May 28, 2019
Eric Brown
Brown and Brown General Contractors, Inc.
124 S. Elkhart Street
Wakarusa, IN 46573
PHONE 574/ 235-9251
FAx 574/ 235-9171
RE: Change Order No. 1 - Bendix Theater Lift at Century Center — Project No. 118-036C
Dear Mr. Brown:
The Board of Public Works, at its meeting held on May 28, 2019, approved the above
referenced Change Order for an increase of $9,550.77 plus an additional fifteen (15) days,
bringing the current contract amount to $80,850.77 and the revised project completion date to
June 13, 2019.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU
ti✓"tl Yft 1),}1
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER w3
DATE: 5/21 /2019
PROJECT NO: 118-036C
PROJECT NAME: Bendi �.�x _-..e..a`i _
LL_Theater Lift at Century Center
CONTRACT DATE: 2/12/2019.....w.m......._._
CHANGE ORDER NO: 1
SUBJECT OF CHANGE ORDER: PCR #1-Chan es in 929t26al and §cc �
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
ONTRACTOR.
Co11 ntra Swgnature
w
Printed Name and Title
Brown and Brown General Contractors,
Inc.
Company Name
124 S Elkhart St.
��
Address
Wakarusa, IN. 46573
.. .......w- ._..m...........
Cit.....
y, State, Zip
X Increased
Decreased
$ 71,
300.00
�..,—............... �.�....._�.. �� s
$ 71 „300.00
9,550.77
.........85.0...77
13.40 %
13.40 %
5/29/2019
15 days
6/13/2019_.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
Approved Date;, ," .
Gary A. Gilot, President
Genevie E. Miller, M mber
Elizabb a ,,....
aractik, Member
....�.m......�....__.......�....�.....�,� SINGE 9939 .__,�.,m�. _..�.....-
� rown and � rown
124 S. ELKHART ST.
P.O. BOX 487
WAKARUSA, INDIANA 46573.0487
PHONE: (574) 862.2171 FAX: (574) 862.3930
Greg McGowan
City of South Bend
1316 County -City Building
227 W. Jefferson Blvd.
South Bend, IN 46601-1830
Re Bendix Theater Lift
South Bend, IN
Greg:
May 20, 2019
Here is a list of the extras to date as per Ed's summation -
1. Change the brick construction to ground -face block Add $3,660.00
2. Changes requested as per Ed Kowalczyk's email dated 4/30/2019
Item #1 New bulkhead area
Subcontractor $1,743.00
Material 600.00
Labor 2,072.00
10% Oh/P 441.44
Item #2 Change brick fill-in to drywall
Subcontractor ($1,380.00)
Material 160.00
Labor 564.00
Add $4,855.77
Deduct $665.00
'Browrt and
rown
`r" fw arm. �e'A
Item #3 Lintel change in size
Delete spec lintel ($740.00)
Add re -used lintel 515.00
Item #4 No change
Item #5 Additional CMU because of missing piece
Subcontractor $670.00
10% Oh/P 67.00
Deduct $225.00
Add $737.00
3, Add for temporary wall required by Scott Add $231.00
4. Add for brick exterior at ceiling Add 957,010
Total add $9,550.77
Because of all the changes in this project, please extend our contract by
fifteen (15) days.
Brown & Brown General Contractors, Inc.
Eric Brown
President
ADA Lift at Century Center Project changes explanation 5-17-19
Item 1
The existing corridor ceiling elevation is lower than JPR had documented. Therefore, the area of ceiling
above the lift needed to be raised to maintain the minimum required ceiling height of 7'-6". This was a
field discovery during construction.
Item 2
The cut opening for the lift is shown on the design to receive re used brick (from the cut opening) as the
new door way returns toothed in. This will be changed to metal stud and painted gyp board with corner
guards. This will result in a credit to be used on the other field discovery related changes.
Item 3
The 4-layer existing wall that the opening is cut into between the stage and corridor does not have all 4
layers go up to the existing ceiling as shown on the drawings. Therefore, our designed lintel can be
smaller. The contractor has provided a lintel that will result in a credit to be used on the other field
related changes
Item 4
The lintel shown in the drawings above the door to the lift on the corridor side will not work with an
angle. It interferes with the required lift clearance. This angle will be changed to a 3/8" thick 3 %" wide
plate that needs to have 4" bearing on each end so if opening is 43.25" the plate shall be 51.25" long
(field verify) This is not an add or deduct.
Item 5
The pilaster shown on the construction drawings is in a different location than in the field. This will
require more CMU ground face block than originally bid and supplied.
Item 6
Due to the field discovery related changes the opening cut in the existing wall remained open longer
than anticipated. In order for the Century Center events to continue to take place the Scott from the
Century Center requested a temporary wall be erected until the opening could be closed off with the
project scope.
Item 7
Due to items 1 and 3 the existing brick wall at corridor and stage had to be extended upward next to the
new ceiling opening.
Item 8 (if needed)
The original project scope had the ceiling in the corridor as well as the can lights and sprinkler heads
remaining in their existing positions. Due to item 1 the sprinkler head moving up in this area can no
longer provide the required coverage in the newly created alcove at the top of the lift platform so a new
head will need to be added.
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
Project Number: 118-036C Project Name: Bendix Theater Lift at Century Center Change Order #: 1
DATE INITIATED:5/21/19 BPW DATE:.
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.),
Changes to project scope, materials, and time
Attachments: (List documents support change — required)
PCR #001
Pricing from contractor
Explanations of changes from consultant
................................. --------
Amount of IngIncrease / ❑Decrease: $ 9550.77
.....................................................................
Categories (Pick One):
Previously approved Change Order(s): $ 0 B Scope of Work
El Differing Site Conditions, Changed Conditions
Current Percent of Change: 3'40 % ❑ Conflicted Specifications and Drawings
El Failed Materials
New Total Amount. $, 80850-.77 ❑ Error
13.40 El Omission
Total Percent of Change: ,wwwwwwwwwww..... wwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww„ % El Final Quantity Adjustment
Funding Secured From: MW VA
LA In( NnA �
(filled out by PM)
RECOMMENDED BY:
Greg McGowan
Project Inspector (Print Name) (,nature) (Date)
REVIEWED BY:
Toy Villa I
Construction Manager (Print Name) (Signature) (Date)
APPROVED BY:
Rebecca Plantz 5 21
Engineering Project Manager (Print Name) (Signature) (Date)
APPROVED BY:
Kara Boyles
City Engineer (Print Name) (Signatur (Date)
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 5/21/2019
Department Public
Name Becca Plantz Works _
Extension . .....
BPW Date 5/28/19 Phone E
5998 ...... ,.....w m...... ...,.�.
�""��"��'^�"� '. p r�umiHiHiHUHUHUHUHuwmuiuiuiuiui�uurt!�v° �,�m ur�vvv�... m000mimimimimom�uuwium,!�rorar�rvmuw,�e�n����mm�w„�vnr���iwmw�mw�
RRwired Prior to Submitta
l al to Board
BPW Attorney Attorney Name Clara Mcaniels
Dept. Attorney ❑' Attorney Name
Purchasing
Check the A
Item Type --- Required ffir All Submissions
❑ Professional Services Agreement Contract
Open Market Contract ❑ Amendment/Addendum
Bid Opening ❑ Bid Award
EJ Quote Opening ❑ Quote Award
E] Proposal Opening ❑ C/O & PCA No.
Chg. Order, No. 1 Traffic Control
❑ Other:
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Required Information
Proposal
n Special Purchase, QPA
Fj Req. to Advertise
Reject Bids/Quotes
❑ PCA
El Resolution
Ease.../Encroach...�.�
Brown & Brown
❑ Y s❑ If Y s� Approved by PurchasingW
Y
® No
[� MBE Completed E-Verify Form Attached
❑ WBE
Ben _ ix Theater Lift at Ce
nt:
118-036C
Hotel Motel ...............
Tax Fund ,� �.._..................�...... �..�....
7304.42010.000.0099
❑ Title Sheet
Lump Sum _
Cd time.
❑ Yes
❑, No
-
.... � � .._..w
�� For ti,a � Orders Only �.... ..
Amount of ®
m.m.._ m....... _ w_ �,.....�.
Increase $ 9,550.77
❑
Decrease ($
Previous Amount
$ 71,300.00 _ ..........................�.. ,.,,,,..�.................__�
.....�..�................�m..........................,..........
Increase_......._���_ 13.4%
Current Percent of Change:
�_ �,..................... _...e.._ �,.......... .
Decrease��
New Amount
.....
$ 80,850.77
.wnncrease....._....._m13.4%�...___......�....
. � ... ... �....�.�................................
Total Percent of Change:
�� kw ....�_ . .....
Decrease %)
Time Extension Amount:
1 � _ .....
ays,,,,.,,,,,,_
New Completion Date:
6/1/2019