HomeMy WebLinkAboutChange Order No 1 - Civic Alleyway Repaving Project No 118-110 - Walsh & Kelly IncoV Th 11 1865 July 23, 2019 Dustin Hilary Walsh & Kelly, Inc. 24358 SR 23 South Bend, IN 46614 lg' �,IJM4jWAJ RE: Change Order No. I (Final) - Civic Alleyway Repaving — Project No. 118-110 Dear Mr. Hilary: The Board of Public Works, at its meeting held on July 23, 2019, approved the above referenced Change Order for an increase of $3,355, bringing the current contract amount to $54,047.51. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Enclosure Sincerely, Linda M. Martin, Clerk 11�11�1;11;11�g 11 '111 1 1 1!11111v k0.r4k'A dq p6 CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER_ DATE: 7/2/2019 PROJECT NO: 118-110 PROJECT NAME: Civic Alle )Nay Repaving CONTRACT DATE: 12/20/2018 CHANGE ORDER NO: 1 (Final) SUBJECT OF CHANGE ORDER: PCR #1-Adjustment to Final Quantities. All items completed substantially as planned. See attached Comparison of Estimate for overruns and underruns, The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time P_QN1EACTOR Contractor Signature' Printed Name and Title Walsh & KeNNy, Inc. Company Name 24358 SR23 Address South Bend„ IN 46614 City, State, Zip $ 50,692.51 $ 0.00 $ 50,692.51 increased Decreased $ 3,355.00 $ 54„047.51 6.62 % 6.62 % 6/1 /2019 0 days 0 da s 6/1 /2019 _RggQMMENDF,D FOR 6REBQVAL CONSTR'- INN MANAGER CITY OF SOUTH BEND BOARD OF PUBLI WORKS pproved Date:. qlg Gary A. Gilot, President Gea . Miller, ember Eiizabeth A. Maradik, Member The e�Jorw"I6 b r "".�..._.... aura O'Sullivan, MemN DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING FINAL COMPARISON OF ESTIMATES CONTRACT VS FINAL Contractor: Walsh & Kelly, Inc. Project No. 118-110 Project Name: Civic Alleyway Repaving Over/ No. ITEMS Quanti Placed Under ................ UNIT UNIT PRICE EXTENSION 1 Maintenance of Traffic 1 1 0 LS $3,500.00 $0.00 2 Mobilization and Demobilization 1 1 0 LS $2,450.00 $0.00 3 Milling, Up to 1.5 inches 729 657 -72 SY $10.00 -$720.00 4 lHMA Surface, 9.5 mm —Type B 60 57 -3 TONS $150.00 -$450.00 5 Tack Coat 1 1 0 ............................. TONS ...... .._ $0.051 $0.00 6 __._._ Joint Adhesive, Surface ..�._._._._._ 246 246 0 LF $0.01 $0.00 7 Ad'ust Inlet to Grade 2 0 -2 ..........�..—.. EA ....... ........_.wawa $500.00 L -$1,000.00 8 Concrete Approach, Remove 60 80 20 SY $100.00 $2,000.00 9 PCCP For A roaches, 6-IN 60 80 20 �. SY $135.00 $2,700.00 10 Secunt Bollard, Removable _.. ........... .._.M ........_ 4 4 0 EA $2,400.00 $0.00 11 Standard Curb, Concrete 50 61 11 LF $75.00 $825.00 12 ....... 0 0 $0.00 13 0 0 $0.00 14 0 0 $0.00 15 0 0 $0.00 Contract + Approved Change Orders $3 355.00 DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Number: 118-110 Project Name: CIVIC Alleyway Repaving Change Order #: 1 DATE INITIATED: 7/2/2019 BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope Etc.). Adjustment to Final Quantities from an Overrun of Drive Approach Quantities. Attachments: (List documents support change — required) Quantities Comparison Form. Amount of®Increase /❑Decrease: $3,355.00 Categories (Pick One): Previously approved Change Order(s): $, 0___- ❑ Scope of Work ..° ❑ Differing Site Conditions, Changed Conditions Current Percent of Change: 6.62 _ % ❑ Conflicted Specifications and Drawings El Failed Materials .New Total Amo .00 unto $ 54047.,_,_.— ❑ Error ............................. El Omission Total Percent of Change: 6.62 % 8 Final Quantity Adjustment Funding Secured From: (filled out by PM) RECOMMENDED BY: Josh Ehmer 7/3/2019 Project Inspector (Print Name) ('S'i atu (Date) REVIEWED BY: a Construction Manager (Print Name) (Signature) (Date) APPROVED BY: 7VIA Engineering Project Manager (Print Name) (Signature) (Date) APPROV D BY: p City Engineer (Print Name) (S�gn' tore) (Dale) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date Name July 1y 7 �2019,LL....na.. _.,........ ......... Charlotte Brach Public Works - Eng. BPW Date Jul 23 2019 Phone Extension 9246 'd 19✓4W,1 IN'MAMMIINIINIIII ,�„� Nif�NMFlkkXfXf�/.fRfd��YRi RI A �nF+vzzwan +//�AFiI/k'... JdiM 'S1011YW W1 Mp91NNIVImmwumvrvNMlfi'4F/1E,NlJi/fim �,�, �,�, www. ........,,w..... ..... ........ .......... - ...........m... Required Prior to Submittal to Board BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing Check the ❑IT] Professional Services Agreement ❑, Open Market Contract Bid Opening E] Quote Opening ❑ Proposal Opening ® Chg. Order, No. 1 ❑]_ Other: ate Item T e --. Contract Amendment/Addendum Bid Award F] Quote Award C/O & PCA No. Traffic Control All Submissions E] Proposal ❑, Special Purchase, QPA ❑] Req. to Advertise ❑' Reject Bids/Quotes ❑] PCA [� Resolution Ease./Encroach ❑ Title Sheet Re wired Information Company or Vendor Name Walsh & Kelly, Inc. �] Yes ❑d b If Yes, Approved ers...� � ���....._ ..... _.�.�� ...._ �...e._. New Vendor prov� �ey Purchasing No MBE/WBE Contractor ❑❑ WBE Completed E-Verify Form Attached F Nos Project Name Civic Alleyway Repaving Project Number 118-110 Funding Source �. Complete Streets Transportation Account No. 404-1001-460-42.30 Amount Terms of Contract Base Quote Purpose/Description ff �_ ... l.�......__. _...._ _�._._ __ For Change Orders Only _.. .._.._. F. ... Amount of Increase $ 3,355.00 ❑ Decrease $ ) Previous Amount $ 50,692.51 Increase 6.62% Current Percent of Chane: Decrease %) �.. .. __.. - ...... New Amount $ 54,047.51 Increase 6.62% Total Percent of Change: Decrease %) Time Extension Amount: New Completion Date: