Loading...
HomeMy WebLinkAboutChange Order No 1 - Three Twenty at the Cascade Site Utilities Proj No 118-074D - Ritschard Bros Inc1316 COUNTY -CITY BUILDING 227 >► Donald Ritschard Ritschard Bro., Inc. 1204 W. Sample Street South Bend, IN 46619 o����1Y1n1't 4 A. 1 la June 25, 2019 PHONE 574/235-9251 FAX 574/235-9171 RE: Change Order No. 1 - Three Twenty at the Cascade — Site Utilities, Division B — Project No. 118-074D Dear Mr. Ritschard: The Board of Public Works, at its meeting held on June 25, 2019, approved the above referenced Change Order for an increase of $2,063.50, bringing the current contract amount to $53,487. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GI LOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 6/25/2019 118-074D Three Twenty at the Cascade - Site Utilities Division B 12/20/2018 1 PCR #1-Remove Section of Abandoned Watermain PCR #2- Remove Old Foundations The original contract sum $ 51,423.50 Net change by previously authorized change orders $ 0.00 The contract sum prior to this change order $ 51,423.50 By this Change Order, the project amount is X� Increased Decreased $ 2,063.50 The new contract sum including this change order $ 53,487.00 This Change Order represents a total change of 4.01 % Total change for entire project 4.01 % Original contracted completion date/time EtI,on of date/time by pr,@viouA change orders ion co order ContracZir Signature's - _*LoNM-t:� 2. 'rodU L Printed Name and Title Ritschard Bros., Inc. Company Name 1204 W. Sample St. Address South Bend, IN 46619 City, State, Zip 8/5/2019 0 days 0 days 8/5/2019 ElIMM.)ON MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS yyA,,pproved Date: +11�:?Ic / 9 Gary A. Gilot, President ZGenevUA,W'L E. Miller, Member Elizabeth A. aradik, Member Therese J. Dbrau, Member Laura O'Sullivan, Member DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Number: 1 -074D (Div U') Project Name: Three Twenty at ft Cascade Site Uhli ses (Div B) Change Order #: � DATE INITIATED: 6-13-19 BPW DATE: 6-25-19 Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Added work includes unforeseen conditions. A section of abandoned watermain needed to be removed for the sewer lateral as well as two old foundation walls that were in the path of the sewer lateral. Attachments: (List documents support change — required) Price breakdown Amount of BIncrease / ❑ Decrease: $ 2, 063.50 ................................ Categories (Pick One): Previously approved Change Order(s): $ 0.00 ❑ Scope of Work ____..... 4'01 B Differing Site Conditions, Changed Conditions Current Percent of Change: % ❑ Conflicted Specifications and Drawings New Total A__ .............. 53 487.00 Amount: $ ' � ❑Failed Materials ❑ Error 4.0 1 ❑Omission Total Percent of Change: ❑ Final Quantity Adjustment Funding Secured From: E (filled out by PM) RECOMMENDED BY: Dan Jones .f .: (�._ 3 - / Project Inspector (Print Name) (Signature) _ (Date) REVIEWED BY: ` Toy Villa .......... _.......- �._ Construction Manager (Print Name) (Signature) (Date) APPROVED BY: Zach Hurst Engineering Project Manager (Print Name) (Signature) (Date) APPROVED BY: Kara Boyles w .,,+ City Engineer (Print Name) (Signature (Date) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 6/17/2019 Department Public Name Zach Hurst Works BPW Date 6/25/2019 Phone Extension 3057 �wio�wd�ai¢artu^�uww�muuuuiwllw.uumiuumi .. ivw�w�urcre�wwrvrvrvrvrvvwmo�.m�Nex���.-������.�mm. rr�r� uruHiHiHiHuumHUHUHiHiHuuuuHiHiHUHUHuuuuHUHmwuwuwuwuwuwuuum v�er,�,�.. xrurrsmmiva�,HHrv,�mm�mwu�rr�,�mwuw�wwwwwwwwwu�rmrr.n _�....,,,,�,.,,m,�. .......... ..�,�............... ..... ... Required Prior to Submittal to Board BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing Professional Services Check eehe A�apro�� a��tc Item :"1'y �c — (���c r,� gr Went ❑ Contract El Open Market Contract ❑ Amendment/Addendum Bid Opening ❑ Bid Award Quote Opening ❑ Quote Award Proposal Opening ❑ C/O & PCA No. ® Chg. Order, No. 1 ❑ Traffic Control ❑ Other: Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Amount of F] Previous Amount Current Percent of Change: New Amount lVd61 All Submissions Wr d Information LJ Proposal Special Purchase, QPA ❑� Req. to Advertise ❑ Reject Bids/Quotes PCA Resolution Ease./Encroach ❑ Title Sheet Ritschard Bros., Inc. Yes❑ If Yes, Approved by Purchasing No MBE MBE Completed E-Verify Form Attached Yes Fj No 320 at the Cascade — Site Utilities, Division B _... ,..m...........................................�..��r�uu_...............................................................................� .�_ I I8-074D, Div. B River East TIF ...... 429 1050-460-42.02 C :,hanbye Order No.,...J accounts for unforeseen foundation and abandoned watermain removal. For Cl1 Orders Onl Increase 4.01 Total Percent of Change: Decrease /o Time Extension Amount:, 0 days NewCompletion Date: 8/05/2019...........................................................................................��-