Opening of Bids - 2019 Community Crossings Project No 119-015 - Rieth-Riley Construction
r R CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK :5 Project Name 2019 Community Crossings Project No. 119-015 ........ _ For Bids Due May 28, 2019, 9:30 a.m., Local Time PART (Must be completed for all bids. Please type or print) Date: May 28, 2019 Bidder (Firm): ,Rieth-Riley Construction Co., Inc. Address: 25200 State Road 23 City/State/Zip: South Bend In. 46614 Telephone Number: 574 288 8321 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: 2019 Community Crossings, Project No. 119-015 the City of South Bend, Indiana, in accordance with plans and specifications prepared by: n/a and dated milliot�;n/ it rlcl're irT nine or t end dated for the sum of (enter the Total Bid as shown on the Proposal) thousand,One eight hundred ven%,� da gilr.rsuf1 cents 1,339,827.15 _. (Enter sum of all Divisions shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting, If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separatatthrttorit. B i Hato. y S chta McC ormlck 9aei_ _ �anager (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this day of Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member Laura L. O'Sullivan, Member Genevieve E. Miller, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk Version 4/2/2019 Contractor's Bid for Public Works - 2 BID/PROPOSAL�, CITY OF SOUTH BEND Project Name: 2019 Community Crossings Project Number: 119-015 For Bids Due: May 28, 2019, 9:30 a.m., Local Time Contractor Name: Rieth Riley Construction Co. Inc. DIVISION 1: CORBY BLVD. (IRONWOOD TO MANCHESTER) . .......... ........ ..... Item No. Line Item ........ .................wwww Quantity y unit Unit Price Cost .... $10,366.45 $10,366.45�...m 1 ........... ,— Maintenance of Traffic �__w ........... ............ 1 LS _....�_ $26,000.00 ........ _ ..... _......_.. $26,000.00 2 Mobilization and Demobilization 1 LS $546.55 $1,639.65 3 Coring ............................ _......__... 3 EA $1.72 $24,768.00 4 Milling, Up to 1.5" �....................w_w...ww 14,400 SY ................. $3.30 $14,520.00 5 Milling,Additional 2" 4 400 SY �._...... ..�. $89.24 2 ,32 �m�....... $138.00 6 . HMA Surface, 9.5 mm —Type B ............. ..__ 1,'!�1'!1511 1� TONS $101.93 $5,096.50 7 HMA Wedge and Leveling — Type B 50 TONS $126.36 $12,383,28 8 HMA for Patching 98 TONS $0.05 $0.35 9 Tack Coat ..._ w . ....... __............ TONS $0.05 $455.00 10 .� ....................w_ Joint Adhesive, Surface .......�...................... 9,100 LF �._..... ..... ._....... $250.00 ........ $4,000.00 11 Adjust Manhole to Grade 16 EA $250.00 0.00 $1,75 12 Adjust Inlet to Grade 7 EA $2.50 $425.00 13 Line, Thermoplastic, Solid, White, 6" 170 LF $0.45 $2,362.50 14 Line, Thermoplastic, Solid, Yellow, 4 .. 5,250 LF $0.45 $288.00 15 Line, Thermoplastic, Broken, Yellow, 4 640 LF $0.35 $2,061.50 16 Grooving for Pavement Markings, 4" �...... ....................... ............. 5,890 LF _.._ .... .. $2.00 _..... $340.00 17 Grooving for Pavement Markings, More than 4" 170 LF $114.01 $9,690.85 18 Concrete Sidewalk, Remove 85 Sy Addendum No. 2 BID/PROPOSAL CITY OF SOUTH BEND` Project Name: 2019 Community Crossings ��..��.. �. ............. Project Number: 119-015 For Bids Due: May 28, 2019, 9:30 a.m., Local Time Contractor Name: Rieth Riley Construction Co. Inc. ...... Item....__�__��_�..... ...�................ No. Line Item Quantity Unit Unit Price Cost $58.17 ,7 $40_.. 1.90 19 Concrete Sidewalk, 4" 70 SY _......... .........._ _ ... .._. 4.63 ._.__ ............� $6,716.70 20 Concrete Curb Ramp, Remove 90 SY $177.11 $12,397.70 21 Concrete Curb Ramp 70 SY 22 Detectable Warning Surface 35 SY DIVISION 1 TOTAL $280,910.38 D I VISION mm 2: JEFFERSON BLVD TO LOGA IRONWOOD N ....................... j_. ..__....... Item No. ......._..........____....... Line Item .................�.......w__w Quantity Unit Unit Price Cost m$m15,099.15 $15,099.15mm 1 Maintenance of Traffic 1 LS $33,000.00 $33,000.00 2 Mobilization and Demobilization 1 LS .._� . $546.55..._ ....a.... $3,279.30..��..��..�m 3 Coring 6 EA 4 Milling, Up to 1.5" ..�._._......�....w � ._........._ � w 28,055 SY $3.68 $12,990.40 5 Milling, Additional 2" 3,530 SY $88.70 $230,620.00 6 HMA Surface, 9.5 mm — Type B _.............................. 2,600 TONS $94.45 $28,335.00ITmmmmm 7 HMA Wedge and Leveling — Type B ... ................_ ...........a.a. 300 TONS $142.32 $10,958.64 8 HMA for Patching 77 TONS $0.05 $0.60 9 Tack Coat 12 TONS $0.05 $958.70 10 Joint Adhesive, Surface 19,174 LF _.. I $250.00 $1,000.00 ....... 11 Adjust Manhole to Grade 4 EA Addendum No.2 BID/PROPOSAL��°�"�. CITY OF SOUTH BENDAl Project Name: 2019 Community Crossings ..... Project Number: 119-015 1865 For Bids Due: May 28, 2019, 9:30 a.m., Local Time Contractor Name: Rieth Riley Construction Co. Inc. Item ................ ...................... .........N ............_____. No. ...... Line Item ..... ......... Quantity Unit Unit Price Cost _.... ___.. $150.00 $30 0.00 12 Adjust Water Line Structure to Grade 2 EA _.................. ..... _.........ww.._ ................_............ $250.00 $3,000.00 13 Adjust Inlet to Grade ................................................................_.................... 12 EA _...�...�.�....................... $411.00 $2,466.00 14 Traffic Detector Loop Replacement ._......:..._.................._ .............................. w 6 EA $1.88 $282.00 15 ................... w. Signal Cable, 2C 16 GA. Shielded . _.. _............................ _. 150 LF $17.90 $1,074.00 16 2" Conduit -_...�............. 60 LF _....... $688.00 $1,376.00 17 Traffic Detector Housing .......................................... 2 EA Pavement Message Markings, Thermoplastic, �... .. _............ $90.00 $2,700.00 18 White, Lane Indication Arrow mmMarking, 30 EA Pavement Message Thermoplastic, $350. 00 $12,250.00 19 White, Bicycle and Arrow 35 EA $0.45 $8,131.50 20 Line, Thermoplastic, Solid, White, 4" 18,070 LF 2.50 $1,900.00 21 ... .____... Line, Thermoplastic, Solid, White, 6" ......... __ 760 LF $0.45 $3,775.50 22 Line, Thermoplastic, Solid, Yellow, 4" ._._........_. .._...._................................................................._.w 8,390 LF _ _..........._ $ 2.00 _ $100.00 ...................__ 23 Line, Thermoplastic, Solid, Yellow, 8" 50 LF $3.00 $1,272.00 24 .............. Line, Thermoplastic, Solid, Yellow, ..................._... ... .................. 424 LF $0.45 $796.50 25 Line, Thermoplastic, Broken, Yellow, 4" 1,770 LF $2.50 $455.00 26 Line, Thermoplastic, Broken, White, 6" 182 LF $0.35 $9,880.50 27 Grooving for Pavement Markings, 4" 28,230 LF Addendum No. 2 BID/PROPOSAL 401 11 *" CITY OF SOUTH BEND ��? �' Project Name: 2019 Community Crossings Project Number: 119-015 For Bids Due: May 28,m 2W01W9,�WW9:W30WWWa m., Local Time ......, Contractor Name: Rieth Riley Construction Co. Inc. Item No. Line Item Quantity Unit Unit Price Cost Grooving for Pavement Markings, More than $2.00 $2,832.00 28 4" 1,416 LF Transverse Marking, Thermoplastic, Solid $69.00 $9,108.00 29 Green . .... Transverse Marking, Thermoplastic, Solid, $5.00 $1,250.00 30 White, 24" 250 LF $10.00 $400 00 31 ..............................._.............................. Line, Multi -Component, Solid, White, 24" 40 LF _......... $10.00 $750.00 32 Paint, Solid Fill, Green 75 SY $520.00 $4,160.00 33 Pedestrian Push Button 8 EA ................ $134.32 $.1.................0 3,432.00 ......... Concrete Sidewalk, Remove ................ _..._................. 100 SY r34 $54.86 $4,388.80..._.....� 35 Concrete Sidewalk, 4" 80 SY $120.25 $9,620.00 36 Concrete Curb Ramp, Remove 80 SY $171.90 _ $13,752.00 37 ........... Concrete Curb Ramp 80 SY $94.50 w $5,670.00 �.. 38 Detectable Warning Surface 60 SY DIVISION 2 TOTAL $509,156.89 BIDDER: Rieth Riley Construction Addendum No. 2 BID/PROPOSAL<� CITY OF SOUTH BEND Project Name: 2019 Community Crossings .... . _ ....... .. Project Number: 119-015 For Bids Due: May W28, 2019, 9:W30 a.m., Local Time Contractor Name: Rieth-Riley Construction Co. Inc. DIVISION 3: LINDEN AVE. (MAYFLOWER TO LOMBARDY) ....... Item No. Line Item Quantity Unit Unit Price Cost $6,069.76 $6,069.76 1 Maintenance of Traffic 1 LS 15,500.00 $15,500.00 2 Mobilization and Demobilization 1 LS $546.55 $1,093.10 3 Coring 2 EA ww $1.95....._._ .... $16,6�72.50�........ 4 Milling, Up to 1.5" ,',"'�'�"�p� SY $3.03 $7,787.10 5 Milling, Additional 2" .........._.. � SY ...._....._ $68.51 $5,138 25 6 Compacted Aggregate Base 75 TONS �....... µ....� ....... .._ .. _...... $86.81 $82,469.50 7 HMA Surface, 9.5 mm - Type B 9--�:)u TONS ........_.._._._._._._............_......_...._.......................................... $109.99 $3,299.70 8 HMA Wedge and Leveling - Type B 30 TONS �...._ ........................................ $143.51 _ ...... $4,305.30 9 HMA for Patching 30 TONS ._._._..._ .$0.05 ..................$0.25 10 Tack Coat TONS $0.05 $231.00 11 Joint Adhesive, Surface 4,620 LF �. _... ............mm. $250.00 _- .............. $1,250.00 12 Adjust Manhole to Grade 5 EA ___... .—_________________________________....._W__---------------- w__........ ..... ....._ $250.00 � _ $1,750.00 13 Adjust Inlet to Grade 7 EA $0.45 $1,665.00 14 Line, Thermoplastic, Solid, White, 4" 3700 LF ._......... ---------- __________W__..._.._......__...___....._................._.__wwwwwwwwwwww__ww...wwww__ww. $5.00 $ 7 5.00 ..._ _..................... 15 Line, Thermoplastic, Solid, White, 24" 15 LF .�.....�.....................� � _.......... _........................ .............. _. .....mm.. E _..... $0.45 $94.50 16 Line, Thermoplastic, Solid, Yellow, 4" 210 LF BIDDER: Rieth Riley Construction Addendum No. 2 BID/PROPOSAL ;�+►�, CITY OF SOUTH BEND`W Project Name: 2019 Community Crossings Project Number: 119-015r , ................. 9:30 a.m.._............ For Bids Due: May 28, 2019, , Local Time _........................... _ .__........... . Contractor Name: Rieth Riley Construction Co. Inc. Item ........... _........... .. No. Line Item �. ........ Quantity ........ Unit Unit Price Cost 45 $969.75 17 Line, Thermoplastic, Broken, Yellow, 4" ��...� .................. _. 2155 LF $0.35 $2,122.75 18 Grooving for Pavement Markings, 4" ... 6055 LF ement Markings, More ..._ Groovingfor Pavement g , ____W............... $.�._ 2.00 ..._..�..... ......_ $30.00 19 than 4" .�....................... .......... 15 LF m$183.67 $1,836.70 20 Concrete Sidewalk, Remove 10 SY $91.. $917.40 21 Concrete Sidewalk, 4" ..�..._......_............_. 10 SY . ..74 $. . ........... 103.56 $2,071.20 22 Concrete Curb Ramp, Remove 20 SY $230.21 $2,302.10 23 Concrete Curb Ramp ........_ .......... 10 SY ................ $90.00 $630.00 24 Detectable Warning Surface .. SY DIVISION 3 TOTAL $158,280.86 DIVISION 4: RIVERSIDE DR. (ANGELA TO ACADEMY) Item No. Line Item _.............................................. ._... _..........._............... Quantit Unit Unit Price Cost $13,773.15 _ ........................ $13,773.1 5 1 Maintenance of Traffic 1 LS 0 $28,000.00 2 Mobilization and Demobilization 1 LS $546 55 $3,279.30 3 Coring 6 EA . �......... $2.35 $50,196.00 .. 4 Milling, Up to 1.5" 21,360 SY $3.64 $19,656.00 5 Milling, Additional 2" 5,400 SY BIDDER:_ Rieth Riley Construction Addendum No.2 BID/PROPOSAL„�'� CITY OF SOUTH BEND, Project Name: 2019 Community Crossingsmmmmmmmmmmm G Project Number: 119-015 For Bids Due: May 28,2019, 9:30 a.m., Local Time Contractor Name: Rieth Riley Construction Co. Inc. $47.47 $18,988.00 6 Compacted Aggregate Base _... ._.,_......_..............._yp.................... .. 400 TONS .._ .$9... ...... 0 99 $200,905.92 7 HMA Surface 9.5 mm — Type . ._........................................ . TONS $113.10 $6,786.00 8 HMA Wedge and Leveling —T. ....... .......................... _ �. _ .........__ $172.30 .... $9,476.50 9 HMA for Patching 55 TONS $0.05 $0.65 10 �.�....... Tack Coat ................... ........ ww 13 TONS $0.05 $600.00 11 ......W...__ Joint Adhesive, Surface ................................ 12,000 LF $250.00 $1,500.00 12 mm._....._ Adjust Manhole to Grade ................... 6 EA �-13, EA $250.00 _ $1,500.00mmmmmmmWWWWWWWWWWWWWWW _ Adjust Inlet to Grade .......................................... 6 14 Line, Thermoplastic, Solid, White, 4" �.� _ 11,840 LF $2.50 $400.00 15 Line, Thermoplastic, Solid, White, 6" 160 LF $2.00 $220.00 16 _........... Line, Thermoplastic, Solid, White, 8" ..................... 110 LF $0.45 $5,557.50 17 Line, Thermoplastic, Solid, Yellow, 4" ..............................._....._......... 12,350 LF $2.50 �...... $375.00.._........ 18 .. Line, Thermoplastic, Broken, White,12" ..Grooving 150 LF 19 �$0.35 $8,46.6. .50 _. for Pavement Markings, 4" .......................... 24,190 LF Grooving for Pavement Markings, More than .........._W...._�w $2.00 $840.00 20 .................w_. w 4" 420 LF �..... $165.38 $4,961.40 21 Concrete Sidewalk, Remove 30 SY $90.39 $2,711.70 22 Concrete Sidewalk, 4" 30 SY .�5 $153.0 $3'......061.00 23 Concrete Curb Ramp, Remove 20 SY ........... ............... $181.82_____ $3,636.40 24 Concrete Curb Ramp 20 SY $84.00 $1,260.00 25 Detectable Warning Surface 15 SY DIVISION 4 TOTAL $391,479.02 Addendum No. 2 BIIDIPROPOSAL�,x� CITY OF SOUTH BEND' r Community Crossings Project Name 2019 Commw �._ Project Number 119 015 .. For Bids Due �.,�.. Local Timmm..._..........�._��...�. � NNa 23 2019, 9:30 a.m., e . t .... Contractor -� Name: Rieth-Riley Construction Co., Inc. Bidder (Firm): Rieth-Riley Construction Co., Inc. Address: 25200 State Road 23 City/State/Zip:South Bend, In. 46614 Telephone 57^ �2 -8321 Number: 4 m By Joshua A (Signature) �McCormick, Sales Manager (Printed Name of Person Signing) Addendum No. 1 When thepowspective Contractor is unable to certijjr to any of the statements below, it shall attach an explanation to this Affidavit. (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana } St. Joseph COUNTY ss� The undersigned Contractor, being duty sworn upon his/her/its oath, affirmsunder the penalties of perjury that: I Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or OWN AMAMARMI 611 W 141 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are�lresentiv debarred, suspended, org_Qosed for debarinent. declared ineligibi ,mvw participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran, a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time, provided by Ind. Code § 5-22-16.5-8, as aniended from tirrie-to-time, a Contractor is engaged in investment activities in Iran if either: WWI million dollars ($20,000,000) or more in value in the energy sector of Iran; ,*r Contractor, its Successor or its affiliate, is a financial institution that extends twerity fflffliNl dollars ($20,000,000) m niore in credit to another person for tl')rty-five (45) days or more, if that person will (i) use the credit to provides goods and serviecs in the energy sector in Iran; and (H) at the tirne the financial institution extends credit, is a person identified on list published by the Indiana Department of, dministratio t, Version 4/2/2019 Contractor's Bid for Public Works -0, 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 4/2/2019 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. r+• I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 28th— day of MaY , 2019 Subscribed and sworn to before me this 28th My Commission Expires 4/18/23 County of Residence Rieth-Rile Construction Co., Inc. Contractor/Bidder ([`irn i) q r ° tnt onus t�fA idler or Its Agent .Jshu.A. McCormick, Sales Manager Printed Name and Title otat,°,( public DAWn E. ArmstrongE. Armstrong LaPorte �WoYmwuWhWLLWaMUPINIttl�mm IfiVN �uufekPtimmmi�ffiY�m mmmllry�ii�10110V�rtmmim'cU'Nv�ifl4Po,rvu�rtbfib5 wWilplu� W N E, A N'iM Si lli0PliG 11 W1 11 ne Cuwnty c day CmnvvOssp uin # 6655106 ilk+ C:ornff ii,rswiiu Ex!Hu :1;5 °°leer nWt APM 18, 20i23 j7agwwiw�ooio�mmvgr�,,m� wYgA"'�9 wv�utl�r Version 4/2/2019 Contractor's Bid for Public Works - 6 No. 1107 BID BOND KNOW ALL MEN BY THESE PRESENTS, TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA Hartford, Connecticut 06183 That we, as Principal, hereinafter called the Principal, and TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, of Hartford, Connecticut, a corporation dLdy organized under the laws of the State of Connecticut, as Surety, hereinafter called the Surety, are held and firmly bound unto Cit of South Pere+ lniana as Obligee, hereinafter called the Obligee, in the sum of i errant o total bid Dollars Surety,uly to bind ourselves, our heirs,rexe executors, u ce sorsr and ass assigns, jointly and severally, e, the said Principal and the said 5% of bid the firmly by these presents. WHEREAS, the Principal has submitted a bid for 2019 Community Crossings Project No. 119-015 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 28th day of May Wi l ess Dawn . Armstrong e, "Ile" 110, � Witness Aaron Griffin 2019 RIETH-RILEY CONSTRUCTION CO,„ INC, (Principal) (Seal) �swrie& Title) ... g Jo fiu, -A-." -'McCormick, Sales Manager TRAVELERS CASUALTY AND INSURANCE COMPANY y Sandra M. Nowak, Attorne In -Fact ACKNOWLEDGEMENT BY SURETY STATE OF ILLINOIS COUNTY OF WILL On this ,.` day of _ � - �� i _ ,before me, Debra J. Doyle, a Notary Public, wi . , . and for said County and State, personally appeared Sandra M. Nowak to me personally known to be the Attorney -in - Fact of and for Travelers Casualty and Surety Company of Aierica and acknowledged that she executed the said instrument as the free act and deed of said Company. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal, at my office in the aforesaid County, the day and year in this certificate first above written. OFFICIAL SEAL CEEI A J C O'YLE Notary Public m e State of IllinoisL�TARY USLlc, sT of I� L of County of Will c sc sssr0l E I Es 1118 Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company TRAVELERS St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Sandra M. Nowak of Chicago Illinois , their true and lawful Attorney -in -Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 3rd day of February, 2017. State of Connecticut City of Hartford ss. B : `r " y: Robert L. Raney, Se tier Vice President On this the 3rd day of February, 2017, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. In Witness Whereof, I hereunto set my hand and official seal. t My Commission expires the 30th day of June, 2021 ".A fk �1 Marie C. Tetreault, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this day of ( m Kevin E, Hughes, Assistant Secretary To ver;4, Ale 0111heaNcity of this Power of Attorney, please call us at 1-800-421-3880. Please refer to the above-namedAttorney-in-Fact and the details of the bond to which the power is attached. 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAx 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: -May 21, 2019 To: All Planholders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: 2019 Communi Crossin s Project No.: 119-015 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM. Date Received:This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy "MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: .ry S,,a . W , Authorized Signature: / t..w Date: t 1316 COUNTY —CITY BUILDING o 4" ra PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD FAX 574/ 235-9171 SOUTH BEND, INDIANA 46601-1830 TDD 574/ 235-5567 a �N �. CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: -May 22, 2019 To: All Planholders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 2 Project Name: 2019 Communi Crossin s Project No.: 119-015 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 19 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy USTalso be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: (24 Authorized Signature: Date: 2- arsJ oc 9 CITY OF SOUTH BEND INDIANA riz* CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name 2019 Community Crossings Project No. 119-015 For Bids Due May 28, 2019, 9:30 a.m., Local Time From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner, Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE1WBE Contacted X Form [MWBE-2.1]. X Acknowledge Receipt of 2 Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X ww printed or typed underneath signature. X This checklist submitted with the Bid. This checklist Is provided for bidder's use in assuring compliance with required documentation; however, It does not Include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder Rieth-Rho ConstructionwwCo , Inc. Date: May 28, 2019 By Authorized Representative: Signature: Print Name & Title: Joshua ormick, Sales Manager Version 4/2/2019 Contractor's Bid for Public Works - t see attached 96 form PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid, Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e, persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. attachment H 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 4/2/2019 Contractor's Bid for Public Works - 3 4 Po ma' W 2t C3 w C0 R a. 2pWQ O m w z 0 o Q MOO 'IL xv)a wc) �w� 00F= OZZ 3Q m W m a Omp m O� vmj w m Q 0 z a O z_ 9 E O 75 O a`) am x c O E a En O F— m E m U z m U �o a c 0 U 7 L y c O U LO 0 0) t a> (0 0 .� F `O a o m c 16 = 0 n 0o O EU O Q W LO m O) m It a� cc Q w (0 � o E � L m � � N a� 00 o a� of c NU o m !A in CL o F- N L 5O ` U _ N � a o N L CL C U CD c°0 at ZE co E ? m m 0 -7 W m in 2 o N N m N U Q m 06 co m E Z C/) E m 7 m a> E m z c d I, cn 0 O U a 0 m y O U N c 0 U Ai 0 N N C O CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY AVV iv DEVELOPMENT PROGRAM „� d FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS ........................... This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: 119-015 Project Name: Community Crossings Bidder: Rieth Rilev Construction Co.. Inc. Contact Person: Ruben Alvarado Address: City: Email: 25200 SR 23 South Bend State: IN ralvarado@rieth-riley.com Date: Telephone: 574-288-8321 Zip: 46614 To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business RA Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: 1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. RA 2. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. **Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, RA including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by RA MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: RA 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 4/2/2019 Contractor's Bid for Public Works -16 CITY OF SOUTH BEND�iara"' MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY � - DEVELOPMENT PROGRAM FORM MWBE-2.1 rags MBEIWBE CONTACTED xM 107: This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts.. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. I'PAGE. OF Project Number: 119-015 MBE/WBE Participation Goal NA Project Name: Bidder: By: 2019 Community Crossings R(elh Riley Construction Co., Inc. r (Title) MBE/WBE Firm State Barricade Owner or Contact at MBE/WBE Firm James Michalski Telephone: 574-287-2078 Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: MOT Sions -i (Date) Email: statebarricadel@aol.com RESULTS OF CONTACT WITH THE MBE/WBE FIRM:. MBE/WBE Firm Owner or Contact at MBENVBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM„ Version 4/2/2019 Contractor's Bid for Public Works - 17 Appendix 119-015 Community Crossings CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC "FORK RESPONSIBLE BIDDER CHECKLIST Project Name 2019 Community Crossings Project No. 119-015 For Bids Due May 28, 2019, 9:30 a.m., Local Time Contractor Name: Rieth-Riley Construction, Inc. Co., The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification, Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing„ on a f'ormu provided by the City (`Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31,11 for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing, if the status of any itern changes within the twelve (12) months it is the responsibility of the contractor to notify the City. Failure by any pre-quallfied contractor to submit its complete application for continuation of "pre -qualified' stariding within time time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the 'removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 3/19/2019 General Conditions - 6 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 3/19/2019 General Conditions - 7 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) X indiana Secretary of State"s° on -fine records (ie Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report„ and eligible for a certificate of good standing, (foot applicable to individuals, sole proprietors or partnerships), X.... Statement on staffing ca,pabalities, Including labor sources. This statement Indicales and ensures I have :sufficient e rnployees on stuff to complete the work. It outlines how i intend to rneet the staffing needs of the work, X Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) X„wy List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (v) X , For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of tabor's Office of Apprenticeship, or its successor organization, Version 3/19/2019 General Conditions - 8 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) _ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: 0) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) List identifying all former business names. (iii) Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 3/19/2019 General Conditions - 9 Ox) Written staternent of any foderal� Stale Or JoCal tax liens or tax delinquencies owed to any, federal, stale or local taxing body in the preceding three years, (i) List of projects of sirnilar size and s(ml,)e of work performed in all areas, including the State of Indiana, Within three (3) years prior to the date on which the bid is due, Date: May 28, 2019 ...... .. .. .. ...... . ...... .. . Jloshua A. McCormick (Print Name Here) Rieth-Riley Construction Co., Inc, (Name of Company) 25200 State Road 23 (Address of Company) South Bend FCi t i) . .. .. .......... — Indiana 46614 574-288-8321 (Telephone Number) Version 311912019 General Conditions - 10 1316 COUNTY -CITY BUILDING 227 W. JEFFERSoN BOULEVARD SOUTH BEND. INDLANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS August 17, 2018 N1x. Joshua McCormick Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 RE: Pre -Qualification Verification — 2018 Street Paving Dear Mr. McCormick: PHONE 574/ 235-9251 FAx 574/ 235-9171 '17his letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre-Qualificafion Status is effective for twelve (l 2) niontlis from the date of this letter. There"ifter you are required to re-SUbmit a complete application for continuation of pre-qualilleatiorl status prior to Deceillber3l for the upcoming ca I endar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the city of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, Lim, Martin, Clerk GARY A. GILOT DAvrD P. RELOS ELizABETH A. MARADIK JAmEs A. MUELLER THERESE J. DORAu &A,"Xe4t (;) Business Name: RIETH-RILEY CONSTRUCTION CO., INC. EntityType: Domestic For -Profit Corporation Creation Date: 08/08/1952 3626 ELKHART ROAD, POST OFFICE Principal Office Address: BOX 477, GOSHEN, IN, 46527 - 0477, USA Foreign Legal Name.: Jurisdiction of Formation: BUSINESS INFORMATION CONNIE LAWSON INDIANA SECRETARY OF STATE 05/15/2019 03:33 PM Business ID: 192874AO67 Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due Date: 08/31/2020 EMEM11111MMENEENEEMEMENUMMEMMM TITLE Vice President NAME BRIAN A, 1NNIGER ADDRESS 3626 ELKI-IAR ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA TITLE Director NAME RONALD G. POPE ADDRESS 1124 BARON DRIVE, MYRTLE BEACH, SC, 29577, USA TITLE Vice President NAME Eugene E. Yarkie ADDRESS 3626 ELKHART ROAD, GOSHEN, IN, 46527 - 0477, USA TITLE Vice President NAME Peal J, Tate ADDRESS 1751 W, MINNESOTA STREET, INDIANAPOLIS, IN, 46221, USA TITLE Director NAME Robert L. McCormick ADDRESS 3205 WAKEFIELD DRIVE, GOSHEN, IN, 46528, USA TITLE Director NAMF- WILLIAM P. JOHNSON ADDRESS 6310 TRUSDALE AVENUE, SYRACUSE, IN, 46567, USA TITLE Director NAME Jack K. Matthys ADDRESS 57457 PINE ROAD, SOUTH BEND, IN, 46619, USA TITLE Director NAME William J. Schmuhi, Jr. ADDRESS 1421 HONAN DRIVE, SOUTH BEND, IN, 46614, USA TITLE President NAME A. KEITH ROSE ADDRESS 3626 ELKHART ROAD, P. 0, BOX 477, GOSHEN, IN, 46527 - 0477, USA TITLE Secretary NAME ROBERT L. KONOPINSK] ADDRESS 3626 ELKHART ROAD, P. 0, BOX 477, GOSHEN, IN, 46527 - 0477, USA Type: Individual Name: ROBERT L. KONOPINSKI Address: 3626 ELKHART RD., GOSHEN, IN, 46526, USA TION CO., 160%, . - --- ---------- 11--.-4A= Quality - 100% FmP1QY6e Owned aOver 100 -Years Febmary 20, 2019 To Vhom it May Conoerh, Rieth-Riley Constrtiction Co, Inc. is A 100% ualon contuctor, Therefore, all Wrenticeship, OJT progrms, and training programs are approved by and registered with the USDOL through the wilon Please reel ftee-to call Me it withany questious of concerns at (5 -S 18 3, ekt. 2G212. Respectfully, Rieth-Rile Construction Co.., Inc. on'"'Jc Dordk Carroll Human Resources R-6, Box477 - J626 Elkhart Pd. - Goshen, IN 46527 Phone: P74) M.sm - www,rj th-fileydom EY CONSTRUCTION , 10"a Quali% ' 0 Emp10Ye ' awned Over i I ears RE Cltypf Sbuth,Behd M Cofttrtctpr°s Bid fore blic WNk Pre-cpuaBRfA�atuure: hecklist Pr qualification Checklist Attachments ie h-Riley pnstrUcticn Co" Inc, is a 100 union cohtracto and Recruits thruuRh union , halls as necessary to ccrrnpfet -the word regtalred„ iv., All du1ddaI Beth i far Meth -Riley �y Construction Co,, Irrc, are subject'tepur pglicles and ,y Cc�n tructicn Co.„ I,nc. participates In I= -Verify, and requires all employees to present proper id n Mcation:, V. Rleth-Riley Construction to., Inc. Is,a lo,o%'union coiitractor,, and recrultsthrough union hall apprenticeship pro'grams which are registered through, the united States' epartment of Labor Office of,Apprenticeship, Respectfully, JO hLia ,, McCarrT l�ck, a'ies 1V halger i (RR" U . 13, 23 + South h Bend, IN 4 POhe: (74)2 8'•8 t INDIANA COLLECTIVE BARGAINING AGREEMENTS CRAFT LOCAL TAT DATE EXPIAF DATE BARGAINING By RIETH-RILEY SIGNATORY? SIGNATORY? TYPE OF AGREEMENT 6 GEOGRAPHICAL COVERAGE Zone 1 B, 2A, 2B, 2C, 3A, 3B, 3C 4A, 48, 4C, & 40 04/01/16 03/31/19 ICA YES Statewide, except for Northwest Indiana Zone 1A 06/01/15 05/31/18 NWICA NO Like, Porter, LaPorte, Starke, Pulaski, Newton &Jasper Counties Local #692, Area #165 06/01/15 05t31118 NWICA NO Building 0 Local #692, Area #406 06/01/15 05/31/18 NWICA NO Building ro Local #692, Area#438 06/01/15 OS/31/18 NWICA NO Building m ...w ., U Locals116 06/01/15 05l31/18 Rieth•Riley YES Lake„ Porter, LaPorte, Starke, Newton, Jasper, &North 1/2 of &. Areas 438 �... _.. -. ...... Pulaski Counties Local #692, Area #101S 06101/15 05/31/18 Rieth-Riley YES SL Joseph, Marshall, Fulton S 112 of Pulaski Counties Local 41 & 81 03/07/12 05/31/17 NWICA NO Building Laborers _.._ .._...... Stale of Indiana District Council 04/01/17 03/31/22 ICA YES i Statewide Heavy & Highway 04/01115 03/31/18 Rieth-Riley YES Asphalt Plants & Supporting Equipment in jurisdiction of Lo 1103 Ondtanapolis & Lafayette) Heavy & Highway, Adams, Alien,„ Benton, Blackford, C�. arroll, Cass, Clinton, Dekalb, Delaware, Fayette, Grant, Hamilton, Local Union 103 04101/15 03/34/18 ICA YES Hancock, Henry, Howard, Huntington, Jay, Johnson, Madison, Marlon, Miami, Randolph, Rush, 811e11ryy Sleuben, Tippecanoe, Tipton, Union, Wabash, Wayne, Wells, Utlttile ........ __nd'WlflBe rN 05/01/15 04/30118 Rleth•Riley YES Shops: Covers the Indianapolis & Lafayette shops W 05l01/17 04/30/22 Rielh-Riley YES 4 Co. Shops`. Lake, LaPorte, P orter & SL Joseph a)06/01/14 05/31/17 NWICA NO 4 Co. Building: Lake, LaPorte, Porter & St. Joseph q1 04101/17 03/31/22 Rielh-Riley YES 10 LaGrange, ap15+Newton,INoble, Pupaski &Starkesciusko, LU 7 03/31/22 Rteth-Riley YES Asphalt Plant_ Etkhartonly Local Union 150 10 Co. Heavy & Highway: Elkhwil Fulton, Jasper, C 04/01/17 03131/22 ICA YES Kosciusko, LaGrange, Marshall, Newton, Noble, Pulaski & �. _._.-.. Starke 05/31/17 m 06/01114 Michoa Builders Association Inc. NO Building. Rleth-Riley Is not signed to this agreement. 01/01117 12/31119 Rielh-Riley YES Hunt Lake Materials CL 05/01/17 04/30/22 Four Co, Highway Contractors Group YES 4 Co. Heavy & Highway: Lake, LaPorte, Porter & St. Joseph Brown, Franklin,Gibson, Harrison, Local Union 181 04101/16 0331/18 ICA YES Jackson, Jefferson, JJenninngs, Lawrence, Orange, Perry, Pike, Posey, Ripley, Scott, Spencer.' Swftzerland-..derbl wg,)n��r1lck Wtishin lock. �V�i�'._.� Heavy & Highway.."Boone, Clay, Daviess, Founlain, Greene, Local Union 841 04/01/15 03/31118 ICA YES Hendricks, Knox, Monroe, Montgomery, Morgan, Owen, Parke„ Putnam, Sullivan, Vermillion, \Ago and Warren. Also fncludes as halt glanC Joint Council No. 69 04/01/17 03/31/22 ICA YES Statewide Heavy & Highway, except for Lake & Porter Counties Teamsters Local 135 04/01/17 03/31122 Rieth-Riley YES Lafayette Addendum for Stockpiling Local No. 142 _ 06101/ 16 05/31/19 Four Co. Highway Contractors Group YES Lake & Porter Indiana Counties & Calumet City, Illinois Pago 1 of 1 9/2012017 m/_(iir) TRAVELERS) insurance. In•Synce March 29, 2017 RE: Rieth-Riley Construction Co., Inc. To Whom it May Concern: It has been the privilege of Aon Surety and Travelers Casualty and Surety Company of America to provide surety bond's on behalf of Rieth-Riley Construction Co., Inc For over thirty-six years, during which time Rieth-Riley Construction Co., Inc. has performed and we have issued performance and payment bonds for contracts valued in excess of $05,000,000.00. In our opinion, Rieth-Riley Construction Co., Inc. remains properly financed, well equipped, and capably managed,. At the present time, Travelers Casualty and Surety Company of America provides a $50,000,000 single project/$ 00,000,000O aggregate surety program to Rieth-Riley Construction Co., Inc. As always, Travelers Casualty and Surety Company of America reserves the right to perform normal underwriting at the time of any bond request, lnciuding, without limitation, prior review and approval of relevant contract documents, bond forms, and project financing, We assume no liability to Pepper Construction Company of Indiana, LLC or its affiliates if for any reason we do not execute such bonds. Travelers Casualty and Surety Company of America is listed on the U.S. Treasury Department's Listing of approved Sureties (Department Circular 570), and is rated A+ XV by A.M. hest Company. Very truly yours, Aon Surety As agent for Travelers Casualty and Surety Company of America fiy [ Sandra M. Nowak, Attorney -In -Fact A r -, —KNOWLEDGEMENT BY SURETY STATE OF ILLINOIS COUNTY OF COOK On this 29h of Marchbefore L ,2017 ore me, Deb J—.D--oy—le, a Notary Public, within and for said County and State, personally appeared Sandra 1,1`ov�al� to me personally known to be the Attorney -in -Fact of and for Iraveler, �3 Casualtv and fStirety Cq,jnRqny( of Arneri and acknowledged that she I 0a p1_A4pgjLCg executed the said instrument as the free act and deed of said Company. INWITNESS WHEREOF, I have hereunto set my hand and affixed my official seal, at my office in the aforesaid County, the day and year in this certificate first above written. Notary Public 6n.-i-11-4ta te of Vln—ois County of Cook OFFICIAL SEAL DEBRA J. DOYLE NOTARY PUBLIC, STATE OF ILLINOIS MY COMMISSION EXPIRES 3 FEBRUARY 21,2018 THIS POWER OF AtTORNEY IS INVALID WO-HOUT THE kii-g&iiii-E—A POWER OF ATTORNEY TRAVELERS Farmington Casually company St. ]?out Mercury insurance Company Fidelity imd Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company orAmerica, St. Pout Fire and Marine Insurance Company United Slates Fidelity and Guaranty Company St. Paul Guardian Insurance Company Atlarney-In Fact No. 230983 CerfiricateNo. 007084548 KNOW AIA, MEN BY TFILSE PRF-SENT& Thal Farrifingion Casutilty curapany. St, Pout [Z'Iro and lvjtcHjjc Iraxatraaicc CGMPTUIY„ St,. Paul Guardian Insurance company, St, Paul Mcrvury In"i'manec Company.Travcfers Comnilly anA Surrty CornpacjyTrivekrN CusuAlIcY and S111-0Y Company OfAmerkti, and United States pi,dcWy unit Guaranty Coallo;tcly ate coriviatiorv; duty orgacared under the laws of the Scale of Connecticut, that FkMity and Guaranty Insurance company, 11 a corraoicotion dilly oiganczed ua&v Uve how, Of 111c,Sinic of Iowa. and that Fidelity and (haoramy Insurance Undcr%whers, Inc,, Is 3 C0910rutiOn duly organized under the lows of the Suite of wiscorhin (11CMA collectively called the "Compunics"). said that dw conipivsk's (it) herebytankeconsfiltric and apppint, Debra J. Doyle„ Diane M. O'Leary, James B, Nieraggart, Jennifer L Jakaitis, Judith A. Lucky7l2ftirnov, Sandra M. Winstcd, Sandra M. Nowak, Susan A. Weish, Christina L, Sandoval. Unh Eck, and Jessica B. I)ccripsey of tilew y e Theirvue nlawful tey-tF=each Iileirsepanle capacily i(more than one is named above, to sign, execule. seat and acknowledge any and all hands. rccognizances, conditional undertakings ando(her itings.obtory in the nature thereof on behalf Of the Comparties in their busincz orguaraniceing the fidelity of'persons, guaranteeing the performance of contricK and executing or guaranteeing boad!, and undertukin gs required or permitted in tiny actions or proceedings allowed by law, IN WITNESS %VHEREOF. the Companies have caused this inxtruintan to be signed and their corporate seals to be hereto off Ned, fink- 28th day of �DCCC(Obcr "afllCi Scale or Connecticut City of liartrord sq. Farmington Casualty Company - - Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underavrftcrs, Inc. St. Paul Fire and Marine Insurance Company St. ]'out Guardian insurance Company -S(, Pout Memory Insurance connitany Travelers Casually and Surety Company T)ruvelors Casualty and Surety Company of America United States Fidelity and Guaranty Company & 02j 'Kt« t ynr,u�. V, A' By: Robeti L. Rafiey�Sditinr Vwo Pipsi(knt On this the 281h d ay a tf --.,qgqc cribe r 20iQbcI',rcjIr.%,Ojj, �kjjy appeared Robtri L. Rancy, w1jo aclillowledged linnseff to be the Senior vice plesid'on ("asoally conwany. Vidolity and Geniality frisrurAlict: CoMpAny" HdOny ane Guaranty Insurance Undcrwriteri, Inc,,St. Paul Fire and Mwina lwwraucc Conip.any. Sl. Paul Goirdiall lnstnalk�e coqiqnloySI, Pinji Ntcrcury la',UralWO COMP-Y, "Travelers Casually and Surcty Compaq.,1'rivelcirs CRAU011Y and StINly C(Anpaoy of Anicrica, 11flj United.slaw's vidtflicy and Giaj-acuy CoillpIlAY, 11114 that Vic, as sock. hchig abihorized s�o to do„ cLA motcd thou foregoing Ininumvin for the purpwivt flicrein contained by signivig on bohalf of die corporatioms by hiltirselfas a duly nudlorizcd officer. In Witness Whereat, I hereunto set my hand and official seal.My Commission expires the 30th day of June, 2021. k —Iorioc. Teircaull, Notary Nblic iw 58440-5-16 Printed in U.S.A. This Power or Attorney is granted under and by tile a wharity of the to 110MUSTesolutions adopted by the Boards of Dirt clors of Farmiligto" Cast, ally Company,pidelity, and Guaranty Ismunince Corrilauy, Fidelity And Guaranty Insurance Underwriters, lac,, St. Paul rite and M'Aritic Insurance COrnPQnYSI. Paid Guardian Insurance Company, St, Paul Mercury Insurance Company, Travelcri Casualty and Surety Company, Travelers Casualty and Surety ClOmpAlly of America, and United States Fidelity and Guaranty Company, which resolution Are now it' Nil force and effect, reading as foflow$j RESOLVED, that the Choirrimn, the Prcsidem, any Viet Chairman, any Executive Vice President, any Senior Vice President, any Vice president„ ally Second Vic such authority as his or her cerlificate of authority may prescrilm to sign Willi the Company's name and sea] With IM or the Company anti may give, such apPOinter -in-Fact arid Agents to act for and on behalf President, the Tmasuma, any AssLstanr Treasurer, the Corparme Secretary or any Assistant SOMMY pray appoint Attorneys e Company's sear bonds, recognj2Anccj, COMMU Of indemnity, and other writing: Of said Officers or the, Board of Direct 5 obliBal0fY in tilt nature Of A bond, recognizance, or conditional underinking, and any Ols 'it any time "lay te'llave ally Such OPPOIA410 and revoke the power given hirn or her, and It is FURTHER IMSOLVED, that the Chairman. the President, any Vice Chairman, any Ex6curive, Vice President, any Senior Vice President or any Vicr, President may delegate all or any part of the foregoing aullurrily to one or more officers or employees or this CO, jp4nY, Provided that each Such delegation 4 in writing and a c ice a f the Secretary; and it is copy thorear is filed in lhr� off' I FURTHER RESOLVED. that Any bond, reco3ni?anae, contract of lndentnhy, or writing obligatory In the nature of a bond, recognizance, or conditional Undertaking shall be valid and binding uFkjl the Company when (0 signed by tilt Prcsidcnt, arty Vice Chairman, any Executive Vice president, Any Senior VJC,: President 0 e -asurcr, any Assistant Treasurer, the COrFOralt &crclau or any Assistant Secretary and duly attested and scaled wult the President„ any Second Viet prcsidelry. tjtc Tm , I or any Vie. Comfamy'3 seal Java Secretary Or Assistant Secretary; or (b)duly executed (tinder sea], it required) by one Or morcAitorneys-in-fract and Agents pursuant to live power jnc3cfted In his er her ccojfjcaje or their ccnificarcs or aulhority or by one Or 41101c Company officers Pursuant to a written delegaticu, Of4rdhoruy, and It is FURTfiRM RESOLVED, that flie, signature of each of the following officeis° President, any Executive vice prell(tv affixed by facsimile to nay Power of Allarric any Assistant Vice President, any secreLuy.,any, Assistant Secretary„ and the seal Of the Company may be AM 311 � ally Senior Yee President, any Vice. President, j other writift s obligatory tit the nature (hrrcof. arid! airy snCh Power of Attorney Or certificate bearing such raicsimile signature or f1c$j die s and undertakings ant WaIll Sectelaries or Atromeys-in-Fact for purposes only of executing Rut arresting bonds ortificate relating thereto appointing Resident Vice Presidents, Resident ASS' y or (a any tile Company it) Ille finure with rt CSIM110 sizzuttura and facsimile seal $11tall be valid arid bindin on shall be valid and binding upon tile comPA"Y and AOY such Power So executed arid certified by such f.1 it 4,31 aspect to any bond of understanding to whict, it is 3unched. 9 L Kevin E. Hughes, the UAAeisigued, AsAisiani Secretary, of Farmington Casualty COlopOrty, Fidelity and 003santy Instuance, Company, Fidelity and Guaranty Insurance Underwriters, Jac,, St, Paul rue and fiJarinc Insurance, (- .culpaily, St. Paul Guardian fnsumnec Carripany' St, Paul &joc4ury insurance C m juaranty Company do hereby certify That OIL Above And foregoing, SlirctY COMPMIY. Travelers Casualty and Surety Company OfAincrica, and United States ]Fidelity and ( 0 panY-'rra"IM Casually and is n true and correct cOpy, of the power or Attorney exceutod by said Compamev, which is in fail f,,e and effect and has riot been revoked, IN TESTMIONY WHEREOF, [have hereunto set my hand And affixed the seats of said Companies this U--tday Of eKevin— To verify the 2uthclatichY Of this Power of Attorney, call 1-800-421-3880 or contact abOve-oarmed individuals and the details of the bond to which the power is attached. US At WwwAravelershond,com. Please refer to the Attorney -tin -Fact number, the it ff 411a6�1 m � 6 Y, n 1A D D D =1 Z) > A z < z z z z 51 ZR ce o ou u u > 0 o z 17, u 2t u YirvT; u L9 g c, 6 vi u z Ld 9 z z C, z o C) z c, z z ik' c, w, (U Z O U o Z O w UIL O U F- Y Z 0 O U L4 WIL _i N 2 F- W w 4?fwxl*0�1 Plasterers" & Cement Masons" Apprenticeship Coordinator Local Union #692 Email; kri b ' Phone: (219) 707-7767 stoff @plcThIOcaI692,org '1864 To Whom ]t May Concern: February --23, 2019 Rieth &Ikil-ey'con8fruction Co. Im is a signatory q 9, ontractor with Local 692.and, -paitid ates in the-PI'asterers & C Iement:-MasonsApprenticeship:P .Trai ning Program, 1 -1 m4yte:reached atl-,(119) 707-7167 if additional information is needed. Thankyou, Brian Kristoff Apprentice Coordinator :Plasterers & Cement Mas . ons 9200 Louisiana Street - V es I I I v 111 e , Indiana 46410 W W W P ILC M L 0 C AI6-92. 0 R G ONO aw Now tool. < < zo Z,Q) Wo Z 0 - iw uj L UJ U), (Z:E o U) w uj LLJ F- ry w LLJ 5 a_ 6—Mom C9 0 w r4 C\l 0 115 110, 0 INTERNATIONAL UNION OF OPERATING ENGINEERS LOCAL UNION NO. 150, 1508, 150A, I50C, I50RA, ISOD, 150G, 150M AFFILIATED WITH THE A..RL: C,I.D. AND BUILDING TRADES DEPARTMENT JAMES M. SWEENEY PRESIDENT-13USINESS MANAGER Date: 3-6-2019 To whom it may concern: (708) 482.8800 - FAX (706) 482.7186 6200 JOLIET ROAD COUNTRYSIDE, IL 60525.3992 Countless individuals, businesses, and communities -- in the private and public sector, alike — recognize the added value of doing business with contractors who support Workforce Development through their participation in United States Department of Labor (USDOL) approved apprenticeship programs. USDOL-approved apprenticeship programs ensure that the young people of Indiana have the opportunity to develop a portable skill set that remains with them throughout their careers in the construction industry. The training provided by these programs addresses the evolving concerns of communities, businesses and industry for the development of a quality skilled craft workforce that meets their needs, whether the projects are public or private in nature. To that end, please be advised that Reith Riley Construction Co., Inc, is signatory to a collective bargaining agreement (CBA) with the International Union of Operating Engineers Local 150. This CBA requires the above -referenced employer to participate in Local 150's USDOL- approved Apprenticeship and Skill Improvement Program. Sincerely, .lames Aard�neu°� Business Representative,. IUOE Local 150 flVDL4NA LABORERS' TRAINING TR UST FUND David A. Frye .Secretary -Treasurer Jerry J. Bolk Chris L. Guerrero Ricky Henson, Jr. Ramon Mendoza, Jr, Robert S. Wright P.O. Box 758 -Bedford, Indiana 47421 (812) 279-9751 March. 5,2019 To Whom It May Concern: Sean Coakley. Director John P. Brown Chainnall Kelly Abel Brad Dreibelbis Michael Ferrara Stan Meyer Jim Wiseman FAX; (812) 279-5545 "This letter is to confirin that "Rieth-Riley Cons[Tuction " is a signatory contractor in good stancling with the hidiana Laborers' Training Trust lFund. The above ineritioned company is a participant in the: Joint Apprenticeship and Training Con-anittee through this Union and balls been an active participant in good standing for each of the past five plus consecutive years, and is currently eligible to use our apprentices on as project. Further, our organization's prograin is approved by the U.S. Veterans Administration to Participate in the 01 educational benefits prograrn. A copy of our approval letters are attached along with the collective bargaining agjeernent stating the ratios of Journey workers to Apprentices; which is one (1) Apprentice for every five (5) Journey workers and thereafter may not employ more that (1) Apprentice for every (3) Journey workers, Sincerely, 4' I(C) Sean Coakley, Director SC:dc www.indianalaborerstraining.org s STATE OF INDIANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W469 INDIANAPOLIS, INDIMA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor ,lames IhJN. Ero~,wrri, Director January 9, 2019 This will acknowledge receipt of your updated Wage -Scale for the Construction Craft Laborer program offered by Indiana Laborers Training Trust Fund -Apprenticeship. The State Approving Agency has reviewed the document as listed below: Wage Scale: Construction Craft Laborer FACILITY CODE: 30004114 To the best (:)f my knowledge Indiana Labomrs Training Trust Fund -,A ,pprentic eslzip does not atilixe ez°roneo��s or misleading advertisem, ont, citlner by actual statement, omission, or Inntunzat6.ou. It is understood by Indiana Laborers Training Trust Fund -Apprenticeship that they will maintain a complete record of all advertising utilized by or on behalf of the, Indiana Laborers Training Trust Fund -Apprenticeship in regards to their training programs during the preceding 12 months, Indiana Laborers Training Trist Fund -Apprenticeship's advertising will be available for review by any and all fixture supervisory visits by the SAA, or the U.S. Department of Veteran Affairs, Please Review the entire packet for content and accuracy. Approval is granted pursuant to the provisions of Title 38, U.S. Code 3687, with an eflective date of April 1, 2018. If you have any questions, please feel free to give me a call at 317-232-3916 or email me at tgriffin@dva.in.gov. Thank you for what you do for our Veterans, and have a great day! Sincerely, r Taniqua Griffin Program Director State Approving Agency Cc: VARO/ELR � 1441 T1C40 STATE OF INDIANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WtSTWASH[NGTON STREET ROOM W-469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Jhdian a Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor James M, BFOw--n, 6i7e-ctor--- January 9, 2019 TheIndiana. State Approving Agency conducted a supervisory visit on 01/8/2019 at Indiana I,aborers'F�TaiiiiiigTrust Fuiid-Ap.pTentice,sI,upThepurpose ofthe v'sitwastopr provideto .i ov the Certifying, Officials and review enrollinent certifications, record retention mid reporting procedures. The organization deramstrated proper record maintenance and record maintenance mid reporting procedures.- Dining the visit., we discussed the irnportance of reporting hours on a monthly basis good record keeping tecluiiqucs, and how to report a leave of absence or completion via VA Form 22-1999b. We also updated the Certifying Officials via VA Form 22-8794, work processes, and wage scale. If you need any assistance or have any questions regarding this technical visit please contact me directly attgriffiii@dva,in,g,ovor(317)232-3916, Thank you for the courtesy extended during my visit. The education awl training opporttinities that your orgatrimition continues to provide vetermis and their dependents are appreciated. Sincerely, Taniqua Gfiffm Program Director Phone (317)-234-6062 Toll Free (800)-400-4520 Fax(317)-234-8744 STATE OF 1N IANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W-469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brower Apprenticeship Coordinator Indiana Laborers Training Trust Fund-Apprentoeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor .�...-.. Samos M. Brown Director January 9, 2019 This will acknowledge receipt of your revised Work Processes for the Construction Craft Laborer program offered at Hoosier Energy, located in Bedford, Indiana. The State Approving Agency has reviewed the document as listed below: TRARNING PRQG tAM LENGTH DOT CODE Construction Craft Laborer FACILITY CODE: 30004114 4,000-7800 hours 47 2061'.00 To the best of my knowledge Indiana Laborers Training Trust Fund -Apprenticeship does not utilize erroneous or misleading advertisement, either by actual statement, omission, or intimation. It is understood by Indiana. Laborers Training Trust l nd- pprenticeship that they will maintain a complete record of all advertising utilized by or on behalf of the company in regards to their training programs during the preceding 12 months. The company's advertising will be available for review by any and all fixture supervisory visits by the SAA, or the U.S. Department of VeteranAifairs. This approval is made pursuant to and under the provisions of Title 3 8, U. S. Code 3687, with an effective date of January 8, 2019. If you have any questions, please contact me at 317-232-3916. Sincerely, Taniqua Giffin Program Director State Approving Agency CC:VARO/ELR Phone (31'7)-234-6062 To)] Free (800)-400-4520 Fax (3I7)-234-8744 J��M,, G] I� LO It clm Imti r C) r� w o O p O O O d O d O O d O a I H O N tl LO M <q N O a r Q} � � M L Q N p h O d M IX) r �i ,y oLO N o CDM ch r u7 �M- d N 'n r I--(Np phj N 0 CD m N Ocq OD CN CD b CV O r O pw O r co r r p O O O O N m 'CMN:wFWI iAW'Mar.:MpIC{!'.TT",Yu� �J'kG.n6'„ i'�%2%%'�M'ri"t� TF�C%G x 31;g9}we.. a:Y4M '"„5T:"p{4 ,ISAaXY':R�". M�Mdd^!%#.2' R�^�.w4Yx'44 u3flL'*.YI '-ax'AMRC%A 16 Ca LO ,LO�,.. in r m N co CO O LO O r W I r 4 w C p�q N r N CO CO d r !N O r co z r a�ia.rw .rem �a•.� a"x _..ace r�„:,. Wit+ m ...�c . t�, O O N O O O O O O p p N i FL o. a ZO cp co CV) � d r Y cn W& U � C N d Cqi NCO v rn r co coon N �YN I', cNi � a O h `�"�.'�,�:a�taao,Rmuuux �nwv�.. a��r� ,. .� °saa,�ra�. mx...® «mean ^^.r„ss ��as„,,„n�,, �� n • �rxarx '. co Lo r GO # N tto D v C} � N , ZR # �t -J, J Q ZR a cv T w U z w a Fa cz=M.w. u=zt.... ...w.. � � I �' ; I O co N 25 CC C K4 a o o a a a o o I q w GSA w e OD La N O Q. Lf7 Oi L(] S`7 Lti Lo i N a N P'1 CD N N a N r L�CT Cho 'Gt' L fro 4 �rrcm7^r c �e„wa rr,...�.t 99T'u„ w�ixr�•rrcx rrr � r�r � -. �^ ,� '.� rr nw.". w. ,. e=;,MIX '-I TZ7,..=-.. 77.7rf+".�M'.�.R'I;cz _ ..wt'w U".:., :r „'ST""�W r,,. ,v.rr Y:24,:°»u- v,x .w'P ,.,.. r 'tom T^ u>> cu O Gp Vi tx rn N� � I � o N c+7 r- e- o f o r- o a �y GRyp (D w..a,.u; u..s, w m IT O N N e O (Di .P'fl....,M rl u; T- m co a5 w o ti (NN N co � Lo mCD m� r m v a o 0 o m� a a I Z r 00 N M N my �O m H I _ U C }� C 11[ pb I. H a. 00 � (n m 4 r 00 N 10 ...c"_�*:.*-ter- y. . z.•,rn� mr w..;rr '�r .a .,,n... .r,� ;.. .r, .. N r O 1- (r0 Yd' O ..i M O O N CM t- ID is 0 4 00 "i r r- 00 N CO � .. a o p. m y o C) C] O O CD r c) o q r q N R ~ yyK FI Lo (rD 00 CLi CV LO N N CO CO N b 04 q LO LO 04 N M N a� �i Rs e M 00 c*7 c0 M CO CD U) T r r r N r CD .r. co i LO M M fm LO N r O N r F-c .. �� m � � =. -3 ,:. we AC) r N O r O CD O NOSi' -rOC) r 0 ,..,.,�� m CY) co b r Cp C7 w A CD c- 0) r M M co o M r CD (D o MI ro Pt A q F-� N ' • r m C*' r Cp m p CA CA M N z . myI�v CD o o 0 0 0 0 0 oLO a ZZ CA N rmr N d0 La m CD l j cN � Lo y O In u cy Lo to to h ' ' .��M, �a. r� ,, r. . �s ffom vt r � N h r ■■ a —j .� IR,�,a,�_���.m Lo O N M U d5 0 0 r O N O sr O O ONO O * N f O i r � Qp Cd m cv a M a r r e N W O Rt O f0 kn Il? Oso M � CI N '�? co Vr' NIq S7 O ~ t- r pppp M it W N v? 0. K ,..N, p '. N _. N O -o to - O —IN N v— .Z S O a m a� N N cV M © a .- � O a O 40 Z C00 N � N qk aeq N 3 3 03 1 18 B (D �' N tt (h v t' A a n p 8 0' r � T M to Ns-- h N .x M I q O y \ p, o N w N fV N l0 crj Cp �j O Co o� to d V1 a tn V CC)LO M p N .N T Cl) 0 O r >C, r M e Lo Z N pW n r � M CY) M M N v T W O ii wm+ m mw Miliqu ,mom; wm µw 18 ae O 00 N r M ti F� crGi r M N 10 CD Q' a,� M .w 1plY� tl r . .. P7rib PAW 4 "� ^+4v�' I,,. uOmdrot* Q d ch T c7 O T O' N O O r p T N GO o r z TO (NO M in r 00 ~ to N 'd co � N i r r `rl T C7 t- rr T C) O O O N p p 0co to T z Lr)O' r O N N N CO0 N ter& mwnu,. wwwrnpppp yawt di. m+h �TIM MMVM aawm+ewwa O Cl O> E°� r lam)r N LO co r N n vM mmne, N N o coti rV 0) Nt C r # � ~ -=.I ' J Fa TYN"aaaVlrv=�u;.Irc' .. YHYdaSdN' mW ,kiN '' A;�di MWMY>Po '�q'r.. ,. .�... r . auwwn. �'ww,im"ew4 PAWSIW,i� F=57414 (Ml Z43)fFQrMW(RoW5ell2,Q13) 611) OF RIETH-FRUY CCASTM�JCTY)fq Cr,), 25200 SFAT'E ROAD SOUTH BEND, K 4f56 �4 M OF City of South Bend, Indiana 2019 Community Crossings Proiect No, 119-015 FJWd May 28 2019 Action Wken FCONTRACTOR'S BID FOR PUBLIC WORK - FORM"96 State Form 52414 (R2 12-13)1 Form 96 (Revlwd 2012) Prescribed by State Board of Accounts PART I (To be completed for all bids. Please type or print) Date (month, day, year): ITIT May 28,.2019 1. Governmental Unit (Owner), City of South Bend, Indiana 2, County: St. Joseph 3. Bidder (Firm)i: Rieth-Riley Construction Co,, Inc. 4. Telephone Nurnber. (574) 288-8321 5. Agent of Bidder (if applicable)._Joshua A. McCormick Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of 2019 Communitv Ca. rossings , Project No. 119-015 and dated n.,/,a for the sum of see itemized proposal $ see itemized proposal The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the governmental unit. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment, The contractor and his subcontractors, if any, shall not discriminate against or intimidate any employee, or applicant for employment, to be employed in tho performance of this contractI, wily respect to ally ,letter directly or indirectly related to ernploynnent beratme of race, religion, color, sex, national origin or ancestry. Breach of this covenant may be regarded as a material breach of the contract. (If applicable) 1, the undersigned bidder or agent as a cont-mc(or on a public works protect, understand my statutory obligation to use steel products rnade in the United States (I-C, 5-16-8-2). 1 hereby certify that I and all subcontractors employed by rne for this Polect will use U,S, steel products on this Project if awarded, I understand that violations hereunder T118Y in to feituro of contractual payments. ETOTS�.1'111 day of following conditions: Contracting Authority Members: PART I I (For projects of $150,000 or more — !C 36-1-12-4) Govemmental Unit: City of South Bend, Indiana (Firm) Rieth—Rile Construction Co, Inc. Bidder Firm �n _IT _ �ww Date (month, day, year;i _May 28, 2019 , subject to the These statements to be submitted under oath by each bidder with and as a part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? Completion Contract Amount --- Class of Work Date Name and Address of Owner $2,950 000.00 HVY HWY WY _ m Awwww 2018 INDOT, DOT, Indianapolis, Indiana' $1,399,625.00 HVY HWY 2018 City of South Bend, Indiana $11,264460.00, HVY HWY 2018 Indianapolis, Indiana INDOT,P __.......__..��.. 6 700,680.00 _HVY HWY 2018 Elkhart County, Indiana What public works projects are now in process of construction by your organization? Expected Contract Amount Class of Work Completion Name and Address of Owner �,_.. _Date � $4 945,02000_ HVY HWY 2019 INDOT Indianapolis, , Indiana §L6,080,459.00 HVY HWY 2019 INDOT Indianapolis, Indiana $5,865,000.00 ,, g -�� HVY HWY 2019 myµ INDOT Indianapolis, Indiana WY HVY H........ 20 19 ..._�.. �.. ..__ City of Mishawaka, Indiana ....__._�._ Have yoever failed to complete any workd toyoO It so, where and wh" AM General Mishawaka Indiana 574-?, � —4- 728 Navistar South Bend„ Indiana 574-654- .466 ITR Concessons LLC_ �IT _ rarlr Indiana 574-674-5136 University of Notre Dame _ _ South Bend, Indiana_mww_ 574 631-7356 SECTION11 PLAN AND EQUIPMENT QUESTIONNAIRE Explain your plan or layout for performing proposed work. (Examples could include a naTrativo of when you could begin woA complete the project, number of workers, etc, and any other information which you believe would enable the governmental unit to consider yourbid.) Ac�to flan specifications — —. T list the names and addresses of all subcontractorspersons or firms outside i 1p wrl I I Air, 1011# vmg I mom I weiEq sumnflI is4mK f I I`I maim &' Trucking r'Elmer Street, South Bend, you Intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listling, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to Immediately notify the governmental unit in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. What equipment do you have available to use for the proposed, project? Any equlpmentto be used by subcontractors may also be required to be listed by the governmental unit. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not please explain the rationale used whiGh would corroborate the prices listed. Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall the rebytmrendered Invefid. T lie fina nciat statement provided hereunder to the governing body awarding the contracl most bu specific enough In detail so INA said governing body can make a, proper deterrnination of the bidder's capabifity for cornpletingi the prefect if awarded. SECTION IV CONTRACTOR'S NON — COLLUSION AFFIDAVIT The undersigned bidder or agent, being duly sworn on oath, says that he has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered Into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to include anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. He further says that no person or persons, firms, or corporation has, have or will receive directly or Indirectly, any rebate, fee, gift, commission or thing of value on account of such sale. SECTION V OATH AND AFFIRMATION I HEREBY AFFIRM UNDER THE PENALTIES FOR PERJURY THAT THE FACTS AND INFORMATION CONTAINED IN THE FOREGOING BID FOR PUBLIC WORKS ARE'TRUE AND CORRECT. uth BeIthis 28th day flfWMa�tl„W µ 2019 Dated at So nd m.�. m.n n. ....w 5,ie,th-Rfley Construction Co., Inc. ormick, Sales Manager ACKNOWLEDGEMENT STATE OF Indiana I ) ss COUNTY OF St. Joseph l Before me, a Notary Public, personally appeared the above -named McCormickand Joshua.._.:..._.- swore that the statements contained in the foregoing document are true and correct. Subscribed and sworn to before me this 28th r,9ny�f a 01" . _...... �......� � . 121"Pl1f) Dawn E. Armstrong No PubAc My Commission Expires: 4/18/23 County of Residence: LaPorte I)AWN f , APM81' N oh'uV Pula9k�%,Sf (, or an w WMY ApW1II 02 �1pm-mw�,rfgw,� mm�r�a,�wmm��1Ww��w��oum�uuwr.. !t ■' '� �' d .� a WIA 70U% UUallty 100% Employee Ovvned - Over l00 Years CERTIFICATE OF AUTHORITY KNOW ALL MEN BY THESE PRESENTS, that the undersigned President of Rieth-Riley Construction Co,, Inc,, a corporation duly organized and existing under the laws of the State of Indiana, hereby represents and confirms that Joshua A, McCormick, Sales Manager, has full power and authority to make, execute, seal, if required by law, and deliver for and on its behalf, and as its act and deed any and all bids proposals or contracts„ said bids, proposals or contracts not to exceed $2,000,000.00 which bids, proposals or contracts call for work, services or materials to be furnished by Rieth-Riley Construction Co., Inc., whether such bids, proposals or contracts are being submitted to an individual or entity„ public or private and to bind Rieth-Riley Construction Co., Inc. thereby as fully and to the same extent as if such bids, proposals or contracts were signed by an Executive Offcar of Rieth-Riley Construction Co., Inc., and sealed, if required by law, and attested by one of such officers, and hereby ratifies and confirms all that the above named designee may do in pursuance hereof. The authority granted to the above named designee is pursuant to Section 6.03 of the Restated By -Laws of Rieth-Riley Construction Co., Inc., as amended„ which Restated By -Laws were effective February 9, 2010, and which Restated By -Layers, as amended, and the authority granted to the above named designee continue in full force and effect. This Certificate of Authority is issued, signed and sealed, if required by law, by facsimile under and by authority of the following standing resolutions adopted by the Board of Directors of Rieth-Riley Construction Co., Inc., at a meeting held on the 16th day, of February, 1996, at which a quorum was present, and which resolutions have not been amended or repealed and continue in full force and effect: 'Resolved that for purposes of clarification and in furtherance of tlae intent ofSection 6,03 of the BpLaws of the Company the authority granted in Section 6.03 shall extend to the making, execution, sealing, if required by lave, and delivery on behalf of the Company of all documents required as part of any bid„ proposal or pontract; which is for workservices or materials to be furnished by Company and which is being submitted to air individual or entity; public or private, " "Resolved that in carrying out the provisions of Section 6.03 of the By -.Laws of the Company the signatures of suctr directors and officers and, if required by law, the seal of the Company may be affixed to any scrch Certificate of Af.rthority or any certib'cate relating thereto by facsimile, and any such Certi rate of Authority or certificate bearing such facsimile signatures or facsimile seat shall be valid and binding upon the Company and any such Certificate of Authority so executed and certified by facsimile signature and facssirnife seal strati be valid and binding upon the Company„ with respect to any bid;proposal or contract to which it is attached.,* IN WITNESS WHEREOF, Rieth-Riley Construction Co., Inc., has caused these presents to be signed by its President and its corporate seal to be hereto affixed, this 23th day of March, 2016. RIETH-RILEY CONSTRUCTION CO., INC. SEU STATE OFINDIANA ) A. Keith Rose, President )SS: COUNTY OF ELKHART ) On this 23th day of March, 2016, before me personally came A. Keith Rose, to me known, who, being by me sworn„ did depose and say, that he is President of Rieth-Riley Construction Co., Inc., the corporation described in and which executed the above instrumenl; that he knov�s the, seal of said corporation; that the seal affixed to the said instrument is such corporate seal; and that he executed the said instrument on behalf of the corporation by authority of his office pursuant to corporation's Restated By -Laws and standing resolutions. Nly Commission Expires: May 8, 2016 ov,4�w Paula K. Frizsell, Notary Pub pc Residing in Elkhart County, Indiana I, Robert L. Konopinski, do hereby certify that I am the duly appointed and acting Secretary of Rieth-Riley Construction Co., Inc,, a Corporation duly organized, validly existing and in good standing under the laws of the State of Indiana; that the foregoing Certificate of Authority has neither been amended or rescinded and remains in full force and effect; and furthermore, that the Restated By -Laws and standing resolutions of the corporaton, as referred to and set forth in this Certificate of Authority, continue in full force and effect. r6i ed and Sealed at the Corpo � i f Rieth-Riley Construction Co., Inc., in the City of Goshen, State of Indiana ..Dated this ay of Y �SEAL �� ��(• " Robert L. Konopins i, Secretary P.O. Box 477. 3626 Elkhart Rd. • Goshen, IN 46527 Phone: (574) 875-5183 • www.rieth-riley.com I I CERTIFICATE OF QUALIFICATION to provide CONSTRUCTION SERVICES for PUBLIC WORKS PROJECTS to the STATE OF INDIANA This Certification Board, having duly considered application for qualification In terms of apparentexperience and financial resources; and under the applicable Indiana Code 4-1 d.5-4 and adopted rules orthis Board, hereby issues a Certificate of Qualification to provide construction services to the. State of Indiana For Public '4 arks Projects to. RIETH RILEY iGn CON STRUCTION CTION CO INC 3626 ELKHART RD PO EX 477 GOSHEN IN 46527-0477 i Phone 574-875-5183 Fax 574-875-8405 a Company Official L KEITH ROSEMM ror the twenty-seven month period stated herein, unless revoked by this Board for cause, and in the classifications of services stated below. This certificate supercedes any previous certificate. 1611.01 Concrete Construction of Roads & Curbing 1611.02 Asphalt Construction of Roads and Parking Lots 1622.01 Gen Contr-brdgs,vdcts,elvd hwys,rlwy,tnls 1623.03 Sewers andlor Water Lines 1794.01 Earthmoving and Land Clearing 1794.02 Excavation 1795.02 Demolition of Pavements and Roads CERTIFICATION DATE 12/6/2017 EXPIRATION DATE 3/6/2020 THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PLIBI IC WORKS DIV SION CERTIFICATION BOARD, 402 WEST W'ASHIINN91'ON STREET ROOM "krIi467, TND1AWAP0I.,IS, INDIANA 4620'4,, ALSO ACTS AS THE 6f''RCIAL NOTICE OC E PMA"ITON, Tracy L. Cross, Executiv dretary Certification Board DAPw PD2 Slate Fenn 3963R Rei. 07/06 "T" : , , "1 INDIANAPOLIS, IN August 7, 2018 TO RIETH RILEY CONSTRUCTION GOSI-IEN, IN whohas filed with the Department aContractor's Statement of Experience and Financial Condition as required udder Indiana Code 8- -10, Is hereby qualified to bid at any Department of Transportation. letting in Classes of Work and within the amount and rather limitation of each classification as listed below, for such period as the uncompleted work can hared from all sources does not exceed theAggregate amount. Classification references by name or symbol are In accordance With the definitions In the Contractor's Statement of Experience and Financial Condition.. This certificate supersedes any certrflc ate previously issued, but is subject to revision or revocation according to the lawn, if and when changes to the financial condition of the contracting firm or Other facts justify such revision or revocation.. Valid Aug" 1, 2018 Thru July 31, 2019 AGGREGATE................................. .............................................................. ................. ....... ..... .......... $UNLIMIITED 0085 CLEAN/SEAL CRACKSHOINTS: PCCP&h\4A PVi4rr ..................... ... $ LQ000,000 0103 3 SIDED BOY STRUCTURES OVER 20 FOOT SPAN................................... ........................................... 0290 SEWER A.NI D PIPE CLEANING AND LWING..................................................................... ... .. $10,000.000 03I S TRAFFIC CONTROL:SNOW AND ICE REMOVAL.................................................................................. $10-000,000 0390 UNDERSEALING.......................................... .................................................... ... $10,000,000 A(A) CONCRETE PAVEMENT: GENERAL.......................................................................................................$UIvZll41LTED B(A) ASPHALT PVMT:W/LNDOT CERTIFIED Mi 4 A PLANT ................................................... .. $UNLR U1ED C(A) HEAVY GRADING...................................................................................................................................... $UNL.II IITED D(A) HIGHWAY OR RAILROAD BRIDGE OVER WATER ..... ........................................................................ SUNLIAIITED D(B) HIGHWAY OR RAILROAD BRIDGE OVER MGHtiVAY .................... ,,,...,.. ...,........ 5UNLMffrED D(C) HNVY/RR BRIDGE REQ RR TRACK PROTECTION......_........................................................................$UNLI vICFED E(C) BRIDGE DECK OVERLAY"& MNOR BRIDGE REPAIR......................................................................... $10,000,000 E(E) SMALL STRUCTURES AND DRAINAGE ITEMS .. . ................................................................................ $10,000,000 E(F) SURFACE MASONRY AND MISCELLANEOUS CONCRE...... ........ ......................................................$UNL-NflTED E(H) DEEP SEWER AND/OR E.-,CAVATION ..........................••---...................................................................$UNLIMITED E(R) ASPHALT PAVENTNT M1LL]I IG................................................................... ...... $UNLIVffTED E(T) DEMOLITTON...................,.....---------................---......---..........._...........................-- ..... ........................ $UNLIMITED PREQUALIFICATION ENGINEER COMMISSIONER State Form 20508 (R3 / 5-05) Attachment H Rieth-Riley Construction Co., Inc. Equipment List 3131/2018 INDIANA N..IU..d COMPRESSOR AIR 185 WELDER COMPRESSOR 75 HP COMPRESSOR AIR 185 W/HOSE COMPRESSOR AIR 75 HP ATTACHMENT MULE W/10151 PAVER ATTACHMENT SCALE BUCKET ATTACHMENT SCREED WEDGELOCK ATTACHMENT TIE BAR INSERTER BARRIER MOLD DISTRIBUTOR ROSCO W/6285 TRK F'GNi1S11EA FINAL BIDWELL W4050 F'dNIIVWA FINAL BWMELW. W4373 GRADE CONTROL SENSOR W/5373 MOLD CURB 31 IN F16894 PAVER WATER CONVERSION W/5119 WATER CONVERSION W/5360 WATER CONVERSION W/5866 WATER CONVERSION W/5991 WATER CONVERSION W/5992 WATER CONVERSION W/6043 WATER CONVERSION W/6044 WATER CONVERSION W/6045 WATER CONVERSION W/6046 WATER CONVERSION W/6050 WATER CONVERSION W16342 WATER CONVERSION W/6343 WATER CONVERSION W/6344 WATER CONVERSION W/6422 WATER CONVERSION W/6423 WATER CONVERSION W/6441 WATER CONVERSION W/6523 WATER CONVERSION W/6524 WATER CONVERSION W/6541 PAVING PACKAGE ATTACH SPRAYBAR CONV W/6043 ATTACHMENT BED FOR 7249 TRUCK WATER CONVERSION W/7203 ATTACHMENT SCREED W/6800 AUGER GUARD KIT W/7283 PAVER MOLD CURB W/6694 MATERIAL REFERENCE SKI ATTACHMENT BED FOR 7258 TRUCK MOLD PARAPET W/6136 ATTACHMENT TRAILER W1494f ATTACHMENT BURLAP DRAG W/6777 PAN HYDRAULIC VIBRATOR W/5832 WATER/FUEL CONVERSION W/7257 ATTACHMENT RAKE W/7273 LOADER ATTACHMENT MEDIAN MOLE ATTACHMENT CONV GOMACO W/613f SNOWPLOW POLY BOSS ATTACHMENT CONVEYOR ATTACHMENT PLANER 18" BED FORM W/7382 FORM TRK ATTACHMENT BED FOR 7419 TRUCK MOLD SIDEWALK 4 5 AND 6 FT GRADE CONTROL SENSOR W/7125 FUEL TANKS W/6578 DUMP TRK ATTACHMENT 24 FT SKEW W/6777 ATTACHMENT TRUCK HITCH W/7383 ATTACHMENT SHELL PADFOOT GRADE CONTROL SYSTEM W1105387 REBUILD CAT POWERTRAIN 7923790 ATTACHMENT JOINT MATCH HEATER ATTACHMENT PAVER SKI Wr7209 ATTACHMENT RAKE TLR REBUILD CAT POWERTRAIN WI6787 ATTACHMENT GRABBLER REBUILD CAT POWERTRAIN 7923860 ATTACHMENT BED WATER/FUEL ATTACHMENT PLANER 24" WATER CONVERSION W/6000 REBUILD CAT POWERTRAIN W/6905 WATER CONVERSION W/7256 WATER CONVERSION W/5864 ATTACHMENT TIMING SYSTEM ATTACHMENT PAVER SCR W/105387 ATTACHMENT WHEEL SAW WATER CONVERSION W77647 ATTACHMENT PAVER AUTO W/10614( WATER CONVERSION W/7856 REBUILD CAT POWERTRAIN W77098 REBUILD CAT PTRAIN W/7923870 ATTACHMENT CONVEYOR C-3 40 FT REBUILD CAT POWERTRAIN W/6783 01900728233770 04/01/00 36 400.00 (40000) 0.00 0.00 73589 07/10/96 60 15,64395 (15,64395) 0.00 0,00 188X1 04/01/06 36 1,000.00 (1,000. 00) 0,00 0.00 176576J89317 04/30/09 36 75000 (760.00) 0,00 0.00 04/01/00 12 2,300.00 (2,100.00) 200..00 20000 004-109930 02117/95 36 13,66460 (12.384.60) 1,300,00 1„300.00 HF877021 0030/09 36 1,600.00 (1,500. 00) 0,00 000 04101116 60 27,86000 (11,140,00) 16,709.92 0,00 HOP050554 02122/17 60 0.00 0-00 0,00 000 201701310024 04/30/17 120 27,714,37 (2,540,45) 25,173,92 000 "'I0/03018"0'�9'7 04122/11 96 0.0d 0i0NY 0,00 0,0098 73a 7 g53 4 53 9 n3 4 ro 6a o 99 �a2 - 04J0MNi2 _ a0 s1�9r 94 n00 000 .. '303)'w�w`w�__ b7:1a'rr__._ 07aV94 96 3,870,03 o ar�� JIA;""iu 06/19/98 96 4,168,00 t'3'n Iem) 417,00 41700 N0933 07/11/00 60 12,02196 Qtl?„02A.90d 000 0-00 10620-05 OW09/97 96 37,129,92 ( J^,41Ati,139'd 3,712.99 3,71299 03/25/10 49 21,00000 (91,000,001 0..00 0.00 04/01/04 96 61,340,66 (m.�,2044:5TJ) 6,134.07 6,134.07 04/22/10 48 21,205.90 01,.20a 00,i 0,00 0.00 06/06/97 96 8,171,26. (7,35413) 817,13 817.13 06/20/97 96 6,16872 (7,351.85) 816,87 816.67 04/01/04 96 140,540.00 (140,54000) 0,00 000 OW30/04 60 23,371.50 (23,371.50) 0,00 0.00 34568 09/03/97 96 45,614.00 (41,06260) 4,561,40 4,56140 FF94008 08/15/94 96 28,432.50 (2.,589.25) 2,843,25 2,843.25 02/10/95 96 30,46000 (27,414,00) 3,046.00 3,04600 2242 04/28/92 96 13,563.96 (12,207.58) 1,356,40 1,356.40 08/04/03 96 5,94252 (5,34B 26) 594,26 .59426 06/16/01 96 20,203.76 (18,183,38) 2,020-38 2,020.38 06/Ot/99 96 10,30395 (9,273.55) 1,030,40 1,030.40 04/01/01 36 11,12822 (10,015,39) 1,112.83 1,11283 6162 05/01/96 96 10,55580 (9,50022) 1,055.58 1,055.5B 6160 05/01/96 96 11,356.06 (10,220.46) 1,135..60 1,13660 05/01/96 96 12,19116 (10,97205) 1,219,11 1,219..11 05/Ot/96 96 11,61121 (10,450.09) 1,161, 12 1,161.12 6163 05/01/96 96 8,90638 (8,015. 75) 690,63 690.63 05/01/96 96 12,069.96 (10,86296) 1,206.99 1,206,99 7027 05/17/03 96 19,413.24 (17,471,92) 1,941,32 1,941.32 04/06/98 w- 13,996,90 (12,696,90) 1,400,00 1,400.00 04/23/98 96 13,996,90 (12,596,90) 1,400..00 1,400.00 05/04/98 96 13,996,89 (12,596,89) 1,400.00 1,400.00 05/09/98 96 13,528. 11 (12,175, 11) 1,353.00 1,35300 05/09/98 96 10,77235 (9,695,35) 1,077,00 1,01700 05/30/98 96 2B,552.54 (25,69754) 2,655.00 2,855.00 04/01/99 96 17,699.14 (15,83922) 1,759.92 1,75992 04/05/99 96 10,377.75 (9,339.98) 1,037,77 1,037.77 04/20/99 96 24,11941 (21,707.47) 2,411,94 2.41194 04/22/05 48 12,40268 (11,162,41) 1,240.27 1,240.27 08/08/05 96 27,79407 (2.5,014.66) 2.779.41 2,77941 03/3l/10 72 21,262.00 (19,135.80) 2,126,20 2,126.20 03/15/10 96 13,64814 (12,46333) 1,3?A 31 1,38481 21590105 02/07/05 48 62,947,00 (62,947.00) 0,00 0.00 12244 08110105 48 3,00722 (2,70650) 300..72 300.72 03122/00 96 15,312.00 (13,780.80) 1,53120 1,631.20 09110/03 96 6,91484 (6,223.35) 691.49 691.49 03/31/10 72 20,057.31 (18,051,68) 2,005-73 2,005-73 06/20/01 96 22,41600 (20,17350) 2,241.50 2,241.90 8150 04/28/89 96 19,973.55 (17,976,19) 1,997..36 1,997. 36 05/18/01 96 13,604,30 (12.24387) 1,360,43 1,360.43 06/14/01 4B 3,591.31 (3,232.18) 059.13 359.13 03131/10 72 40,005.76 (36,005, 10) 4,000,58 4,000.5B AT99012 09/09/05 4B 18,593.46 (16,734. 11) 1,859,36 1,85935 00/16/06 4B 12,960.10 (11,807,10) 1,153,00 1,153,00 CK16-005-B 06/03/97 96 22,745.00 (20,47050) 2,274,50 2,27450 11/21107 60 4,440.00 (4,440,00) 0,00 0.00 IE08732125 04101/06 36 1,00000 (1,000. 00) 0-00 0.00 HFP00457 05/16/18 60 14,840.00 (7,716,78) 7,123.22 11,871.98 03/15/10 30 3,59179 (2,736.79) 855.00 855.00 06/26/06 4B 14,202.94 (12,78264) 1,420.30 1,42030 06/14/06 4B 20,07080 (15,06372) 2,007,08 2,007.08 2061 03/02/92 96 21,486.00 (21,48800) 0.00 000 05/18/99 96 5,99945 (5,399.60) 599, 95 599.95 06/20/06 413 19, 159,00 (17,24310) 1,915,90 1,91590 05/31/06 48 11,083.36 (9,975.02) 1,108,34 1,108.34 03/13/07 48 }1,644.06 (10,47965) 1,164.41 1,164.41 62486 OW30/07 46 000 0.00 0,00 0.00 02/29/08 96 182,01245 (182,01245) 0,00 000 08150003 0312610E 48 0.00 0.00 0.00 0.00 61781 09/13I06 46 11,62884 (10,46595) 1,162.89 1,16289 01/29108 12 0.00 0.00 0,00 650.00 04/30/07 120 199,113.56 (199,11356) 0,00 1,65924 01/29/08 24 3,500.00 (3,150.00) 350.00 350.00 04/01/08 96 1/7,615.53 (177,61553) 0,00 000 04/19/08 96 5.5,704.62 (55,704..62) 000 0.00 PCT10069 05/16/16 60 17,80600 (9,260..16) 8,547,84 14,246.40 04/01/08 48 37,25309 (37,253.09) 0.00 0.00 03/22/10 48 191,712,44 (191,71244) 0,00 000 03/31/10 72 23,852.58 (21,467.32) 2,386.26 2.38526 07/25/09 96 23,273.47 (20,946..12) 2,327,35 2,98180 03/25/10 48 12,916.40 (12,91840) 0,00 0,00 03/31/10 48 0.00 0.00 0,00 0,00 WWSO0303 06/25/10 60 20,20800 (20,20800) 0,00 0.00 04/01/08 72 30,051.85 (30,051,85) 0,00 0..00 SEE SUPP DAFA 03/31/10 48 20,15600 (20,156,00) 0,00 0.00 04/01/10 96 20,812.74 (13,731,46) 2,081,28 4„422.66 07/03/11 48 173,99706 (173,997,06) 0,00 0.00 07/03/11 72 174,WK 26 (174,034..28) 0,00 7,251,62 07/03/11 48 51,600,00 (46,350,00) 6,150,00 6,150.00 07/03/11 '72 174,370,10 (174,370,10) 000 7,265.21 Rieth-Riley Construction Co., Inc. Equipment List 3/3112018 INDIANA 760301668 03131/05 36 '7,0000o i(rt,000,0+01 0.00 6482646 03131/05 60 t 0aooa (5,000..00) 0,00 673601702 03131/05 36 'd,750,00', (1,150,,00) 0,00 5439466 03/31/05 60 �000.00 (15,000,00) 0.00 5607676 07105106 60 't4,600,00 i('4 4,!w9u1.091 0.00 20240620 04/01114 36 VMI(4,0 117,$1'W9 0.00 20240619 04/01/14 36 17,010006 (17,090.%l 0.00 COMPACTOR PLATE 082003253 03131/05 36 1100.0) (00,001 0.00 6593967 04116107 60 110061A4 %1,406,,04) 0.00 COMPACTOR VIBR 78"CB534D XW EAA00656 02101/10 24 S*'056.00 (44, IWO 11,50ZOO EAA00617 02101110 24 0.00 000 000 EAA00717 04/01109 36 26,10.17 125,367, 02) 0,00 EAA00718 04/01109 36 25, 167',1.7 %'25, 167.1i") 0,00 EAA00720 04101/00 36 25,,16i'l'R ps;167. 17) OAO EAA00716 04/01100 36 2,5„404.59 (25 404,%) 0.00 COMPACTOR VIBR 51"CB34B XB400136 04/29116 48 K19Cu0 3 (41,614.'W) 31,184.07 XR400220 02/21117 96 0.00 0.00 0.00 00103117 96 11{ 1',0' 40 (1,f%O'I,es) 16,819.12 XB400137 04/29116 46 fa6.IWri 14 30;dN z''..0 XB400135 04/2911: 48 641,O191'k2'3 4d5„514. 16% 31,184.07 X13400196 06106/1 48 56.61d0,R3 (24.451.07} 32,247.40 XB40Dl9B 06/06116 48 6610%21 (24,4$1,07y 32,247.16 XB400134 04/29116 48 5J}106.2';J (26,$ b4, 10 31,184.07' X6400129 04/29116 48 $41068 111 (2;" vs;64',1 30,02'W XB400219 05/06/16 48 SO,:16t13'4 (24122'?,68) 31,945,66 XH400211 05106116 48 56.16634 f,24„272,68g 31, tl445,66 X0400140 04/29/16 48 W05,23 (25,5$4, 16p 31,164.07 COMPACTOR PNE TIRED C530A A09104390S 03/31/05 36 0371G 40 ('0.4 zw) 9' 150 AOICS048Z 03/31/05 12 3,.'75000 (3„105,00p' 376,00 COMPACTOR VIBR 78" CB54 XW JLM00195 03/05/10 36 30,,201,'tl2 [00„'oI ITk 0.00 JLM00193 03105110 36 36,642 04 (48„54264) 0.00 JLMOD565 04/26/16 36 02,736.22 (49,641, 1 Z'p 33,094.10 JLM00194 03/05110 36 90,642.64 (39,542 64} 0.00 JLM00850 04/26110 72 79,705.46 (°m,°0,91i"BBp 55,1 0,70 JLM00360 06117116 36 513201,72 (0,n;11.08'p 23.o40,84 JLM00664 04/26110 36 84„055.50 (4$,63fiiA43 32,423.64 K3J00252 00103/17 96 1048117,05 (1.4.32.92d 18,406.53 JLM00896 04126/16 72 92,007:05 (2'9„7w lop 64,0Z4; 89 JLM00212 04126/16 24 40,490,71 (44..,42,64p 4,948,07 K3J00153 05112/16 90 141,3%.90 ('*'Ono"') 112,476.75 K3JO0147 05MV16 96 144,240J60' (0'0„211.09) 113,637.91 KW00207 05/12178 96 144'749(0 (al ,211.C% 113.537.91 KW00219 05MV16 96 143,37P548 (30,W 4_G1sY 112;4e50'.49 KW00257 06112116 96 i44,1000 P8,Z'tli,69) 113,537.91 KW00266 06/12/16 96 144,749,60 (3N.,211.09p 113,537,91 KW00277 OB/03/17 72 221'1.64'1,$5 Q, V21.4,72p 20,202.83 KW00253 08/03/17 72 26A'02'.46 Q7,00.24p 23,402.24 COMPACTOR VIBR 78" HD120 H2O70123 03/08117 96 0.00 0.00 0.00 H2O70109 03/08/17 96 0.00 0.00 0.00 COMPACTOR VIBR 78"CC522HF 63720630 04116/03 95 93,200.'71 02.03947'1) 10,335,00 63720534 05/30/03 96 03,01110 @'60„0TaI% 10,335.00 63720629 03/23106 96 103'aw'O0 (03,m6"00) 10,335.00 51720549 11115/12 16 22'154'ao QN,O,064,00) 2,000.00 51720528 03/31/10 30 4,'2;I8'91.M,15 f,"°Zwa 06) 9,945.00 51720532 03/31/10 30 02,529.83 {32,584.83d 9,946.00 51720534 03131110 30 0-0 % 05 (iA0,906.0,S) 9,945,00 51720551 11/15112 18 27,362.00 %2VJ,2'13.00l 2,00.00 51720562 07126/08 42 7'BX1Z52 46'7,i16J'1.i2') 10,tToQ* 51720664 07125/00 42 'n5, 20..60 5i720566 07125/08 42 79,5a1P,r.,144 d0'8,'r"25.,04J 10,070.00 61720567 07125/08 42 Z$ 002512 (07,I)v 52'.l 10AV20,00 COMPACTOR VIBR 78" CB64B C5600200 03108117 96 0.00 0.00 0.00 08103/17 84 40'7W 01 Q4„.^6'7,'E2) 45,515.49 05600199 02/21/17 06 0.00 0.00 0.00 00/03117 84 P,1O„802e04 (4,: '.'16) 46,182CXU COMPACTOR STATIC BWSAS B168CO495V 03/31/05 24 5100.0,7 (6000,00) 0.00 COMPACTOR VIBR 84" CC722 63920825 11/15/12 18 '31„50,00 128'i11:=„ ao) 2,950..00 63920769 0313111: 30 5Z,,449:71 QiUA,+;"4W0'1'1,) 12,160,00 63920024 1111 18 31„'1i8�6 on (210,615..01',0 2,950.00 63920822 11115112 18 31,50'$00 (28v511500) 21990DO 63921014 11N5/t2 18 3.564 00 ('"w'6,11Y:,J,000 2,950,000 6392,009 11115/12 16 31,5G$'0(J (28,61.15001 Z950,00 COMPACTOR TRENCH TR-100 TR-1081208 03117110 36 21'1„49;ti:!0.0 1,3014VIlool 0.00 COMPACTOR VIBR 66"CC422VHF 49720426 03/31/10 30 40,3440.W, 13001.°w.95p 9,345.00 49720424 03/31/10 30 4011440,9.'3 9,345A0 49720427 03/31/10 30 30.909,93 1;30'sta'IrM 9,346,00 49720433 03/31/10 30 40,74005 (30,9'05.OGp 9,345,00 49720475 07125106 42 'i,1,1110-02 (0„1.;2'?9;w) 9,950,00 COMPACTOR VIBR GRADE 66" CS433 3TM01451 03/31105 60 60,000.00 f54,00p,00) 6,0W,0l0 3TMO1460 03116109 48 27, KA100 001%4.) 00k 2,200.00 COMPACTOR VIBR GRADE 84" SD100 149919 04I18/97 06 0.00 000 0,00 150606 12/01103 30 0"00 0,00 Q00 COMPACTOR VIBR 78"HD120V H1760093 04/24107 96 ilV,70,50 (02T,074 Sy 13,774.95 H1750095 0/125/07 96 0'7 1„74kM,50 (12'3,I97M.Yx'Cr) 13,774.95 COMPACTOR STATIC C330A A16802234H 12110/87 96 :31d;'k4400 (X'16ROrj) ZW4,40 A15BC2241H 12110/07 90 2' „,Z41,00 126,76060) 2,974,40 Al6BC1957D 0313115 12 2„i100.0'0 (2'.,J1n0.00) 250.00 COMPACTOR VIBR 06"CB534D FGHO0816 07103111 24 391. 9.Z0 (28;WD2,Gp 10,729,00 FGH00819 07103111 24 30,'01.0:d:'0 (26,390aro1 10:729.00 FGH00816 07103/11 24 39,119-2,0 gZB'3¢d0', 201 10729.00 COMPACTOR VIBR GRADE 84" CA250 65020472 03/31/10 30 95,41.n"V.84 (Z'1„sa9$4p 8:300.00 65020473 03/31110 30 :'15,6„?0,04 (?,"7.%F',u`Oe4) 8,300.00 55021028 09130113 36 "",,515x60 (IP2,81"F4"5p 2,535.26 COMPACTOR STATIC C330B B158C30121 (B/23I88 98 20900.00 01974.00) 2,0$6.00 B168C3018J 08/23188 96 12d4, .0o (25,6744i 2XV00 B150C3301S 14/31109 24 3.000..00 (3'000J1b,A) 0,00 8158030381 .413.100 24 13,000,00 (3,017P:1,Wy 0.00 BIBSC3303S 04/30109 24 3,OOd:00 0,060,.00) 0.00 COMPACTOR VIBR GRADE 66" SD70 05453 05122J93 96 0.00 0.00 0.00 152666 12/02/02 42 32,082'..110 t2O,58 k.0O) 6,101.00 153067 12102/02 42 0.00 0.00 0.00 Rieth-Riley Construction Co, Inc. Equipment List 313112018 INDIANA 04 1/17 84 102,941 29 (13,23528) 89,70601 000 KY20041045 03113/17 96 000 000 000 000 04101117 84 103,01060 (13,24428) 89,76632 000 DOZER 150 HP D6N LGP PBA02572 06117115 96 219,271 13 (77,65838) 141,61275 169.021,59 DOZER 70 HP FD5 LT 202355 07101116 12 6,00000 (6,40000) 60000 1,50000 DOZER 100 HP D51<2 LGP WIRIPPER KY202263 03/13117 96 000 000 000 000 04101117 84 116,54746 (15,241 80) 103,30566 000 DOZER 200 HP D6T XW W/RIPPER TMY00283 03/13117 96 000 000 000 000 DOZER 150 HP 160K LOP I TOM AKXAOV �IAM$6 12a0t17 60 01,60194 bdzk4s�y:w ------ ------ 1,3 91,13 EXCAVATOR EXCAVATOR GW 7045 33al azva yol avo101e Ga 152,478 65 145,743,60p PQ6,F3$ 05 134,181 01 BzYolBoo 08101J16 60 152,49515 (45,74860) 106,74655 134,195 71 BZY01491 02101116 72 210,14000 (63,044 40) 147,10360 178,625 80 EXCAVATOR 185102399 08/25116 60 000 000 Goo 000 EXCAVATOR OW 40-55 320ELRR TF X00480 08/01116 60 112,12276 (33,636 Bo) 78,48596 98,66804 rFX0023 08101/16 60 104,49347 (31,34800) 73,14547 91,95427 TFX001964 04/26116 72 167,34913 (50,204 64) 117,14449 142,24681 TFX00998 04/26116 72 167,94984 (50,304,M) 117,56496 142,767,40 EXCAVATOR OW 70-85 3308L 3YR01552 03/16109 46 60,000,00 (54,00000) 6,00000 6,000,00 EXCAVATOR OW 17 30SE TC FJX05057 03/13117 96 0,00 000 000 000 04/01117 64 81,820,14 (10,519,68) 71,30046 000 EXCAVATOR OW 40-55 PC200.6 C11519 07101116 12 40,00000 (36,00000) 4,00000 10,00000 EXCAVATOR OW 40-55 320EL WBK01402 08101/16 60 106,62327 (31,907,00) 74,63627 93,82847 WBK01326 08101/16 60 9B,339 83 (2q,902 00) 6B,837 83 86,539,03 EXCAVATOR OW 115, 349FL HPD00615 03/14/17 gel 0,00 000 000 000 EXCAVATOR TELESCOPING SL4100 4100000239 07/11100 gel 277,091 48 (249,382 33) 27,70915 27,709 15 EXCAVATOR OW 30 314EL W/PLC zi T01241 05105115 60 000 000 000 000 EXCAVATOR OW 70-85 336FL RKBOI 775 03/13117 96 000 000 000 000 EXCAVATOR OW 30-35 314EL TC ZJT01192 03/13117 96 000 000 000 000 EXCAVATOR OW 70-85 320DL CR RMX01057 03/13/17 96 000 000 000 000 RMX01060 03/14/17 96 000 000 000 0.00 RMX01063 03/13/17 96 000 000 000 000 EXCAVATOR OW 17 308E2 FJX05007 MUM 96 000 000 000 ago 04101117 64 85,39225 (10,97904) 74,41321 0 00 FJX03197 10/25/16 60 000 0,00 000 000 EXCAVATOR OW 70-85 336F RKB01676 03/13/17 96 000 ago 000 000 EXCAVATOR OW 40-55 PC200 C50400 01/29/08 46 000 000 000 9,81600 EXCAVATOR OW 25-30 312CL CBA01857 03/31/05 96 B5,000 00 (76,50000) 8,50000 8,50000 EXCAVATOR OW 40-55 320EL RR TFX01537 03113/17 96 000 0,00 000 0.00 TFX01651 03113117 .96 000 000 0.00 Goo EXCAVATOR OW 30-35 314ELCR ZJT00309 09127113 96 185,071 94 (106,030 65) 79041 29 102,17525 EXCAVATOR WHEEL M320F OW 40 FBW00172 03113/17 96 0,00 000 000 000 EXCAVATOR OW 70-85 330EL BZY01644 00101/16 60 152,777 96 (45,83340) 106,94456 134,44460 EXCAVATOR OW 55-70 CX290 DA0291200 02104/12 24 0,00 0,00 000 2,24700 EXCAVATOR WHEEL M318F OW 40 FBB00378 03113117 96 000 0 00 000 000 EXCAVATOR TELESCOPING XL4100 4100000725 07127116 96 0,00 0,00 000 000 EXCAVATOR OW 31-35 314EL ZJT01186 03113/17 96 000 000 000 000 EXCAVATOR WHEEL M322F OW 45 F2Z00144 03113/17 96 0100 000 000 000 EXCAVATOR OW 70-115 328D LCR RMX01057 03113i17 96 000 000 000 000 EXCAVATOR WH M320F OW 40 FBW00172 03113/17 96 0100 000 000 000 EXCAVATOR OW 56 323F YEJ10058 04120/17 60 000 000 000 0,00 EXCAVATOR OW 70-85 336EL W/BKT FJH01337 10110/14 96 000 0.00 000 000 EXCAVATOR OW 30 314EL ZJT01138 10127117 60 000 Goo 000 000 EXCAVATOR W/BUCKET 36" OW 18 FJX09023 03/23118 60 000 000 000 000 KX TT !j�,CR 2S_ t9j, M 0 0 RCxvK kh�itl l .�M -E-- .............. --�2 --2 --- ---- F 02UR- w 2110'VIFIff gw,rn,n) 2tl94k n Mv ns AF 82B-02235 02101J99 60 14,17500 (14,17500) 000 000 JJG0291844 04123102 96 22,83272 (18,62772) 4,20500 4,20500 AF82B-04061 12117107 60 7,20800 (7,20B 00) 000 0,00 IA 41000 M 6 Aml�-O-tvefco 000 F T S`f� Ml -O '", 15,10t-,t7j, III , - � RATOR UT2_ Do f $2,5100 (0, 175 00$ _ 4'00 _j,jjtM 00p0 91291158 0W31105 16 47101 10� 000 000 91291156 03/31105 6 47500 �471 47500 000 000 91291169 03/31105 36 47500 (47500) 000 000 91131380 03t3l/05 36 47500 (475,00) 0,00 0,00 031586378 04/01109 36 2,00000 (2,000,00) 000 000 GENERATOR SET 825KW 929-209492-1 01101/17 60 000 0,00 0,00 000 �M�z ... ....... . . .... . . ........ . ...... . . . . .......... 2ffz2-- ln- ........ . . . . . . ...................................... - - 4S ---- ................... ..... . ......... GRAMRS . . . . . .. ...... . ...... GRADER 1400 T2V114S0 ................. 00 1 NIS 48 0,500,00 (5F,3rww) 6IS0.0D 6,150,00 72V13097 03131105 36 28,12500 , 11 'e, j� Q) 2,81250 2,81250 72V3681 04101/06 60 40,00000 P6,001,00) 4,00000 4,00000 GRADER 120G 87V1665 03131/05 36 16,87500 Q%,1ar80) 1,68750 1,687,50 GRADER I 60H 9EJ00833 0U31105 96 101,00000 10,10000 10,10000 GRADER MAINTAINER 02568 04101/17 36 21,85932 (6,557,76) 15,301 56 000 12121/16 36 000 0,00 000 000 GRADER MAINTAINER 724 1011 03131105 12 6,25000 (5,625 00) 62500 62500 724ZC5070MDL 03/31105 12 7,60000 (6,75000) 7W 00 750,00 5063 03131105 12 7,500,00 (6,760 00) 750.00 75000 7242C5067MDG 03131105 12 7,50000 (6,750 00) 79000 750,00 5064 03ri1l05 12 7,500,00 (6,750 00) 750.00 75000 GRADER MAINTAINER 214E SLP214FCXE0477688 04101100 60 35,20000 (30,200 00) 6,00000 5,000,00 SLP214FCXE0477822 04101106 60 25,00000 (22,50000) 2,50000 2,50000 GRADER14G 96U3871 03/31105 36 20,18800 (16,16920) 2,010BO 2,018,80 GRADER 140H APM00602 04101104 96 210,04347 (189,039 12) 21,0043, 21,004,35 APM 1495 05/24104 %,' 229,135,92 (206,222 33) 22,91359 22,913,59 AM03339 044 TOOT ORADE'RS TOW .... ..... . . ......... 2?,A!7, LASER 7d1..p6NY -- - -------- UOL-AM" 80L ......... . . ........... . . 0b COR OQi Of SKRU5,258 0 1 000 . olou .. ...... 0,00 LOADER SKID STEER 776481 07/0�D/16 36 30,00000 (16,600.00) 13,50000 22,50000 LOADER WHEEL 93BG RTBOI 167 11/20107 66 000 0.00 0,00 17,19756 CRD01625 01/11/08 66 000 OM 000 17,151 65 LOADER WHEEL 972G ANY00350 04/01/04 96 275,03090 (245,323.07) 29,70783 29,70783 ANY00351 04/01/04 96 272,75540 (242,366,07) 30,36933 30,36933 ANY00352 04/01104 96 303,69330 (273,323.97) 30,36933 30,36933 Page 5 of 27 Rieth-Riley Construction Co., Inc. Equipment List 313112018 INDIANA 06/1 3/00 go 82,90102 (82,90162) 000 000 HYDRAULIC PRESS-DAKE 170732 0'/' 370 60 3.82637 (3,528,04) 29753 297.53 INSPECTION SAMPLING RACK 04/13101 120 5,05866 (4,552,70) 50580 505.80 05/22/00 120 6,03500 (5,25150) 58350 saa so INSULATION HOT OIL LINES (KI/1111101 120 22,42000 (20,17800) 2,24200 2,242.00 MOBILE DRILL MODEL B-31 626230 011161" 60 19,71373 (19,71373) 0,00 000 PAVING FABRIC INSTALL MACHINE 116164 03112102 60 12258 79 (12,25879) 0.00 OX0 PLANT SET UP 4367 02125100 IOU 516,a4O 61 (465,161 95) 51,68466 51.08466 PLANT SET UP 327 60% 09/21199 120 63,501 67 (63,501,67) 000 000 PRESS HYDRAULIC-DAKE 163507 02/05166 so 2,06550 (1,90489) 160,61 16061 153508 02/05166 60 000 0,00 000 89,23 PUMP UNDERSEAL ASPHALT 01015742 03/04105 60 26,001,19 (26,981.19) 0,00 OX0 SCREED AIRALLEN 04/26MI 60 4.84676 (4,845,76) 000 OX0 SCREED CONCRETE MBW 05/31/95 60 7,676AO (7,67546) 0,00 0,00 10101203 10/01100 60 7,491 31 (7,491.31) 0,00 0,00 STARTING GEAR 05/10102 180 45,88505 (45,085,05) 0100 25437 STONE BOX 15790 08/06102 60 6.47634 (6,47534) 0,00 000 19591 06116105 60 8,13680 (8,13508) 000 OXO TACK SPRAYER LEEBOY L260 L250TISO 04/01/00 36 3,200 00 (3,200,00) 000 0-00 TRENCH BOX 04123/99 60 1Al2.08 (1,412,0) 000 0.00 TRENCH BOX EFFICIENCY 107688 05/27194 60 8,14367 (8,14357) 000 000 106358 05/01194 60 8,14357 (OA43,57) 0.00 0.00 TRENCH BOX TITAN PLUS 8768 00106/02 60 8,72324 (0,723,24) 000 000 8780 08106/02 60 8,72324 (8,72324) 0.00 000 8790 00/06/02 60 8,723,25 (8,72325) 000 O= VIBRATOR MANIFOLD 05/02/91 Go 3,06&92 (3,083,92) 000 000 WASHER PRESSURE KEW 40C3KA 2000005097 06114101 Go 2,16250 (2162,50) 0.00 000 FORM REVERSIBLE 04101104 60 16.00000 (16,00000) 0.00 000 STREET PRINT FORMS 03131105 36 9,37600 (9,375,00) 0,00 0,00 SNOWPLOW POLY 11102/06 60 5,29236 (6,29236) 0,00 000 TRENCH BOX PRO@ W/SPREADER 20650 05126/08 60 14,60047 (1068,47) 0X0 000 HEATER PAVEMENT KEIZER MORRIS 060727 04101/06 36 1'0=00 (1,000,00) 000 000 MIXERCEMENT 04101106 36 600.00 (500,00) 000 0,00 GRINDER SHINGLE BHM30CBCBGNNH-07-006 07130107 60 0100 0100 000 000 DRILL 3256-26 10108/07 60 9,11006 (9,110,06) 0,00 OX0 CUTTER EXTRACTOR FOR MANHOLES 07129/06 60 16.03930 (16,03930) 000 OX0 FEEDER HOPPER W/SCREEN DECK 04101109 60 16.00000 (15,000,00) 0.00 0,00 BLENDING SYSTEM INSULATION 09101109 180 09,423 20 (51,17040) 30,252.60 44,214.40 FUME COLLECTION SYSTEM 10110/10 120 539,93031 (404,947,80) 134,982,51 188,975.55 LIGHT PLANT 5753537 09119107 60 7,900 10 (7,00018) 0.00 0.00 4ZJSL141771000183 06105/07 60 7,246,27 (7,24627) 0.00 0.00 TRACTOR UTILITY MOOOMD026912 11120/96 60 0,00 000 0.00 0.00 PUGMILL 07101/96 96 21.236o0 (19,11240) 2,123.60 2,123.60 PATCHER JOINT SEALER 1CO141412DMI19047 04/11/13 60 41.81025 (41,810,26) 0.00 0.361.93 IC9141419DM119M 04/11113 60 4WO 25 (41,81026) 0.00 8,361.93 1C9141412DMI19050 04111/13 60 41,01025 (41.81026) 0.00 8'361.93 IC9141410DMI19046 04/11113 60 41,81025 (41.81025) 0,00 8'361.93 1 G91M134FIM119019 02/15117 60 000 0,00 0,00 0.00 14/01117 60 46,587 ' 8" (9,317X2) 37,270.28 0.00 IG91MI32HM119021 02/1 7 60 000 000 0.00 0.00 04101/17 60 46,60780 (9,31762) 37,270.28 0.00 PLANT SCREEN 6&06-201 1 1/05/01 24 48,29644 (37,211,44) 11,084.00 11,004,00 CONTAINER STORAGE 01115199 60 3,69500 (3,6m 00) 0.00 0.00 12111195 60 2,67750 (2,677.50) 0,00 0.00 COLD PLANER ROTOMILL 06-05-10031796-1160 0313,105 72 47,660.00 (42,750,00) 4,75000 4,750.00 62009 3 041/011113 24 99,14Z54 (88,32829) 0,814.25 9,814.25 n ou100tzlaololll 03/06/06 42 169,727,28 (126,730 48) 42,996.80 42,996.80 VIBRATOR HYDRAULIC 09/24191 60 7.15135 (7.151,36) 0.00 0.00 TRENCHER IVRK120BOX1000278 07/09/15 60 69,01600 (37.05826) 31,066.76 44,859.75 DISK IOTAW2643-8 10130175 96 OX0 0,00 0.00 429.60 WASHER POWER 176620 04101/00 36 WOOD (00000) 0.00 0AO DISK ROAD 2126 04123199 12 Goo 0,00 0.00 355.08 RO�!V 'YRRSIA 138 VI—Ey -Mn. ln2lb I L. tNl M. 9 AL AM ................................ —MY!!k— ?Y�ls �q —x MOW— PI)FI.I$T14 (1014,IWU 14� 0100 0,00 183636 03117109 48 126.00000 112$,000 kV) O00 0,00 651030-73 03117109 12 3%000,00 (w'000 W) 000 000 PAVER OFT TRACK PF4410 102877 03127109 48 120,000= (120,000 w� 000 000 PAVER I OFT TRACK RP195 RP195XI57 04101113 24 69,308,80 (09,00e,60) 000 000 RP195X122 03131l10 36 97A8903 (w,180,m) 000 000 RPI 95XI 36 07103/11 24 96,78860 mt 001 000 000 PAVER CURB ASPHALT 04/01106 36 100 00 (900,00) 10000 10000 PAVER LOFT TRACK AP1055D FAC00752 03/22/1 0 36 97,46340 (9';MO 40) 000 32,40772 FAC00721 04/115109 36 72,381 82 (72.30122) 000 24,12718 FAC00463 04130107 96 0.00 0.00 000 000 FACC0719 04101109 36 0.00 0.00 0= 25,16TOB FAC00724 04115109 aG 80,273.65 (60,273.65) 0,00 26,757.97 F:ACO0OOI 0312 10 36 113,281.63 (113,201.63) 0,00 3T76O 59 PAVER aFT TRACK RP155 133 03116109 72 0.00 0,00 0.00 000 RP166-106 04101106 84 0,00 0,00 000 000 PAVER LOFT TRACK AP1055E TJF00137 12MG117 24 152567.33 (25,426,24) 127,131 09 000 TJF00226 12115117 24 153,0w 55 (25,666,08) 128.33047 000 TJF00428 03/24/14 go 0*00 0.00 000 000 TJF00260 1 2MB/17 24 14Z2l;? 