Loading...
HomeMy WebLinkAboutChange Order No 1 - Gemini at Washington Colfax Apts Masonry and Stair Repair Div A Proj No 118-080B - Bokon Masonry Inc1316 COUNTY-CrrY BUILDING 227 W. JEFFERSON BOULEVARD SOirrH BEND. INDIANA 46601-1830 Ryan Bokon Bokon Masonry, Inc. 56571 Pear Road South Bend, IN 46619 � r ACE " x � 186 May 28, 2019 PHONE 574/235-9251 FAx 574/235-9171 RE: Change Order No. 1 - Gemini at Washington/Colfax Apartments Masonry and Stair Repairs, Division A — Project No. 118-080B Dear Mr. Bokon: The Board of Public Works, at its meeting held on May 28, 2019, approved the above referenced Change Order for an increase of $47,542 plus an additional fourteen (14) days, bringing the current contract amount to $237,713 and the revised project completion date to June 14, 2019. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely,. Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU DATE: PROJECT NO: PROJECT NAME: �FtiAY M ld JBpr a CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER , 5/28/2019 118-080B CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: The original contract sum Gemini at Washington -Colfax Apartments Masonry and Stair Repair Division A 10/23/2018 1 PCR #1-Repair Masonry Around Three Northernmost Stair Towers PCR #2-Re air Mason Around Southernmost Stair Tower Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time Ryan Bokon Printed Name and Title Bokon Mason , Inc. Company Name 56571 Pear Road Address South Bend, IN 46619 City, State, Zip $ 190,171.00 $ 0.00 $ 190,171.00 X Increased Decreased $ 47„542.00 $ 237,713.00 25.00 % 25.00 % 5/31 /2019 0 days 14 days 6/14/2019 RECOMMENDED FOR APERQVAL CONSTRUCTION MANAGER CITY OF SOUTH BEND BOARD OF roved Date PUBLIC WORKS A pp S.,)OCif Gary A. Gilot, President aGene'eveE. Mill r, Member Elizabeth A. Maradik, Member d eeJ. Dq auM o„ aS ullivan,Mnb 56571 Pear Rd. South Bend IN 46619 Name / Address City of South Bend Board of Public Works 1316 County -City Building 227 W. Jefferson Blvd. South Bend, IN 46601-1830 Description GEMINI APARTMENTS AT WASHINGTON / STAIR TOWER MASONRY REPAIRS. 4 Stair towers total, working from North to South, A, B, C, D. (Labor and Materials.)..._, .__ Stair Towers A, B, C I.) Plug holes where brick are missing where stair towers where attached to the building. 2 ) Tuck point the worst if the areas as needed, 3,) Using a man lift operating trom the empty lot next door to the east. 4.) All materials, Labor and man lift rental rc`a $154.00. per square foot. Approximately 137 SF. (Labor and Materials.).,_,,......,... Stair Tower D Separated On Its Own. ** This is separated out because of the extent of the damage on this area of the building. It is a whole different Animal oil its own_** 1 ) Take down the entire corner that has been badly deteriorated by the down spout from top of wall down to the top of footing Putting in temp supports for the windows that are set in the masonry wall, 2,) Using a forklift with a bucket attachment for disposal of debris and rubble in the lot east of the building 3 ) Rebuild entire corner with new brick to match the Chicago Commons as close as possible. 4 ) Repair areas of brick damaged where the steel stairs were connected to the building, 5 ) Replace one badly rusted steel lintel over tunnel at bottom of the stair tower Approximately 186 SF. () $141 88. SF (Labor and Materials) ... _ .. _, .. .. Looking Ibrward to doing business with you ME Estimate Date Estimate # 4/14/2014 465... Rate Total 21,152 00 I 21,15 2.00 26,390.00 I 26,390.00 ON'' 16 Y, DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING 118-080B ��e�at„a�r�un�� ��,,..aaa���„.�,, 1 Project Number: Project Name: Change Order #: DATE INITIATED:5-14-19 BPW DATE:5-28-19 Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Includes masonry repairs that were unforeseen. These locations were behind the existing stairwells and the extent of the repairs was unknown until the old stairs were removed. Repairs are needed prior to installing the new stairs. Attachments: (List documents support change — required) Quote from contractor ......_. ........ Amount ofBIncrease /❑Decrease: $47,542.00 Categories (Pick One): Previously approved Change Order(s): $ 0.00❑ Scope of Work — _...... ... 8 Differing Site Conditions, Changed Conditions Current Percent of Change: 25.00 ❑ Conflicted Specifications and Drawings ❑ Failed Materials New Total Amount: $, 237,713.00 ❑ Error IT ❑Omission Total Percent of Change: 25.00 ❑ Final Quantity Adjustment Funding Secured From: ... (filled out by PM) RECOMMENDED BY: Dan Jones Project Inspector (Print Name) (Signature) (Date) REVIEWED BY: Toy Villa . . . . . . ...... . . ................................ . . . . . . .......... . - _._. Construction Manager (Print Name) (Signature) (Date) APPROVED BY: Kyle Silveus Engineering Project Manager (Print Name) (Sign at ) (Date) APPROVED BY: Kara Boyles City Engineer (Print Name) (Smgn to e) (Date) INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Kyle Silveus SUBJECT: Change Order No. 1 DATE: May 24, 2019 reeror�am9 inmer��un..�rou. rr�uumeuuuu�momr ua�pi�r�m�w�uv�,�rcmrr�m umimawrc�u�nuumm�mr nu:ui. aus�rtar�fi�,r�a�i rrm✓r run+�u:�ui naerv�s�r eee��o uwnoGn.. iummmxnooxrnrmn.nrx mrvoinam�rmm.�v�mmawra�mx�wrwt��rp�ua�er�at sRr vrwv¢�awu��wvr� �nadWuio �tir�.mwsra�uim�nm�,� The apartments known as Gemini at Washington and Colfax are being renovated. Improvements include roof repair, fire stair replacement, and masonry repair. The project has encountered an unforeseen condition that were not reasonably foreseen during the design phase and is going beyond 20% of the contract value. It was not possible to know the condition of the masonry behind the existing fire stairs prior to their removal. The single Wythe of brick must support the new fire stairs and therefore must be repaired before the contractor can complete the stairway installation. Brick at the southernmost fire stair is in particularly poor condition. Limited repair is not appropriate for this stair. The other three stair shafts are in better condition such that repairs can be limited to just what is required to secure the new stairs. Safety is an issue as the stairways must be securely anchored to the building. Please call with your questions, BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 5/21/19 Department Public Works �._ .�.................. �.�...�� ............�� .......... w,,,........... �..................�.e. Division/Bureau Engineering Name ......Kyle SilveusDi ........................................................._.��.....................���.....mu.......�.........................�����.�� ..�,�...............�......�... BPW Date 5/28/19 Phone Extension 9083 �Wm rtrcAmnmvx vw �wui mu m„rhrroxir ioiw� mm ouw¢�mr�mMimmMimm MMIMmmrremimi¢ � ;� w wwraaaw wwwrr+inmm000uumwwuwwwim�unr.H ,.. .... �.. � mm��m!ni,�av✓m�. eu� ......................_ . Re ....uired Prior to Submittal to Board rd _...._ ..�_ „ Legal ❑ Attorney Name: Clara McDaniels Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ ITITmmm Check the L_J Agreement Amendment El Professional Services Bid Opening Quote Opening Change Order No. 1 F Ease/Encroach. F] Other: Michael Schmidt mete Itmorpw Type — El Contract Resolution F1 Bid Award Quote Award El c/O & PCA No. Traffic Control: for All Submissions � Proposal ❑ Req. to Advertise Required Information ❑ PCA Addendum ❑ Title Sheet : Bokon asoqry -w o IYes, m .....— ... . New Vendor Vendor Name Yesn A No ❑ If A loved by Purchasing MBE/WBE Contractor MBE ❑ WBE MBE/WBE Contractor Requested �...... q No [ Yes Name of Coman 1--080Project Name G18 ashin�cton-Colfax Masonry andStairRepairs Project Number „mmm Funding Source West Washington TIF Account No. 422-1050-460-42.02 Amount Division..A......$.......� �.,,...�. .....................m................ww 190,171 m .......... _ .... Terms of Contract LumSum Purpose/Description Masona repairs that were unforeseen. These locations were behind the existing stairwells and the extent of the repairs was unknown until the old stairs were removed. Repairs are needed rior to installing the new stairs. L JI Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) Amount of Increase $ 47,542 � Decrease $ Previous Amount �90..�1..7. �.. � �....m.........w Current Percent of Changer 25 /o New Amount Total Percent of Cha Copy Original ❑ ❑ 11 El El El $ 237, 713 25% Dispersal After Approval