Loading...
HomeMy WebLinkAboutChange Order No 2 - Historic Leeper Park Improvements Project No 118-010A - Ancon ConstructionCITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD PUBLIC July 23, 2019 Sean Welty Ancon Construction 2146 Elkhart Road Goshen, IN 46526 PHONE 574/235-9251 FAX 574/235-9171 RE: Change Order No. 2 - Historic Leeper Park Improvements — Project No. 118-010A Dear Mr. Welty: The Board of Public Works, at its meeting held on July 23, 2019, approved the above referenced Change Order for an increase of $23,784.10, plus an additional twelve (12) days, bringing the current contract amount to $1,345,797.07. The project completion date remains unchanged at November 1, 2019. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAMA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 7/15/2019 118-010A Historic Leeper Park Improvements 4/23/2019 2 PCR #2-Pi e re air and bench uantit adjustment The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is X Increased Decreased The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR �t Co ra for Signature ,J Printed Name and Title Company 'IINappme 9 wl,^�W � �I����� M , � v .I.� Address � mm i City, State, Zip $ 1,308,129.03 $ 13,883.94 $ 1,322,012.97 $ 23,784.10 $ 1,345,797.07 1.80 % 2.88 % 11J/0/2019 Acikc — 7' S/20k4 j2 days . F,,A41(� I I/ 112- vie RECOMMENDED FOR APPROVAL CONST ION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC W RK S Approved Date: m Gary A. Gilot, President G nevi ve E. Miller, Member Eliza eth Maradik, Member O'Sullivan, Member Project Number: 118-010A DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Name: . DATE INITIATED: 7/15/2019 BPW DATE Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). • Cost for pipe repair: $14,043.70 Historic Leeper Park Improvements Change Order #: 2 • Cost for bench quantity adjustment: $9,740.40 * $25,587 60 (12 backed benches) - $15,847 20 (8 backless benches) 0 Fountain completion date extended to 8/9/2019 due to delayed delivery of electric panel and unforeseen fountain -assembly faults. Attachments: (List documents support change — required) Amount of C Increase/ ❑Decrease: $ 23,784.10 Previously approved Change Order(s): $ 13,883.94 Current Percent of Change: 1.80 % New Total Amount: $ 1,345,797.07 Total Percent of Change: 2.88 Categories (Pick One): fl Scope of Work ❑ Differing Site Conditions, Changed Conditions ❑ Conflicted Specifications and Drawings ❑ Failed Materials ❑ Error ❑ Omission ❑ Final Quantity Adjustment Funding Secured From: r'++ITITmmmmmmITITITITIT . -Il i ' c� (filled out by PM) RECOMMENDED BY: _..... _ ........ _ _ _ _..._ _ _. ..... .?.-..... -� Project Inspector (Print Name) ;gnature) (Date) REVIEWED BY: Construction Manager (Print Name) APPROVED BY: ....-Al Engineering Project Manager (Print Name) APPROVED BY: City Engineer (Pr� � int N me) (Signature) (Date) (Sign r�) (Date) ................. _..... 7AV (Signatur) (Dane) ANCON CONSTRUCTION CO., INC. ProJect: Leeper Park Improvements Job No: 173041 PCO No. 02 Reference: Replace additional 24" drain pipe with DIP Date: 6/1412019 Description: Replace approximately 40'of clay drain pipe with 24" ductile iron pipe Includes: 1. Provide and install 24" D.I.P. 40 linear feet to the north of STR. 1001 2. Dewatring is included Excludes: Change Order Amount: $ 14,043.70 Should you need any additional supportive documentation and/or breakdown, please call us at your convenience. Thank you for your prompt review and cooperation. Approval: Authorized Signature: Sean Welty Project Manager Date of'Approval: Ancon Construction M C E N > U O C Q U L c m d O :- -0 M CD N U 2 O LO Cfl m CM a m c co Z 39 0 O Y 0)O O) U N L C w N O N M O N O N 00 CD C0 U _ 00 CU _l 2 Q N U' - in .�- C� « C Co lu >. W 7 v G G° °' o a U), Iwo d c' ° c c CL n1aaQ' o'Q o'E z; z o ° H m:oCL w, o E E E, o E o o WI W' �, V 2d r '1- C IL, a. o IL)a U.0 o o z 7 (a;m =; E ii LL'S m 0 m. V H E co00 00 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 7/16/19 Name Kyle Silveus Department E ineenrig ................ - ----- ...... - ---------------------- - 111­­ ­.. ­­ N_­­­ -, ­ ­ BPW Date 7/23/19 Phone Extension 9083 Required, Prior to Submittal to Board Legal Attorney Name Clara McDaniels Controller Controller review is required for all Contracts $5,000.00 or more anc greater than one year in length per the City Purchasing Policy Purchasing F-1 Michael Schmidt Check the A LJ Agreement El Professional Services Bid Opening Quote Opening Z Change Order No. 2 El Ease/Encroach, [JOther: iropriate Item Type - Contract F-1 Resolution El Bid Award F1 Quote Award C/O & PCA No. Traffic Control for All Submissions ­ ------------ Proposal Addendum E] Req. to Advertise [] Title Sheet ired Information [:1 PCA Company or Vendor Name Ancon Construction Company, Inc. New Vendor El Yes El No El If Yes, Approved by Purchasing MBE/WBE Contractor [:] MBE F-1 WBE MBEIWBE Contractor Requested E] No E] Yes Name of Company_ Project Name Historic Leeper Park Improvements - Bid Package 1 . .......... . ­ . . .... ...... .. . ...... . . - - -------- . . . . ...... . . . Project Number 118-01 OA . . ....... - — ­­ .... . ------- - Funding Source RW TIF Bond . . ...... - ----- ­­ ­ . . ................ . . . . . . . . . . ..................... Account No. 452-1101-452-31.02 ........... . . . - ------- Amount ----- - -- 23,784.10 Terms of Contract .................. . . . ... . ............... --­­­.--- . ..... Purpose/Description �niRequired BQn lay AdjuContractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc. Amount of z F-1 R i lqd�For Chq99 Orders Increase $23,784.10 ..... .... . ..... -------- Decrease $ ............. ........ ................ . . .. Previous Amount $ 1,322,012.97 ­­ ... . ...... . . . ..................... . . . . .......... ... Current Percent of Change: 1.80% New Amount 345,797.07 .. .... . . .... Total Percent of Change: 2.88% Dispersal After Approval Copy Original Kyle Silveus Patrick Sherman