent of Change...55.88_.......................................................... %
Funding Secured FromZN ,►t�50. N(c0.�1'j (�
(filled out by PM)
RECOMMENDED BY:
Dan Jones
Project Inspector (Print Name)
REVIEWED BY:
Toy Villa
Constriction Manager (Print Name)
APPROVED BY:
Kyle Silveus
Engineering Project Manager (Print Name)
APPROVED BY:
Categories (Pick One):
Scope of Work
iml Differing Site Conditions, Changed Conditions
- Conflicted Specifications and Drawings
Failed Materials
Error
Omission
= Final Quantity Adjustment
._�.._ (Signature) .(Date)...—.......__._._.
k
�..._w _ _ . ,_�.._.��1-1 22-l`
( Signature) (Date)
(Signatu&I (Date)
)
Kara Boyles
�..r.. �w.� _ ... m.....��-... ..__ .....
City Engineer (Print Name) (Signature (Date)
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 8/6/19
Name Kyle Silveus Department En crIn
BPW Date 8/13/19 Phone Extension 9083
irvxrmav�rr�uurrvw�em�mmm� cud mmmmmmmwmm mr�vncarauv�ummwmmmwwmmmmmm�o mum�m ni
IT Required Prior to Submittal to Boardm
Legal Attorney Name
Controller ❑ Controller review is required for all Contracts $5,000.00 or more anc
greater than one year in length per the City Purchasing Policy
Purchasing ❑
Check th
rl Agreement
El Professional Services
Bid Opening
❑ Quote Opening
® Change Order No. 1
❑ Ease/Encroach.
El Other:
Company or Vendor Name
L� Contract
Resolution
❑ Bid Award
[] Quote Award
❑C/O &PCANo,
❑j Traffic Control
Niezgodski Plumbing, Inc.
)r All Sint
Proposal
❑ Req. to Advertise
n
❑ PCA
Addendum
❑ Title Sheet
New Vendor ❑ Yes ® No ❑ If Yes, Approved by Purchasing
MBE/WBE Contractor ❑ MBE ❑ WBE
Project Name Lafayette Buildi!I wDrain Replacement
Project Number 119-042A . .............................�.
Funding Source RWDA
AccountNo. 324-1050-460-42.02.......................�.�.�.�.�.�.�.�.�.�.�.�.�.�...............w.�..�..��....�.�........................�...._.�... ,�.
Amount $
Terms of Contract
Purpose/Description Sub floor drains were deteriorated to the extent that the top third of the
metal pipe was gone. No way to tie in roof drains without having a good
piece of piping to attach to. Roof drain under concrete floor needed to
replaced
❑ Required Contractor's Certification Form Attached (Non -
Collusion, Non -Discrimination,. Non -Debarment, E-Verify, Iran, etc.1
Amount of Increase $ 20,745.60
�] ....
Decrease $ .........
Previous Amount $ 37,1270
Current Percent of Change:. 55.88% ....._. New Amount$_5.7a87.2...._W.........................ww
60
Total Percent of Change: 55.88%
Dispersal After Approval
Copy
Original)
❑
❑