Loading...
HomeMy WebLinkAboutOpening of Proposals - RFP VPA Signage and Wayfinding - Burkhart Sign Systems1. - Cover Letter Burkhart Sign Systems (BSS), having a 55-year presence in South Bend, is vested in the community of South Bend. We are anticipating Howard Park will be an incredible addition to our community, and we welcome the opportunity to be considered for the VPA Signage & Wayfinding Project #1080-2019. Burkhart in the past year has worked with VPA on the Morris Theatre Display solving a rather large problem resulting in an absolutely beautiful display system. We won the bid for the Charles Black signage, and brought creativity to the project by networking with the architect to solve municipal code issues and by VPA giving us the opportunity to execute some interior work from design through installation. The Charles Black Center is a great story, and a story we followed from ground -breaking to the grand opening celebration. We are currently working on the Century Center project, again solving a potential structural issue hanging the large electronic display over MLK drive. Our goal is to ENHANCE our community. We will work through issues that arise, issuing change orders only if absolutely necessary and at a pass -through cost because our goal is the same: Make South Bend a better place to live. As with the projects listed above, and with respect to this project; Richard Johnson will act as the primary contact. Richard I Johnson of - Business Development/Operations Burkhart Sign Systems - 1247 Mishawaka Avenue - South Bend, IN 46615 574-236-5615 574-210-4315 - RJI cell TABLE OF CONTENTS - Project #1080-2019 VPA Signage & Wayfincling Item 1. Cover Letter Page 1. Item 2. Table of Contents Page 2. Item 3. Company Profile Page 3. Item 3.2. Relevant Experience Page 4 & 5. Item 3.3 Project Team - Organizational Page 6. Item 3.4 Work Samples; Parkview Page 7 & 8. Item 3.4 Work Samples; Hubble Page 9 & 10. Item 3.5 References Page 11. Item 4. Local Presence Page 11. Item 5. Technical Approach Page 12. Item 6. Example Package Page 13 - 16. Item 7. Example Package Costs Page 17. Item 8. Sample Submitted (1) Sample Item 9. Affidavit Submitted (1) notarized copy 2.P­ 2 3, - Burkhart Sign Systems Burkhart Sign Systems (BSS) has been located in South Bend for 55-years. Our larger entity, Burkhart Advertising was started from the sign business. We occupy 10,000 square feet of manufacturing employing 18 people. Our shop labor is union labor (IBEW Local 153) with well over 100-years of combined experience. Our capabilities constitute a full -service sign supplier. Our sources of revenue are manufacture/install, 3rd party installations for national sign companies and sign service. We are presently doing (2) national accounts, and have had these national accounts for 10-years. National accounts require a team approach to execute including remote code -checks, provide pricing for budgets, manufacturing, crating, shipping and finally out -sourced installation. We design within client budgets as well as municipal code. We manufacture with large shears, (2) routers, certified welding, a large paint booth and electrical work. Our strengths are in our routing, welding and painting - processes that are very difficult to out -source. Over the years we have executed many projects within the city as well as for the city. We would welcome the opportunity to offer the above to SBVPA in their ambitious plans for OUR park system. Below are pictures (continuing on the next page) showing one of our many signature projects in our community that are similar in scope to Howard Park. ri 3.2. - Relevant Experience Burkhart Sign Systems collaborates in wayfinding programs continually. We refer to them as "Campus Sign Programs" implying a design is to be followed giving identity to the organization's property. We recently completed a 2-year project for Notre Dame surveying, removing and installing approximately 2200 signs! This project started as the "Campus Crossroads' initiative and went to a Phase I with Phase 2 being the 2200 informational, directional and street signs. The organization and execution of this project was very intensive considering utility notifications, the hydro-vacing (winter conditions) and the pouring of concrete foundations for every sign. We are presently working with Marian High School, Hubble in the Ameriplex Complex, continuing work with the Parkview Trail System (noted here in 3.4), as well as continuing directional work with General Motors in Ft. Wayne where every GM pick-up truck on the road is produced. Being a union shop we are the exclusive sign company for GM. All of these projects are executed with a site plan, sometimes a Google overhead, and collaborating with the client for effective directional signage. We have chosen a Campus Sign Program for the Center For Hospice in Mishawaka as an example for this proposal.. This project is similar in area to Howard Park with the challenges being mail delivery to (3) addresses, a one-way exit to Cedar Street, the need to use the right-of-way, both entrances being shared with Central Park and beautiful building architecture that the signs need to enhance and not interfere. This project was a collaboration between the Director (referenced in this proposal), JPR as the civil architects, DJ Construction as the contractor, and Jeff Lowry as the building architect. As well as similar property area; this project is a good blueprint for the successful execution of the Howard Park project. Again, this proposal exceeds the 2-page limit so the site -plan is shown below. one `x" Z� -Paso4, 9=20 mm� M oo &ARDENS OF REMEMBRANCE & RENEWAL our �s 3.2. M—t Up,, ... Pages. 0 > a 00 .2� 1 0 72 0 u w 0 0 > u t to 0 < � }\ g : 75 C) U 0 I 3.4 - Work Samples: Parkview Trails Below and following page is an overview of the Parkview Trail System, Ft. Wayne; financed by Parkview Hospital. This project is very extensive and is many more than the 2-pages requested in this proposal (upon request we can bring the entire proposal to the interview part of the process). The project was a collaborative effort between the civil architect, Parkview (The Owner) and Burkhart that started with a site plan by the civil architect and the style represented by their merchandise. This was a project executed in Ft. Wayne also speaking to our ability to execute a project of this scope at a remote location. Note the "totem" pole designs, pole banners and elaborate monument style markers. Construction consisted of larger -sized painted aluminum square tube, panels and applied digital printing. � 19PKIN 11111111111 i f f "IMAI "I'MR it 11% f .. . ..... .. V . ... ...... of BY A, �'P The entire proposal can be presented at the interview if requested.. AM= 3.4 - Work Samples: Parkview Trails (cont'd.) PROPOSED DIRECTIONAL SIGNS FI 0 0 P I 3.4 - Work Samples! Hubble - Ameriplex PUD Hubble is an Interesting project due to it originating from a 'Google' site plan and resulted in very nice branded -work South r' BUILDING FRI Note; Plans such as this are intended for The Owner to approve as well as a "map" for our Installation planning and field-direction.y , gwK .(AIH A Wll I ovurvVyle-cell) . r/lam ",r�,{Q7 cuv„xn,e 3R WorkSampies Page 9. w..u� w,mmuimo Z1, auiwa JC�� 3.4-Work Samples: H.bbl—A—lpleK PUD (coned.) BUILDING - CENTER — North rx ONLY lo re f 3.5 - References Mike Wargo; Director, Center for Hospice - 574-243-2059 - wargom@cfhcare.com Chris Chockley; JPR - 574-232-4388 - cchockley@jprlsource.com Natalie Troyer; Business Furnishings - 574-243-3255 - NTroyer@business-furnishings.net Jim Douglas; General Motors - 260-358-6846-jim.r.douglas@gm.com City of South Bend - Reference List: -Patrick Sherman - SBVPA -Matt Esau- SBVPA -Jonathon Jones-SBVPA -Jim Monroe - Morris Performing Arts -Scott Herzog - Century Center -Dan Jones - City Engineering -Greg McGowan - City Engineering 4.- Local Presence Burkhart is a continuing contributor to many local artistic endeavors, educational organizations and social agencies. Our ownership group lives in South Bend, and supports the growth of South Bend. Again, we have a 55-year presence/brand in this area. In addition to our work with VPA, we have done some very nice work at Liberty Tower and the a -loft Hotel in DTSB. Other DTSB work is our ongoing relationship with the South Bend Cubs with major work done for the UFCU RoofTop last summer. We have a very good working relationship with the Area Plan Commission, the Building Department and the ABZA. 5. -Technical Approach Howard Park is not just a "wayfinding" project but a creative exercise that incorporates wayfinding. With that; it is important for The Owner & BSS to go through the budget (hopefully determined in this bid) and assign some level of importance to the signage to possibly design those items "down" to a projected cost. For instance, there are alternative materials to use with the FCO`s, the post/panels as well as the interior work if money needs to be removed from those and applied to other areas (i.e. the video requirement, Donor Wall, etc.). We should budget 1-2weeks to meet and revise to changes. Any project similar to this is a collaboration between The Owner, the Civil Architect, the General Contractor and the sign company (Richard Johnson would handle all onsite planning). This particular project will also need consultation from the maintenance department to discuss a plan to maintain the grounds around the signage (mowing, cleaning, etc.). We need to first put this group together in an environment where information is shared, with the "budget" revised signs on the initial site plan. From this meeting with input from the architect, the GC, maintenance, etc.; a revision(s) will be required. At this time we would discuss everyone's best method of communication. Google Does looks to be a decent tool to share ideas/revisions with notes. BSS has assigned a Project Assistance to get a feel for Google Docs, and will be asked to monitor the notes, if that is what we decide to use. Revisions/suggestions are then incorporated into a 2nd revision. At this point we will need the area marked for utilities (BSS Installation would initiate this, working woth the GC) so we can evaluate decided placements. We would walk the site with sign -numbered stakes (by BSS) and mark the locations. Our Installation Foreman would be made available to discuss foundation types to use, access to the sites, wall infrastructure for facades, equipment requirements, etc. The GC needs to be consulted for all building mounted signage (FCO's, Dimensional Letters, Digital, etc.). We need to allow 4-6weeks for this process to evolve (plus the 1-2 weeks for the 1st draft). Interior work should be relatively simple and again a walk thru, more so with The Owner using masking tape to mark and photograph. The GC can review as their time permits. The Donor Wallis) will require the most attention on the interior. Access to the site and the required lifts is an unknown at this time. What conditions will be present at the time of install? Can we use our trucks? Do we need to rent equipment to use the sidewalks? Is there a lift onsite to handle the Donor Wallis) and the exterior window treatments? Final designs with shop -ready drawings should be completed within 8-10 weeks of the initial "Owner" planning meeting. Production and installation would be 6-8 weeks depending on weather, site conditions etc. . Yy�„�."�-,�•Y, T 5, Technical APp-0-Page 12. =MN 6. - Example Package Again, Howard Park is not just a 'wayfinding" project but a creative exercise that incorporates wayfinding. Our goal is to achieve an industrial look using charcoal colors to match the building architecture with bright colors against the charcoal. We are proposing to work with rectangular tubing or I-beam profiles as opposed to traditional square tubing that offers a unique look representing "building", "growth", "infrastructure" and "permanence". Furthermore, this look is central to the architecture of the building. This look can be carried inside adding brightly colored acrylics and frost acrylics to the "industrial" materials. Wall mounted signs would be inset in the charcoal C-channel again conveying "permanence". The central Donor wall would be similar rectangle tubing and C-channel with frost (or colored) recognition panels. As SBVPA continues the development of their 40(+) parks, this look can be carried over, with perhaps simple color -changes, to show a continuity and "ownership" of these resources. Our added signature to the project is the "park identifier" shown on the sign posts, and submitted as a sample. Again, these would appear at every park, and could be used in any number of ways. Example Package -Page 13, Mmm kPpcndlu C: Nim, I M p,,, Appendix A ( ith ,oi:,,,,) S&giri . 0—phon embbba .a.i.fity OrnmLity Coet/. To"11 III Street Sum coi 'evoir C.—I Alcon,pul on[. I 1450 1.2. Street sto Look ea Pei Aluminum on V S 1450 1.3 Stle. Sju d. by lodge Aluminum on Z' e 1 1450 I, Street Sin Look: Art ftc! Area by 0, dip, Akpi on 2' 1 1450 is 2 AW Sign. NE Garner of Supp.n Building Aluminum on 2' pool. 1 1980 Is Street Eagn LOGY: RI—lik, by Pecuiftnan Grid Aluminum on V We I 1450 ZA Glaze Ce- Im—, 'k, Vinyl 1 125 22 Gl— Decal. Logo above door aM houffs, no, viri4 I 180 ZZ Gpi. Decal ell U. CqhBI d— Vinyl 1 125 2.4 Glass Decal. steti only vinyl 5 375 —1 —5 vounlao, Artlunin, 1( Vi 4 4840 2.6 class C Dal ,gaff Eoirimce OWV/Igety info wino 3 360 31 Fire pi, inub—ni Aluminum 2 290 3.2 Bocce Salim -- On Post Aluminum ort 2' Pa. 1 1570 33 C Y—i on— Aluminum 1 220 14 m—d P.,k Purl, ,,r Aluminum 2 1730 3.5 Opinioner pick up or. Aluminum 2 400 3.6 aryboni infcoinwevt Aluminum 1 290 37 LEED SwIde% into Aluminum 1 290 3.3 So e, bi Aluminum 1 290 39 c.Ai edueaxronak di part Alum— on 2' pd. 3 5940 A I ... Sing txttrtat dri display D%ft.1 Oiplry 1 8980 51 'MOWARD FAAc' per spec Aluminum 1 4850 5.2 ",-d hark Lgo per spec Aluminum 1 3420 5.3 Support Balding Adde. Alum— 1 360 5A 'ScAIE5' Aluminum .1 380 SS Aluminum 1 390 5.6 ven— Pairkr & Arts Logo, per spec Aluminum 1 1480 5,7 'WWARD Payg" An budge AlUmAlum, 1 4380 5.8 C.M—i Burning Adl Aluminum 1 360 5.9 Sanw Fwne: W X S' Alunnunum, 2 1080 6.1 negg.odabde sign Aw"o 3 1690 62 loge Nurnbe, Appliol. VoVt 4 1580 6.3 no, A.-niou 2 5400 7A ADA Cnllplp� ReArcom A� I B 516 72 ADA rAmplia,FumLobel, 2937 2', 3- Floor. Tube per Example Package 2-13" Fort Tube per Example Package 2'. 3- Ro,t. I'ub, per F—py, P,rk,, 2". 3- R— Tubi, per Example P-­ 2'. 3" 11— Tub. p., E...pW Pa,Icure 2', 3- R-. tube pee B—ple -k. 43" NnsP'Th h.nigh,B V Dli ... I (channel) FCO FCO FCO FCO FCO 10" I-h— hanging c per AL Example Package C-cha,n "Vir, per Example Package C-channel/Ao,ow in, Example Package I Total 1 $64058.00 S-,,, LM &/.'r ILG -tMx ("ll" -t he ,dId—w,-Build 7, Example -ho, Page 17 When the prospective Contractor is unable ro —tify to ony of the statements below,, It shalt attach an explanation to this Aff+d_ni CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) S-IA"IBOF f/1! ' S: COUNTY ) The undersigned Contractor, being duly sworn upon hislherlits oath, affirms under the penalties of perjury that: l . Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 3 Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes ofthis Certification, "Iran" means the government of Iran and any agency or instrumentality of ]ran, or as otherwise defined at Ind. Code § 5-22-16.5-5, w amended from time -to -time. b. As provided by Ind. Code § 3-2.'r16.5-8, as mnended from time -to -lima, a Contractor is engaged in investment activities in ]ran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or mmc in credit to another person for forty-five (45) days or mae, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the fimmeial institution extends credit, is a person identifier) on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Conti -actor subsequently learns is an unauthorized alien. Contractor agrees that lie/she/it shall enroll in and verity the work eligibility status of all of Contractor's newly hired employees through the F-Verify Program as defined by LC. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating inthe E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of' this provision no later than thirty (30) days after being troubled by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies-, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terns, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination ofthe foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontractto an MBE/W BE; however, it may not unlawfully discriminate against said WBEJMBE. A finding of a discriminatory practice by the City's MBEIWBE utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made apart of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. f, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United Stales. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of Un ited States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination ifthe price of United States made steel or foundry is unreasonable- I understand that violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Gated this _% ...... day of /�Jn%� ,20j% ConhactorBidder (Phm) ./iSure ont/Bidder or Its Agent Printed Name and Title Subscribed and sworn to before methis day of_­/W 20_� My Commission Fxpires, touA(. Q .G(, UUUU Notary Public ,FOQ,\NPOT`/ cc<<•� '�Q�`� � ,—�' County of Residence Mr V 1: �pims`. Jai SEAL _ -L- ' io a�oson S.& (1°age sTyAUBL\Q: •aP ,rF OF INS\# SIDE VIEW CEILING HANG OR WALL MOUNT 7.1 - RESTROOM ADA 7.2 - ROOM IDENTIFIERS ADA RECESSED COLOR (OR FROST) ACRYLIC RECESSED COLOR (OR FROST) ACRYLIC IN PAINTED LOW -PROFILE C-DHANNEL IN PAINTED LOW -PROFILE C-DHANNEL INTERIOR SIGN AG E «�" o0 on0000nn000000nnnnno �,4A�flvL�=,a="flF��A CONCEPT COPIED,. E — ADAflAISDD DY N� E ARLD. AS ADA TRIED ALL BFA LLE ' ADDED AS COMPONENT 4 J� 05/12/2019 'WAIL ANCHOfl SIGN9➢BTEb15 6. Example Package- Page 14. 1247Miuh ke Arenue-South&M-4EV5 Richard Johnson-ii rlAL kl Ajgp�sy2rp-51d-21R-0318 draw Color options (multi?)ul�l to consider... 3.2 1.5 SIDE -VIEW 2" DEEP ANGLE -FRAME; PAINT BRUSHED ALUMINUM, ADD INFORMATION WELD ANGLE TO POST; PAINT GRADE CONCEPT - I -BEAM T CIN . DURING GROUND-BREA.G r N A MAJOR FIGURE FROM THE ! „ POTAWATOMI TRIBE SPOKE. TO CONSIDER IS A MAP SHOWING THIS AS ORIGINAL POTAWATOMI ANIT14 A BRIEF HISTORY OF IT ET RIBE.(ATNATUREAREA?) r; "U RA III.......,,.) f" �T. '° 05/12/2019 6. Example Package - Page 15. SIGNSYSTfAAS 1247Mishawaka Avenue-S-8erd-4— Pochettl JalYneon- �j{J�ggiktJhit(khdilY.ULL9Jdd41-514-21b§315 d 3.4 - PARKING (THEME PER DESIGN) INSTALL/LOCATION STREET SIGN CONCEPT - I -BEAM oM­1 T -- G VPA MAINTENANCE NEEDS TO BE CONSULTED FOR GRASS INSTALL. WE PROPOSE ROUND PADS 6" OFF -GRADE FOR EFFICIENT MOWING STREET SIGN CONCEPT - 2" X 3" ­V­ .. ( All W11111 T­ ­­. I-- ­) ­1 :o1or Option Illustr; L�ZJZ=F_- 05/12/2019 s— SIS-5 6. Example Package - Page 16. 1247 Mlshe l,,A­w Southa,d-46615 Rld,x,d Joh, - 674210,015