Loading...
HomeMy WebLinkAboutChange Order No 1 - Mishawaka Ave Traffic Signals at Fire Station No 9 Project No 117-120A - Pemberton Davis Electric Inc227 W. JEFFERSON BOULEVARD 9is l d At m CITY OF # BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS July 23, 2019 John Ferro Pemberton Davis Electric, Inc. 916 E. McKinley Avenue Mishawaka, IN 46545 PHONE 574/235-9251 FAX 574/235-9171 RE: Change Order No 1 - Mishawaka Avenue Traffic Signals at Fire Station No. 9 — Project No. I I7-120A Dear Mr. Ferro: The Board of Public Works, at its meeting held on July 23, 2019, approved the above referenced Change Order for an increase of $16,638.57, bringing the current contract amount to $187,923.94. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 6/25/2019 117-120A Mishawaka Avenue Traffic Signals at Fire Station #9 2/26/2019 PCR #1-Bore 3" Conduit PCR #2-Install Handholes PCR #3- Increase Quantities; Sidewalk Removal and Curb Ramp Replacement The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time Co ractor Sig Printed Name and Title Pemberton Davis Electric, Inc. Company Name 916 E. McKinley Avenue Address Mishawaka, IN 46545 City, State, Zip $ 171,285.37 $ 0.00 $ 171,285.37 IrR11 Increased El Decreased $ 16,638.57 $ 187923.94 9.71 % 9.71 % 7/17/2019 0 days 0 days__ 7/17/2019 CONST ON MANAGER CITY OF SOUTH BEND BOARD OF PUBLI 4iy0 KS Approved Date: Gary A. Gj ot, President Genevie E. Miller, tuber Elizabeth A. Maradik, Member IM w ura O'Sullivan, M DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING 117-120A Project Name: Change Order #: Mishawaka Avenue Traffic Signals at Fire Station #9 1 Project Number: DATE INITIATED:6-13-19 m.... BPW DATE: 7-9-19 ........ Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Intersection at Mishawaka Ave/Ironwood Dr. is not up to date. Handholes to be added at each corner with independent conduit runs to each. Additional concrete work needed to tie everything together properly. Attachments: (List documents support change — required) Price breakdown Amount of B Increase / ❑ Decrease: ¶16, 638.57 Categories (Pick One): Previously approved Change Order(s): $ 0.00 ® Scope of Work ............................ .....••••••-...... 8 Differing Site Conditions, Changed Conditions Current Percent of Change: 9.71 ........ % ❑ Conflicted Specifications and Drawings New........ �.....,....�,,,,.. �ww..._.� El Failed Materials Total Amount: $187,923.94 El Error ❑ Omission Total Percent of Change: 9'71 ❑ Final Quantity Adjustment ,� L7 Funding Secured From: • • ................ (filled out by PM) RECOMMENDED BY: Dan Jones Project Inspector (Print Name) (Signature) (Date) REVIEWED BY: Toy Villa 27 . Construction Manager (Print Name) _. _. (Signature) Y n WWXITITITWWWWmmmIT� (Date) APPROVED BY: Roger Nawrot -- Engineering Project Manager (Print Name) Sig ire) (Date) APPROVED BY: Kara Boyles City Engineer (Print Name) (Signature) (C1 te) VI Cd C 12 U V1 m CO C L1 C Y 9 � N Q C :3 O O C L O U C C ucu ,,,,,'',.. L X W W = O N C ` � � O O N L C � � 41 C C f0 � L U O m w 3 v m vo N aJ U C C L C -0 O c L C ry1 _ O mo Q u v o r, c 11 o W ui v L to to V? a wkD o v c v� ,4 L' 7 in to �ol 'D a+ � r r c o et � m C Y f0 m Y L O E Y 7 O C C O u u fm f0 O` = O Y O > in Q Q BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 07/05/2019 ,17011 Name 1 oy i I la ...... -----. ----- Department: Engineering _ ..�.�. BPW Date 07/23/2019 Phone Extension 5920 ' :'�4'd-4'NdYXM ..1Vu�. d fu c935 ra�dip�,y�gWSy?A. fWdYfiBx.. u^,�B &dGiM�IFwM✓ Se/e'uw„, LkWWWIIm'I�VlYNN9MwVplulul!WWI e'�2'�' IIIIIIPiu@IUIIIIIIM 1 .. " ,MEMM rMMON .+: ...................��„��,,,,,,,,��,,,,,,,.,..,.,.,,.,,,,,,,,,,,,,,,,,,,,,,,,.,,.,,...................W...................... ����,.........,,,,,,,,,,,........_..,,,..,, _ Re uired Prior t _�.�.0 _.... t q Board o Submittal to Boa BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing --- ------ ..._ �. Check the Avou..onfiate Item Tvne Reaulred LJ Professional Services Agreement L_J Contract [J Open Market Contract Amendment/Addendum Bid Opening Bid Award Quote Opening ❑ Quote Award Proposal Opening ❑ C/O &PCA No. Z Chg. Order, No. 1 ❑ Traffic Control ❑ Other: Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Information All Submissions Proposal F] Special Purchase, QPA ❑ Req. to Advertise ❑ Title Sheet F-1 Reject Bids/Quotes PCA Resolution Ease./Encroach Pemberton_ -Davis Electric, Inc. _ Yes If Yes, Approved � �❑ ❑ pP Y Purchasing ® No ❑ MBE Completed E-Verify Form Attached E]Yes WBE ❑j No ........ i Mishawaka Avenue Traffic Si nals at Fire Station _mon #9y„ ___ m.�.......... 117-120A Div. A - LRSA Traffic Signal Maintenance / Div. B...................... -EMS Capital Fund �... ............... - - --_ m...m.,mm._ ..m._. ......_. 1.0608.431.36.67 / 287.0902.422.42.02 AVproval of C.O. #1 Change Orders On ...__ ��. .� �............._...µ........... _ For .................. aY _____----__ Amount of z Increase $ 16,638.57 [ j Decrease ($ ) .................... Previous Amount $ 171,2 ........... ---_____- . .. M_.. 85.37 .e�Increase... ... 9.71 %.... ...�., �—_......, ....... ..W�. Current Percent of Change: Decrease,_ �m ..m.,%).,_ .. New Amount $ 187,923.94 ........................................... Increase % �.............................. ........ .. ---------------- Total Percent of Change: Decrease'9.71% Time Extension Amount: ..... -- ......... ----- ------ ----.___...-_...................__..... ...... ........ _..... .— New Completion Date: