HomeMy WebLinkAboutOpening of Bids - Wayne St and Leighton Plaza Parking Structure Repairs 2019 Project No 119-048 - DC Byers Co Detroit IncCITY OF SOUTH BEND, INDIANA w"'�'
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Wayne Street & Leighton Plaza Parking Structures Repairs 2019
Project No. 119-048
For Bids Due July 23, 2019
PART
(Must be completed for all bids. Please type or print)
Date: July 22, 2019 Bidder (Firm): D. C. Byers Co./Detroit Inc.
Address: 16429 Upton Rd. Suite #3
City/State/Zip: Easl, L n in I' l 4 2a Telephone Number: 517 339-1946
Agent of Bidder (if Applicable): Stephen J. Davis
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Wayne Street & Leighton Plaza Parking Structures Repairs 2019 Project No. 119-048
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Wantman Group, Inc. (WGI)
and dated July 22, 2019 for the sum of (enter the Total Bid as shown on the Proposal)
Seven Hundred Fifty Eight Thousand Three Hundred Thirty and 00/100 dollars $ 758,330.00
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract
shown in the original contract if accepted by the Cil
basis, the itemization of the units shall be shown op,
By
eeded, the cost of units must be the same as that
South Bend. If the bid is to be awarded on a unit
J. Davis,, Gdr%ral Manage
(Printed Name of Person Signing)
ACCEPTANCE
The above bid is accepted this day of
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President Genevieve E. Miller, Member
Elizabeth A. Maradik, Member Therese J. Dorau, Member
Laura L. O'Sullivan, Member Attest: Linda M. Martin, Clerk
NEI
Version 4/2/2019 Contractor's Bid for Public Works - 2
BID/PROPOSAL oasun
CITY OF SOUTH BEND"
Project Name: Wayne Street & Leighton Plaza Parking Structures Repairs 2019
Project Number: 119-048
For Bids Due: July 23, 2019
Contractor Name: D. C. Byers Co./Detroit Inc.
BASE BID PART #1 — WAYNE STREET PS
ISO
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Contractor Mobilization
1
LS
N/A
20,000
2
Contractor General Requirements
1
LS
N/A
3000
3
Cast -in -Place Concrete Testing
1
LS
N/A
1000
4
Floor Repair
250
SF
32
8000
5
Column Repair
5
SF
200
1000
6
Beam Repair
50
SF
200
10,000
7
Grout Pocket Repair
25
EA
50
1250
8
Stair Tread Repair
15
SF
3004500
9
Stair Landing Repair
10
SF
100
1000
10
Repair Control Joint Sealants
50
LF
6
300
11
Cove Joint Sealant at Stairs
900
LF
6
5400
12
Cove Joint Sealant at Walls
220
LF
6
1320
13
R&R Horiz. A Sealant at Walls (1-1/2")
120
LF
7
840
14
R&R Horiz. A Sealant at Walls (2")
450
LF
8
3600
15
R&R Horiz. A Sealant at Walls (2-3/4")
120
LF
9
1080
16
R&R. A Sealant at Wall Caps (1/2" to 1")
300
LF
8
2400
17
R&R Vert. Jt Sealant at Facade (1/2" to 1")
450
LF
10
4500
18
Rout & Seal Cracks at Stairs
40
LF
7
280
19
R&R Ribbon Seal
45
LF
100
4500
20
R&R Winged Seal
61
LF
100
6100
21
Deck Coating Repair
400
SF
6
2400
22
Sealer at Stairs
3,300
SF
2
6600
23
Wet Sealant at Stairs
2,300
LF
3
6900
24
R&R Mullion to Concrete Sealants
1,100
LF
4
4400
25
Paint Touchup at Ceiling
2,500
SF
2
5000
26
Repaint Wall & Columns
23,000
SF
1.50
34,500
27
Install Door Push Bar
1
EA
750
750
28
Remove Corroded Door Frame Bottom
6
EA
400
2400
29
Clean Floor Drains
1
LS
N/A
5000
BASE BID PART #1 — WAYNE STREET PS TOTAL $148,020.00
Version 4/2/2019 Contractor's Bid for Public Works - 7
BID/PROPOSAL���
CITY OF SOUTH BEND
Project Name: Wayne Street & Leighton Plaza Parking Structures Repairs 2019 ,
Project Number: 119-048 .
For Bids Due: July 23, 2019 w 1865
Contractor Name: D. C. Byers Co./Detroit Inc.
BASE BID PART #2 — LEIGHTON PLAZA PS
Item No
Quantity
Unit
Unit Price
Amount
1
Contractor Mobilization
1
LS
N/A
40,000
2
Contractor General Requirements
1
LS
N/A
3000
3
Cast -in -Place Concrete Testing
1
LS
N/A
1000
4
Floor Repair
340
SF
32
10,880
5
Tee Flange Repair
20
SF
500
10,000
6
Tee Stem Repair
15
SF
200
3000
7
Column Repair
30
SF
200
6000
8
Beam Repair
10
SF
300
3000
9
Wall Repair
10
SF
200
2000
10
Stair Tread Repair
10
SF
300
3000
11
Repair Tee -to -Tee Joint Sealants
50
LF
7
350
12
Repair Cove Joint Sealant
50
LF
7
350
13
Rout & Seal Cracks
1,300
LF
6
7800
14
R&R Horiz. Joint Sealant at Walls (1/2"
270
LF
7
1890
to 1
15
R&R Vert. Joint Sealant at Cols. (1/2")
400
LF
8
3200
16
R&R Expansion Joint Gland
240
LF
100
24,000
17
Install Expansion Joint Cover
80
LF
30
2400
18
Column Coating
26
EA
11200
5200
19
Sealer at Floors
125,400
SF
.60
75,240
20
Sealer at Walls
2,500
SF
2
5000
21
Chemical Grout Cracks
50
LF
40
2000
22
Clean Floor Drains
1
LS
N/A
5000
23TPavement
Marking -T
1
LS
N/A
6000
BASE BID PART #2 — LEIGHTON PLAZA PS TOTAL $220,310.00
Version 4/2/2019 Contractor's Bid for Public Works - 8
BID/PROPOSAL��r1°��
CITY OF SOUTH BEND %C,4 1�
Project Name: Wayne Street & Leighton Plaza Parking Structures Repairs 2019
Project Number:
For Bids Due:
119-048
July 23, 2019
Contractor Name: D. C. Byers Co./Detroit Inc.
BASE BID PART # 1 & BASE BID PART #2 TOTAL
136
Base Bid Part #1 & Base Bid Part #2 Total $368,330.00
ALTERNATES
Alternate Description [tQuantlty Unit Unit Price Total Amount
No.
1 Paint Fire Protection System at Leighton L.S. N/A 120,000
2 Remove all Paint from Wayne Street 1 L.S. N/A 270,000
ALTERNATES TOTAL $390,000.00
Bidder (Firm):
Base Bid Part #1, Base Bid Part #2 & Alternates Total $758,330.00
D. C. Byers Co./Detroit Inc.
Address: 16429 Upton Rd Suite #3
City/State/Zip: Bast Lansing M148823 Telephone Number: k§17 ) 339-1946
By
(Signature)
J. Davis„ General
(Printed Name of Person Signing)
Version 4/2/2019 Contractor's Bid for Public Works - 9
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF „ Michigan )
SS:
Clinton COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 4/2/2019 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 4/2/2019 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 22nd day of JUIy , 2019
Subscribed and sworn to before me this 22nd
My Commission Expires April 1, 2023
County of Residence
D. C. Borers Co./Detroit Inc.
ontractorr` idder (Fjgi)
or Its Agent
Stephen J. Davis, General Manager
Printed Name and Title
day of JUYI 20 19
Notary Public Kathy Wolcott
Ingham
KATHY WOLCOTT
NOTARY PUSLIC -' STATE OF MICHIGAN
COUNTY OF INGHAM
MY Cwnnrndeefon Explr* THI, 202
Acting, in the Oounty of
Version 4/2/2019 Contractor's Bid for Public Works - 6
Conforms with The American Institute of Architects AIA Document 310
e #If*A
CONTRACTOR: SURETY:
(Name, legal stolus and address) (Name, legal slalus and 1raUac/pal place ttrh arinaaa)
The Guaiantee Company of North America USA
Byers D C Daum, Inc If}BA D C Byers Cornp+anyiDwroa,
Ivre„ One Towne Square, Suite 1470
5715 Rivard St. Southfield, MI 48076
Detroit, MI 48211 Mailing Address for Notices
OWNER:
(Name, legal staters mid a(Iress)
City of South Bend
227 West Jefferson Blvd
South Bend, IN 46601
BOND AMOUNT: 5a'/i Five Percent of Aniount Bid
This document has Important
legal consequences. Consultation
with an attorney Is encouraged
wlih respect to Its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
PROJECT:
(Xame, location or address mad l'rgfect number, (%mn}
Wayne Street & Leighton Plaza Parking Structures Repairs 2019 - Project No. 119-048
Tile Coalraciorand ,surety arc bonrrd lo the Ownerin The anuoma sot roeall atx)vc, fur tine plylncnt of which The Contractor and Surety bind
tgroiraselves, llaair hairs, oxccualors, adminisiraiols, successors and assigns, jointly and severe^illy, as provided hcrcia.''file conditions of this
Botrd arc such that it'Ilia Owvncraccepts the bid of tlae Contractor wviflaha Ilic tinic sInciiied ill tine bid docaanrcnis, or within such Ifine f riod
as lnay be agreed to by the Oww°ner and Coninictor, grad Iltc t oariraelor eilher(1) clttals ilrio a eotitrract wvith the Owner in accordance with
the terms ofstich bid, and gives smh boast or IiNtd's as inrny be specified in the bidding orC"ootrael Vocitnients, With a surety admitted in
Ilia jatisclicdoat of the llna¢act and otherwise acceptable to Tile Owvner, for the faithful ficrIbruiance of such C"olnraet and for the Prompt
pay+anent of labor and naalenal Nrilished'In lha prosecution thercol', or (2) pays to the Owvarer the difference, not to exceed ilia amount of
thus Bond, befwvicen the amount sivcified ill said bid .and srich urger aniount for which the Owner may in good faith contract with another
parly to periirmi the wvork covered by said hid, than this obligation shall be null and void, otherwiso to remain in till lorcu and ellccl, Tlic
Surety° hcroby wt°aivcs silly notice of un ugrucmcnt Wtvmco the Oww°ater and Gmlruclur to extend the linic in which ilia Owner may accept the
hit), Waiver of"arralice by the Surely shall not apply'tir any c"acrrwnm oxeeeding sixty (60) days in ilia: aggregate Beyond the lime tier
lreuelrtuuea of Hds :,Fcealied its the hid doctinienls, and the, Owvner and Cunhuclor shall obtain the Surety's consent liar un extension beyond
sixty (60) days.
If this Bond is issued in connection wvith a subcontractor's bid to n Contractor, the term Contractor in Ibis Bond shall be dccmcd to be
Subcontractor and ilia term Owner shall be dccmcd to be Contractor.
When this Bond haw been faaroished to coarrply wwith n wtirlunory°ear ollicr legul rcquilenient in the location oflhc I) ojeuk ally provision in
this Build eonflieling wvitil said alalulory or Regal rcq uirumcnl shall bo d'cenied dulord herchoni and provisions eonl'unuing to su'ich
stahtlory, or oThcr iqui realnirvilluirl shall be ducillo l wogesraToraaTcaN heseirl, When sea lunmshcd, the intent is that this Moat shall ho construed
us u slululory hand and nol us u common law bond,
Sighed and scaled this 23rd day of July, 2019,
Kathy Wolcott
S•0054/AS 8/10
D.C. DeXcAl. Inc. DBA D,
Inc.
r//?� er Davis, General Manager .
The fl grantee Com aan of North America US aroarr
ftirrrr.q) (Barr!) +- � i
Bye:
itle)Vaiehe Giuliano Attorney -in -Fact aatnaaw "r"
UE The Guarantee Company of North America USA
GUARANTEEO Southfield, Michigan
Bond No. Bid Bond
Principal: °""flC UNrot U9A ❑C o,enlmumyU ec:
POWER OF ATTORNEY Obligee: City of South Bend
NOW ALL BY THESE PRESENTS: That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the
laws of the State of Michigan, having its principal office In Southfield, Michigan, does hereby constitute and appoint
Valerie G&14717o
Mapes /assurance Agency, Inc.
its true and lawful attorneys) -in -fact to execute, seal and deliver for and on its behalf as surely, any and all bonds and undertakings, contracts of indemnity
and other writings obligatory In the nature thereof, which are or may be allowed, required or permitted by law, statute, rule, regulation, contract or otherwise.
The execution of such instrument(s) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA
as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at the principal
office.
The Power of Allomey is executed and may be certified so, and may be revoked, pursuant to and by authority of Article IX, Section 9.03 of the By -Laws
adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 311' day of December, 2003.
The President, or any Vice President, acting with any Secretary or Assistant Secretary, shall have power and authority:
1. To appoint Altorney(s)-in-fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and
undertakings, contracts of indemnity and other writings obligatory in the nature thereof; and
2. To revoke, at any time, any such Attorney -in -fact and revoke the authority given, except as provided below
3. In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given to the
Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts
required by the Slate of Florida Department of Transportation. It is fully understood that consenting to the Stale of Florida Department of Transportation
making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surely company of any of its obligations under its bond.
4. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the
Attorney -tin -Fact cannot be modified or revoked unless prior written personal nolice of such intent has been given to the Commissioner — Department
of Highways of the Commonwealth of KenlucFy at least thirty (30) days prior to the modification or revocation.
Further, this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting
duly called and held on the 6lh day of December 2011, of which the following Is a true excerpt:
RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attomey or certification
thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and
such signature and seal when so used shall have the same force and effect as though manually affixed.
IN WITNESS WHEREOF, THE GUARANTEE COMPANY OF NORTH AMERICA USA has Caused this instrument to be signed and
00%14�' its corporate seal to be affixed by its authorized officer, this 21.d day of October, 2015.
THE GUARANTEE COMPANY OF NORTH AMERICA USA
t
rnnt�" w
STATE OF MICHIGAN Stephen C. Ruschak, President & Chief Operating Officer Randall Musselman, Secretary
County of Oakland
On this 2nd day of October, 2015 before me came the individuals who executed the preceding instrument, to me personally known, and being by me duly
svdcrn, said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said
instrurnent'is the Corporate Seal of said Company,` that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of said
Company.
k
'
Cynthia A. Takai
Notary Public, State of Michigan
County of Oakland
n + t ,y
My Commission Expires February 27, 2024
+ wA°
Acting in Oakland County
IN WITNESS WHEREOF, I have hereunto set my hand at The Guarantee
Company of North America USA offices the day and year above written.
I, Randall Musselman, Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA, do hereby certify that the above and foregoing is a true
and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA, which is still in full force and effect.
IN WITNESS WHEREOF, I have thereunto set my hand and attached the seal of said Company this 23rd day of July, 2019,
;7
a r x
Randall Musselman, Secretary
-,t
1316COUNT Y-CaiTYBU11u.o.)ir G, PHONE' 5741235-9251
27 �IV.�'lf°B::N�SON 1Cau!u,iF.vaau�u.:N ',.• FAX 7 9 171
T865
(,Try' O ot.rm B1:?15D B1.1°➢"TIGll1= G, MAYOR.
1I JA.ti .11l)OF . °lWORKS
Date: July 19, 2019
To: All Planholders
From Linda M. Martin, Clerk, Board of Public Works
Subject Addendum Number: 1
Project Name: Wa ne Street &Lei hton Plaza ParKn8 Structures Repairs 2019
Project No.: -.-119-048--
ACKNOWLEDGEMENT OF RECEIPT
F ADDENDUM
Date Received: July 19, 2019
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST : also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
D. C. Byers Co./Detroit Inc.
Authorized Signature:
1% � J. Davis
Date: July 19, 2019
ADDENDUM w1
City of South Bend
WAYNE & LEIGHTON PARKING STRUCTURES REPAIRS 2019
CITY OF SOUTH BEND PROJECT NO. 119-048
July 19, 2019
PREPARED BY:
WGI
5136 Lovers Lane, Suite 200
Kalamazoo, MI 49002
WGI Project No. 24193987.00
The Construction Documents dated July 12, 2019, for the above captioned project are hereby amended and/or
supplemented by this Addendum No. 1. All applicable provisions of the General and Special Conditions,
Instructions to Bidders, and all other Contract Documents apply to this Addendum as though items included herein
were part of said Contract Documents as originally issued.
Attach this Addendum to the Project Manual for this project. It modifies and becomes a part of the Contract
Documents. Work or materials not specifically mentioned herein are to be as described in the main body of the
Specification, and as shown on the Drawings.
5136 Lovers II..ane, �jfte 200, IKaarnazo , M I49002 1 gin. 93E1.?222 1 III c.corn/pairki
Add the attached drawings to drawings set.
Drawings are for reference only.
END OF ADDENDUM No. 1
Ideas for parking. SOLUTIONS FOR(DEOPLE. gage 2 of
II3116Ca UN'ry-CIry BUILDING
227 w. JEFru:u SON Boull-NARD
scu ni IBEND. INFAAIVA46m601-11830
CITE' OF SOUTH BEND PETE BUITIGIEG, MAYOR
BOARD OF PUBLIC WORKS
December 13, 2018
Mr. Stephen Davis
D.C. Byers Co.
16429 Upton Rd., Ste. 3
East Lansing, MI 48823
RE: Pre -Qualification Verification
Dear Mr. Davis:
PHONE 574/235-9251
FAX 574/235-9171
This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South
Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you
are required to re -submit a complete application for continuation of pre -qualification status prior to December 31
for the upcoming calendar year.
A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of
South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
Linda M. Martin, Clerk
�...... ........ ...,,,
{SARI` A. GILOT DAVID P. RELOS ELIZABETH A. MARADIK JAMES A. MUELLER THERESEJ. DORAu
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Wayne Street & Leighton Plaza Parking Structures Repairs 2019
Project No. 119.048
For Bids Due July 23, 2019
Contractor Name: D. C. Byers Co./Detroit Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31 s' for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 3/19/2019 General Conditions - 6
POST BID SUSMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 3/19/2019 General Conditions - 7
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii) X By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments:
(i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) X Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) X For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
Version 3/19/2019 General Conditions - 8
II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) _ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) _ By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments:
(i) _
Indiana Secretary of State's on-line records (i.e. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii)
List identifying all former business names.
(iii)
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv)
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v)
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi)
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
(vii)
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii)
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 3/19/2019 General Conditions - 9
(ix) Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: July 22, 2019
(Sign ere)
Stephen J. Davis
(Print Name Here)
D. C. Byers Co./Detroit Inc.
(Name of Company)
16429 Upton Rd. Suite #3
(Address of Company)
East Lansing,
(City)
Michigan 43623
(State)
(517) 339-1946
(Telephone Number)
Version 3/19/2019 General Conditions - 10
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK,'
CHECKLIST FOR BIDDERS
Project Name Wayne Street & Leighton Plaza Parking Structures Repairs 2019
Project No. 119-048
For Bids Due July 23, 2019
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
X or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted
X Form [MWBE-2.1].
X Acknowledge Receipt of One Addendum(s) included with the bid.
X All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
X printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: D. C. Byers Co./Detroit Inc.
By Authorized Representative:
Signature:
Print Name & Title: Ste hens J. Davis, General Man
Date: July 22, 2019
Version 4/2/2019 Contractor's Bid for Public Works - 1
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 4/2/2019 Contractor's Bid for Public Works - 3
CO
W
°
w
N
2
a�
° W
O
H
mw0
IL
0 z
y N W
O ma
O
WW
vow
°
zd
0
z
i
z
0
IL
o~
Q
W U
m �
�a
�W
Om
a�
w
m
2
� � W
O C
C E
a0
mt.
Q..z,
LU !m 'C
L =_
m�
o
C_ C
•� O
C fRJ
._
v •�
0) c
.60 Q
a
0 y
O 0
3E
t� H
C
a 'rn
00 �
C
3
O `
m 0
o
S E
c �
H
d=
rm
aw
m t
3
3�
L
d >
.Q -0
0�
O
O
O O. N N
.02 N
� y N
w d r
a� E
0 0 �
� H C
H= 0
0
-01
Q� TI
O o
C T
0
/
Co
M
a
W
m
2
O
O
O
CO
CO
00
Ln
rn
6S.
c
0
Q
m
ai
E
cc
z
aci
'o
a
N
z
U L:
a m
m m o
c
o
F- a
LO
0-1
6%
0)
LO
IL
Q O
O
O
O O
U
CYi
C'7
O
m
LO
0
poW
c�
a
cn
c
Cl)
N
�a
o ro
v
(U
aa)
IL
.0
C
oT
0
od
U
o d
�
a vai
p
cn a
CO
(U
L)
;_.
W
a�
c
o
FL
0
�o
dr
a r
cn
0
O
ch
U
� M
�
00)
C
00
Ln�
ACo
>M
a)
Z
EL
+U+ r
(A Lo
Cn
N
JI
Lij
00
t, N
m
7 CO
W
T
Oct
cnZ
U c cm
-J r-0
Q
cn
i O C_
CD Q
J �:c
- L
as
>, :D
0 U d
co
ogcm
E
m
Z
C\j
a w o
QC.0 „V
0 T LL
VJ
C)
N
C\
CV
7
7
U)
cc
03
0
cu
z
c
CITY OF SOUTH BEND,�"'� ,., Vd
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY,
DEVELOPMENT PROGRAM
FORM MWBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: 119-048 Date: July 22, 2019
Project Name: Wayne Street & Leighton Plaza Parking Structures Repairs 2019
Bidder: D. C. Byers Co./Detroit Inc.
Contact Person: Stephen J. Davis Telephone: (517) 339-1946
Address: 16429 Upton Rd. Suite #3
City: East Lansing state: MI Zip: 48823
Email: sdavis@dcbyersdetroit.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (hfp://www.in.govAdoa).
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
(I Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and
`"' °` subcontracting opportunities.
2. Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBE/WBEs reasonable time to respond.
3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBE/WBE firms.
**Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBEIWBEs,
including providing such MBE/WBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
13. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE/WBE was unqualified to perform the job.
*Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 4/2/2019 Contractor's Bid for Public Works -11
CITY OF SOUTH BEND`""
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM„ `
FORM MWBE-2.1'
MBEIWBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE 1 OF 2
Project Number: 119-048 MBE/WBE Participation Goal 100%
Project Name: Wayne Street 8 Leighton Plaza Parking Structures Repairs 2019
Bidder: D. C. Byers Co./Detroit Inc.
By. General Manager 7/22/2019
(Signature) Stephen J. Davis (Title) (Date)
MBEM/BE Firm Reece Rebholz Co. Inc.
Owner or Contact at MBEM/BE Firm Julienne Rebholz
Telephone: 317-359-0633 Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Industrial Painting Service
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
Does not work in South Bend IN
Email: julie@rebholzinc.com
MBEM/BE Firm Standard Coating Service Inc.
Owner or Contact at MBE/WBE Firm _Arup DaS
Telephone: 317-331-8826 Fax: Email: standcoat@sbeglobal.net
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Industrial Painting Service
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
Does not bid in South Bend IN
Version 4/2/2019 Contractor's Bid for Public Works - 12
CITY OF SOUTH BENDS"�
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM,
FORM MWBE-2.1
MBEIWBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE 2 OF 2
Project Number: 119-048
MBENVBE Participation Goal
100%
Project Name: Wane Street & Leighton Plaza Parking Structures Repairs 2019
Bidder: D. C. Byers Co./Detroit Inc.
By: General Manager 7/22/2019
(Signature) Stephen J. Davis (Title) (Date)
MBENVBE Firm D. A. Dodd LLC
Owner or Contact at MBE/WBE Firm Julie Blackwood
Telephone: 219-778-4302 Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Plumbing Construction Services
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
Email: julieblackwood@dadodd.com
D. A. Dodd is available to work with D. C. Byers Co.
MBE/WBE Firm Highway Safety Services, Inc.
Owner or Contact at MBE/WBE Firm Doug Nagel
Telephone: 765-474-1000 Fax: Email: doug.nagel@hss-mmco.com
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Pavement Marking Services
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
Highway Safety Services, Inc. is available to work with D. C. Byers Co.
Version 4/2/2019 Contractor's Bid for Public Works - 12
1111iSINCE 1903
2la"0104121"'EC',.l t.t `N IN t±: "t'dtttATIO O 'r .U(.'t'0Rf,'S SINCE :ow
'.
C. Byers Company
5715 Rivard Street
May 16, 2017 Detroit, p 48211
(313) 875 45
F' (13) 875.6579
To Whom It May Concern:
The Board of Directors of the D.C. Byers Company/Detroit due hereby resolve that the
following management personnel of the D.C. Byers Company Corporation have
authorization to sign bidding and contractual documents including (material purchases,
rentals, leases).
James Boettge, Vice President
Thomas Stackpoole, Estimator
Michael Doran, Estimator
Chad Wilson, Estimator
Stephen Davis, General Manager
Douglas Harshbarger, Estimator
°r
.TYLoretta Orsette, President/Treasurer
L
State of Michigan County of Wayne
Sworn and subscribed before me this 16th day of May, 2017
An Equal Opportunity Employer
SINCE 1903
SPECIALISTS IN RESTORATION OF STRUCTURES SINCE 1903
D. C. Beers Company
16429 Upton Road Suite #3
East Lansing, Mi 48823-9428
(517) 339-1946
Fax (517) 339-4315
July 22, 2019
City of South Bend, Indiana
Office of the Board of Public Works
227 West Jefferson Blvd.
South Bend, Indiana 46601
To whom it may concern —
In accordance with the Contractor's Bid for Public Work for the Board of Public Works, City of South Bend,
Indiana, Part II Section II L, D. C. Byers Co./Detroit Inc. can begin work on the Wayne Street & Leighton Plaza
Parking Structures Repairs 2019 Project August 12, 2019 and complete the project by November 15, 2019. We
will use a minimum of 4 workers and a maximum of 10 workers to complete the project.
Sincerely,
Ateppin' J. Davis
General Manager
kw
An Equal Opportunity Employer
100 SINCE 1903
logologo -�� SPECIALISTS IN RESTORATION OF STRUCTURES SINCE 1903
A C. Byers Company
16429 Upton Road Suite #3
East Lansing, Mi 48823-9428
(517) 339-1946
Fax (517) 339-4315
July 18, 2019
City of South Bend, Indiana
Office of the Board of Public Works
227 West Jefferson Blvd.
South Bend, Indiana 46601
To whom it may concern —
In accordance with the Pre -Qualification Checklist for the Board of Public Works, City of South Bend, Indiana,
Item Section I B iv, this statement indicates and ensures D. C. Byers Co./Detroit Inc. has sufficient employees on
staff to complete the work required by this bid for the Wayne Street & Leighton Plaza Parking Structures Repairs
2019 Project.
Sincerely,
teen. J. Davis
General Manager
kw
An Equal Opportunity Employer
Business Name: BYERS D.C. DETROIT INC
Entity Type: Foreign For -Profit Corporation
Creation Date: 05/06/2009
Principal Office Address: 5715 rivard st,Detroit, MI, 48211, USA
Jurisdiction of Formation: Michigan
Original Formation Date: 06/18/1999
BUSINESS INFORMATION
CONNIE LAWSON
INDIANA SECRETARY OF STATE
07/18/2019 11:31 AM
Business ID:
2009050700373
Business Status:
Active
Inactive Date:
Expiration Date:
Perpetual
Business Entity Report Due
05/31/2021
Date:
61NIM
Title Name Address
President LORETTA ORSETTE 7267 RIVERSIDE DR, ALGONAC, MI, 48001, USA
Type: Individual
Name: CT CORPORATION SYSTEMS
Address: 150 West Market Street, Suite 800, INDIANAPOLIS, IN, 46204, USA
0
n-u
m0
90
�
(nw
ror.
ODZ�
m�
O --A
m�
m
0 0
A D
z
o
=
v�
0v
0
;uO
_0
m
�
m
25
za°
�
"�
G) O
rD-
r
Z 0
C m
n
m0
r
O
r-
m
o
z
ai
cmn
cmn
cDn
Z
cmn
cmn
z
�I
-�
m
i
Z
Z
Z
Z
Z
m
cn
O
z
N
N
{i9
69
A
s
W
Oo
N
A
�
tpD
C
N
N
0)
O
V
OD
O
p
O
ODCA
CJI
O
OD
O
0
O
O
?
O
O
0
0
m
cn
Z
Z
rD-
C
�
G)G)
O
o'
r
m
z
z
o
G)
G)
�
G)
Q
co
N
O
O
N
o
m
cD
cc
m
O m
D
z �
y
r
_
0
ml
O'
Z
_0
�
O
�
m
m
-�
o
cn
cn
z
Zm
G)
m
r"
�
o
0o
�
00
O
D
O
2
Z Z
Z
D
CO
co
r
v
z
<
z
m
0
v
O
Z
cn
Oo
co
w
co
0
0'
0
0
0
0
0
r
i
T
m
O
m
a0
3z
a
—1 0
T
Om
30
�m
rZ
m G)
m
m=Xxvom-1 0 p
gmmzccgm mg z
mFnzmowx-OmDDoyyo�zmy
Z C
mpWWMTWMDmm �
�m-iOm rn �z�cm z
TTmOmcz m
OO�z�<mju�-0zrnmO�-0zrnm0�z
mmmm��nm
oTzzcrn
0v�mz
DzD�Doz0zmm rn
z �rn
D Ln
�mm �� -zjmm�
X rn z
�C/)
c
m
i �1
�CTONN)0�n0I-rtt DhhIn N)�v4
�D�DDDDDDDD
rc
Wcn
c
0
m
00
n 0
-aG)
X �'
O
G)
U)v
0 m
G)
m
� m
n
� D
��'
D
m
cn
z
�0
D
m D
9
z
mm
�,
o
z
D
z
i
<
Z
W
w
m
�
O
o
�
C
Z �
D
D
�O
CO
z
z
X
-<
X
m-<
m
O
O
�
'
O
mO
G
GZ)
0
0
0
z
i
69
m
w
o
4A
w
OD
w
rn
ao
to
co
cr
CA
v
A
w
PD
SA
CO
Cb
i
CD
Oo
o
c�ii,
o
o
�'
00
N
0
N
0
0
0
0
0
0
ry�
W
CD
d0
w
co
v
co
0
0
0
0
0
0
0
0
0
0
0
0
0
0
m
�
0 00
z
X
X
3
�m
CD
�,
z�
m
X
�, m
a) z
oo
X
oo
;u
- i
m
--Ig
�
o
o G
O
m
o m
n
G
9
0
x
z
T
O
C-
m
n
Oma
m
�O
n
0 -4
a
40
-I
IV
m
,�
ON
3T
m
v
0
?:E
z
m
�;R
O
X
REFERENCES
Frank Rewold and Son Inc
Contact: Mike Gagnon: (248)651-7242
Type of work includes waterproofing, joint sealants and firestopping.
Memorial Hospital
Contact: Larry Lies: (574)647-1474
Type of work includes concrete repair, coating, and joint sealants.
Post Cereal LLC
Contact: Kevin Wolff. (269)-966-1000
Type of work includes concrete repairs, masonry repairs, and injection.
Detroit Regional Convention Center
Cobo Hall Bridge Deck
Contact: Mr. John Kull w/Cobo Center (313) 477-6150
Type of work includes concrete bridge deck restoration, waterproofing, asphalt
repairs & expansion joint repairs.
Detroit Edison Power Plants
Contact: Mr. Kevin Bennett w/DTE Facilities (313) 995-6977
Type of work includes concrete, masonry and limestone restoration.
Devon Industrial Group
Contact: Rick Ryan: (313)-350-3518
Type of work includes concrete repairs, masonry repairs, waterproofing and joint
sealants.
Michigan State University
Contact: Tony Rhodes
Type of work includes concrete repairs, masonry repairs, parking deck restoration and
waterproof coatings.
The D.C. Byers Company has been in business since 1903. We are specialized
concrete & building restoration 31nd waterproofing contractor. We self -perform an
average of 400 to 500 projects each year with individual contract values ranging from
$1,000.00 up to $3,000,000.00. We complete an average of 11 to 14 million in self
perform work each year.
77
SINCE 1903
EQUIPMENT
375 AIR COMPRESSOR
185 AIR COMPRESSOR
2 - 30 LB HAMMERS
DUMP TRAILER
SPECIALISTS IN RESTORATION OF STRUCTURES SINCE 1903
Last of ti Maui .mru+ent Available
BOBCAT
14 - RIVETBUSTERS
2 - 60 LB HAMMERS
D. C. Byers Company
16429 Upton Road Suite #3
East Lansing, Mi 48823-9428
(517) 339-1946
Fax (517) 339-4315
An Equal Opportunity Employer
i
C Z
Z D
n N
W
W
C.
7
N
c:
n
i
CD CCU
V.
=o
x
o' O
z o
r
N (D
CD F.
s —
r'
co
m
�.
N N
W O O
—
ONo w OD
r r:
"wmn°
W
—
.x7
Z
G.
m
y m
r
W c�
r
. d3
N
�
J
C
f
m
r:
z
r
py�
r
r�
j
r.
A
E
FY 2017 201),S
I iFill �l�ililill
This is to certify the business below has met all requirements set forth
by city of Detroit Civil Rights, Inclusion & opportunity as
Byers DC Detroit, rnc.
Detroit Headquartered Business (DHB),
,knd Woman -Owned Business Enterprise (WBJ
commencing August 09, 2018 expiring on August 09, 2019.
City of Detroit
v 0 7, 1 () t 7
ncca"pt 11III ]CPI 7M 8 PC 111P I I I It 2�i115
::7
V)
r+
C) Ci
C)
(T)
aL Z
0 0
3
0 3
0
n
VI
we
v
rid
M
............
This certifies that
BYERS DC DETROIT INC
5715 RIVARD ST
DETROIT, MI 48211
Has complied with all the requirements of the Wayne County Business Certification Program. This firm is hereby
eligible to participate in Wayne County's procurement process utilizing the Equalization Credits for the following
programs and/or has established compliance with Wayne County's Fair Employment Practices Resolution.
(Listed under tho Certification Medallion is the date through which your Certification/Registration is valid.)
3/1912022
11/1/2021
3/19/2022
MIME Registered through: 8/11/2020
Victoria I. Edwards, Director
Warren C. Evans, County Executive
Michigan
1,
i ? Institute
February 22, 2019
Attn: Charlotte Brach
City of South Bend
227 W. Jefferson Blvd., Ste. 1316
South Bend, IN 46601
Dear Ms. Brach,
Hello, my name is Scott McDonald. I am the Director of Apprenticeship for the trade of Construction Craft Laborer
in the State of Michigan. The D.C. Byers Company is one of our signatory contractors who employ Construction
Craft Laborer apprentices. It is my responsibility to coordinate the training activities of each apprentice, calculate
the work and training hours and notify companies including D.C. Byers when their apprentice employees advance
through the stages and eventually complete the program.
Please let me know if there is anything else you need.
Have a good day,
Scott McDonald,
Director of Apprenticeship, MLTAI
d
v 3 , D
0 -4
o z
OV D
3
z
Q
bd
CD
Q.
m
41
cp
A
v'
�0
�0
m
Gd
m
�
m
c-)
ca
A
A
m
d
o
OO
Q�
X
�
rn
z
ti
�b
b
NCD-0
d�
z
�
a
b
cn
ti
,ram.
c)
3
ti
y
rn
A
m
AM ;
iv.
As
Robert Makdlmi, Bushmess Mairmager lloinrmie Malcom rmrm, i„wresideint Dan Minton, Secretary -Treasurer
Canstructionrya
Local Union 499
r 2 $ 1 4u '
3080 haatt Road, Ann Arbor, 1'148 M (877) 4992 WO (7 4) M .!52Q Fax: (734) M -F 094
June 5, 2019
To Whom It May Concern:
D.C. Byers Company is current with all Fringe Benefit Contributions and is in good standing with
Laborers' International Union Local 499.
If you have any questions or require additional information, please feel free to contact our office.
Sincerely,
�4
Dan Minton
Business Manager
Section 3, Grievances shall be handled in the following manner:
A. The grievances shall be referred to the Union Steward and to the Employer's designee for
adjustment.
B. If the grievance cannot be settled pursuant to paragraph A of this Section, the grievances shall be
referred within five (5) working days to the Field Representative of the Union and the Employer.
C. If the grievances cannot be settled pursuant to paragraph B of this Section within three (3) working
days the grievances shall be submitted, in care of the Association Director and BAC Local 2
Representative, for Joint Arbitration Board consideration and settlement.
D. If the Joint Arbitration Board cannot reach a satisfactory settlement within five (5) working days
following a referral of the grievance to the Board, it shall immediately select an impartial arbitrator
to review with the Board all evidence submitted relating to the dispute and then cast the deciding
vote. If the Joint Arbitration Board cannot agree on an impartial arbitrator, the impartial arbitrator
shall be selected from a panel of arbitrators submitted by and in accordance with the rules and
regulations of the Federal Mediation and Conciliation Service. All expenses of the impartial party
shall be borne equally by the Union and the Employer. All decisions reached by the Joint
Arbitration Board at any stage of the grievance shall be final and binding upon all parties.
Section 4. When a settlement has been reached at any step of this grievance procedure, such a
settlement shall be final and binding upon all parties.
Section 5. The time limits specified in any step of the grievance procedure may be waived or expedited
by written mutual consent of both parties. Failure to respond within the time limits provided above,
without a written request for an extension of time, shall be deemed a waiver of such grievance without
prejudice, and shall create no precedent in the processing of and/or resolution of like or similar grievances
or disputes.
ARTICLE XVIII
APPRENTICESHIP
Section 1. Wages and Fringes. The wages of Apprentices shall be based on percentages of
Journeyman scale, plus full (non -reduced) fringe benefits and other contributions and deductions, except
Local Dues as noted on the applicable fringe form.
The Apprentice rate of pay for Bricklayers ONLY shall be the following percentages of Journeyman scale.
1.
0 hours —
60% of scale
5.
3000 hours =
80% of scale
2.
750 hours =
65% of scale
6.
3750 hours =
85% of scale
3.
1500 hours =
70% of scale
7.
4500 hours =
90% of scale
4.
2250 hours =
75% of scale
8.
5250 hours =
95% of scale
Note: Apprentices must have a minimum of 6,000 hours before completion of apprenticeship; The Joint
Apprenticeship & Training Committee (JATC) will determine the final wage increase to Journeyman scale
(100%). The four (4) year — 6,000 hour apprenticeship program applies to Bricklaying only.
16
The three (3) year — 4,500 program will continue to apply to the other crafts covered by the agreement until
further notice. The Apprentice rate of pay for the other masonry crafts will be as follows:
1.
0 hours: =
65%
2.
750 hours: —
70%
3.
1500 hours: =
75%
4.
2250 hours: —
80%
5.
3000 hours: =
85%
6.
3750 hours: =
90%
7.
4500 hours: =
100%
Section 2. Ratio. There shall be one (1) Apprentice after five (5) journeymen, two (2) Apprentices
after ten (10) journeymen and so on. As the job lays -off, the same formula in reverse shall apply. If any
Employer wants to employ more Apprentices than the above ratio, with the concurrence of the Union, the
Employer may do so.
Section 3. The Apprenticeship Committee or Fund trustees shall have complete authority to administer
the Apprentice Program. All parties shall be bound by the Apprenticeship Standards currently in effect.
Section 4. In order to assure the masonry industry is replenished with highly skilled and experienced
journeymen, the parties agree an apprentice shall not be permitted to operate a saw more than one (1) day
per week. This provision excludes working with a grinder for the purposes of restoration (PCC) work.
Section 5. Improver: Each Improver, prior to employment may be tested at the Michigan BAC
Training Center. In turn, the Training Center will issue a recommendation on the skill level and subsequent
beginning pay schedule of the Improver. The Employer may also establish an Improver's beginning wage
schedule subject to Union approval.
All parties to this Collective Bargaining Agreement hereby agree to recognize the "Improver" classification
primarily for organizing purposes.
ARTICLE XIX
JOB STEWARD
Section 1. Steward Appointment and Duties: On any of the Employer's projects which employ two (2)
or more Employees, (including the Foreman) the Union shall have the right to refer for placement on such
projects, one individual and appoint him the job Steward, subject to the Employer's approval. The
Employer will not withhold its approval arbitrarily or unreasonably. The Employee designated as the Job
Steward shall be a qualified Journeyman and must fully perform his job duties as directed.
Section 2. When a job is temporarily laid off before completion, the Steward shall be the first called
back (after the jobsite Foreman), when work is resumed. If the Steward cannot be reached, the Employer
shall notify the Union and a new Steward will be appointed.
Section 3. The Field Representatives shall have the authority to view Employee pay records.
Section 4. When the Employer has a series of small jobs or projects the Union at its sole discretion
sliall have the right to appoint a Steward for a specified period of time so as to avoid having to appoint
several Stewards on multiple small jobs.
17