Loading...
HomeMy WebLinkAboutChange Order No 12 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction Inc1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD S01JTH BEND. INDIANA 46601-1930 186 SOUTHCITY OF r BOARD OF PUBLIC May 14, 2019 Tim Morey Ziolkowski Construction, Inc. 4050 Ralph Jones Drive South Bend, IN 46628 PHONE 574/235-9251 FAx 574/235-9171 RE: Change Order No. 12 - Erskine Clubhouse Renovation — Project No. 116-108 Dear Mr. Morey: The Board of Public Works, at its meeting held on May 14, 2019, approved the above referenced Change Order for an increase of $9,811, bringing the current contract amount to $1,101,342. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, *"' ka'* Linda M. Martin, Cl J�L"11 Enclosure GARY A. GILOT GI-NENIEVE E. MILLER ELIZABETH A. MARAWK LAURA L. O'SULLIVAN THERESE J. DORAU INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Kyle Silveus SUBJECT: Change Order No. 12 DATE: May 7, 2019 nw.errie uaraour 2avxr:r: mn.w.r: n rrrcuvra a.r rwr.rammrua wramauutmu rra,oeaaex;uiwwrro s:nm a munwr:� rtdun¢�wa m ikraAm!awrcmimsropdarcnrwvra mvrmsrp-vusro :.nrnve :xrc reerurrir rmw Erskine Clubhouse building located at 4200 Miami Street is a currently being renovated. Interior repairs include new HVAC systems, plumbing and electrical systems, restroom upgrades, interior finish upgrades, walls and ceilings. Exterior repairs and site improvements include a new concrete ramp, window and door upgrades, replacement of the north porch slab, gutter repair, exterior trim repairs, a new roof and a modification of the cart path layout. The project has encountered numerous unforeseen conditions that were not reasonably foreseen during the design phase and is going beyond 20% of the contract value. Items include the discovery of lead paint on the concrete floor below existing carpet in the basement, asbestos in the adhesive of VCT in the main area of the clubhouse (below carpet), and most recently the discovery of two Underground storage tanks containing gasoline and fuel oil. There have also been several items that were added to the project. Some items were identified after the project was bid that made sense to include in the current project. With the latest change order that includes Fuel Tank and Oil tank underground storage fuel removal, wood floor repair, and exterior concrete stair replacement (Severely deteriorated concrete hidden by carpet and thin overlay), 11.4% of change orders resulted in unforeseen conditions and 10% resulted in "extras" or items that could arguably have been foreseen during the design phase. Engineering requests the approval of Change Order 12, for $9,811.00 that will increase the total of unforeseeable and foreseeable percentage of change orders at it relates to the contract value to 21.43%. Please call with your questions. %4111 AIA Document G701 TIVI -2017 Change Order PROJECT: (Name and address) 17043 - Erskine Clubhouse Renovation City Project #236563 OWNER: (Name and address) Board of Public Works City of South Bend, IN 1316 County City Building 227 W Jefferson Boulevard South Bend, IN 466011830 CONTRACT INFORMATION: Contract For: General Construction Date: 8/28/2018 ARCHITECT: (Name and address) Gregory A. Kit & Associates, Inc. (d/b/a) Kit Architecture / Planning 1126 Lincolnway East South Bend, IN 46601 CHANGE ORDER INFORMATION: Change Order Number: 11 Date: 5/13/19 CONTRACTOR: (Name and address) Ziolkowski Construction Co., Inc. 4050 Ralph Jones Drive South Bend, IN 46628 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Per the attached RCO #048, add $1,222.00 to provide labor, material and equipment to remove 1000 gal of liquid and 600 gal of solids from fuel tanks. Per the attached RCO #049, Rev.1, add $4,613.00 to provide labor, material and equipment to provide an alternate route for the return air the the inspector requested. Per the attached RCO #050, add $1,730.00 to provide labor, material and equipment to repair, patch and finish plaster on main floor as needed. Per the attached RCO #051, add $3,587.00 to provide labor, material and equipment to remove damaged boards, replace missing boards and set face nails as needed. Per the attached RCO #053, add $2,153.00 to provide labor and material to remove existing concrete steps, form pour and finish new steps. Per the attached RCO #054, add $2,300.00 to provide labor, material and equipment to construct 2 new newel post and wood base/skirt board around second floor. Add $575.00 to remove existing double doors to the east and cut door off and cut off harware as needed so new threshold can be installed, Work to be done on a T&M ticket with remaining budget amount to be credited back to City. Add $2,297.00 to wrap exposed wood with white metal around pro -shop door, Snack bar windows and wrap the inside of the windows with wood. Include 1 window sill inside snack bar and cover header above north window in proshop. All exposed wood to be painted on inside. Note no charge for white metal, work will be done on a T&M Ticket with any remaining amount to be credited back to the City. Deduct $1,050.00 for Shower Room accessories and Ceiling Deduct $5,301.00 for Basement Painting Credit Deduct $690.00 for Rubber Base labor only Deduct $750.00 for Bike Rack Deduct $875.00 for Parking Lot signage. The original Contract Sum was $ 907 000.00 The net change by previously authorized Change Orders $ 184,531.00 The Contract Sum prior to this Change Order was $ 1,091,531.00 The Contract Sum will be increased by this Change Order in the amount of $ 9,811.00 The new Contract Sum including this Change Order will be $ 1,101,342.00 The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be March 22, 2019 AIA Document G701 TM — 2017. Copyright m 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. tW&WAI" INIlV'p Q "I'lhis AWAlm Il�t=ArriemuiY !is protected by US, Colpyir glhit Il..aw air d IlinP:marnatonamll Tireatuaus, UnauuthapxWzed improduuctuoin or a ilstrilbu& ion ol' fll is AIIA� IDoc uirm¢eint, or any Ilmamuikk m of It, nna y uresuuft in severe, civil) aped cidi ni nall Ilpenallties, harm wiillll the Ippira secuuted to the ummamxiimuuirmn axienmt IpuossiilViAe uunde the Ilaw, This document was produced by AIA software at 16:30:01 ET on 05/13/2019 under Order No, 0969002698 which expires on 05/1212020, and is not for resale. User Notes: (3139ADA52) NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Gregory A. Kil & Associates, Inc. Ziolkowski Construction, Inc C CONTRACTOR (Firm name) =SIGNATURE ;iIINCARB. AIA Architect klA Mor5,�4 wxwg L-r PRINTED NAME AND TITLE PRINTED NAME AND TITM 1 - DATE DATE Board of Public Works, City of South Bend, IN OWNER (Firm name) AITAQVIO i*1GNATURLV"'JV',1 Uf "Puwl� wr,-,;6 - -------------- A�A Document G701 TM - 2017. Copyright Q 1979, 1987, 2000 . 2001 and 2017 by The American Institute of Architects. All rights reserved. WAFOHING: ['Ws A A" IK1mucwneint is protected Idy US,, Copyright t aw and internafi onall Tirea Hes, Unauthorlized reproduction or, dWrUbiufion of tuft at Docuinileint, or, any pmUon of it, umay iru,mflt in seveire, OvIIII and cidaflnM penallbos, and w11111I be prosecuted to the imaxhnuuicrrn extent possVe undertho Ilaw, This document was produced by AIA software at 16:30:01 ET on 05/13/2019 under Order No 0969002698 which expires on 05/12/2020. and is not for resale User Notes: (3139ADA52) DATE 4/16=1 9 City Of South Bend Venues, Parks and Arts Erskine Clubhouse Renovation Project No. 116-108 Ziolkowski Project # 17668 RCO # 048 4.16.19 DESCRIPTION: Provide labor, material and equipment to remove 1,000 gal of liquid and 600 gal of solids. Note: This is additional cost to the original quote as noted on RCO # 044 that there may be some additional cost. Item Scope of Work Estimated Unit Subcontractorl Material Total Labor Man] Craft 11-abor Total No. I I QuantityI Quote Subcontractor) Price I I hours I Type I Rate I Labor I cost 0 Xontractor Markup Subcontract Total $0.00, $0 0 Woo - $0 0 $0.0( $6-66 $0 $0.0 $0.00 . .......................... $0 0 $0,0 $0.00 $0 0 $0.0 $000 $0,0 $0.00 ol 0 $0.0 P-00 $01 0 $0.0 Woo $0 0 $0,00 sol - — --------------- .. A $0.00 $ol 0 $0.0 Lo 2Q $o'o $0.00 $0 0 $n.n $0,00 $0 Oil $0.0 §6.66 $o $6-0 KgR $0 $010 $0.00 $0 0- Woo $0 $0.0 �-O:Fo $0 0.0 9-00-0 $10 -fi-0 15% Material Markup Material Total ±100 Payment & Perf Bond TOTAL RCO AMOUNT 15% Labor Markup Labor Total DATE 4/25/2019 Item No. City Of South Bend Venues, Parks and Arts Erskine Clubhouse Renovation Project No. 116-108 Ziolkowski Project # 17668 RCO # 049 Revised 4.24.19 DESCRIPTION: Provide labor, material and equipment to provide an alternate route for the return air that inspector has requested. See attached emails and drawings. Scope of Work Estimatedl Unit I Subcontractor Material Total Labor Man Craft Labor Total Quantity l]uote Unit Price Material hours Type Rate Labor Cost _.. Cost ZGI � 1 $$0,00 00 S6 2 Su t $5700 $i _... Labor (demo walls, remove door, frame, 0.._._. $0. 0 0 ...... $0 $ construct new walls 0 ...... __ $0.00 $0 4 Carp $53,45 $21 5/6" drywall on door side, taped, finished, 0 $0.00 $0 0 _-- ...._._. _$0,00 0 0 0 8 Q $0.00 $0 ......... ........0 0W __ $0.00 sol 6 0 $2,446 $0,00 $0 0 0 $0,00 10 0 p $0.00 $0 0 0 $466 $0.00 $0 0 $0 0 0 .........._.$0.0p $0.00 . $0 _ 0 0 $0,00 $0 0 0 ..._ ..... s0.00 $0 0 $0.00 0 0 0' ..... _. ..... $0,00 $0 0 $0,00 $0 e..���.__ .. 0 0 �.�.-'s oQ �w $0 0 0 $0.00 $0 0 O i IT �$0.00 $01 0 Subcontract Total 15% Material Markup i4 Material Total 79 Payment & Perf Bond TOTAL RCO AMOUNT 1I Labor Total SUR IF c0[,11001R LV-7�M 711 G0 c c III NOW ION 11111 ERSKINE CLUBHOUSE South Bond Venues P.,ks.ndAds q��ka MiAl,til HfIll I T PROPOSED FLOOR 00, PLAN E= Tim: Please see below. Per our conversation, we will make the following adjustments to our pricing and scope of work for Option A (Option B is still not applicable and is not being priced): • Return air ductwork will be installed as shown on Greg Kil's sketch. The R/A ductwork will come off of the South R/A opening on the furnace with a filter rack, it will go to the East into the shower room and then turn South to terminate with a grille at the hallway wall. • The North R/A opening on the furnace will have a 10"-12" wide plenum box with a filter rack. The 8" outside (O/A) duct will drop into the top of this plenum. • The R/A ductwork at the furnace will no longer connect to together around the backside of the furnace. • The sheet metal installation is the same as we originally priced, except for we have about 2' less of return ductwork that is on the backside of the furnace that originally connected the furnace openings on the North and South sides of the unit. Deduct reflects this 2' of unlined return ductwork. Again, everything else stays the same. • We will not have any plumbing work associated with this to cap the old shower. All plumbing will remain as is. • We have not included any wall cutting, framing or lead abatement. Someone will need to verify that the wall the separates the shower room and mechanical room does not have lead paint on it. The same goes for the wall on the North side of the shower room that will need to be cut open to expose the shower valve. • The grille has a lead time of approximately 3-4 weeks from date of order. • E. J. White Mark -Up is reduced to 5% in lieu of the original 10%to help with this pricing. The breakdown is as follows: Subcontractor —Stalker's Sheet Metal: $2,326.00 Subcontractor Mark -Up (+5% Gross): $122.42 Total: $2,448.42 Please advise if/when we should proceed with this work. Thank you. Jeffrey M. Bucher, Jr. Vice-Presidcnt 1011 South Michigan St., South Bend, IN 46601 011ice: (574) 289-6351 Fax: (574) 289-3755 Cell: (574) 532-3488 F-ail: Web mwww wvB61v im rant STALKER'S P.O. BOX 3681 SOUTH BEND, INDIANA 46619 (574) 234-2009 To: Jeff Re: Erskine 4-18-19 We propose to fabricate and install (1) 48x12 return air duct from proposed grill location straight back to north wall with (2) take offs connected to existing filter racks including, * Fabricated return air duct * (1) 8" F/A spiral duct connected to return air duct * (1) Titus 48x12 louver faced return air grill (figured with 5 day build) Material $ 643,00 Labor $ 1,833.00 Total $ 2,476.00 Items Not Included * Cutting of holes (Grill location or wall between rooms) 04/23/19 Thank you, New Total: $2,326 Brad *Per conversation with Brad Stalker, reduce overall total by $150 if 2' section of ductwork is removed on backside of furnace that connects return plenums together. A return plenum box with filter is still required for North side of furnace to connect 8" outside air ductwork. on Wit ammom wo nnm w%w a IMMM IECH. RM A rw6l /\ e r o "Ir vmwmnmmw' to -CH. RM A R�g FM ii ARM P LM i I' 4 A NCA ARC 674. FAX. 1141, 'A ERSI CLUE South I Flaft i 4200 MU SOM 1 4 6 8 1 Project ERSKINE 48x12 Date 04118/2019 Architect Office Marshall�and Wells Engineer �n�ritu's Preparer Andy Prochko Contractor Version 2014.0439 Des natlon 355 S Louvered Return Grille, 350 Deflection, '/2" Spacing, blades parallel to short dimension, Aluminum. Main Product 366FS 366FS-1 . �.._. a.....m„_.,�.........., . ..,_,.... ....ee ... D 01us .J ...,.............., ..�.. �...�...»,w..,�e..wm .�.�.� i. d ...,..., 0 Slot op� � , r wu,e�, P.r oa,.,n�i '�I, Damper ...., ...,...� . w_... u., NoI �......,,. _-_.... .,.»., ....._�..._�.p,„,. ,,.,e...e.w.,,..�m.�. m.� c yr en Da.noer s �:„ri-Gpcn acicl 3 U r� o,�rou Deutr: Screw Hole Fastening, Grille Mounting Detail w� 4, Duct Width Duct Height Grille OA Width Grille OA h 48 12 4975 1375 General DescrAfrtaon 365FS-1 ......... .......................... • Louvers are vertical to width with %" spacing at 35 degree deflection • Optional opposed blade damper has screwdriver adjustment accessible through face of register • Odd and fractional sizes are available at additional cost • Sizes larger than 48` x 48" are shipped in multiple sections with joining strips for field assembly #8 x 1 '/l' Ig Phillips flat head sheet metal screws painted white • Wall or duct opening should be duct size t 118", • All dimensions are t 1116' • Material: Aluminum on Schedule 366FS-1 ID Quantity Ta 1 1 Page 1 of 2 - Edge Version 2014.0.439 - Product Information is Subject to Change without notice Project 1 'NdiEA qb' i Date 4Li_4a0 9. Architect Office 64asd1q�c r,l,lm Engineer rl tus Prepatrer , .LO 'Lqa: ikQ Contractor �^ ate r,�a �, :<;nttnriton�• Version 2014,0,439 Schedule continued 366FS-1 MODULE 312E NONE DAMPER MODEL 0 - NONE BORDER 1 - SURFACE MOUNT ACCESSORY 1 NONE FINISH 26 -WHITE ACCESSORY 2 NONE FASTENING A - SCREW HOLES ACCESSORY 3 NONE Page 2 of 2 - Edge Version 2014.0.439 - Product Information is Subject to Change without notice ----„,.» M per. m - Project N441 1 t Date 04 2019 Architect Office C plrrsi 4CI and. ells Engineer ritu's Preparer em4jC.irFi Contractor i.r ;S�,tia�� .,.- ;,ruis.r r' �n�s�� Version 2014.0.439 Desl nation 355FS Louvered Return Grille, 351 Deflection, '/2" Spacing, blades parallel to short dimension, Aluminum. Main Product 365FS-1 366FS wrgM.................................. ....e,,,,...m..�,.�„ .n..�.. .�,. D' {itu5 ? 3 .i . m...,. .m.....m,...A..._�.�.�...�.,....��..gpw... �a� C��a..�7�,aI wr„ ice' , ,,, �. �„� ,:- ,.,•,� ., ,.,, ..,,. . �, , .. ,. „, . _. ,....�,... r �.rr r a, „Mye.........._ ...... ._...... _._.... ij rnino, _ ... ....__�,._................_._.M�,..........,,.,., 'Job.,.....,�,,,.....�..�........,. V'rhvn D'IT"vor iS .y�WNr......... ............ ...w,�, m....,.,�e,,,,,......,...,....�.,...,.. �1;)I?!iFl�l; :.ZIICi f 'p 0,-xi Dfi)(h Screw Hole Fastening, Grille Mounting Detail Duct Width Duct Height Grille OA Width Grille OA Height 48 13 4975 13 75 General Description 366FS•1 Louvers are vertical to width with %" spacing at 35 degree deflection Optional opposed blade damper has screwdriver adjustment accessible through face of register Odd and fractional sizes are available at additional cost Sizes larger than 48" x 487 are shipped in multiple sections with joining strips for field assembly #8 x 1 7�' Ig Phillips Flat head sheet metal screws painted white Wall or duct opening should be duct size t 1/8" All dimensions are t 1/16' Material: Aluminum Option Schedule 366FS-1 ID P uantity To 1 i Page 1 of 2 - Edge Version 2014.0 439 - Product Information is Subject to Change without notice Project ERSKINE 48x12 Date 041/ 1 Architect r tus Office Marshall and Wells Engineer m ' Preparer Andy Prochko Contractor' rir," "`' "`�"`'� Version 2014.0.439 Des��o�n Schedule (continued 366F8-1 MODULE SIZE NONE DAMPER MODEL 0 - NONE BORDER 1-SURFACE MOUNT ACCESSORY1 NONE FINISH 26 -WHITE ACCESSORY 2 NONE FASTENING A - SCREW HOLES ACCESSORY 3 NONE Page 2 of 2 - Edge Version 2014.0.439 - Product Information is Subject to Change without notice 7 § o k n2 I }\R o o $ E E C § 6 A 0 01 ,no 06 ƒ gc % �g j} , a) ID ; § CD �< Q-o ■3 k k g3 �$ 7CD CD E -9 ■� to 91 �t k § § %(§ 0 ( �m2 .&n 0 /(§ ERR 8 k 0 »2� i -00 i cr �0 - 0 _ CL k ƒCD m § 2 CD / kf § § g } k E � 0CD ® I a e Ro ;a N vm0 xN O = N '< o o �5 O m� v �_ O O (D c w —nO 3 Z O w C o S CD M. °' O W C (D of a Go CD Q (D CD C 3 O C m N� O 7 S1 3 x y w` � Q o 7 n m m N co N v N O 3 U C Ol 'a m w s v;.g > g oll, t C-i rn ow I. k 7 7ƒ 2 0 U 7 g0 ; E n o ow on « \� k t /C z ��o =r3 . � g R a== § co e CL \� ■ < k k Er < 0 $ sG \ 2 o2 CL � \ \ CL R > iZ cr \( cr (CL COD Z� m/ IL 0 /\ |N5ERV,|nc 514E. Marion St. Mishawaka, |N4d545 — wwwinserv24'7zom Phone # 574-968'0372 pax# 574'968'0372 BILL TO Ziolkowksi Construction South Bend, IN 46628 Invoice Details E-mail ar@inserv24-7.com oauc 03o7/2019 ` mvv(ne*, |ww351 Terms: me,3n Due Date: 011m6/2019 JOB SITE Erskine Park Golf Course South Bend, IN 46614 Work order No. Purchase order No, Date of Service Quantity Description Rate Amount Taxable We appreciate your bu-siness! Subtotal $13,390.00 Please remit all payments to: Sales Tax (7,0%) $0.00 INSERV, Inc. Mishawaka, IN 46545 NOTE: All credit card payments will have a 3.0% convenience fee added at the Lime Payments/Credits $0.00 of processing. Balance Due 111,390.00 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date _5/7/19_ Name We...Silveu............................................_...................�......................m.._ BPW Date 5/14/19 Department E n m eenn P ..........������� ..��.. �...... De �� ...... .�...-........... Phone Extension 9083 nWm Required Prior to Submittal to Board Legal Attorney Name Clara McDaniels Controller El Controller review is required for all Contracts $5,000.00 or more anc greater than one year in length per the City Purchasing Policy Purchasing Michael Schmidt .._ .... ................... _......... _........ ....... . .. _— Check the A ra?p i tw Item ITTyp guired for All Submissions ....._.......-.�...._.................... ..-.. _ ._.. Agreement El Contract F Proposal Addendum 0 Professional Services ❑ Resolution Bid Opening E Bid Award ❑ Req. to Advertise ❑ Title Sheet F] Quote Opening 0Quote Award Z Change Order No. 12 0 C/O & PCA No. ❑ PCA El Ease/Encroach. Traffic Control E] Other: ......... ............. ._. ......_.... ....... __� ... e4 gJreq.1nformation Company or Vendor Name Ziol'kowski Construction Inc. New Vendor El Yes Z No El If Yes, Approved by Purchasing MBE/WBE Contractor ❑ MBE ❑ WBE MBE/WBE Contractor Requested ❑ No ❑ Yes Name of Company Project Name Erskine Clubhouse Renovation �_. .r.........,, �_........ _..... Project Number 116-108 Funding Source Account No. Amount $9,811.00 Terms of Contract Purpose/Description Cost for removal of fuel in fuel tanks revised mechanical room intake duct routing, front porch concrete step replacement, and other miscellaneous items ❑ Required Contractor's Certification Form Attached (Non - Collusion„ Non -Discrimination, Non -Debarment„ E-Verity, Iran, etch Required For Chancie Orders Onl Amount of ® Increase $9,811.00 ❑ Decrease $ Previous Amount $1,091,531.00 Current Percent of Change: 0.90 _ New Amount $1,101,342.00 Total Percent of Change: 21.43% Dispersal After Approval Copy Original ® Kyle Silveus ® ❑ Patrick Sherman ❑.............__m_—._�_................