09 (24,636.40) 122,67761 000 TJF00262 03120/13 90 0.00 0.00 000 000 12MS/17 24 146,701.93 (24,450.32) 122,261,61 0,00 TJF00261 03120/1 3 go 0.00 0.00 0,00 0.00 1211 6117 24 14T 124,45 (24,620,76) 122,603,69 0.00 TJF00259 1211117 24 147,661 Al (24,69364) 12Z966 17 0100 PAVER $FT TRACK AP66$0 GNZ00336 .10 0 36 89'70'00 (89,790,00) 000 20,92092 GNZ00442 12116117 24 140,3'A W (23,39910) 116,99580 000 MATERIAL TRANSFER ASPHALI SB2500X249 05101195 96 262,600.00 (227,260.00) 25'250.00 25,250A0 066 12102/12 24 71,013,60 (64,657L60) 6,768X0 6,766,00 S82600OX778 03r31110 36 0.00 0,00 000 000 SB2600D-1016 02104/12 36 83582.20 (83,582,20) 000 000 E2850-1014 1 2111117 42 142,834.02 (13,603.24) 129,23078 000 E2850-`1068 0610 13 96 0,00 0,00 000 000 12/15/17 42 171,415.61 (16,325.20) 165,09033 000 E2850-1042 03124/114 96 0,00 0.00 000 0,00 E2850-1097 11108/1: 96 519,040,1 E (194.800.24) 324,80007 389,760J5 E285D.1107 04/26/1 84 408,428.16 (116,693.76) 291.734,39 350,081.27 939NAZM Rleth-Riley Construction Co., Inc. Equipment List 3131/2018 INDIANA GRAVEL DEWATERER POWERSCREEN TRIDENT 3501018 02104103 180 23,30000 (20,97000) 2,33000 3,49600 ELECTRICAL SYSTEM 06/24198 120 244,451 05 (220,005 94) 24,445 11 24,44511 POWER UNIT HYDRAULIC 1810726 02/04103 180 6,00000 (5,40000) 60000 900,00 SAFETY LADDERS & PLATFORMS 08t30103 120 22,09362 (22,09362) 000 000 SCREEN SYSTEM 06/24/98 120 105,48480 M,936 32) 10,54848 10,648,48 WASHER COURSE MATERIAL 06117100 120 27,311 93 (24,5B074) 2,731 19 2,731 19 20013012 04/01/01 120 44,54528 (40,09075) 4,45453 4,454,53 2003036 05/20/00 120 34,09353 (30,68416) 3,40935 3,409,35 WATER PUMP SYSTEM 06/24/98 120 03,109,14 (29,79823) 3,31091 3,310,91 WEIGH BRIDGE 07/22100 120 8,74375 (7,86939) 87436 874,36 TRAILER CONTROL IGRBA9021 DBO94904 02/04103 180 2,00000 (1,80000) 20000 300,00 SCREENA00RECATE 539196 04127/91 96 41,661 41 (37,67527) 4,186 14 4,18614 PLATFORM WATER PUMP 06112/04 120 7,20398 (7,20398) coo 000 CONVEYOR LATTICE FRAME 07/01/16 240 8,00000 (73326) 7,26674 7,666,70 SCALETRUCK 06/03/06 120 85,663,88 (85,66388) 000 0100 31155 02/04/03 180 23,30000 (20,97U 00) 2,33000 3,495,00 MOD 13-BI60 06/03177 120 29,41764 (29,41764) coo 000 G32600269 05/30/06 180 65,89562 (44,40579) 11,48983 15,21619 GENERATOR 02VV812006 03131/05 120 0,00000 (7,20000) 60000 80000 CONVEYOR STACKING 02/04/03 180 76,30000 (70,47000) 7,83000 11.745,00 04/01/06 180 9,50000 (6, B40 00) 2,66000 3,23000 04/01/09 36 5,00000 (5,00000) 000 000 2423556 02104/03 100 5,00000 (4,50000) 50000 760,00 2466433 02104/03 100 14,300,00 (12, B70 00) 1,43000 2,145,00 2467216 02104/03 180 21,00000 (18,90000) 2,10000 3,15000 2467531 02104/03 100 14,30000 (12,670,00) 1,43000 2,145,00 24677B3 02104/03 180 14,30000 (12,67000) 1,43000 2,145,00 421002 02104/03 ISO 19,30000 (17,37000) 1,93000 2,895,00 466340522 06103/02 120 40,03864 (40,03864) 000 000 0699�1 511 02104/03 IBO 38,30000 (34,47000) 3,83000 6,74500 699A612 02104103 ISO I B,300 Do (16,47000) 1,80000 2,745,00 CONVEYOR TRANSFER 02104103 ISO 66,50000 (66,95000) 0'550,00 9,B25,00 07101116 240 1,00000 (9174) 90826 95830 BIN COLD FEED SYSTEM 06124/98 120 30,233,96 (27,21055) 3,02340 3,02340 CONVEYOR 02104/03 160 3,20000 (2,88000) 32000 48000 04101109 36 3,50000 (3,500 00) 000 0,00 07101116 240 74,00000 (6,78304) 67,21696 70,91&80 3566 03128175 96 ISAB6 23 (14,281OB) 1,204 16 1,204,15 4112 08131f78 96 19,40042 (19,400-42) 000 0,00 4113 08/31R8 96 19,40042 (19,40042) 000 000 4409 03129180 96 14,35000 (14,35000) 000 0,00 4411 03/29180 96 14,350,00 (14,350,00) 000 000 CRUSHER B87269 10124776 96 13,00000 (13,00000) 000 000 SCREEN TRIPLE DECK 11 FIA0871 0 07101116 240 18,000,00 (1,65000) 16,36000 17,25000 PLANT SCREEN 89-137-30-50 07/01116 240 15,00000 (1,37500) 13,62500 14,37500 WASHERLOG 9305 11/20104 120 39,75367 (39,75367) 000 000 CRUSHER CONE 07/01/16 240 295,00000 (27,041 74) 267,95626 262,70830 ECSDC900001 02/04/03 ISO 73,30000 (65,97000) 7,33000 10,99500 C53499 ast30108 180 63,240,51 (30,56600) 32,67451 35,836,51 22AO307 07101/16 240 45,00000 (4,12500) 40,87500 43,12500 PUMP WATER 1100401600 02/04/03 ISO 4,70000 (4,23000) 47000 706,00 SCREEN 04101/06 46 23,000,00 (20,70000) 2,30000 2,30000 PLANT SCREENING 02/04/03 180 74,30000 (66,B70 00) 7,43000 11,145,00 04/01106 120 40,00000 (36,00000) 4,00000 4,00000 6702683 02104/03 180 BB,300,00 (79,47000) 8,83000 13,24500 FG451178 03131/05 120 44,00000 (39,60000) 4,40000 4,40000 PUMP A-3336 05118105 120 9'awo9 (9, BOO 09) 000 000 CONVEYOR SYSTEM LATTICE 12/29/06 96 31,31264 (31,31264) 000 000 DRAGLINE 136909 07/22/13 120 0,00 000 goo 000 SCREEN DECK TRIPLE 32LO390 07101/16 240 25,00000 (2,291 74) 22,70826 23,95630 32LO290 07101116 240 25,00000 (2,291 74) 22,70826 23,95630 VT10736 07101116 240 000 000 coo 14,376 00 3412 D 573 F 07101116 240 5,00000 (45626) 4,541 74 4,791 70 054172 01101/16 240 30,000,00 (2,75000) 27,25000 28,75000 B56837 07/01116 240 000 000 OOU 14,376 US CONVEYOR WEIGH BELT 4474 07122180 96 10,787,63 (10,787,63) goo 0,00 SCALE BELT 04101105 120 17,14572 (17,14572) 000 000 SAND SCREW 109-76 03102/79 96 34,600,00 (34,50000) 000 0,00 TANK CLASSIFYING 10956 04102/89 96 105,26220 (94,735 SO) 10,52622 10,52622 CONVEYOR (2) OSt30102 120 93,667,49 (84,30074) 9,36675 9,36675 PLANT JAW 07/01116 240 305,00000 (27,95826) 277,041 74 292,291 70 PLANT CONE 07/01116 240 240,000 00 (22,00000) 218,00000 230,00000 CONVEYOR A FRAME 07101/16 240 10,00000 (91674) 9,08326 9,58330 CONVEYOR FEEDER 07101/16 240 12,00000 (1,10000) 10,90000 11,50000 2575 07/01/16 240 10,00000 (916,74) 9,08326 9,58330 CONVEYOR STACKER RADIAL 07/01/16 240 S6,500 00 (3,345 t6) 33,16424 34,97920 2007121 07/01/16 240 30,00000 (2,750,00) 27,25000 2B,750 00 94-030-B 07/01/16 240 45,00000 (4,12500) 40,87500 43,12500 345099 07101/16 240 15,50000 (1,420,76) 14,07924 14,85420 HOPPER W/PLATE FEEDER 07101/16 240 4,00000 (36674) 3,63326 3,63330 WASHER MATEfMAL FINIE 07/01116 240 25,00000 (2,291,74) 22,70826 23,95E 30 A27756-636-JN 07/01/16 240 35,00000 (3,20826) 31,791 74 33,541 70 SCALE TRUCK 100 TON B603024163 04101/16 120 57,16019 (11,431,92) 45,72827 51,44423 SURGE BINS (2) 07101/16 240 2,00000 (18326) 1,81674 1,91670 HOPPER AGGR 07101116 240 4,00000 (366,74) 3,63326 3,833 30 CONVEYOR CHANNEL FRAME 07101/16 240 35,00000 (3F208 26) 31,791 74 33,541 70 CONVEYOR STACKER LATTICE 07101116 240 7,50000 (60750) 6,81260 7,16750 CRUSHER CONE 4,25 4914 04101116 ISO 141,601 3,9 (14,16024) 127,441 11 134,521 23 CONVEYOR FEED 07/01M6 240 8,00000 (703,26) 7,26674 7,66670 GENERATOR SET 455KW 07101/16 240 26,00000 (2,36326) 23,61674 24,916 70 CONVEYOR 42" X 2800' 07/01/16 240 450,000,00 (41,250,00) 408,75000 431,25000 BINS SURGE (5) 07/01116 240 7,50000 (68750) 6,81250 7,18750 PUMPS WATER 6" (2) 07101116 240 3,00000 (27500) 2,72500 2,875,00 CONVEYOR STACKER 07101116 240 5,00000 (45826) 4,541,74 4,791,70 GENERATOR SET 225KW F020380729 07/01116 240 24,00000 (5,50000) 18,50000 23,00000 CONVEYOR FIELD 3327 07/01/16 240 10,00000 (91674) 9,08326 9,58330 CYCLONE (2) 07101/16 240 3,00000 (27500) 2,72600 2,87500 PLANT AGGR 07/01/16 240 65,00000 (7,791 74) 77,20826 81,45830 GENERATOR SET 100 KIN 232824 07/01/16 240 6,00000 (73326) 7,266 74 7,666,70 PLANT TRACK SCREEN 33411677 07/01/16 240 125,000 00 (11,45626) 113,541,74 119,791 70 GENERATOR SET 25OKW 07/01/16 240 10,00000 (91674) 9,08326 9,58330 CRUSHER JAW 59034 07101/16 240 0,00 000 000 34,50000 Rieth-Riley Construction Co.. Inc. Equipment List 3/31/2018 INDIANA 00�v42404 11 11 11 1 11 FIL66J COLD FEED BIN IMPROVEMENT 04/01103 120 6,259.79 IS, mx 7% 000 000 COMPRESSOR AIR 08/29188 120 12,15335 O0I9.160N1 1,215,34 1,21534 73030 08/14/97 120 12,036.58 00,0191) 1,203 66 1,20366 90231S103ACA3LG 04/03103 120 SOO 6100 0100 85000 379706 03131105 120 320.00 pftoo� 32.00 3200 72626 03M6109 1SO 110W,00 J640 001 4,80,00 62000 UN049100 03/16109 180 71000.00 (1'0' o 00 020 SO 1.04000 7182 03/16100 180 700.00 (w'8,00y 322.00 36400 95297 06121110 48 1 wano j11,900.fi00( 0.00 000 BU1302250094 03/04113 60 26,1S6,01 as, 1 Os 07( 0.00 5,16M99 003-112239 01103115 48 (9,754 00) 1.950.78 4,876.98 CONTROL CENTER 04/03187 120 IVIDElIzo 18.29663 18,29663 07101187 120 0.00 0.00 0.00 17,767,70 02099 07121107 180 57163ZQ3 (9i032&C. 151 34,200 SO 39,17008 CONTROL HOUSE 02125100 180 1215,04649 (0 11,670, M I N4,074 78 14,074.78 03116109 180 125,000 00 (0uoo ov'( 671600,00 65,owoo 07101/07 120 fy U7710 17,757.70 000 07110179 120 1 N,Ooo " t0,000L00) I I 9 010,00 ljwoo 07127103 120 1011V,76 (17, 307 O73 Ilfl2'100 1,92308 08109/05 120 16,002.07 (16w,071 0.00 0,00 09/21/99 120 44,S0019 (3e5'97,2'6') 4,433,03 4,43303 10/14/86 120 IS al 30 ( I OS*2 24) 1,881,36 CONVEYOR AGO SCALE 07/27/83 120 Xvols p%") 4,6C63,013 4,03208 CONVEYOR BELT 1376 09/30/01 120 0.00 0.00 0.00 223.57 4010 02117170 120 10,466,00 (10,450 00( 0.00 000 CONVEYOR DRAG 03116109 160 lfle,Dftoa (85,no.ard) MOSS 00 82,16000 03118/02 lea (1439'sn 61) 0.00 76911 40OTPHSCXIO6-566,96-NA 03/16/09 lea 42,000L00 P5151$ 00p 16,4811"00i 19,320,00 1411 09129/08 120 N04 tw,00 (Kvx� 301 6, 1 go 07 15,59966 117 04/15/10 120 7740Z10 (8 15,480 18 23,22042 2140039 05/04/14 120 .262,010 w (1 m) 14,002 S4 249,94980 CONVEYOR RECYCLE 02125100 180 37L 140,92 MIMI 10 8,100.15 6,10616 03131105 120 2$,7w O�O W5,415 001, 21875,00 2,87000 lea 75,00,100s#e,) 19,74940 23,99962 06122191 120 19,,167,17 (I 7,S3'561) 1,048:14 1,948 74 4637 07/20/81 120 1$I606 60 IlUO'eo 1,38066 4540 11/23161 120 13,433,13 1,343.31 1,34331 4546 03122162 120 14,9",14 (10462,23D 1111*5,81 1,49581 4580 09/30182 120 22 626 84 I20,w4m4 Z20AS 2,26268 IBR-1255-1-84-5A 03/31105 120 W,7001013 (15,0w,w) 11,670.00 1,67000 CONVEYOR TRANSFER INCLINE 04/01/03 ISO 65001.63 (5 9 W� 47) 1,4,54h9 IV, 10,41436 CONVEYOR VIRGIN AGGREGATE 02125/00 180 65.528.04 (5711*31SI) an$ 31 0,20333 200 09121/99 120 21,W9,2S (ITO"I"IS M3 21 *i , 0, 2,192,92 CAUSHER SYSTEM HU1366 06130100 120 6", I'm, 1217, 00) 62, 1 altj 22 62,13922 HU-1865 05115/04 120 119,11Y Dry 1 (I 19,3ss,01y 0,00 0.00 HU1649 04122/06 120 12W469 42 (20*,44S,42V 0.00 0,00 DRUM MIX'Sk 03103/12 lea 29J05,00 (6,744 ?16) 21,WO,04 22,48420 03116/09 lea 944000.00 (609,'mo 00V 434:4.240.0d 490,880,00 03/31/05 120 3v,000100 jZ8 WA00 3, ',Ga oo 3,200,00 180 75,01,,0,00 19, 74940 23,99952 04/01/96 120 49872-40 g44,605 15p 4.U47 24 4,98T24 07110179 120 300,000,00 (270,000.00) 30,1000.00 30,00000 07/27183 120 .197 730 SO (2337,Pw ao� ;7%?YaQa 29,773.00 108 09/21199 120 148,4903 19,777 20 19,77720 DRYER DRUM 03/03/12 180 (d4,141 S✓5) 170,305.04 186,35720 0313110s 120 Mmlfio 100000 2,00000 04/01113 120 7W3 W-a9 061,50S,OM 16 1'"160 218,160,59 04112103 180 071614n,19 q$2,09l 7ey 04S42 64 100,065.55 04/271 3 120 3s9„31166 (1 7SL156-60 17(0,15560 214,987,02 05102116 120 3•'k1 oO218S 237,394,70 265,69411 05103114 ISO 744, It$ 26 f, I IS,',ca S4) 566,021,42 610,70738 OSM1113 120 0.00 0.00 0.00 219,11726 07101/12 120 26#65,11 4 (10�301bl) 11 0.36Z 51 136,310,36 SCE583 03131/03 120 44,(MO 00 00j 4,400 09 4,40000 001432201 04101/07 108 0.00 0.00 0.00 57.741 95 393-97 12114110 120 102,61856 (6701,441 34,050. R 2 44,06268 PUB-9637 03128/14 76 121Z01 as 5 E,S$al 69,46713 DRYER DRUM DISCHARGE HOOD 04126/03 120 X1696 29 (X,ewzw 0.00 000 DRYER SHELL REPLACEMENT 05/08199 120 wl%,0 ¢0, 0C41 S7II 611%6 N 5,09529 DUST RECOVERY SYSTEM 07101187 120 20102 1 .N 1 P,*s,7 m,") 201$02N 1 26,302,11 07127/83 120 IS5,100,00 (14S,60 00 '16,610 0 16,5i0.00 ELECTRICAL BUILDING UPGRADE 04101103 120 ;kljool 00 (O,m,001 0.00 000 ELECTRICAL POWER HOOK UP 10/17100 120 617R6 00 (8,0a660) 674150 676,50 ELECTRICAL SYSTEM 03/16109 100 317V0000 mjs* 00) 1471eiv 00 164,84000 03/28114 75 t 1,vq w, ( 7, 202,56 COO$ 44 6.91710 04101/06 180 71 127F, 00 (40,407 62( 22,80749 26,846 44 04/01107 108 21,345A0 (I'I, Pdio 27'i 7,115A3 7,115 IS OSM3193 120 4100,00 I3'vA9404p 41 We CA 4,16606 12114110 120 42,91 724 (."I8,,126,441 14,69v,00 10,464.46 ELECTRICAL UPGRADE 04104169 120 080 151 QJ2�7,46) V" 05 860 SO 04M5196 120 32,008,96 (29,618 06p 3,290,90 3,29090 04115197 120 1075 00 (7', 1 "'50) 797LO 79750 ENERGY CENTER 02125100 180 40,509 08 (30, 1 „3O 34;1, 4.02,74 4,46274 160 12Q,29932 (73 222 e2) 47017,0 53,83451 EXHAUST STACK FAN :7121/07 4101/06 120 26.00 W (j,aso 5s) 17,08,346 19,583,42 08/11/01 120 42,3862N (""1146 "� 4,M63 4,23053 FUGITIVE SYSTEM 04/30/94 120 21.50160 (Iilfig 44) 2,150 Is 2,160 16 07129195 120 flkav W (14,T4394) 1AM012 1,63822 FUME EVACUATION MODIFICATIOh 05/02198 120 3,505.10 (31, 1 S4,691 350.51 350,61 FUME EVACUATION SYSTEM 05118102 180 161A 7201e9 0 57 2os"15) 10,91Z2.04 17,76E 49 HEATER HOT OIL 275 GAL 6093-90 10115199 120 110fA1,76 42e,42357) Z I Se, IS 3,15816 HOT FUEL OIL STORAGE 08/29186 120 12,064M (I ojw w 1,:0,44 1,20648 HOT OIL HEATER 02125100 180 1 @„% tl,$a (10,408,6a) Z162 89 2,162.69 04101108 120 35,0v 10 0.00 3,59238 04101192 120 44,315.35 (e0,883 al 4,431.64 4,431,54 09121190 120 13,532.20 1,353.22 1,353.22 5113-00 04129100 120 41J67,95 (37,SW, 15p 4 175 00 4,17580 SAMPLING RACK 07/01102 120 5.IA9,al �4,814 $41 534.98 63498 :N U LATE TANK/LINE INSULATE 08/29168 120 19, ISO Q (172)42,4S@y 1,9R514 1,01684 INSULATION HOT OIL LINES 08101105 120 41000100 (4A00 00) 0.00 0,00 08119/04 120 9,90000 (9,000.00) 0.00 0,00 ,ry Rieth-Riley Construction Co., Inc. Equipment List 3/31/2018 INDIANA 12121/09 180 111,700,00 (53,744.049) 47,95694 53,885,62 1691.01-BC 'R.16V 08104/01 120 102,174,05 (01,050,64) 10,217,41 10,217.41 DOUBLE COMPARTMENT 08123167 120 4,750.00 (4, WO4) 36%36 369.36 Ill 08109/06 120 22,415.79 (22,4i6.7Ai) 0,00 0.00 H86-0&3 03116/09 ISO 2,30000 (1.,242,00) 1,05800 1,196..00 239 03H6109 ISO 33,00000 ('tl2,S2O.00) 15,18Q00 17,160,00 H04-04'7 03116109 180 61,000,00 07,640,.00) 23,460.OD 26,520,00 H04.046 03116109 100 42,00000 ('.r'?'6w.00) 19,320.00 21 A40.00 H04-280 03/16/09 180 56,000.00 (30'240,0) 26,760,00 29,120.00 HT-35P 03128114 75 36,22926 (20�BSS,90) 16,36126 20,67026 'rA-35P 03/26114 75 27,744.30 (15,9SR64) II,76366 15,760.02 261LH'TT327 05/19107 60 31,00009 (;91,80,O:OMY) 000 000 25L.H'TT265 06/19107 60 37,100,00 (37,1C,0,COT 0.00 0.00 CONVEYOR TRANSFER CROSSOVER 03/16/09 100 36,00000 (18,1A00.aoS 16,100.00 16,200,00 DRUM REBUILD PORTABLE PTD400 04/26/08 120 195,960.SO (195,;04&W.86). 0.00 19,597.30 BIN COLD FEED (9) 03/15/09 160 136,100.OD (73,494,00) 62,60600 7OE772.00 CONDITIONER WATER & PUMP 05/11/09 180 16,30858 (9,100.35) 6200.23 7,228.03 BURNER HOT OIL CONVERSION 04/01/09 120 63,150,40 (47,062,36) 5,310,04 10,63608 06741/O9 120 26,341.67 (23,26806) 3,073.61 5,707,73 INSULATION (PIPING) AC 05/11109 100 234,796,80 (139,574X1) 95,222,79 110,075.96 GAS TRAIN & REGULATOR 04101/09 120 17,70526 (15,934,32) 1,770,94 3,541.42, CONVERT BURNER TO NATURAL GAS O4101109 120 16,440A7 (13'sw36) 1,64411 3,088.15 CONVEYOR COLD FEED 03/31/05 ISO 83,500,00 (61,592,36) 21,98FA4 26,719.36 141 04/01/09 120 62,011,60 (47,530,80) 5,200,70 10,581.90 INSULATION (COLORED) AC 05/11/09 180 437,36175 (259,990.30) 177,383.46 206,S4225 LATEX IN -LINE BLENDING 00106/09 120 15,037.59 (14,166.90) 1,070,69 3,474.49 BIN RECYCLE W/FEEDER 2160798 04/01/17 120 74,68671 (7,46860) 67,127,11 0.00 VALVES (PUMPS &. PEPING)AC 06/11/09 180 2,023,600.23 (1,202,917,54) 620,682.69 055,589.33 HEAT EXCHANGER & PIPING 05111/09 180 184,04S.42 (109,405.36) 74,641.06 86,910 0Z MN VIRGIN AGGREGATE. 112A 12121/09 100 57,247,10 (34,072.57) 22,374,53 26,618.49 112 12/21/09 ISO 57,24709 (34,872S7) 22,374..52 25,618,48 LOADING RACKS & CONTROLS 06/11I09 180 74,06298 (44,572.99) 30,409.99 36,408,83 ELECTRICAL SYSTEM UPGRADE 04101/09 120 49,80053 (44,020.00) 4,980.53 R960153 BURNER DRYER DRUM CONVERSION 05/02109 120 49,574.29 (44,616,96) 4,95'7.33 9,914,'77 TANK SET UP MANISTEE 05111/09 180 618,755.76 (300,371.06) 210,304.90 244,968,66 SILO MIX STORAGE 03/16/09 160 951,650.00 (513,091,00) 437,759,00 494,85800 160 133,750.. 00 (61,252'72) 52,49'7,28 61,525,36 03731105 120 22,320.00 (20,008,09) 2,232..00 2,232.00 04/01103 100 140,098,45 (126:079.60) 14,009..85 22,414.53 04/11108 120 138,209.12 (124,387.92) 13,521.20 27,64208 04123/99 120 100,761,40 (90,605,26) 10,076.14 10,076,14 04/24199 120 160,169.43 (170,270.49) 18,918,94 18,918.94 04/27191 120 0.00 000 0,00 12,18819 06/02/98 120 297,95421 (268,156.79) 29,795,42. 29,795A2 05/11/13 120 212,525.63 (104,639.4.5) 100,186,15 129,466,70 05/27198 120 79,637,19 (71,673.47) 7,96372 7,963.72 00/03191 120 130,17705 (117,1%34) 13,01771 13,017.71 09/29108 120 261,000,60 (266,950,30) 14EO4962 42,149.66 10/14/86 120 133,180,34 (119,862.31) "T315.03 13,310.03 10/23103 120 7,242.16 (6,517,94) 72421 724.21 107 07115/09 120 147,611:90 (147,611,98) 0.00 0.00 16OTD138361BUTA 04121180 120 146,131.26 (131,51812) 14,613.13 14,613,13 6322-1 06107r75 120 117,28694 (108,160.60) 9,120,34 9,120.34 117 08109105 120 61,22766 (51,22766) 0,00 000 146 & 147 02/25100 180 240,926,99 (218,384.41) 28,542.60 28542,58 CONVEYOR TRI PACK 05101/10 180 100,4.50,00 (56,77344) 49,676,56 56,773,24 PIPING&INSULATION 08123/10 120 09,267.91 (76,10616) 23,16275 33,009,51 SCALE TRUCK END SECTIONS (2) 093034 04/15/10 120 50,065,86 (40,69248) 10,173,33 15,259,94 LIQUID STORAGE SYSTEM 03103112 180 364,775.00 (131,319.36) 233,455,64 255,34220 SCREEN S/D CMI SET UP #7693 07/03/11 120 13,535,62 (9,138,80) 4,398.82 5,752.42 WARM MIX BLENDING SYSTEM 03119/12 120 264,119,12 (158,472.40) 105,647,12 132,0.59,12 05102/16 60 19,44T03 (11,668.32) 7,770.71 "A68.15 05104/13 60 32,379.55 (31,839.94) 639..61 7,015.63 05/30115 60 44,830. SO (26,151.30) 10,679.56 2704&74 06/01113 60 23,127,80 (22,74214) 355.66 SO" 15 06/06/13 60 24,916.94 (24,085.66) 830.20 5,B13. 52 00/16113 60 36,306.90 (35,175.84) 1,213.06 6,490,82 00/27116 60 30,950..47 (22,071,78) 16,07889 24,66673 08/20110 120 67,886.02 (52,04624) 16,039.78 22,62642 0073 08101112 120 21 E20620 (12,01032) 9, 189.. 88 II,310.76 $AMPLI NO YNS PECTION RACK 07/21/07 120 IOE695.00 (10,695,00) 0.00 2.66,79 BURNER DRYER CONV TO NAT'L GAS 08/01/12 120 120,008AO (66,004.76) 62,003,54 64,004AB 08111112 120 94,214.47 (53,38616) 40,826.31 60,24775 09102/12 120 47,235,93 (26,37321) 20,862, 72 25,58628 BURNER HOT OIL CONV NAT'L GAS 08/01/12 120 7,000,92 (4,012,66) 3,06&24 3,776.36 08111112 120 '7,850 12 (4,453,32) 3,405.60 4,191. S8 LIQUID ASPHALT PUMP CONVERSION 08101112 120 0„369A6 (4,743A0) 3,626.46 4,463.48 PlrllN'OS YS:TL' MASPHAL:E 03128/14 75 10,232,15 (6,540AN 3,603,54 5,32070 AUGER DUST 05111113 120 33,447.67 (16,445,07) 17,002.60 20E347.36 BIN COLD FEED (3) 02/19/08 120 117,758 67 (117,750 67) 0.00 000 04104189 120 109,082,67 (08,174.40) 10,900.27 10,90027 SCALE TRUCK SET UP 12/14/10 120 2.4,75486 (18,15362) 6,601. 33 %07601 AUTO CONTROL 03116/09 160 31,000.00 (10,53304) 12,166.96 14,26952 03/31106 120 0.00 0.00 0.00 100A0 04101103 100 163,677. 07 (147,309.36) 16,36771 26,16TS5 04101/09 120 46,97067 (4'1..,280. 92) 4,697,75 9,395,63 04/01192 120 36,107.56 (34,296,70) 3,81086 3,810.06 04104189 120 22,89767 (20,60006) 2,2139.,79 2,289.79 04123185 120 OX0 000 0.00 475.76 04/27/02 120 OX0 0.00 000 0,00 04128/08 120 16,405,00 (16,405 00) 0.00 1,640.32. 06102/98 120 31,725.53 (29,552,9B) 3,1'7255 3,172.55 05/13/93 120 0,00 0.00 000 40051 OB/29I86 120 0.00 000 0.00 1,33977 10101/06 120 16,680.01 (16,680.01) 0.00 0.00 12/14/10 120 108,379.81 (71,530.80) 36,04901 46,603.21 11,OS9 04/01/00 120 23,601.'20 (21,241.08) 2,360.12 2,360,12 19,090 04/01/00 120 24,36465 (2.L92816) 2,43047 2,436.47 19,160 04101/00 120 25,901.20 (23,311.15) 2590,13 2,590.13 6501 04101/92 120 65,005.11 (49.504.60) S,50061 S50051 00143'7401 04101/07 108 36„308.35 (24,205.56) 12,10279 12,102'79 Rieth-Riley Construction Co., Inc. Equipment List 3/3112018 INDIANA 06124103 120 46,60947 (46.601) 47) coo 000 06118/05 120 137,419.06 (131,4%040) 0,00 0.00 180446-BCF30 09106t00 120 123,133,75 1110,020.37) 12,31130 12,31138 196302-CVRT15 04129/02 120 71,02341 (63,921 07) 7,10Z34 7,10234 RACK TRUCK SPRAY DOWN 04101/03 120 10,66710 (10,867.19) 000 000 04113101 120 6,194,00 (4,674,60) 51940 61940 06103108 120 9,304.65 (9,30465) 0,00 93033 05120/06 120 4,45902 (4,459.02) 0,00 000 07121107 120 20,10876 (20,10076) 0,00 60307 SCREEN DECK DOUBLE 04101103 100 47,42409 (42,681.60) 4,7424I 7,56793 06130/98 120 60,86616 (45,781,34) 6,08682. 6,086 02 06/12100 120 24,07952 (22591 57) 2,48796 2,46795 350306 07/11/83 120 8,933 60 (OC40 24) 89136 89136 870199 05112101 120 000 000 0,00 2,71928 PSS-2612-60 03/28/14 76 31,13601 (17,934J2) 13,20200 17,685,77 BIN COLD FEED (6) 03103112 180 192,37500 (09,25536) 123,11964 134,66220 041011)6 160 01 ,71 0,00 (66,662 40) 26,147,60 30,777,60 04/23/99 129 102,791,86 (92,51267) 10,27919 10,27919 05/08/99 120 230,301,41 (214,543 27) 23,83814 23,83B 14 12/14110 120 111,63624 (73,601 52) 37,M 72 46,004.20 001431001 04/01107 108 95,6B069 (6C24134) S5,43T25 35,43725 SILO SYSTEM 04/01106 180 213,795= (145,3ftffi) 60,414 04 80,62912 04103/87 120 314,1%57 (282,75151) 31,41686 31,41606 06113/93 120 151,31SA4 (136,164.08) 15,131.56 15,131 56 07101187 120 314,46818 (283,030 36) 3IA4682 31,44862 12/14/10 120 128,604JO (94,466 66) 34,347,60 47,22804 CONVEYOR 03/16109 180 20,ODO 00 (10,80000) 9,20000 10,40000 03131/05 120 1,080.00 (97200) 10000 10800 06101109 36 1000 00 (10,00000) 0,00 0,00 06129184 96 000 0,00 0,00 1,34Z67 2429 03/27168 120 10,763.03 (9,91688) 83616 aw 16 3100 11129/72 96 0.00 0,00 0,00 475,09 3774-630-120-60 06118/80 96 57,09735 (57,00735) 000 000 4412 03/29180 120 14,35000 (12,01500) 1,43500 lA35 00 PDBOXIOG 07/27/66 96 11,778.79 (%862 87) 915,92 91592 PN40 03/31/05 120 16,205,00 (I3,76660) 1,52850 1'520,50 PN40X200 03131j06 120 1%750 00 (17,T15=) 1,976X0 I,975..00 PUMP AC UNLOADING 05/00104 120 5,41303 (5,41303) 000 0,00 05/16104 120 6,1 94A0 (6104A8) gue coo 07/24/04 120 20,231,65 (20,23105) 000 0,00 11/27110 120 6,04812 (3,744,23) 1,30309 1,80873 TANK LIQUID AC (3) 05;11109 180 1,073,496,06 (lJ73,134 00) 000,361,97 931 V2B 41 HEATER ASPHALT 04/01106 ISO 000 0,00 coo 34000 H90-126 03/31/05 180 6,00000 (3'68316) 1,31684 1,60016 11611 05/01116 40 10,74640 (8,90266) %763 75 14,45035 CRUSHER 04101106 ISO 10,00000 (12,96000) 5,040.00 6,120X0 CC-2249 02102r71 96 5,06667 (4,56000) 506,67 60667 BIN COLD FEED (5) POF-1014-5 03126114 75 56,81243 (32,72400) 24,08043 32,269,43 CONVEYOR AGGREGATE 249 GO/09105 120 14,355,12 (14,355 12) 0,00 0,00 BURNER EXTENSION 05102115 60 10,32500 (0,19468) 4,130,12 6,195x6 AUTO CONTROL 6 HOUSE 03/03/12 180 179,190,00 (64,50912) 114,60088 125,432-40 04/01/06 ISO 95,245,00 (64,76086) 3g47&12 35,875,36 04128108 120 125.736,69 (125,736 69) 0,00 12,57321 0 S RAOGE S:L M 09130100 120 f36,167,64 (122,541,87) 13,61577 13,616,77 MI SLO XSTORAGE(21 03131105 120 64,355,00 (57,91950) 6,43650 6,43650 04/17/04 120 313,250,60 (3i3,258 80) 000 000 200-TD-138-339-79-NA 07/02/00 120 08.381s5 (61 ,543 30) 6,83816 6,638,16 31479 08101179 120 110,720,00 (09.04800) 11,07200 11,072,00 SILO STORAGE 04101/90 120 231.171.1E (208,054 07) 23,117JI 23,117JI TANK FUEL (3) 04129106 120 121,014,71 (121,014,71) 0.00 000 AC TANK INSTALL 2316 05130/15 120 38,94741 (11,35960) 27,58701 31,48263 CONVEYOR UNLOADING 12111la7 120 21,71703 (19'546,33) 2,17170 Z171 70 SCALES TRUCK SECTION 07115/99 120 9,21T04 (9,21704) 000 000 AC SYSTEM RECONFIGURATION 05130115 120 140,266J3 (43,24460) 105,02213 119,04685 SCREEN SINGLE DECK 07121107 180 7.00000 (4,264 74) 2,73526 3,131 98 SCALE UNDER SILO 08/08/86 120 82,91671 (74,62604) 6,201,67 0,201 67 TANK HOT OIL 3OLHT1509 /3 01 ill: 1120 9,70000(0,73000) 07000 97000 TANK LIQUID ASPHALI L H90 017 13,10 3(1 80 25,00000 0,41736) 6,02 64 7,999 36 "CA IER INLgNE, PUEL 07/07101 120 10,66300 (9,61470) 1,06030 1,06830 CAR UNLOADER TRACKMOBILE LON973211299 07103100 120 0,00 000 000 19,02T67 PREHEATER OIL 09/20179 120 3,78466 (3,406.10) 37046 378A6 1901-01-BFPSO0 03/31106 180 300100 (2210 52) 70948 959.52 TRUCK SCALE 63300-40291 09/21/01 120 39,38019 (3%380 19) Moo 0,00 TANK PROPANE 03131106 120 2,95000 (2656.00) 295,00 295.00 SCALE TRUCK ADDITION 04124/99 120 16,950as (16,255 79) 1,69509 1,69509 0510 98 120 25,26409 (22J37 68) 2,528,41 2,52641 CONVEYOR FEED BIN 02/04103 180 5'300.00 (4,77000) 63000 79500 PUMP AC METERING 03/19/12 120 34,46867 (20,68128) 13J07 39 17,23427 10/25108 120 SISBAB (4,89&50) 25790 77354 MACC-2025 03/28114 75 %733,25 (5,689J2) 3,14413 4,54141 CONTROLBURNER 03/31105 1 SO 13,15T22 (%754 41) 3,40281 4,14837 BIN SHINGLE 09/20195 120 20,M00 (25,33050) Z814 50 2,814,60 11102102 120 TM 24 (7,394.24) 000 COO BLENDING SYSTEM 09/01109 180 405,44346 (232,003 30) 173,440X7 200,46959 ELEVATOR BUCKET MODIFICATION 07130/16 60 16,838 12 (6,71101) 7,127J 1 10,294JS TANK RUOrrACK 463 03131106 lea 10,00000 (7.36632) 2,63168 3,20632 CONTROL 03131105 Igo 10,000,00 (7.36632) 2,63308 3,200 32 TANK BURNER FUEL 04101/92 120 19,60652 (17,64587) 1'960 as 1,980.65 Ole 06110/79 120 60,630,25 (54,56722) 6,063.03 6,063 03 375 03/31/05 120 13,50000 (12,15000) 1,350 00 1,350..00 TANKCOILS 01111/09 ISO 154,617 50 (ql,qltw) 62,70666 73,01364 TANK LIQUID AC (2) 05111/09 100 685,60,94 (407563,33) 278,07OA1 323,78069 EXHAUST FAN INSTALL W/DUCTWORK 04101/15 120 42089,22 (12,960,64) 30,00868 34,29546 TICKET SENDING UNIT (2) 08/29/09 120 13,88062 (12,029,68) 1,850,94 3,23590 TANK ASPHALT CONDENSOR 08102/03 120 16,671,26 (15.67125) 000 0.00 IRAMER FLATOED lDTPIOW24KPO26965 03131105 120 53000 (47700) 63.00 53,00 PUMP AC 0735223 02105r70 120 IA74 10 (1,35947) 11463 114,63 CONTROL BLENDING 0410110T 120 8,000.00 (8,00000) 0,00 000 CHUTE RECYCLE CALIBRATION 05120196 120 17,836 77 (16,04769) 1,789o8 1,789,00 UNLOAD fpNO S'FS7fM OARCI6 05111/09 100 27,66067 (16,382.77) 11,17790 13,01522 STORAGEASPHALT 04103187 120 Goo (LOO 000 4,079O0 w3masm p 1, It, RReth-Riley Construction Co., Inc. Equipment List 313112018 INDIANA BATCHING SYSTEM CONCRETE 04/02/09 120 69,83954 (62,855,59) 6.983.95 6.983.95 DRUM MIXER CONCRETE 980602 07/03/11 120 150,213,00 (101,394,18) 48.81882 63,840.18 HEATER WATER E12H00240661 ll120112 60 13,950.00 (13,950.00) 0.00 1.627.60 CONVEYOR FEED BIN O6101192 120 32,569.95 (29.312 95) 3,257.00 3,257,00 5484 06/01/92 120 32.569.95 (29.312,95) 3.257.00 3,257.00 FLY ASH SYSTEM O6/01/92 120 58.227.46 (52.404,71) 5,822 75 5,822,75 BATCHING SYSTEM 06/01/92 120 169,615.77 (152,654.19) 16,961,58 16,961.56 COARV'EYOIR SAHEB FEE1 O7129PL #20 1m 4]'F,pO 00 0 d YGPO IOIy� 9 Ai00,00 1 D06 p0 .. ........_. .�._.... M........ .. ..............mm..........,,...m....,.,..m,.....,,,,,,,w....m..�_„w.w ON4 RETETn4 p F"9PUPAP �.... �..._.�.,...m,.. ,..m,...............�.._._._._�..,.._.....-...... ..........� ..._m.... _....,.m....�. 1d43'F131A,.R �1.8289Y8M-4.E6) ., ........ 1AB.tgj.!4 NY3t Y.,90;¢. 1BRIMPS PUMP '101NDER8EAL.ASPHALT P3513 11012d98 80' 13.:0':70-o0 ('13:020,100) 0,00 10,00 TRAILER UNDERSEAL 05/24/04 60 2,8013 20 (2,e0B,20) 0,00 0..00 PUMP WATER 5558482 06/09/06 84 11,448,00 (11,448,00) 0,00 0,00 7STO901A.. m7m 1lO6 0... 6+d, t'.O"L(562 BgVN.,,48 m1 CI 00 000 ®.. P ...,..m .............. ..... ..... ...... 3'233577,2��32,M ., 900 , .-.-_,. mm0 K3UALRiY G�ONTRYUL, E;OM111RaM1C6N'W O}R'Y....,'TNAp4ER..� .A4(44 A.� r"«7741 .. ,�........ ,,.w. 00' sm O,iPL"(63'9k�7GJ 75) dY O0 8P 9d1 PROFILE READER 2891 05/10/91 60 9,460,00 (9,450,00) 0..00 0,.00 TRAILER DRILL CORE GAS FAE 03/31/05 36 6,00000 (8,00000) 0.00 0.00 TRAILER lILR4'COkEM0 4B20016 $0, N13O2.64 ttlA�6S d. dY7� 11016k tl944 A.62 f,3N.XANTYONTROMNYTo '.�... _ _- T ll-Vy6 191N41162. SAWS BAW'GONCRETE" DWAMi3HD A26 q&So 0'4M If98 so 12,IAss 55 ('tl2,08RA5�5J� 0,00 0,00 12647B1 04/01/02 60 14,637,00 (14.637.00) 0.00 000 SAW WALK 9EIRIND 160296 04/01/00 36 1.200.00 (1,200,00) 0.00 0.00 SAW-METALCUT--WELLS 1713 04/27/66 60 0.00 000 000 7498 ............... ..m ,,,,,, _...,,.,,,,,,, ..SAW CONCRETE HUSONARNA 001234026001 03/31/07 ...mm.mmr.mm..........mm.mm...... ._._.....60.. .... r.5,M16....,..,6b....:24k 11kY1,......... _ ..U:(�j.-, 6AWTb7 k X 431T2 a1 431' N24� m99 7000 .. SCALES FRUOK' SCALES TRUCK I�s8.1 GCIAaO P9/241f79. --.�..................... ... Jl`,:40 A.41 �(37,31,b9.4{4)`. _.... ow .......�..0,0b... 67PT2582 08/17/67 60 5,650,29 (6„2:RO9lM,) 439.37 439,37 G594796 12/17/65 60 8,539.28 17,vs,27g 664.01 66401 SCALETRUCK 01/29/08 60 9,000,00 QAOOO,001 0.00 0,00 04/10/08 60 3,672.56 (3,07'an„Sal 0.00 000 501093 10/23/93 120 30,660,35 Cv,%4321 3,066.03 3,066.03 71 PT4810 05/06/71 120 9,678.58 i(6,g,15JX4 75262 752.62 75'F 09/04/74 120 8,000,00 Q7,2r'A11.d0) 800,00 600.00 PTBL 43 X 10 02/04/77 120 5,00000 R4 500,00J 500.00 500.00 92129 04/29/04 120 52,638,30 (01,6,lSO0( 0.00 0,00 BU'SP'19ki o v'9�5P00 Prim P 77m,:Y9 23.1987i^ 2577.Rdd 25i'A:.04 SM1.ALE,S TRIaCKTEOp 1959168'9 1ffi7'Sti7�3My u, 67d99.F 87kY4'BR. .. .� SbCfl8AP9=R9 ._.._. BCRA&��E.R 0 3C 6yxv97'33 .,..,..._._. 03fS 1f05. -4._. .� .....,... / 1X 8�7Nr iWf'1 a8,19:0N&0 ......... 318T.50 37 Ia?.$0 �.., �. Sq�,,,, W SHOP Tt7iCbLS��........................ ............ .�.,.,�,.,.. &-tlYB.L....'1ON SM9.'kiE.ld ELK S7V.0riP ,,,,,,, ,,, �#�W31dp ���TA7dif�S ....,,� .... 0�.�'i'Aa!75,in4 +",m4 .. ...�26k.�'T at-Vi0 47,6,db 4gs� .30AG7.'51i.... ..................... "" ow 0,00 LUBRICATION SYSTEM - GARY 00/04/03 60 10,686.23 (10,686,23) 0,00 0,00 LUBRICATION SYSTEM - LAPORTE 05/09/01 60 6.606.53 (6,606,53) 0.00 0.00 WASHER PRESSURE KEW 2540CA 7652859 07/11/97 60 1,890,00 (1,890,00) 0,00 0.00 7559491 05/29/97 60 1,690,00 (1,690.00) 0,00 0,00 7559493 05/29/97 60 taREryrA.00 4,892YA 9q FYO0 0.09 ASHOPTOOLST tel -MV1 m,., Ohl) 0�0... SPREADERS ,....._ SPREADER BOX eC0i393 10/08/01 .,, 96 21.108.62 (18,957.76) 2:11116 .,m 1,110.11 6074778 05/03/07 48 34,944.72 (30,730.24} 3,414.48 3,414.48 SPREADER CHIP K-4 170 2li77 96 5411y 38�0'.f 4,M ) 0100 99 VNd r,n, �C"RkACIFN*i -_. ,� _ 'Raanl ... - . _...__. _.�.. .. ,,, .,..,, ,.._,_....�._.. �......._ _ .. ... �� ........RW -. _a m9, t ;gym ....lma!-PRl� .....,.._ s25 aa�_.._.�.. $Wk'ERA ROARS SW�E"fBE'N 408m30 m487t'1716 R+9 9l,0'9 0.00 001) 0101,1 06/03115 60 0,00 0,00 0.00 0,00 409117 06/03/15 60 0.00 0,00 0.00 0.OD 816392 09/28/16 60 0,00 0,00 0.00 0,00 409712 05/12/16 60 0,00 0,00 000 0.00 817599 04/17/17 60 0,00 0,00 0.00 0.00 409680 04/13/16 60 0,00 000 0.00 0.00 817598 04/17/17 60 0,00 0.00 0,00 0.00 409118 04/OS/16 60 0.00 0,00 0.00 0,00 SWEEPER ROAD 2861 04101/0. 18 5,500.00 (4,000.00) 1,500.00 1,500.00 33722 03/31/05 36 5,000. 00 (4,500.. 00) 50000 50000 69160 04/01/06 72 19.500.00 (17,55000) 1,950.00 1,950.00 88452 04/0'1/06 36 13,50000 (12,1.50. 00) 1,350,00 1,350.00 4tY0Am9 m0N2,2A'1ti 6tl 0"N W7A7m 'Il,0O IA.UG7 ,�,�.., .. 'EFWW.R4,k,N,T,�xCaliiY_T; taW .. ........._ ... .._ �............ 40 aap,AO ream vro ,-----.. ,'20l0.09 , - m3mmoum ... p A,NKftPP'A94K)d1i w.,._. ...,,_.,,_... ..,.,. HUEL. 6T'13'RA�3E ........ �..... ...mM mtiq'm3kt2, .......... ....... 0'9 d)f10 dJ.00 p,0 TANK FUEL 05/01/90 60 17,160,00 (1'7, 160,00) 000 0,00 OS/02/98 120 33,446..30 (30,t03..47} 3,344,03 3,344.63 07/31/73 60 2,865,20 (2,642, 41) 222.79 222.79 12NA 1001 60 Jr0812 rtAaaR.12-p'. 0.00 TAN'KBdTANpOEk i'aupdq 5 m8'A.g2 m2 t14 m �0.00 3 6A?A fri ..._.:.... 3l5'&7. 82 ... _,., TOOLOAN YR-A ILF-RmSBM@:RAE'CN tfgaATG. u' Ual,W-.-..� AYmirM1Mtla 6'0d1F7d9tl 9141 �47M�,�7 16,,Ra1a6a) Ir,Rara 090 TRAILER PULL TYPE 14584PPW 05/02/79 60 3,360,00 (3,380,00) 0.00 0.00 TRAILER TOOL 1WC200G27L104777B 04/02/90 60 4,254.65 (4,254.65) 0.00 0.00 1WC200DlXN1054920 03/26/92 60 0.00 0.00 O00 0.00 TRAILER TOOL VAN 125961 08/20/95 60 4,725.00 (4,725.00) 000 0.00 138211 08/28/95 60 4,725.00 (4,725..00) 0.00 0.00 1KKVD4824DL001573 03/20/98 60 6,300.00 (6,300.00) 0,00 0.00 1KKVD482XDL001576 05/14/98 60 6,300.00 (6,300.00) 0.00 0.00 1KKVD5220GL076550 03/01/00 60 5,101.43 (5,101.43) 0,00 0,00 35259 05/13/93 60 6,675.00 I0,676,,Ob) 0.00 0.00 48B500G2011052646 04/01/01 60 4,194.75 (4,104,76) 0.,00 000 48B500G2511050441 03/17/01 60 3,601.50 q.T,dd7'i,GO) 0,00 0.00 4813500G26V1025635 04/17197 60 3,64375 d'^SS43',',75f 000 0.00 4X4TVH4124N034881 03/15/04 60 2,012.94 (2,iC12;94) 0.00 0,00 58495 04/21/97 60 5,46000 (,'S`,4Fk 00) 000 0.00 5NHUCC4254N037248 03/01/04 60 3,736.50 Ia-o N pwO 0,00 0.00 6936640 06/09/81 60 4,881.99 ('0$1,01:YI 0,00 0.00 0520201 06/14/72 60 1,530,00 (1„-j"00) 153.00 153.00 IMDU-401284-0 04/01/98 60 4,33250 14,,''g.310) 0,00 0.00 K62202 07/05/83 60 4,200.00 (4,2'ORB..0oJ 0.00 0.00 1H2V05324RE008142 06/08/05 60 4,770.00 (4,77000) 0.00 0.00 5DT211G2771061417 04/03/07 60 4,107..2.0 (4,107.20) 0.00 0.00 ..............._...... 1rM1'I'6 1INi6 YA.T1'Fa4aul_ ....... .......................__.RAILER. .....,,...,.__.,, ..��. _...,. .... .. ... W.�..erRAli,IERk--- .._.,...._.�._.�.�.� _.�................._......._... ............._............�..m..m.m. ....F ,� ........�....._. .�,,.,-,�..... ........-, 1%�RW ...� 96 d1'05.80 97 m26m 6dd3 mm 1d m6 TRAC'ttC�R (1^APiM TYREr L&' .C7i3Fk 4N470.,4NY +:%Gf7"D Vi3m1d106 O1p 1014`+d',00 ('6d,1Y9 co) 0 d0 cloo L375010241 04/01/06 36 3,000.00 (3,000.00) 0,00 0,00 TRACTOR FARM C760660 03/31/05 12 2,813.00 (2,531. 70) 281.30 281,30 Z7NFS1018 03/16/09 36 8,000.00 (8,000. 00) 0,00 0,00 M48011401 03/16/09 36 10,000,00 (10,00000) 0,00 0.00 ......... .............................. ..... ...... 31618......... ....,.._........ 07101/16 48 4�W 71Ni'..GVO.�I;11R, 4'7d1 A0J idk,:,r..40 04900,.,"i+3 Pay. 17 of 27 P #M Rleth-Riley Conslructlon Co., Inc. Equipment List 3/31/2018 INDIANA /4..�...,.... ._._. _.._,..,,..,n......� ............ .........,,......,m. ..............,.'.....,a FLOLW7�4,AwN IBUD182OX61002834 =17a69. 60 BA27.00 i8.427,a0) 0.00 IOHHDI407SIO00006 04101106 36 1,590,00 0111d0.00)� 0.00 4KNTT2423OL163154 05/00/06 120 26,40326 (21762,W) 2,640,33 IBUD1820961002940 04/04/06 60 0,427,00 i0,427,00) 0,00 IBUD1920671003593 03/28107 60 0,566.00 i&544''vg 0.00 1 BUD1020771003697 06107107 60 6,56600 (81508'100'), 0.00 4KNTT24368LI60414 09/1BI07 96 32,74100 )u,%'ws. W0 %27410 1 BUD1820X81004005 02/O6/OB 60 0,051.00 (0,30r00 000 18UD1820381004007 02/05/08 60 8,85100 [S,W'o00 0.00 1BUDI 020181004006 02/05108 60 0,05100 (0„8r5�6'Ooq 0.00 1BUD1620971003698 06/07/07 60 8,65800 (8,586'00) 0.00 1BUD1620581004008 02/09108 60 0,051.00 (a 8611,00) 0.00 4KNT'72432BL161911 04/02/00 120 32,741.00 y7',9;4afO'W) 3,274.10 IBUD182OX91005320 OW02109 60 9,095 OD (9,005.00) 0,00 1TKCO26225BO61678 03116/09 36 10,600..00 tq'$4000) 1,060,00 1BUD1620891005316 03/02109 60 0,095,00 (9,005,00) 0..00 1BUD1820691005316 03/02/09 60 9,095,00 (9,095.00) 0.00 1TKU020245MO42100 03/16109 36 4,66000 (4,660,00) 0.00 1BUDIS20391006319 03/02/09 60 9,095.00 (9,095. 00) 0.00 ITKU020265MO42101 03/16109 36 1,060,00 (954.00) IWOO IBUD1820191005316 03102/09 60 9,09600 (9,095,00) 0.00 ITKG025265BD61674 03116109 36 7,730,00 (6,967.00) 773,00 1TKCO25205BO61677 03/16/09 36 7,91000 (7,1%00) 791.00 4KNT'72,4U00161912 04102/08 120 32,741,00 (20,466,90) 3,27410 1TKCO26275BO61675 03116109 36 7,73000 (6,95700) 773.00 1BOTN242OY1175917 03M6109 12 1,000.00 (964.00) 10600 4ZECF2028W1122760 03/16/09 12 2,120,00 (2,12000) 0.00 ITKCO25295BO61676 03M8109 36 4,980.00 (4,980,00) 000 ITKU020205MO42102 03116109 36 7,37000 (7,370.00) 0.00 IBUD102OX91005317 03JO2109 60 9,095.00 (9,095.00) 0.00 4KNTT242XAL160650 04/19/10 96 15,565,04 (14,00864) 1,55650 IBUD102OXA1005620 05/29/10 60 9,62TS6 (9,627,86) 0.00 IBUDIS201AIC05596 04/22/10 60 %537.88 (9,537.88) 0.00 1 BUD182OXA1005627 06/29/10 60 9537,68 (9,537,68) 0.00 6FTEE2123G2000467 05102/16 36 % Igo 50 (8,51700) 66150 SFTEE1816GI000508 06/02/15 36 e246..90 (4,85OA4) 360.70 5FTEE242OG200046B 05102/15 36 9,940,96 (9,211.06) 737,12 5FTEE1812GI000537 05/02/15 36 6,246,90 (4,65814) 388,76 TRAILER TOOL VAN 1GHCB1017PHOIB083 04/23199 60 2,00239 (2,00139) 0.00 5NHUVH4204NO38749 03/31/05 36 1,590,00 (1,590,00) 0.00 16HG82028WHO44061 03131/05 36 53000 (530,00) 000 4PL50OF24T1003124 03/31/05 36 1,325,00 (1,325 00) 0.00 1JJV482VOLLIM79 03/04105 60 4JXOO (4,77000) 000 4X4TCCV203NO32867 03131/05 36 L855A0 (1,86600) 0.00 ICE04714810952294 03/31/05 36 1,192.60 (1,192.60) 000 SHCKC14285EU04370 03/31105 38 530,00 (530.00} 0.00 4X4TSE417YNO14655 03/31105 36 1,192.50 (1,192.50) O00 1H2VO281XEHO40617 03I31/05 36 331,78 (33116) 0.00 4X4TSEV22YNO10388 03131105 36 1,590,00 (1,590.00) 000 4X48ET291N021607 03131/05 36 1,524,28 (1,624.28) 000 SNHUCC6296NO47W 04/28106 64 4,943,84 (4,94384) 000 5DT2llG2991065661 03/21/08 60 4,194,12 (4,194.12) 0,00 5Dr21101091065906 04/27108 60 2,450.30 (2,460.30) 000 1 PF02BAHIH9009481 04/15/09 60 9,075,48 (6,075,48) 000 400TE10117AO90234 04101109 60 530.00 (630.00) 0,00 TRAILER DUMP PUP 5MADS20543COOGOOB 01/29/08 00 31,80000 (26,620,00) 3,160.00 6MADS20696CO08562 01/29108 00 26,50000 (23,850.00) 2,660,00 TRAILER LOWBOY 4OFSKS13021021594 04116/07 36 17,622.22 (1104814) 5,67408 40FSK613241023947 03/19109 24 17,022,22 (1 L669,32) 5,352,90 40FW04820RI011219 07M5196 96 6,249.49 (5,624,54) 624.95 40FW04821VI015970 04/10197 96 37,66755 (33,900,79) 3,766.76 40FW048221`1014422 05/01/01 30 15,137,14 (11,633,14) 3,604,00 40FW14023V1015971 04/10197 96 37,667.55 (33,900.79) 3,766,76 40FW05131S10,2684 05/10/95 96 49,2X98 (48,458.76) 776.22 40FW05133TIO14423 05/01/01 30 18,29876 (13,082.76) 4,316,00 40FW05135SI012686 05119/95 96 10,296,02 (9,266.42) 1,02960 40FW0513511014587 05/01101 30 10,298,76 (1302.76) 4,31600 46FW6S136T1614420 05/01/01 30 21,211.01 (16,161..01) 5,050.00 40FWK4129HI007124 05128/87 96 40,416,56 (36,374.02) 4,041.56 40FWK6433MI009374 04122/01 06 62,180.35 (46,962.31) 6,218,04 1DAR4D93X1M015566 03/31/05 60 27,56000 (24,604,00) 2,766,00 I rKA04820 FMO66009 03/31/05 36 12,190.00 (10,971,00) 1,219.00 'BO+,NX(J8' 5Er1111ibM 03131I10 24 16,411,55 01,46B65) 4,943,00 '4h'°?.430217A2..^Ak'S 1.'pb 178 04/01I09 36 24,012,49 (24,012.41) 0,00 21773 0410"0. 48 19,060,00 (17,17200) 1,90800 I FK,10533OGM078250 00104/16 96 82,607.73 (24,70240) 67,825,33 40F80564561028654 09/01/15 48 44,620.00 (25,67T25) 18,64Z75 1TKJO5334GM078249 00104/15 96 82,607.73 (24,782AO) 5T825.33 TRAILER 8 AXLE d14;9[.B4d80,d1O6tl01.8 06101/89 96 84,24000 (76A%AO) 0,424.00 '1R'OL.)S440QJI%tO11 05101/89 96 0,00 0-00 0.00 1ROLS4480P50S1044 06/01/97 48 %404A5 (0.22) 8,40423 1ROLB44BOR1051046 01/25199 36 40,53981 (33,924.81) 6,615,00 1R9LB448OR10S1192 02MG100 36 47,216.19 (30,674,89) 10,541,30 1501„634401R10'51119 08124199 36 37,10000 (27,10000) 10,00000 1R9LB4481 S1051014 06/01/01 24 25,50324 (17,538.24) 8,04600 1R9LB4482P1051045 05/01197 49 10,143.45 (033) 10,14312 1R9LB4482R1051047 05/01/97 48 26,373.32 (15,373.32) 19,=00 1R91-B4463S1051015 06101/01 24 25,50324 (17,638,24) S,M4 00 1R9LB4484P7051046 03/01197 48 0,362,97 (0,22) 8,362.75 1R9LB44S5R1051186 02110100 30 47,216,20 (36,674.90) 10.641,30 1ROLB446SS1051Ole 05/01/01 24 25,583,24 (17,538.24) O'w 00 i R9L64466J1061024 05101/09 96 84,240,00 (76,816,00) 8.424,00 1R9LB4486L1051026 04105014 98 19,760,00 (17,76400) 1,976.00 1R9LB4466R10S1116 06124199 36 37,100,00 (27,100.00) 10,000,00 IROL0440GS1051011 05/01101 24 25,583,24 (17,63824) 8,04600 l R9LB4487N1061068 07/06192 96 108,107,50 (97,296,76) 10.810.75 1R9L64407N1051071 07/18I92 96 108,107.60 (97296.75) 10,010JS l R9LB4487R1051044 05/01107 48 26'766.62 (16:76662) 11,000,00 1R9LB4467R1051173 06124199 36 37,100.00 (77,100,00) 10,000.00 1R9LB4487R1051187 02116100 36 47,2%20 (36,674,90) 10,541.30 1ROLB4487R1051190 02/16/00 36 4:7,216,19 (36,674A9) 10,541,30 Rieth-Riley Construction Co, Inc. Equipment List 313112018 INDIANA TRAILER PULL TYPE 407 ITKCO2624FRO47496 05/02115 96 000 000 0.00 17,922,66 1 RAILFA PULL TYPE 2w ITKCO2624FRO47496 05/02115 96 211215 10 (7,805 16) 15,320.94 000 TRAILER LOWBOY GOOSENECK 30T 4WC044361016878 04/12J17 96 43,69a 67 (4,91604) 38,782.53 000 TRAILER FORM NON TILT 10UD1820931006107 07/03/11 60 14,87621 (14.876.21) 0.00 000 TRAILER FLATBED 30'TIA 1R9GD30297M356516 11/15/17 60 16,40880 (3,281 76) 13127.04 000 TRAILER UTILITY 12 4ZESA121 6G1092580 05113116 60 coo 000 0.00 000 TRAILER TILT 18' 4P5TJ1823JI274350 03/27117 60 000 000 0.00 0100 TRAILER LAB 24 X 004 W so 1ol.1653 00 0013V4) K13D 40 Dal .4 -a---- a TlfRoT 4UI rcuw iaRli 90 0J)o 01W 0,00TWA] Mo _RS TR-UTWTl-XilIHCV WiRR�k-fMMAV �fuz& - - -------- ------- OUAR --- - -------.................... -1--- "?;, . Goa . ... O'Do 0100 4,207NC5 IHTSCABNBVH402570 05101101 00 17,90241 (13,94241) 3,96000 3,96000 3BKMHD7XXVVF789519 12102102 24 20,84042 (15,30342) 5,53700 5,53700 TRUCK FORM 2NKMHD7X07M164476 03115110 36 17,33271 (11,93271) 5,40000 5,40000 2NKMHN7X38M214293 06103/12 24 31,99696 (213,797 26) 3,19970 3,19970 TRUCK DUMP ARTICULATED T4RO1407 12115117 42 190,97080 (16,18768) 172,78312 000 T4RO1410 12115117 42 195,165,95 (18,587,24) 176,57871 000 T4RO1409 12115/17 44 190,97081 (17,361,00) 173,60981 000 TV00485 03114/17 96 000 000 000 000 3196 07101/16 72 250,00000 (68,75000) 181,25000 218,750,00 3226 07101116 72 350,00000 (96,25000) 253,75000 306,25000 A11904 07101116 12 125,00000 (112,500,00) 12,50000 31,25000 W00486 03/14/17 96 000 0,00 000 000 TRUCK TRACTOR TANDEM SXKDDD9X15JG72560 03/19109 24 29,12816 (19,960,36) 9,15980 9,15980 iXKDD69X83J397476 04/01/03 96 89,897,66 (80,907,89) 8,98977 8,98977 IXKDDSOX35JI08116 03/31/10 24 31,22728 (21,407,213) 9,82000 9,820,00 2H8FBGST5HC085823 03/31/05 24 3,31250 (2,981,25) 33125 331.25 1XKDDB0X15J108116 0351/10 24 31,22728 (21,407,28) 9,82000 9,82000 1XKDD89X71J879515 03101/06 84 23,44391 (15,62927) 7,814.64 7,81464 1XKD0D0X36Jl08ll7 03131/10 24 28,85052 (19,86252) 3,988 00 8,98800 1XKDDD0X25J106454 OW31/10 24 31,227.28 (21,40728) 9,1320 00 9,82000 IXKDDBOX05J106453 03/31110 24 31,22728 (21,407.28) 9,1320 00 9,82000 2HSFHBJTXNCO586BI 04101/06 36 13,70000 (12,40200) 1,37800 1,378,00 1XKDD60X62J897915 04101/06 60 71,65000 (64,395 00) 7,15500 7,15500 1XKDD60X9PJ613605 04/01106 36 22,79000 (20,611,00) 2,27900 2,279,00 1XKDD60X12J884179 04/01JO6 60 71,19000 (64,071 00) 7,11900 7,11900 1XKDD60X21J882147 04101106 48 63,600,00 (57,24000) 6,36000 6,36000 1XKDDBQX38J214716 04;01113 24 22,97868 (20,6130 81) 2,29787 2,29787 2HSFDGSR7HC001781 04/01106 24 6,83000 (5,24700) 683,00 68300 1XPAD40XX4DB09865 01129108 48 57,24000 (51,516.00) 5,72400 5,724,00 lXKDD60X79J23B650 02105M3 30 -A,862 63 (31,37628) 3,48625 3,486,26 lXKDDB9X2MJ561340 03116109 12 8,480,00 (7,63200) 84600 84800 1 A2AD62YBXW008929 03116109 12 6,480 00 (7,63200) 84800 84800 1XKDD40X3GJ309149 0310`1/16 36 46,41276 (29,00600) 17,40476 31,32860 3HSJKTKT2GN210602 04126/16 96 155,32940 (34,94904) 120,38036 137,864 80 3HSJKTKT4GN210603 04/26/16 96 155,32940 (34,94904) 120,38036 137,864 88 TRUCK MECHANIC 5PVNJ8JV5D4S553B2 04101/13 72 000 000 000 000 12115117 18 413,2713 98 (10,72868) 37,55030 000 5PVNJaJV6D4S56536 12115/17 18 46,27898 (10,72668) 37,65030 000 5PVIQ8JV1 D4S55468 12/15/17 18 48,27898 (10,726.66) 37,65030 000 5PVNJ6JG5G4S5O088 08/24115 72 000 000 000 000 TRUCK PICKUP 314 TON 1000C24R7WZ237521 07102/01 18 000 000 000 1,736,00 1GCGC24UO3Z236436 02103/03 4H 000 000 000 2,123,38 1GCGC24U22Z263334 02/20102 48 000 0 OD 000 2,010,50 1GCGC24U23Z236244 02104103 4B 0,00 000 000 2,12338 lGCGC24L163Z235131 02104/03 48 000 000 000 2,12338 1GCG024U72Z253667 02/25102 48 000 000 000 2,010,50 1GCG024U73Z236448 02/03103 48 21,233,80 (19,11042) 2,12336 2,12338 1GCOC24U73Z236496 02/03103 48 000 000 000 2,12338 1000C24U73Z238605 02103103 Q 000 000 000 2,12338 IGCGC24UX32237755 02103103 4B 000 0,00 000 2,12338 lGCHC24U04E249345 02101107 12 000 000 000 2,02400 1GCHC24U14E246773 02101107 12 0,00 000 Goo 2,02400 1GGHC24U14E246499 02101107 12 0,00 000 000 2,02400 1GCHC24U34E249016 02101107 12 0,00 000 000 2,02400 1GCHC24U44E246576 02101/07 12 000 000 000 2,02400 1GCHC24U44E246996 02101107 12 000 000 000 2,02400 1GCHG24U54E246604 02101/07 12 000 000 000 2,02400 1GCHG24L)64E248605 02101/07 12 000 000 000 2,02400 1GCHG24U74E247608 02101/07 12 000 000 000 2,02400 1GCHC24U05E236046 02/18/08 12 000 000 000 2,086,00 1GCHC241J05E235446 02118/08 12 000 000 000 2,08600 1GCHC241J45E235918 02/18/08 12 6,63275 (4,54675) 2,086,00 2,006,00 1GCIIC24IJ25E232655 02/18108 12 000 000 000 2,08600 lGCHC241J55E233739 02/18108 12 0 OD 000 0,00 000 1GCIIC24IJ75E236562 02/10108 12 000 000 000 2,00600 lCCHC241JX5E234711 02118100 12 0,00 000 000 2,00600 lGCHG241J45E235451 02118108 12 000 000 000 2,6B6 00 1GCHC24U05F233325 02/18100 12 0,00 000 000 2,08600 IGCHC24U75L234357 02118100 12 0,00 000 0,00 2,06600 1GCHC24U55E236606 02118108 12 000 000 000 2,06600 1GGHC24U24E363368 07107104 48 000 000 000 2,16520 1GCHC24U15E236332 02118/08 12 000 000 000 2,08600 1GCHC24UX5E287070 04129/08 24 7,79159 (5,341 59) 2,45000 2,45000 IGCI iC29Ul6E212283 12111/08 12 000 000 000 000 1GCHC24U66E20B611 12/11108 12 0,00 000 000 1,83E 50 1rCHC24U46E215041 12/11/08 12 6,69921 (4,&53 21) 1,B46 00 1,04600 lGCHC24UB6E20B206 12/11/08 12 000 000 000 1,83650 IGCHC24L176E214983 12/11/08 12 6,69921 (4,85321) 1,846,00 1,84600 1GGHC241JX6E215559 12/11/08 12 6,69921 (4,a53 21) 1,84600 1,846,00 lGCHC24U16E214459 12111/08 12 6,69921 (4,85321) 1,1546,00 1,64600 lGCHC24L126E2079B7 12111108 12 6,67236 (4,83385) 1,B3B,50 1,83650 1GGHC24UIBE 206399 12/11/08 12 000 000 000 1,83650 1GCHC24U76E214403 12/11108 12 6,69921 (4,85321) 1,846,00 1,84600 lGGHC241J66E208348 12/11108 12 000 000 000 1,83850 1GCHC24IJ06E215392 12111108 12 6,69921 (4,66321) 1,846,00 1,84600 10CHC24IJ05E285991 04129108 24 000 000 000 2,45000 1(3CHC24U86E208027 12111100 12 6,735 30 (4,096 80) 1,1338 50 1,83850 10CHC241-117E105582 02101/10 12 6,22740 (4,28740) 1,940.00 1,940-00 1GCHC24U27El 99374 02101110 12 6,16920 (4,22920) 1,94000 1,94000 Page 21 of 27 P v , 101 Rieth-Riley Construction Co., Inc. Equipment List 3/3112018 INDIANA 04101/17 48 n,846 01 (0,96532) 30,08069 3C6LR4AT3FfG620049 02110M7 48 000 000 000 04101117 48 39,046,01 (8,96532) 30,080,69 3C6LR4AT6HG616332 021101117 48 000 000 0,00 04101117 48 39,846.01 (8,96532) 30,880,69 3C6LR4AT4HG620044 02/10/17 48 0.00 Q= 000 04101/17 48 39,046.01 (8,965,32) 30.80060 3C6LR4ATXHG611705 02/10/17 48 0,00 000 000 04/01117 48 39,473,62 (0,081 66) 30.59206 3C6LR4AT0HG616326 02/10/17 48 000 000 000 04/01117 48 39,84&01 (0'9e532) 30.60069 3C6LR4AT7HG620040 02/10117 40 0.00 000 000 04/01/17 46 39,846,01 (8,96632) 30,68069 3C6LR4AT2FiG620057 02/10117 46 000 000 0X0 04101MI 48 39,47362 (8,001 56) 30,592,06 3C6LR4AT1HG620051 02110117 48 0X0 0100 0,00 04/01117 46 39,a46.01 (8.06632) 30.08069 3C6LR4Xr7FiG620064 02110/17 48 0,00 000 000 0410111T 48 39,64601 (8,96532) 30,88069 3C6LR4ArXHG620050 02110117 48 000 0,00 Goo 04101117 46 39,M 01 (8,96532) 30,6ft69 3COLIR4AT6HG620059 02110117 40 0,00 000 0X0 04101117 40 39.47362 (9,881 56) 3%592.00 3C6LR4AT9FiG620041 02110117 46 coo 000 000 04101117 40 39.04601 (8,965,32) 30,88069 3COL134AT2HO61 1701 02MOM7 48 0,00 000 000 04/01/17 48 30'w01 (8,965,32) 30,80069 3C6LR4ArXHG616334 02110/17 48 MOO 000 000 04/01M7 48 39,47362 (8.881,56) 30,592 08 3C6LR4AT0HG820042 02/10117 40 000 000 0,00 04101/17 40 39,84601 (8X5 32) 30,680.69 3C6LR4AT6HG620046 02MO117 48 000 000 0 OD 04101/17 48 39,046.01 (6,96532) 30,88069 3C6LR4AT6HG611703 02MO/17 40 0,00 0,00 000 04101/17 48 39,473.62 (8.881 Be) 30,59206 3C6LR4AT8HG620046 02110/17 40 0100 0,00 0,00 04101117 40 39,64601 (8,96532) 30,860w 3C6LR4AT4I-G616328 02110/17 48 0,00 0,00 0,00 04101/17 48 39.M 01 (6,96532) 30,86069 3C6LR4AT4H0620058 02110/17 48 0X0 000 0,00 04/01117 40 39.47362 (8,86t56) 30,59206 3C6LR4AT8HG616333 02/10/17 40 000 0,00 000 04101117 40 39'w01 (8,96532) 3000 69 3C6LR4AT0HG620056 02110/17 40 0.00 000 000 04101117 40 39,473.62 (8.881 66) 30.59206 3C6LR4A74HG615331 02MO/17 40 0.00 000 000 04101/17 48 39.848.01 (0,96532) 30,86069 3C6LR4AT4HG620092 02110/17 48 0.00 000 000 04101117 40 39.473.62 (&88150) 30,59206 3C6LR4AT2HG616330 02/10/17 48 0.00 000 000 04/01/17 48 39,0,46,01 (8,965 32) 30,86069 3C6LR4AT1HG615336 02MO/17 48 0.00 000 000 04101/17 48 39,473.62 (886156) 30,59206 TRUCK TRACTOR DUMP 1XKDDUOX04JO70048 03115104 go 77.633.36 (69,07039) 8,56297 1XKDDU9X16J107397 03MB110 24 25,200.40 (16,86360) 8,42680 1XKD0U6X98J213701 04101/13 24 18,366.40 (16,52076) 1,83564 1XKD0U8X78J213760 04101/13 24 10,356A0 (18,52070) 1,63564 1XK0DU8X09J238852 02106/13 30 29,627,51 (26,57476) 2,95275 1XKDDU8X99J236651 02106113 30 31,542.60 (28,38834) 3,154.26 1XKDDU8X29J238653 02106/13 30 27.695.80 (24,83622) 2,76958 IXKDDUUXOAJ261471 09130/13 42 33.173.92 (29,05653) 3,31739 lXKDDUaX18J279214 03112/10 36 20,191.90 (20,19190) 0100 1XK.W.38J279205 03112/10 3620'191,90 (26,19190) 000 TRUCK DISTRIBUTOR SINGLE 1FDXF60CITVA2.5255 06101/01 30 33,02023 (26,04923) 6,971,00 1FDXF60C2TVA28326 09/03/97 96 33,031.00 (29,72700) 3,30310 1 FDXF&)C3TVA2.5266 06101/01 30 3%333.94 (20,36294) 6,971 00 I FDXFBUCSTVA26267 11/0111, 30 33020.23 (26,04923) 0,971.00 1 FDXF80CMA?6260 051011.1 30 33:333.94 (2636294) 6,971 00 IFDXF80C6TVA2.6252 06/01/01 30 33,020.23 (26,04923) 6,971.00 1FDXF80C7FVA2,52,50 0 :111011;'011 30 33020,23 (26,04923) 6„971 00 IFDXF80C8TVA2.,5253 30 83,333.94 6,97100 1FDXF80C9WVA37674 0511"" 96 8�0(20,.362.94) 81,090.00 7g8l,00) 8,10900 IFDXFBOCXWA25254 0110110, 3 0 33,020,23 (2604923) 6,971X0 IFDXFBOCXVWA38063 07102/01 40 4117961 (3352961) 7,650,00 IFDXK74 C6pVA08411 0711:/g: go 5 Is 1.94 (4� 63675) 516,10 IFV6HFAA61HF21439 0413 10 36 27.379.80 (2T379 80) 0,00 1FV6H FAAOYFi F21 418 02101/05 24 31,361.44 (22,66144) 8'500.00 IFV6HFAA8XHA52086 02109 24 21,200.00 (13,10000) 8,100.00 a 2NKMHD7X82M 99�61 0 1;04 60 66,250,00 (59,62500) 6,625.00 IHTWAAAN45JI6820 .411111: 3/1 6'. 60 63600'00 (57,24000) 0,360.00 IFV6HFAA?.XHA75850 03116109 12 10,600,00 (9,540.00} 1,060.00 M7 2NKHHN7X88M27l 03/25110 36 44,375.36 (44,37636) 0.00 1FVABTBVX3HH31704 03/1610 24 91,600,00 (28,62000) 3j80.00 2NKHHN7X9CM309063 03101/10 36 55,043.93 (34,777,60) 20,866.43 il-ITIAMIANWHH74,9619 05124/16 96 0.00 000 0,00 TRUCK WATER/FUELT/A INKDLUGXOXJ023470 02/16/04 24 20,029.94 (11,929 94) 6,100.00 3BKMLDGXBXF823342 02/09164 24 16,000.00 (951300) 6,36TOO 1 NKDLU '28J214802 04101113 24 27,076.16 (25,17763) 2,797.62 9X 1 NKDLU9y79J238773 02105/13 36 2%723.76 (26,76140) 2,972.38 1NKDLU9X3AJ261472 09MOR3 42 51,500.80 (46,36702) 6,150AS 1MK0LP9X7CJ309124 03/01116 36 66,900.54 (41,81275) 25,007.79 1NKDLP0X9CJ309126 03/01116 36 66X0.64 (41,81275) 26,087,79 1 NKZLPCX3jj791041 06104117 go 23Z729.74 (21,81840) 210,911.34 I N _ LP0X5JJI9I042 K7 06104/17 96 232,72974 (21,81840) 210,911.34 N _ I LPGX7jJ1 K7 91 043 OW04/17 go 234,702X3 (22,00330) 212,696.73 TRUCK DUMP TANDEM IFDYW86EXVVVA106a4 04101100 76 55,800,00 (60,60000) 6,000.00 1FDZY82E38VA06089 04101/00 36 0.00 000 0,00 1 NKM LDGXOX8823461 02/09/04 24 22,396.76 (16,11985) 7,27COO 1 NKMLDOMS823450 02/09104 24 22.373.42 (16,20852) 7.164,90 3BKMLD9XlWF789517 07102/01 48 42,770.47 (35, B74 47) 6,896.00 1HTSFIZ7R1MH301638 03/31105 24 7,089,28 (638035) 708.93 MIME= 0 1, A " Rieth-Riley Construction Co., Inc. Equipment List W311201 8 INDIANA 1GCHK29K38El82403 02102/11 12 9,63482 (6,671 34) 963,48 IFT7X2B67BEC96826 06122111 14 10,85937 (10,a5g 37) 000 I FT7X21361BEC96823 06/22111 14 10,51361 (10,51361) 000 I FT7X21365BEC961325 06122111 14 10,65937 (W,859 37) 000 3C6TR5HT1EG134735 05122J17 48 13,39257 (2,76221) 10,63036 3c6 rR5HT4FG664659 12115117 18 113,2613 76 (4,05972) 14,20904 3c6rR5HT0FG664B60 12115/17 la 18,1346 61 (4,18812) 14,650,49 3c6 -R5HT8FGG67960 12115117 18 16,B46 61 (4,18812) 14,65B 49 TRUCK TRACTOR LEAD & PUP 1XPAD40XOGN667254 01129108 72 93,81000 (84,42900) 9,3Bl 00 TRUCK 15 TON UTILITY 02110/17 48 000 000 0,00 3C7WRKSL1EG167363 12128/13 48 44,91002 (44,91002) 000 3C7WRKBL3EG177215 07117117 12 19,08313 (12,801,16) 6,201,97 3C7WRKBL2EG237873 07/17117 12 19,03915 (12,851..46) 6,18769 3C7WRKBL5EG177216 07/18117 12 19,08313 (12,881,16) 6,201,97 3C7WRKBL9EG237868 07/17117 12 17,75933 (11,98755) 6,771 76 3C7WRKBL9FG706426 12115117 18 23,66876 (5,30416) 18,564,60 3G7WRKBL2FG707725 12115117 18 24,20449 (5,37B 76) 18,825,73 3C7WRKBL4FG707693 12115117 18 24,20449 (5,37B 76) 18,82573 3C7WRKBL5FG706424 12115/17 18 24,20449 (5,37B 76) 18,825,73 3C7WRKBL2FG706428 12/15117 18 23,97028 (5,32852) 18,64976 3C7WRKBL2FG707692 12115/17 18 25,351 B9 (5,63376) 19,718,13 3C7WRKBL7FG706425 12115117 18 23,86076 (5,104,16) 18,564 60 3C7WRKBLOF0706427 12115117 18 24,20449 (5,37876) 18,825,73 3C7WRKBLOFG707691 12115117 18 25,351 90 (5,63376) 19,718 14 3G7WRKBL4FG706429 12115/17 18 25,17445 (5,59432) 19,580,13 3G7WRKBL7FG706456 12116/17 18 25,17446 (6,59432) 19,500 13 3C7WRKBL3FG706423 12115117 18 24,57525 (5,461 16) 19,114,09 3C7WRKBL9HG6540I0 06101117 48 60,071 94 (12.38985) 47,682,09 3C7WRKBLXI-IG654016 04120117 48 69,51052 (13,38984) 46,12068 3C7WRKBL9I-IG654007 05104117 48 60,071 94 (12,38965) 47,68209 3CTWRKBL5HG654005 04120117 48 60,071 94 (13,51620) 46,55574 3CTWRKBLlHG654003 04120117 48 60,071 94 (13,51620) 46,55574 3C7WRKBL2HG654009 04120117 48 60,071 94 (13,51620) 46,66574 3C7WRKBL4HG654013 06101117 48 60,071,94 (12.38985) 47,68209 307WRKBLOFiC654008 06101/17 48 60,071 94 (12.38985) 47,68209 3C7WRKBL2I-IG654012 06101117 48 60,071 94 (12,389 B5) 47,68209 307WIRKSI711G654006 06101117 48 60,071 94 (12,38965) 47,68209 3C7WRKBL6HG654014 04120117 48 60,071 94 (13,51620) 46,65574 3C7WRKBL6HG663999 06101117 48 60,071 94 (12.36963) 47,682,31 3C7WRKBL3HG654004 06101117 48 60,071 94 (12.38985) 47,68209 3C7VVRKBI.8HG654015 06101117 48 60,071 94 (12,38965) 47,68209 3G7WRKBLGHG654000 04120117 48 60,071 94 (13,616 20) 46,55574 3C7WRKBL6HG654001 05104117 48 60,071 94 (12.38985) 47,68209 3C7WRKBL0FIG654011 04120117 48 60,071 94 (13,51620) 46,65574 3C7WRKBLXFIG654002 04/20/17 48 60,071 94 (13,51620) 46,655,74 TRUCK DUMP TRIAXLE INKDXTOX21JB67972 02101/05 24 40,90891 (29,768 91) 11,14000 INKDXTOX41JB67973 02101105 24 40,90891 (29,76691) 11,140,00 INKDXTOX61J067974 02101105 24 40,90891 (29,76891) 11,14000 1FDYU62E2RVA47066 04101106 36 26,50000 (23,86000) 2,650,00 INKDXUEX88J214717 04101113 24 26,89600 (24,20640) 2,68q 60 1NKZX4TX9GJ488175 08/29/15 96 167,25000 (60,175 04) 117,074,96 1NKZXPTX6GJ493903 00/29/15 96 167,40000 (60,220 16) 117,17984 INKZXPTXOGJ493900 00129115 96 167,55000 (50,26496) 117,2135,04 I NKDXP FX3GJ493853 08129/15 96 167,50000 (50,24992) 117,250 OB 1NKZXPTX9GJ104025 08/29/16 96 164,60000 (49,38016) 115,21984 1NKZXPTX8GJ493899 08129/15 96 167,76200 (50,32864) 117,43336 3EJKDXPTX5GF104015 08/29/15 96 168,150.00 (50,446 12) 117,70488 1NKDXPTX5GJ493854 08/29/15 96 167,90000 (50,36992) 117,53008 3iTJGTK50GN226567 03/14117 96 000 000 000 3I-ITJGTKT9HN693424 03122/17 96 000 000 000 04101117 96 163,531 64 (18,397,32) 145,13432 SH FJG FKT2HN694964 03/22117 96 000 000 000 04/01/17 96 163,531 64 (18,39732) 145,13432 1HTJGTKTODJ145678 04/26/16 60 120,54B 40 (32,548 14) 88,00026 3HTJGTKTOON226567 04/01/17 84 105,51360 (13,56600) 91,947,60 TRUCK WATER FIFTH WHEEL 1XKDDB9XITJ727927 02/16/00 36 39,46026 (32.09926) 7,381 00 1XKDDB9X3TJ729`I62 02/16/00 36 39,46026 (32,09926) 7,381 00 1XKDDB9X6TJ729163 05/01/01 30 26,70589 (20,25089) 6,455,00 1XKDDB9X8TJ726506 05/0`1/01 30 26,705 89 (20,25089) 6,455 00 1XKDDBOX24J070005 03/16/04 96 96,05B 95 (87,57395) 10,495,00 1XKDDU9X3WR769525 06/03/02 36 32,681 78 (25,73270) 7,14900 IXKDDU9X3XJ823480 02116/04 24 20,028 70 (10,59710) 9,431,60 lXKDDU9X5WR789526 06/03102 36 32,881 78 (25,732 713) 7,14900 lXKDDU9X7VVR789527 06/03102 36 32,881 78 (32,981 7B) 0,00 2HSFMATRBVC0IB493 05/01/01 30 21,98977 (16,02077) 5,96900 4VlJDBBF6SR840474 05/01/95 96 83,75B 34 (75,38295) 8,375,89 1XKDPBFXX6J129983 03/15/10 24 30,701,41 (21,04741) 9,65400 1XKDPOEXX13J279263 03/01/10 36 35,042 65 (35,04265) 000 TRUCK FLATBED DUMP IHTSCABN2VH402676 07/15/96 72 8,96349 (8,06714) B96 35 1HTSCABN2VH443177 08/02/99 96 31,62366 (213,223 66) 3,600,00 1HTSCABN6VH4Q2674 06101/01 30 16,73533 (12,751 33) 3,98400 1HTSCABN5VH4322B5 05101/01 30 18,011 62 (14,02762) 3,9114,00 1HTSCABN7VH402575 05/01/01 30 16,73533 (12,75133) 3,98400 1HTSCABN9VH402576 05/01/01 30 16,73533 (12,751 33) 3,984,00 3BKMHD7X0XF8282BI 02/09/04 24 17,911 80 (11,94090) 5,97090 3BKMHD7X9XF823340 02109104 24 15,900 00 (9,929,10) 5,97090 2NKMHVX64M064360 06/21/04 72 59,855.02 (53,66962) 5,98550 2NKMHD7X75MlQ3.591 OW31110 24 19,636 le (13,775 18) 5,861 00 2NKMHZ7X15MG90592 OW31110 24 18,56604 (13,025 04) 5,541 00 2NKMHN7X98M214296 06/03/12 24 23,93672 (21,54485) 2,39387 2NKMHD7X42M899132 04/01/06 60 68,90000 (62,010 OD) 8'89000 2NKMHN7X58M214294 06/03/12 24 21114 11 (21,748,10) 2:'Il 4 2NKMHN7X78M214295 06/03/12 24 24,164,562 1' 748 0 2,416.46 2NKHHN7X4AM261467 09f30113 18 94,VU 14 (30,73783) 3,415,31 2NKHI IN7X6BM279261 03125/10 36 31,722 83 (31,722,83) 000 TRUCKWATEPIFUEL 1HTSDNHR6MH307518 03131/05 36 11,925 00 (10,73250) 1,19260 1HTSDAAR9XH603947 03t3l/05 72 27,825,00 (25,04250) 2.79250 IHTSDAAROVH495764 03131/05 72 19,875 00 (17,687,60) 1,98750 IHTSDAAR2SH210020 OW31105 60 000 000 000 1H rSDAAR4TH417999 03131/05 60 16,56250 (14,90625) 1,65625 1HTSDAAR8SH252456 03131/05 60 15,90000 (14,31000) 1,590,00 P.g. 25 of 27 Rieth-Riley Construction Co., Inc. Equipment List 3131/2018 INDIANA 1NKBLJ9X9JR191046 06104117 96 215,51016 (20,20410) 195,30606 0,00 TRUCK TRACTOR TIA 1XKZDPDX6JJ191044 05MR117 96 160,60854 (16,56281) 144,04573 000 TRUCK HYDROVAC 3HTJLTKT7GN743909 02101118 96 360,02660 (10.125,0 349,90008 0,00 TRUCK FLATBED S/A 1HTSCABN5WH499664 06109197 72 42,694.54 (30,425,0 4,26945 000 rRUCK PICKUP V2 TOM WJPROP W,0JRE*08lJ G=99$ 0019010 4111 41 304.61 (IM4UM 110i14 TO POD =iq S'g64358A3 WELDERS "WELBER - - - - - ---- - ------------- 0- 4-45 �04 an 000 196WR02359 ON19196 60 2,47600 A 000 000 196WRO2360 03119/96 ED 2,47800 pxm'00) 00 000 000 196WRO2363 ovigms CIO 2,47800 (zimoo) 000 000 A1021515 04125/84 go 4,51000 OAW 0) 0100 000 AAW 46502 09/16/64 ED 84500 6671 6571 KF881775 05123195 60 8,47770 (S,477 70) 000 000 KG100832 09103MO Go 1,942.60 0"Ji2"O) 000 000 KJ071830 04123196 60 8,99971 (1#,1009'71) 0100 000 KK214709 10111M9 W 3,87829 0.00 000 5DLUVVIO12YE000434 04110101 W 4,45600 (4,4N00 0,00 000 LF191883 06103/05 60 3,51276 (3$12 1&5 0.00 000 LGO61660B 02110/00 0 2,41120 (2',411 20) 000 000 LF178020 06100105 69) 6,33661 (6,336,61) 000 000 -------- - - --- --- ---- - KI10210H ulms"o 1" 3 "ITT 000 000 - ---- --- -iw-aFHEw-wiA0Q 9-13AK 46.11 fflOENERS 1000,106.mm 00 NJU911w Fa'o.�� 1 O'� .-iLil alf';ODo 8070� 90 WIDENER RW100A 10026-33 12102104 36 72,00568 (72,00568) 0,00 000 WIDENER RW195 0866-013 04110160 96 000 000 0,00 000 19510-02 03131/05 46 31,25000 (28,12500) 3,125,00 3,125.00 WIDENER RW195C 19504-05 04109185 96 000 000 0,00 13,97610 WIDENER RW195D 19514-07 04128/93 96 131,03959 (117,935 63) 13,10396 13,10396 19523-01 07101/98 60 177,22600 (165,753 00) 21,473,00 21,47300 19527-02 07JO2101 48 10%609 12 (94,12712) 15,40200 16,40200 19627-63 04101106 96 17Z600 00 (155,250 00) 17,26000 17,25000 19527-49 11102110 96 32,52760 (30,15587) 2,371,63 6,43769 WIDENER SPD-0 344 12102112 24 20,82348 (18,077 36) 1,94612 1,94612 WIDENER W530 W530-1133 12115117 42 77,691,66 (T399 20) 70,29246 000 W530, 1 M 04126116 60 123,IB4 46 (64,055 94) 59,12851 90,647,55 --- ... .... WIDENER W530A W55OA-1200 I -6UR-j48R - - - - - ------------- - - - ----- --AM AOUli ... . .... -ltl'Llilk --- LIVW11-51' goo 000 0100 "A S4 Q CONVEYOR TRANSFER 06/17117 120 84,70968 000 04,709,68 0.00 LIGHTTOWER 2495PRO213 03/28118 60 000 0,00 000 0.00 COMPRESSOR 75 HP 04/01/16 60 000 0,00 000 22,279.96 DRUM DRYER 10 X 42 04/01/16 120 000 0100 0,00 206,078.66 DOZER W/RIPPER D6T XW TMY00283 03/13117 96 000 000 000 0.00 GENERATOR SET 125KW K980827675 03/01117 60 000 000 000 0.00 04/01117 60 2026307 (5,25264) 21,010,43 0,00 . . ............. ........ tgAh CR *A 12XV0 PORTARLE INK177 04021114 Wa 0�00 0an . . . . ........... 0 lyj . ............ .. . ..................... . ..... . ...... IoX2J5 106,720A 1 169'�Ss'la . ......... .... fikffi"XRQ" , 'jg,282,64� P.g. 27 of 27