RE: Change Order No. 1 - Airport Annexation Area Sanitary Sewer Extension — Project
No. 117-108
Dear Mr. Cain:
The Board of Public Works, at its meeting held on June 25, 2019, approved the above
referenced Change Order for an increase of $7,200, bringing the current contract amount to
$774,157.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
CITY OF SOUTH BEND
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER
DATE: 06/17/2019
PROJECT NO:. 117-108 _
PROJECT NAME: Air�ort Annexation Area---r----�—.......
p San�trr Sewer Extension
CONTRACT DATE: 12/11/2018
CHANGEORDER NO. �_.��.�......_..._.._..�.......�..u_� �,..�,_.................................�..�.�.�.�.�.�......�.�...�.�..._�.6....______ _��
SUBJECT OF CHANGE ORDER: Field Inve i _ Restrained
stwgation and Installation of Eight �8 Restraained Jounts,
t Four 4 Fire Hyrdrants along US 20
All items completed substantially as planned.
See attached Comparison of Estimate for overruns and underruns.
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
CONTRACTOR
Contractor Signature".,__,
Matthew D. Cain, President
Printed Name and Title
HRP Construction„ Inc.
Company name...........��
5777 Cleveland Road, PO Box 266
Address
South Bend, Indiana 46628
C
__..—.ity, ,S§t.,.at..e._.., -Zip _.......�....................
® Increased
❑ Decreased
$ 766,957.00
$ w 0..00.....
$ 766,957.00
$ 7,200.00
$ 7.74.'.1.57.00.....
...T .94 %
+0.94 %
07/31 /2019
0 dayrs
eeeeeeee�e ���.
O..ba� .__.... m
07/31/2019 (No Chanae)ITmmm�
RECOMMENDED FOR APPROVAL
Construction Manager�� oG - ZS- Zo19
CITY OF SOUTH BEND
BOARD OF PUBLIC O tS
Approved Date: �."
.............mw......._�..............
Gary A. Gilot, President
Genevieve E. Miller, Member
...
Laura O'Sullivan, �..............be��������.......�... �_..._�........
r
abeth A. Marad"uk, Member
Therese J. Darau, Member
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Members of the Board of Public Works
Eric Horvath, Director of Public Works
Clara McDaniels, Assistant City Attorney Public Works
Kara Boyles, City Engineer
Linda M. Martin, Clerk
FROM: Jacob M. Klosinski, Assistant City Engineer
SUBJECT: 117-108 Airport Annexation Area Sanitary Sewer Extenstion
Change Order No. 1
DATE: June 18, 2019
The Department of Public Works and Division of Engineering request the Board of Public Works
approval of Change Order No. 1 for Project No. 117-108 Airport Annexation Sanitary Sewer
Extension.
Purpose for Chan e Order No. 1
During construction, four (4) fire hydrants were identified without restrained fittings between the
fire hydrant and their respective isolation valves. The cost for hydro excavation, temporary
removal of the fire hydrant, and the replacement of eight (8) restrained fittings resulted in an
increased cost of $1,800.00 per fire hydrant for a total of $7,200.00 for the additional scope of
work.
It is important to note that the water main installed in this area was installed around 2004 and
should have been installed with restrained water main pipe joints. This water main provides fire
protection along US 20 west of Pine Road and into the Terre Verde subdivision where municipal
water service is provided. Given the installation method of the fire hydrants on US 20, the
remaining hydrants in the Terre Verde Subdivision likely to have unrestrained joints and should
eventually be outfitted with restrained joints between the isolation valve and the fire hydrant.
Funding for this Change Order should be allocated from the 2018 TIF River West — Airport Account
(324-1050 460 ' 1-0 ,).
For questions regarding the above recommendation or the subject project, contact Jacob M.
Klosinski (Ext. 9496) at the Division of Engineering.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date June 18 2019
Department
Name Jacob M. Klosinski Eu ifleerll� / Iftilitics
BPW Date June 25 2019 Phone Extension Ext. 9496
June
- iuiuwu�u�.wuwwwuuuwiuu�ro�,�nmrwwwvw,mzvwmvra�;vr.���r�w�w�u�u�w�w�w�w� w�� +�+w�,� ��xw�, auu��m�m . ........ rrianwioioio��i�immmmmmmmminir�sr--a���uti
e aid Prior to Submittal to Board
BPW Attorney ® Attorney Name Clara McDaniels
Dept. Attorney ❑
Attorney Name
Purchasing
Michael Schmidt
®� Check the Amite Item Tom;—
[T Professional Services Agreement
FJ Contract
El Open Market Contract
® Amendment/Addendum
❑ Bid Opening
❑ Bid Award
Quote Opening
❑
Quote Award
[] Proposal Opening
❑
C/O & PCA No.
Z Chg. Order, No. 001
E] Traffic Control
El Other:
......... .........
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Amount of z
El
Previous Amount
Current Percent of Change
New Amount
Proposal
❑ Special Purchase, QPA
❑ Req. to Advertise
Reject Bids/Quotes
❑ PCA
❑ Resolution
El Ease./Encroach
❑ Title Sheel
[� Yes�f If YSouth Bend, Indiana]
es,
HRPConstruction, m.... ..
Approved by Purchasing
No
E] MBE ❑ WBE Completed E-Verify Form Attached El es
Airport Annexation Area SanitarySewer Extension
117-108
2018 TIF River West Airport
324-1050-460-31-02 -
The Division of lwngineerin reciuests the Board of Public Works ap rp oval
Change Order No 1 for Project No. 117-108 Airport Annexation Area
.Saii.itary Sewer Extension for field invcstt t ;In and installation of ei xlll L8
restrained ioints at four�4 fire hydrants servicing US 20 and the Terre Ver
Increase �$ ,200mm00
...
Decrease ..............�...
$ 766,957.00
Increase 0.94% _
Decrease ( %
$ 774,157.00
Increase 0.94%
Total Percent of Change: Decrease .%�)..............._._---m.......................................
m�.............................................m...._......................_�...... --.....................................�.........ru�
Time Extension Amount: 0 Da s
p y (No Change)
New Completion Date: Jul 31 2019 ..... �.._ , _ ,