May 28, 2019
PHONE 574/235-9251
FAx 574/235-9171
RE: Change Order No. 1 - Gemini at Washington/Colfax Apartments Masonry and Stair
Repairs, Division A — Project No. 118-080B
Dear Mr. Bokon:
The Board of Public Works, at its meeting held on May 28, 2019, approved the above
referenced Change Order for an increase of $47,542 plus an additional fourteen (14) days,
bringing the current contract amount to $237,713 and the revised project completion date to
June 14, 2019.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,.
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
DATE:
PROJECT NO:
PROJECT NAME:
�FtiAY M ld JBpr a
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER ,
5/28/2019
118-080B
CONTRACT DATE:
CHANGE ORDER NO:
SUBJECT OF CHANGE ORDER:
The original contract sum
Gemini at Washington -Colfax Apartments Masonry and Stair Repair
Division A
10/23/2018
1
PCR #1-Repair Masonry Around Three Northernmost Stair Towers
PCR #2-Re air Mason Around Southernmost Stair Tower
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
Ryan Bokon
Printed Name and Title
Bokon Mason , Inc.
Company Name
56571 Pear Road
Address
South Bend, IN 46619
City, State, Zip
$
190,171.00
$
0.00
$
190,171.00
X Increased
Decreased
$
47„542.00
$
237,713.00
25.00 %
25.00 %
5/31 /2019
0 days
14 days
6/14/2019
RECOMMENDED
FOR
APERQVAL
CONSTRUCTION MANAGER
CITY OF SOUTH BEND
BOARD OF roved Date PUBLIC WORKS
A
pp S.,)OCif
Gary A. Gilot, President
aGene'eveE. Mill r, Member
Elizabeth A. Maradik, Member
d
eeJ. Dq auM
o„
aS ullivan,Mnb
56571 Pear Rd.
South Bend IN 46619
Name / Address
City of South Bend
Board of Public Works
1316 County -City Building
227 W. Jefferson Blvd.
South Bend, IN 46601-1830
Description
GEMINI APARTMENTS AT WASHINGTON / STAIR TOWER
MASONRY REPAIRS.
4 Stair towers total, working from North to South, A, B, C, D.
(Labor and Materials.)..._, .__
Stair Towers A, B, C
I.) Plug holes where brick are missing where stair towers where
attached to the building.
2 ) Tuck point the worst if the areas as needed,
3,) Using a man lift operating trom the empty lot next door to the
east.
4.) All materials, Labor and man lift rental rc`a $154.00. per square
foot. Approximately 137 SF.
(Labor and Materials.).,_,,......,...
Stair Tower D Separated On Its Own.
** This is separated out because of the extent of the damage on this
area of the building. It is a whole different Animal oil its own_**
1 ) Take down the entire corner that has been badly deteriorated by
the down spout from top of wall down to the top of footing Putting
in temp supports for the windows that are set in the masonry wall,
2,) Using a forklift with a bucket attachment for disposal of debris
and rubble in the lot east of the building
3 ) Rebuild entire corner with new brick to match the Chicago
Commons as close as possible.
4 ) Repair areas of brick damaged where the steel stairs were
connected to the building,
5 ) Replace one badly rusted steel lintel over tunnel at bottom of the
stair tower
Approximately 186 SF. () $141 88. SF
(Labor and Materials) ... _ .. _, .. ..
Looking Ibrward to doing business with you
ME
Estimate
Date Estimate #
4/14/2014 465...
Rate Total
21,152 00 I 21,15 2.00
26,390.00 I 26,390.00
ON'' 16
Y, DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
118-080B ��e�at„a�r�un�� ��,,..aaa���„.�,, 1
Project Number: Project Name: Change Order #:
DATE INITIATED:5-14-19 BPW DATE:5-28-19
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.).
Includes masonry repairs that were unforeseen. These locations were behind the existing
stairwells and the extent of the repairs was unknown until the old stairs were removed. Repairs are
needed prior to installing the new stairs.
Attachments: (List documents support change — required)
Quote from contractor
......_. ........
Amount ofBIncrease /❑Decrease: $47,542.00
Categories (Pick One):
Previously approved Change Order(s): $ 0.00❑ Scope of Work
— _...... ... 8 Differing Site Conditions, Changed Conditions
Current Percent of Change: 25.00
❑ Conflicted Specifications and Drawings
❑ Failed Materials
New Total Amount: $, 237,713.00
❑ Error
IT ❑Omission
Total Percent of Change: 25.00
❑ Final Quantity Adjustment
Funding Secured From: ...
(filled out by PM)
RECOMMENDED BY:
Dan Jones
Project Inspector (Print Name) (Signature) (Date)
REVIEWED BY:
Toy Villa
. . . . . . ...... . . ................................ . . . . . . .......... . -
_._.
Construction Manager (Print Name) (Signature) (Date)
APPROVED BY:
Kyle Silveus
Engineering Project Manager (Print Name) (Sign at ) (Date)
APPROVED BY:
Kara Boyles
City Engineer (Print Name) (Smgn to e) (Date)
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Linda M. Martin, Clerk
Board of Public Works
FROM: Kyle Silveus
SUBJECT: Change Order No. 1
DATE: May 24, 2019
reeror�am9 inmer��un..�rou. rr�uumeuuuu�momr ua�pi�r�m�w�uv�,�rcmrr�m umimawrc�u�nuumm�mr nu:ui. aus�rtar�fi�,r�a�i rrm✓r run+�u:�ui naerv�s�r eee��o uwnoGn.. iummmxnooxrnrmn.nrx mrvoinam�rmm.�v�mmawra�mx�wrwt��rp�ua�er�at sRr vrwv¢�awu��wvr� �nadWuio �tir�.mwsra�uim�nm�,�
The apartments known as Gemini at Washington and Colfax are being renovated.
Improvements include roof repair, fire stair replacement, and masonry repair.
The project has encountered an unforeseen condition that were not reasonably foreseen during
the design phase and is going beyond 20% of the contract value. It was not possible to know
the condition of the masonry behind the existing fire stairs prior to their removal. The single
Wythe of brick must support the new fire stairs and therefore must be repaired before the
contractor can complete the stairway installation. Brick at the southernmost fire stair is in
particularly poor condition. Limited repair is not appropriate for this stair. The other three stair
shafts are in better condition such that repairs can be limited to just what is required to secure
the new stairs. Safety is an issue as the stairways must be securely anchored to the building.
Please call with your questions,
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 5/21/19 Department Public Works
�._ .�.................. �.�...�� ............�� .......... w,,,...........
�..................�.e.
Division/Bureau Engineering
Name ......Kyle SilveusDi
........................................................._.��.....................���.....mu.......�.........................�����.�� ..�,�...............�......�...
BPW Date 5/28/19 Phone Extension 9083
�Wm rtrcAmnmvx vw �wui mu m„rhrroxir ioiw� mm ouw¢�mr�mMimmMimm MMIMmmrremimi¢ � ;� w wwraaaw wwwrr+inmm000uumwwuwwwim�unr.H ,.. .... �.. � mm��m!ni,�av✓m�. eu�
......................_ . Re ....uired Prior to Submittal to Board rd
_...._ ..�_ „
Legal ❑ Attorney Name: Clara McDaniels
Controller ❑ Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing ❑
ITITmmm Check the
L_J Agreement Amendment
El Professional Services
Bid Opening
Quote Opening
Change Order No. 1
F Ease/Encroach.
F] Other:
Michael Schmidt
mete Itmorpw Type —
El Contract
Resolution
F1 Bid Award
Quote Award
El c/O & PCA No.
Traffic Control:
for All Submissions
� Proposal
❑ Req. to Advertise
Required Information
❑ PCA
Addendum
❑ Title Sheet
: Bokon
asoqry
-w o IYes, m .....— ... .
New Vendor Vendor Name Yesn A No ❑ If A loved by Purchasing
MBE/WBE Contractor MBE ❑ WBE
MBE/WBE Contractor Requested �......
q No [ Yes Name of Coman
1--080Project Name G18 ashin�cton-Colfax Masonry andStairRepairs
Project Number „mmm
Funding Source West Washington TIF
Account No. 422-1050-460-42.02
Amount Division..A......$.......� �.,,...�. .....................m................ww
190,171
m .......... _ ....
Terms of Contract LumSum
Purpose/Description Masona repairs that were unforeseen. These locations were
behind the existing stairwells and the extent of the repairs was
unknown until the old stairs were removed. Repairs are needed
rior to installing the new stairs.
L JI Required Contractor's Certification Forms Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.)
Amount of Increase $ 47,542
� Decrease $
Previous Amount �90..�1..7. �.. � �....m.........w
Current Percent of Changer 25 /o
New Amount
Total Percent of Cha
Copy
Original
❑
❑
11
El
El
El
$ 237, 713
25%
Dispersal After Approval