HomeMy WebLinkAboutChange Order No 1 - East Bank Sinkhole Repairs Proj No 118-305A - Northern Indiana Construction Co Inc1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND- INDIANA 46601-1930
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
June 25, 2019
David Walorski
Northern Indiana Construction Company, Inc.
PO Box 1333
Mishawaka, IN 46545
PHONE 574/235-9251
FAX 574/235-9171
RE: Change Order No. I - East Bank Sinkhole Repairs — Project No. I I 8-305A
Dear Mr. Walorski:
The Board of Public Works, at its meeting held on June 25, 2019, approved the above
referenced Change Order for an increase of $14,482.75, bringing the current contract amount
to $83,210.75.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DoRAu
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER
DATE:
PROJECT NO:
PROJECT NAME:
CONTRACT DATE:
CHANGE ORDER NO:
SUBJECT OF CHANGE ORDER:
5/30/2019
118-305A
East Bank Sinkhole Re airs Base + Alt2
4/23/2019
1
PCR #1-Remove Line Item #22 (-$4,615.00). Decrease Line Item
#23 Quantity to 50 CYS (-$2,200.00). Increase Line Item #21
Quantity by 102 CYS ($18,360). Add Line Item #25 - Remove Roof
Slab of Existing Raceway for Access (LSUM @ $1,970.00 =
$1,970.00). Add Line Item #26 - 3/4" PVC Conduit; 35 LF @ $6.75
/LF ($236.25). Add Line Item #27 - Rebar to Tie Curb into Sidewalk;
38 EA a $19.25/EA $731.50 .
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
e
—Contractor ;Si ure
ked Name and Title
Northern Indiana Construction Company,
Inc.
Company Name
P. 0. Box 1333
Address
Mishawaka, IN 46545
City, State, Zip
$
68,728.00
$
0.00
$
68,728.00
X
�Increased
Decreased
$
14,482.75
$
83,210.75
21.07 %
21.07 %
6/30/2019
0 days
0 days
6/30/2019
r _T
m
CONSTI�T IN MANAGER
CITY OF •
BOARD OF PUBLIC WOR S
Approved Date:
//6
Gary A. Gilot, President
Genevie 'e E. Miller, Vember
Elizabeth A. Maraidik„ Member
Therese I D u, Member
Laura O'Sullivan, Member
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Linda M. Martin, Clerk
Board of Public Works
FROM: Scott Kreeger, Project Engineer
SUBJECT: Change Order No. 1 Project No. 118-305A
East Bank Sinkhole Repair
DATE: June 18, 2019
..nncaee r vn rauia .uars oni v., em�rr�in; vrvra va ��ii�m�rw wu�rrv��.rr n�ra�arapm wirrrtm:rernia.aiw iii uunruwmm�atzwwmo� nvrrrm.Wonn a �n�rimvrvrv�wv,r ie�ir �i re u�rn.::r rr. a �� m��m� mcv��u no�aAvoavre�
On May 10, 2019, a Notice to Proceed was administered to Northern Indiana Construction Co.,
Inc. (NIC) to begin work at the East Bank Sinkhole. The work included excavating the surrounding
area, installing a bulkhead within the structure, and filling it with 10 cubic yards of flowable fill. It
was determined during the design phase additional investigation would be necessary to fully
determine the scale of the underground structure for the sinkhole repairs. On May 13, 2019, NIC
proceeded with the investigation and discovered the dimensions of the underground structure
extended beyond the original plans. Engineering determined it necessary to increase the amount
of flowable fill to in order to fill the structure. In addition to the flowable fill, rebar to tie the curb into
the sidewalk and PVC for the conduit along the sidewalk were added to the project.
Please call with your questions (9245).
l� 0i
Z, '����� DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
Project Number: 118-305A Project Name: East Bank sinkhole Repairs (Base + Altz) Change Order #: 1
DATE INITIATED:5/30/19
BPW DATE: .., ...... �..... m.�
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.).
The original design to repair the sink hole was found to be insufficient after excavating and further
investigation.
Attachments: (List documents support change — required)
Contractors proposal.
Amount of Blncrease / ❑ Decrease: $14482.75
Categories (Pick One):
Previously approved Change Order(s): $ 0
® Scope of Work
8 Differing Site Conditions, Changed Conditions
Current Percent of Change: 2 '07 %
❑ Conflicted Specifications and Drawings
.......
New Total Amount: $ 83210.75
❑ Failed Materials
❑ Error
.................................................................................
Total Percent 21.07
Changer %
I--] Omission
of
❑ Final Quantity Adjustment
Funding Secured From:
(filled out by PM)
RECOMMENDED BY:
Josh Ehmer
6/18/19
Project Inspector (Print Name)
(Signature) (Date)
REVIEWED BY:
�
^1
Construction Manager (Print Name)
(Signature) (Date)
APPROVED BY:
ALAO
� N i
Engineering Project Mash ger (Print Name)
(Sig alure) (Date)
APPROVED BY:
City Engineer (Print Name)
(Signature) (Date)
May 23, 2019
Mr. Josh Ehmer
City of South Bend — Dept. of Public Works
Division of Engineering
227 West Jefferson Street
South Bend, Indiana 46601
RE: East Bank Trail - Sink Hole Repair
Mr. Ehmer;
As requested I have priced the filling of the existing raceway with a non -removable flowable fill. I
have two work items, the first to include the removal of the roof (top) slab of the raceway and the
second work item to pump the majority of the water out of the raceway, place concrete shuts, and to
furnish and place the flowable fill within the raceway. The removal of the top slab was included in the
bulkhead work item. Also, I did not include the cost for a concrete pump, as I believe with concrete
shuts and two separate pours we will fill the entire vault. Please see my proposed additional work
items.
• REMOVE ROOF SLAB OF EXISTING RACEWAY FOR ACCESS
LSUM @ $1,970.00 / LSUM = $1,970.00
• DEWATER RACEWAY, INSTALL SHUTES, FURNISH AND PLACE NON -REMOVABLE FLOWABLE FILL
145 CYS @ $180.00/ CYS. _ $26,100.00 ( The calculated volume is shown on the attach sheet)
As discussed at our meeting the cost of the flowable fill item could be split with the adjacent property
owner. Please have your team follow up with Tom Hall with Tuesley, Hall, Konopa LLP. Please approve
the proposed method to fill the existing raceway so we can continue work on this project.
Respe( tfmally Submitted;
David Walor
Josh Ehmer
From:
David Walorski <davidwalorski@cs.com>
Sent:
Monday, June 17, 2019 9:07 AM
To:
Josh Ehmer
Cc:
davidwalorski@cs.com
Subject:
East Bank Sink Hole Repairs
Josh;
Just a reminder, you still need to revise the change order for the flowable filling of the raceway.
Also we will have to replace approx. 35 Ift of 3/4" PVC conduit and reinstall the wire to the light foundation just east of
the sidewalk. See me unit prices below.
• Conduit PVC 3/4" 35 Ift @ $6.75/Ift = $236.25
• Tie Bars for Curb 38 each @ 19.25/ each = $731.50
Please let me know if you have any questions.
David J. Walorski
Northern Indiana Construction Co., Inc,.
55803 Dogwood Road
P. O. Box 1333
Mishawaka, Indiana 46546
(574) 256-1811 Phone
(574) 256-1879 Fax
f'!"//%
Virus -free . www.avast.com
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date June l l 2019
Department Public
Name m...... m m Scott Kr eec^ Works
BPW Date June 25 2019 Phone Extension 9245
mmrr�;nirrumwrnn�m�mvvvummuuuuuuuuuum � �erummnm�✓Mmn�uuurrr�vuuuuuwuu�uuuuurmrrr� um��vmrvmmm�:
,.,....._.........
BPWAttorney_..............�.._.... ..�,�.. ..,-.... ,,,,�,,,,,,,m..,..� -- .
_ _Required Prior to Submittal to Board
ITIT ITITIT mmmmIT _..._._ Attorney Name Clara McDaniel
Dept. Attorney E] Attorney Name
Purchasing Michael Schmidt
a Sere.
Professional Check I§e_ propriato Item Tie- R to
_.....
nal Services Agreement Contract
Ej Open Market Contract 0 Amendment/Addendum
j Bid Opening n Bid Award
❑ Quote Opening Quote Award
❑ Proposal Opening ❑ C/O & PCA No.
® Chg. Order, No. 1 E] Traffic Control
Other:
R-shred Information
All Submissions
Proposal
El Special Purchase, QPA
Req. to Advertise
E] Reject Bids/Quotes
PCA
Resolution
[❑ Ease./Encroach
❑ Title Sheet
Company or Vendor Name
Northern Indiana Construction
... .......................................................................�.��..�ww
Yes If Yes APurchasing
❑ ❑ Approved b Y Purchasing
New Vendor
No
❑
MBE/WBE Contractor
Completed E-Verify Form Attached
MBE ❑ Nos
Project Name
East Bank....SSole Repairs
inkh.,
..............rs ...................................
Project Number
l 18-305A
Funding Source
_
Streets and Alleys
Account No.
226.0419.672.42.03
Amount
$,728.��0�.�.�.�.�.�.........................................................................................................................................................�..............._w�w�w�w...w�w�..�www�w___- m,..................................�............
687280
Termsof Contract
.....�,
Base Quote�+.. Alternate �...2...................................................................................................................................................�._..�_... m. ,
Purpose/Description
I` e ori,giral ALsign jp re ijjh ,ink hole was found to be insufficientITaftel
excavatinail further
investi gtiM ..........
For Chn!emmOrders On
Amount of Increase $ 14,482.75
❑ Decrease ($ )
Previous Amount $_ 68,728.00
Increase .. ,....._..... 2 1....07.%.._..
Current Percent of Change: Decrease ( %
New Amount $ 83,210.75
Increase 21.07%
Total Percent of Change: Decreasemm mmmmmmmm%
Time Extension Amount:
New Completion Date: