RE: Change Order No. 1 — Venues Parks and Arts Restroom Remodel — Project No. 118-
043 R
Dear Mr. Kirkpatrick:
The Board of Public Works, at its meeting held on July 9, 2019, approved the above
referenced Change Order for an increase of $35,250.82 bringing the current contract amount
to $525,250.82.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAMA L. O'SULLIVAN THERESE J. DORAU
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER
DATE:
PROJECT NO:
PROJECT NAME:
CONTRACT DATE:
CHANGE ORDER NO:
SUBJECT OF CHANGE ORDER:
6/20/2019
118-043 R
VPA Restroom Remodel
1 /22/2019
PCR #1-Unforeseen conditions & omissions
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
CONTRACTOR,
Contractors nature
Printed Name a d Title
Michiana Contractin Inc.
Company Name
7843 Lilac Rd. PO Box 929
Address
Plymouth, IN 46563
City, State, Zip
$
R-11 Increased
Decreased $
8/30/2019
0 days
0 days
8/30/2019
490,000.00
0.00
490,000.00
35,250.82
525,250.82
7.19 %
7.19 %
RECOMMENDED FOS-APPRQY-AL,
-ION MANAGER
CITY OF SOUTH BEND
BOARD OF PUBLIC 0 KS
Approved Dat&: �w°°"
zt
Gary A. Gi ot, President
Z
vi ve E. Miller„ Member
UJ
Elizabeth A. Maradik, Member
d
herese J. D6rau, Member
Laura O'Sullivan, Member
From: Mark Livinahu ouse
To: (eirea®ry McGowan
Subject: Kennedy Park Plumbing
Date: Wednesday, June 19, 2019 9:06:36 AM
Re -piping leaking and aged plumbing in chase as needed
1 Disconnect existing chase piping and prepare piping for selective demolition. Run a camera down
the existing drain pipe and verify the condition prior to connecting new pipe.
Should the underground and site piping also be no good then we will address what will be
required at that time.
2 Furnish and install new sanitary piping (PVC) connect to existing as available.
3 Furnish excavation for new underground sanitary piping connection.
4 Furnish and install new aboveground sanitary waste and vent piping (PVC) connect to existing
venting as available.
5 Furnish and install new domestic water piping (copper with mechanical press fitting) connect to
existing as available.
6 Plumbing fixture modifications to be included in the base pricing with the exception of the
replacement of the "urinal" indicated as a "toilet to remain" to become a standard height toilet in
the women's restroom.
7 Plumbing chase block wall will have to be tore down to make way for plumbing repairs and then
rebuilt
Additional Plumbing sub cost $9,400.00
Block wall rework cost $2390.00
10% mark up $1,170.00
Total cost $12,960.00
Thanks
Mark Livinghouse
Michiana Contracting Inc.
PO Box 929
7843 Lilac Rd
Plymouth, IN 46563
Work (574) 9336-8613
Fax (5_74) 9 ,. Jw.
From: Mark Livinahouse
To: Gregory M___QGowa_n
Subject: Pinhook plumbing
Date: Friday, June 7, 2019 3:19:31 PM
1. Demolition of the existing cast iron pipe ( lead joints ) and carriers
2. Furnish and install new carriers for the water closets in the new locations.
3. Furnish excavation as required for the underground connections as required.
4. Furnish and install new drain and vent piping in chase (WE intend to reuse existing water
piping where possible)
5. Cut concrf�dG rre needed in chase and repour.
Total cost $18,152.00
IX -A -=44-
Thanks
Mark Livinghouse
Michiana Contracting Inc.
PO Box 929
7843 Lilac Rd
Plymouth, IN 46563
Work )-9- D
Fax .74)j)- 6201,
Page No 1 of 1 Pages
MICHIANA CONTRACTING INC
u 7843 LILAC ROAD
„ PO BOX 929 CHANGE
1�.ns
PLYMOUTH IN 46563 ADDITIONAL WORK ODDER
PHONE:574-936-8613 FAX:574-936-6201
TO' Greg McGowan PHONE DATE
Project Inspector 1 3/20/2019
Department of Public Works JOB NUMBER/LOCATION
Division of Engineering 189G - VPA Restroom Remodeling
574-235-9001 Rum Village
Potawatomi
JOB NUMBER JOB PHONE
118-043R
We hereby agree to the chang(s) or additional work specified below:
DUE TO DESIGN OMISSIONS THESE CHANGES HAVE OCCURRED:
1 Provide 5' wide new sidewalks in lieu of 4' wide sidewalks/ wheelchair passing zone at Rum
Village Park as shown on drawing sheet RV-100. Include 24" of detectable warning surface per
City of South Bend Standard 2-42.
$1,710.00 No Tax
2 Provide additional material and labor for ceramic tile installation at Potawatomi Park Women's
Restroom, from 5'-6" aff (as shown on the drawings) to ceiling trim board (approx. 8'-8" aff).P
$180.00 No Tax
3 Provide mixing valves for lavatory faucets (push button with single supply) at Potawatomi Park
(four total) and Southeast Neighborhood Park (four total) as shown on sheets PO-110 and SE-
110. Thermostatic mixing valve w/2 flex connectors & labor to install: Per valve $195.00
8-Valve $1,560.00 No Tax
4 Bobrick double roll paper dispencer: Bid Allowance: $333.08
New Spec: Rolls Royce TP-2: Cost $1,021.90
Price Increase $688.82
CHANGE ORDER #001 WILL INCREASE CONTRACT BY 0.08%
Te��
Note: This Change Order becomes part of and in conformance with the existing cont1t. I
We Agree hereby to make the change(s) specified above at this pride
Date of Agreement: PREVIOUS CONTRACT AMOU T
Authorized Signature R 'ViSEO CONTRACT TOTAL $
Payment to be made as follows: Per contract documents
Accepted: The above prices and
specifications of this Change Order are satisfactory Authorized
and are hereby accepted. All work to be performed Signature
under same terms and conditions as specified in (Owner)
original contract unless otherwise stipulated.
Date of Acceptance
,9J "PMA
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
Project Number: 1 18-043R Project Name: V A Restroom Remodeling , Change Order #: 1
DATE INITOATED: 6/20/2019 �BPW DATE:
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.).
Design omissions, additional/alternate materials, and unforeseen construction changes
Attachments: (List documents support change — required)
PCR #1
Cost descriptions
Amount of B Increase / ❑ Decrease: $ 35250.82
Categories (Pick One):
Previously approved Change Order(s): $ ® Scope of Work
.. El Differing Site Conditions, Changed Conditions
Current Percent of Change. 7' 9 % ❑ Conflicted Specifications and Drawings
. .......--New ❑Failed Materials
525250.82
Total Amou t' $�, ❑ Error
....... ........
El Omission
Total Percent of Change: 7 � 9 % ❑ Final Quantity Adjustment
Funding Secured From; �ALCM B.Qrx]
(filled out by PM)
RECOMMENDED BY:
A
`TrCd N\11JC ,� 6 .2(.I�
Project Inspector (Print Name) (r mature) (Date)
REVIEWED BY:
y
_ ze+—_ .
19
Construction Manager (Print Name) (Signature) (Date)
APPROVED BY:
Engineering Project M m„ ger (Print Name) (S� ature) (Date)
APPROVED B
1 VI—
'Ct r� ry'inear rar t (Sigr a a (Da )m
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date June 28 2019
Department Public
Name......................................Scott Kree2er _ Works _ �..._Y—v..........................
BPW Date JuIX 9 2019.Phone Extension 9245
im�mimi ,.... � � nw m�uoimimimimm�mwmmuuwxn
rvnuuuuuuuuxuxuxuximimuuuuuuuuuuumw�wuen�m+nri
gcci�rd Prior to Submittal to Board
_...._............._ _ . �..
BPW Attorney ❑ Attorney Name Clara McDaniels
Dept. Attorney ❑ Attorney Name
Purchasing ❑ Michael Schmidt
Check theITApp�~o_p,ate Item hype mm 1.�iw
Professional Services Agreement ❑ Contract
❑ Open Market Contract 0 Amendment/Addendum
[❑ Bid Opening ❑ Bid Award
Ej Quote Opening Quote Award
Proposal Opening C/O & PCA No.
Chg. Order, No. 1 E] Traffic Control
Other:
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Information
All Submissions
LJ Proposal
E] Special Purchase, QPA
F'' Req. to Advertise
Reject Bids/Quotes
[❑ PCA
❑ Resolution
Ease./Encroach
[� Michiana
tt:.w ro'Inc,
Yes :.........................__wm_.
�] If Yes, A
pproved by Purc�hasing . .
No
❑ MBE Completed E-Verify Form Attached
❑ WBE
VPA e estroom R modelin
118-043R
471-1138-452.42-.0.1..................m.......�....._ _....... �.........�.............._
-_.�.........................................m�........._
Parks Bond I
m...........
...................................
$490,000
❑ Title Sheet
1:], Yes
No
Amount of z Increase 35,250.82
Decrease
Previous Amount $ 490„000
.Increase 7.19% .................�.m....�...._. _...... m...........................ww
g.........._�_.............. ......�.__.m...............................................m....
Current Percent of Chan e: Decrease /o
_._..............�.m..m........... ................................. _ —
New Amount $ 525,250.82
.. ..Increase. -- _..e ...N..
..19%
�w..... ...................
Total Percent of Change: Decrease .._.... %)
Time Extension Amount:
New Completion Date: